Device for detecting workability of building concrete
By designing building concrete and ease detection devices, using the combination of guide poles, sleeves and ring clips, the problems of uneven lifting of slump barrels and insufficient measurement accuracy caused by manual operation are solved, and the measurement accuracy and Detection accuracy.
Patent Information
- Application Number
- CN202420533811.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-19
AI Technical Summary
During the actual slump experimental measurement process, due to manual operation, the slump barrel lifting is uneven and the measurement accuracy is insufficient, resulting in insufficient measurement accuracy.
A construction concrete and ease detection device was designed. Through the combination of guide poles, sleeves, annular clamps and measuring horizontal plates, the slump barrels are ensured to accurately move in the vertical direction, and reduce artificial operation steps and improve measurement. Accuracy.
It achieves higher measurement accuracy and detection accuracy, reduces the error rate and ensures the detection accuracy.
Smart Images

Figure CN222050211U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a device for detecting workability of building concrete, belonging to the field of building construction detection. Background Art
[0002] The workability of building concrete is a comprehensive reflection of fluidity, cohesion and water retention. The slump test is usually used to test the fluidity of concrete mixtures, supplemented by intuitive experience to evaluate cohesion and water retention for comprehensive evaluation. The specific experimental method of the slump test is to mix the concrete and put it into a metal cone with a height of 30 cm, an upper diameter of 10 cm and a lower diameter of 20 cm. Then, the concrete is vibrated off the mold, and the mold is lifted up. The concrete shrinks to the lowest point and the height H of the concrete collapse is recorded in millimeters (usually the average value is taken), which is the slump of the concrete.
[0003] At present, in the actual slump test measurement process, due to manual operation, when the metal cone (slump bucket) is lifted, the slump bucket is unevenly stressed and the lifting direction is not vertical enough, resulting in insufficient measurement accuracy. When the height of the concrete slump is manually read and a tape measure is used for measurement, the measurement accuracy is insufficient due to manual operation of measurement and reading.
[0004] In summary, in the actual slump test measurement process, the use of manual lifting of the slump bucket and the use of a tape measure to measure and read the data can easily lead to technical problems such as insufficient measurement accuracy. Utility Model Content
[0005] The utility model is to solve the technical problem that in the process of actual slump test measurement, the slump bucket is manually lifted and a tape measure is used to measure and read the data, which easily leads to insufficient measurement accuracy, and thus proposes a device for detecting workability of building concrete.
[0006] The technical scheme of the utility model is a device for detecting workability of building concrete. A bottom plate is placed horizontally, a slump bucket is placed on the upper surface of the bottom plate, a guide upright is vertically fixedly installed at the middle of the right end of the upper surface of the bottom plate, the guide upright is cylindrical and a vertical scale is arranged on the outer surface, the right end of a measuring cross plate is a hollow cylinder, the right end of the measuring cross plate is slidably sleeved on the outer side of the guide upright in the vertical direction, the measuring cross plate can rotate in the horizontal direction with the guide upright as the center, a sleeve is located above the right end of the measuring cross plate, the sleeve is slidably sleeved on the outer side of the guide upright in the vertical direction, a clamping cross bar is horizontally fixed at the left end of the sleeve, an annular clamp is horizontally installed at the left end of the clamping cross bar, and the annular clamp clamps the middle part of the slump bucket.
[0007] As another improvement of the utility model, two handles are installed on both sides of the slump bucket. The slump bucket is pulled to a specified position by the handles, and the lower end surfaces of the handles contact with the upper surface of the ring clamp, and the lower end surfaces of the handles limit the vertical upward displacement of the ring clamp.
[0008] As another improvement of the utility model, the guide upright is provided with a horizontal positioning hole, and the positioning pin is detachably installed on the positioning hole. The positioning pin is used to limit the sleeve, and the tape measure shell is installed on the lower left side of the slump bucket. The bottom surface of the tape measure shell is flush with the bottom surface of the slump bucket. The tape measure shell is used to place an external tape measure, and an opening is provided on the bottom surface of the tape measure shell. The tape measure extends out of the tape measure shell through the opening to measure the distance between the lower surface of the slump bucket and the lower surface of the measuring cross plate.
[0009] As another improvement of the utility model, the right end of the threaded sleeve is fixed to the left end of the clamping cross bar, the right end of the ring clamp is provided with an external thread, and the left end of the threaded sleeve is threadedly connected to the right end of the ring clamp.
[0010] As another improvement of the utility model, the triangular plate is installed at the angle between the sleeve and the clamping cross bar.
[0011] As another improvement of the utility model, the measuring horizontal plate includes a rectangular measuring plate and a circular measuring plate, the circular measuring plate is installed on the left side of the rectangular measuring plate, and the circular measuring plate adopts a transparent plastic plate.
[0012] As another improvement of the utility model, a level bubble is arranged on the upper surface of the base plate, and the level bubble is used to detect the levelness of the building concrete and the workability detection device.
[0013] As another improvement of the present invention, a clamping piece is provided on the upper surface of the bottom plate, and the clamping piece is used to clamp an external vibrating rod.
[0014] As another improvement of the utility model, the funnel is detachably mounted on the top of the slump bucket.
[0015] Beneficial effects of the utility model:
[0016] 1. The sleeve of the utility model is slidably sleeved on the outer side of the guide vertical rod in the vertical direction, the clamping cross bar is horizontally fixed on the left end of the sleeve, the annular clamp is horizontally installed on the left end of the clamping cross bar, and the annular clamp clamps the middle part of the slump bucket. Through the above-mentioned connection position relationship, the sleeve and the guide vertical rod are used to cooperate to limit the moving direction of the slump bucket, so that it can move more accurately in the vertical direction, thereby increasing the accuracy of measurement.
[0017] 2. The right end of the measuring horizontal plate of the utility model is slidably mounted on the guide vertical rod in the vertical direction and realizes horizontal rotation, which reduces the manual operation steps during measurement, reduces the error rate and increases the accuracy of detection.
[0018] 3. The tape measure shell of the utility model is installed on the lower left side of the slump bucket, and the positioning pin is used to limit the sleeve. By setting the tape measure shell and fixing the sleeve during measurement to fix the slump bucket, the slump can be detected using an external tape measure, which saves detection steps and ensures the accuracy of the detection. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The utility model is a front view schematic diagram of a device for detecting workability of building concrete.
[0020] Figure 2 The utility model is a top view schematic diagram of a device for detecting workability of building concrete.
[0021] Figure 3 The utility model is a schematic diagram of the measuring state of a device for detecting workability of building concrete.
[0022] Figure 4 This is a schematic diagram after the ring clamp and slump bucket are rotated 180 degrees. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the examples of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model. In the description of the utility model, it should be explained that the positional relationship indicated by the terms "upper", "lower", etc. is only based on the positional relationship of the orientation shown in the drawings, which is only for the convenience of describing the utility model, and does not indicate or imply that the referred parts have a specific orientation, are constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0024] Specific implementation method 1: Combination Figures 1 to 3The present embodiment is described. The present embodiment is a device for detecting workability of building concrete, comprising a slump bucket 1, a bottom plate 5, a guide rod 6, a sleeve 71, a clamping cross bar 72, an annular clamp 8 and a measuring cross plate 10. The bottom plate 5 is placed horizontally, the slump bucket 1 is placed on the upper surface of the bottom plate 5, the guide rod 6 is vertically fixedly installed in the middle of the right end of the upper surface of the bottom plate 5, the guide rod 6 is cylindrical and has a vertical scale on its outer surface, and the right end of the measuring cross plate 10 is empty. The measuring cross plate 10 is cylindrical in shape, and the right end of the measuring cross plate 10 is slidably mounted on the outside of the guide upright 6 in the vertical direction. The measuring cross plate 10 can rotate in the horizontal direction with the guide upright 6 as the center. The sleeve 71 is located above the right end of the measuring cross plate 10, and the sleeve 71 is slidably mounted on the outside of the guide upright 6 in the vertical direction. The clamping cross bar 72 is horizontally fixed on the left end of the sleeve 71, and the annular clamp 8 is installed on the left end of the clamping cross bar 72 in the horizontal direction. The annular clamp 8 clamps the middle part of the slump bucket 1.
[0025] The sleeve 71 is slidably sleeved on the outer side of the guide vertical rod 6 in the vertical direction, the clamping cross bar 72 is horizontally fixed on the left end of the sleeve 71, and the annular clamp 8 is installed on the left end of the clamping cross bar 72 in the horizontal direction. The annular clamp 8 clamps the middle part of the slump bucket 1. Through the above connection and position relationship, the sleeve 71 and the guide vertical rod 6 are used to limit the moving direction of the slump bucket 1, which solves the technical problem that the slump bucket 1 is unevenly stressed and the lifting direction is not vertical enough, resulting in insufficient measurement accuracy, so that the slump bucket 1 can be moved more accurately along the vertical direction. The measuring plate 10 moves in the vertical direction, which increases the accuracy of measurement; when the slump bucket 1 is lifted to start measurement, the measuring cross plate 10 is first lifted in the vertical direction and then rotated in the horizontal direction to the top of the concrete to be measured, and the measuring cross plate 10 is slowly lowered to the upper surface of the highest point of the concrete, and then the scale reading of the guide vertical rod 6 is read to obtain the measurement result. The right end of the measuring cross plate 10 is slid in the vertical direction to be sleeved on the guide vertical rod 6 and realizes horizontal rotation, which reduces the manual operation steps during measurement, reduces the error rate, and increases the accuracy of detection.
[0026] Specific implementation method 2: Combination Figures 1 to 3 This embodiment is described. The difference between this embodiment and the first embodiment is that this embodiment further includes a handle 2. Two handles 2 are installed on both sides of the slump bucket 1. The slump bucket 1 is lifted to a specified position by the handles 2. The lower end surface of the handle 2 contacts the upper surface of the ring clamp 8. The lower end surface of the handle 2 limits the vertical upward displacement of the ring clamp 8. The setting of the handle can not only lift the slump bucket but also limit the ring clamp, thereby enhancing the reliability of the device for testing the workability of architectural concrete in this embodiment. The other components and connection methods are the same as those in the first embodiment.
[0027] Specific implementation method three: Combination Figures 1 to 3The present embodiment is described. The present embodiment is different from the first embodiment in that the present embodiment further includes a positioning pin 12 and a tape measure shell 4. The guide upright 6 is provided with a horizontal positioning hole. The positioning pin 12 is detachably mounted on the positioning hole. The positioning pin 12 is used to limit the position of the sleeve 71. The tape measure shell 4 is installed at the lower left part of the slump bucket 1. The bottom surface of the tape measure shell 4 is flush with the bottom surface of the slump bucket 1. The tape measure shell 4 is used to place an external tape measure. The bottom surface of the tape measure shell 4 is provided with an opening. The tape measure extends out of the tape measure shell 4 through the opening to measure the distance between the lower surface of the slump bucket 1 and the lower surface of the measuring cross plate 10. The specific position of the positioning pin 12 can be set according to the height of the slump bucket 1. The positioning pin 12 is used to position the bottom surface of the slump bucket 1 at a height of 300 mm from the upper surface of the bottom plate 5. Since the height of the slump bucket 1 is 300 mm, when the slump of concrete is measured at this time, it can be directly read by reading the reading of the external tape measure. The above embodiment can be used to directly measure the slump of concrete and can also be used for retesting and testing. Other components and connection methods are the same as those of the first or second embodiment.
[0028] Specific implementation method four: Combination Figures 1 to 4 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that this embodiment further includes a threaded sleeve 9, the right end of which is fixed to the left end of the clamping crossbar 72, the right end of the ring clamp 8 is provided with an external thread, and the left end of the threaded sleeve 9 is threadedly connected to the right end of the ring clamp 8. The threaded sleeve 9 is used to connect the clamping crossbar 72 and the ring clamp 8, so that the ring clamp and the slump bucket can rotate along the circumferential direction of the clamping crossbar. Since the slump bucket is conical, the direction of the cone of the slump bucket is adjusted to be compatible with the direction of the water flow for flushing the device, which is convenient for the cleaning step after use. The other components and connection methods are the same as any one of the specific embodiments 1 to 3.
[0029] Specific implementation method five: Combination Figure 1 This embodiment is described. The difference between this embodiment and the first embodiment is that this embodiment further includes a triangular plate 11, which is installed at the angle between the sleeve 71 and the clamping cross bar 72. The function is to reinforce the sleeve 71 and the clamping cross bar 72, and enhance their reliability and service life. The other components and connection methods are the same as any one of the first to fourth embodiments.
[0030] Specific implementation method six: Combination Figure 2This embodiment is described. The difference between this embodiment and the first embodiment is that the measuring horizontal plate 10 includes a rectangular measuring plate 101 and a circular measuring plate 102. The circular measuring plate 102 is installed on the left side of the rectangular measuring plate 101. The circular measuring plate 102 is a transparent plastic plate. The use of the circular measuring plate is to increase the possible contact area between the measuring plate and the concrete to be measured. The use of a transparent plastic plate can make observation more convenient and reduce the error rate during measurement. The other components and connection methods are the same as any one of the first to fifth embodiments.
[0031] Specific implementation method seven: Combination Figure 2 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that this embodiment further includes a level bubble 13, which is arranged on the upper surface of the bottom plate 5. The level bubble 13 is used to detect the levelness of the device for detecting workability of building concrete. Other components and connection methods are the same as any one of the specific embodiments 1 to 6.
[0032] Specific implementation method eight: Combination Figure 2 This embodiment is described. The difference between this embodiment and the first embodiment is that a clamping member 14 is provided on the upper surface of the bottom plate 5. The clamping member 14 is used to clamp an external vibrating rod. Other components and connection methods are the same as any one of the first to seventh embodiments.
[0033] Specific implementation method nine: Combination Figure 2 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that this embodiment further includes a funnel 3, which is detachably mounted on the top of the slump bucket 1. The function is to facilitate the mixing of the concrete to be tested into the slump bucket 1. The other components and connection methods are the same as any one of the specific embodiments 1 to 8.
[0034] Combination Figures 1 to 4 Explain the principle of the utility model:
[0035] After mixing the construction concrete, put it into the slump bucket and vibrate and smooth it as required. When lifting the slump bucket to start measuring, first lift the measuring cross plate in the vertical direction and then rotate it horizontally to the top of the concrete. Slowly lower the measuring cross plate to the upper surface that contacts the highest point of the concrete, then read the scale reading of the guide pole to obtain the measurement result. After completing the experiment, use intuitive experience to evaluate the cohesion and water retention to comprehensively evaluate the workability of the concrete.
[0036] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A device for detecting workability of building concrete, characterized in that It comprises a slump bucket (1), a bottom plate (5), a guide vertical rod (6), a sleeve (71), a clamping cross bar (72), a ring clamp (8) and a measuring cross plate (10); The bottom plate (5) is placed horizontally, the slump bucket (1) is placed on the upper surface of the bottom plate (5), the guide rod (6) is vertically fixedly installed at the middle of the right end of the upper surface of the bottom plate (5), the guide rod (6) is cylindrical and the outer surface is provided with a vertical scale, the right end of the measuring cross plate (10) is a hollow cylinder, the right end of the measuring cross plate (10) is slidably sleeved on the outer side of the guide rod (6) in the vertical direction, the measuring cross plate (10) rotates in the horizontal direction with the guide rod (6) as the center of the circle, the sleeve (71) is located above the right end of the measuring cross plate (10), the sleeve (71) is slidably sleeved on the outer side of the guide rod (6) in the vertical direction, the clamping cross bar (72) is horizontally fixed at the left end of the sleeve (71), the annular clamp (8) is horizontally installed at the left end of the clamping cross bar (72), and the annular clamp (8) clamps the middle part of the slump bucket (1).
2. A device for detecting workability of building concrete according to claim 1, characterized in that It also includes handles (2), two handles (2) are installed on both sides of the slump bucket (1), and the slump bucket (1) is lifted to a specified position by the handles (2). The lower end surface of the handle (2) contacts the upper surface of the ring clamp (8), and the lower end surface of the handle (2) limits the vertical upward displacement of the ring clamp (8).
3. A device for detecting workability of building concrete according to claim 1, characterized in that It also includes a positioning pin (12) and a tape measure shell (4). The guide upright (6) is provided with a positioning hole in the horizontal direction. The positioning pin (12) is detachably mounted on the positioning hole. The positioning pin (12) is used to limit the position of the sleeve (71). The tape measure shell (4) is installed at the lower left part of the slump bucket (1). The bottom surface of the tape measure shell (4) is flush with the bottom surface of the slump bucket (1). The tape measure shell (4) is used to place an external tape measure. The bottom surface of the tape measure shell (4) is provided with an opening. The tape measure extends out of the tape measure shell (4) through the opening to measure the distance between the lower surface of the slump bucket (1) and the lower surface of the measuring cross plate (10).
4. A device for detecting workability of building concrete according to claim 1, characterized in that It also includes a threaded sleeve (9), the right end of which is fixed to the left end of the clamping crossbar (72), the right end of the annular clamp (8) is provided with an external thread, and the left end of the threaded sleeve (9) is threadedly connected to the right end of the annular clamp (8).
5. A device for detecting workability of building concrete according to claim 1, characterized in that: It also includes a triangular plate (11), which is installed at the angle between the sleeve (71) and the clamping cross bar (72).
6. A device for detecting workability of building concrete according to claim 1, characterized in that: The measuring transverse plate (10) comprises a rectangular measuring plate (101) and a circular measuring plate (102). The circular measuring plate (102) is installed on the left side of the rectangular measuring plate (101). The circular measuring plate (102) is made of a transparent plastic plate.
7. A device for detecting workability of building concrete according to any one of claims 1 to 6, characterized in that: It also includes a level bubble (13), which is arranged on the upper surface of the bottom plate (5). The level bubble (13) realizes the levelness detection of the device for detecting workability of building concrete.
8. A device for detecting workability of building concrete according to any one of claims 1 to 6, characterized in that: A clamping piece (14) is provided on the upper surface of the bottom plate (5), and the clamping piece (14) is used to clamp an external vibrating rod.
9. A device for detecting workability of building concrete according to any one of claims 1 to 6, characterized in that: It also comprises a funnel (3) which is detachably mounted on the top of the slump bucket (1).