Real-time monitoring device for blanking of super-long-structure high-crack-resistance shrinkage-compensation concrete

By installing cameras and control equipment on concrete mixer trucks, the concrete discharge situation is monitored in real time, and the camera is protected through transparent protective covers and cleaning components, the problem of the existing technology being unable to monitor concrete discharge in real time, realizing the flow state of concrete real-time data acquisition and effective camera protection.

CN222060773UActive Publication Date: 2024-11-26CHINA CONSTR WESTERN CONSTR NORTH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323559755.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-26
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The prior art cannot monitor the discharge of concrete mixer trucks in real time, resulting in quality inspectors being unable to obtain real-time data when the discharge of concrete.

Method used

Design a real-time monitoring device for cutting high crack-resistant and shrinkage concrete with ultra-long structures including cameras and control equipment. Video recording of concrete in the outgoing hopper is performed through the camera, and the recording signal is sent back to the manufacturer for analysis and processing, and the transparent is set. Protective covers and cleaning components to protect the camera, ensuring the accuracy of information transmission and the security of the camera.

Benefits of technology

Real-time monitoring of the concrete discharge process is achieved, ensuring that quality inspectors can obtain real-time data on the concrete flow state, and protect the camera through protective covers and cleaning components, avoiding the impact of concrete splashing and dust on the shooting line of sight.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222060773U_ABST
    Figure CN222060773U_ABST
Patent Text Reader

Abstract

The utility model relates to an ultra-long structure high anti-crack compensation shrinkage concrete blanking real-time monitoring device, which relates to the technical field of concrete mixer trucks, and comprises a guide chute arranged below a discharge hopper and a camera arranged on the side wall of the discharge hopper and used for shooting the guide chute, and the camera is electrically communicated with a control device on a truck body. According to the utility model, quality inspectors can obtain real-time data conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete mixer trucks, in particular to a real-time monitoring device for unloading ultra-long structured high-crack resistance and shrinkage compensating concrete. Background Art

[0002] A concrete mixer truck is a special truck used to transport construction concrete. A cylindrical mixing drum is installed on its body to carry the mixed concrete. During the transportation process, the mixing drum always keeps rotating to ensure that the concrete carried in the mixing drum will not solidify. The mixing drum is controlled by the power supply and control equipment of the body during operation. When discharging concrete, it is discharged from the discharging hopper installed on the body.

[0003] During the production process of concrete, it is necessary to ensure that the performance of concrete meets the standards. The workability of concrete is also called the workability of concrete. It refers to the performance of freshly mixed cement concrete that is easy to operate in each construction process (mixing, transportation, pouring, compacting, etc.) and can obtain uniform quality and dense molding. Its meaning includes fluidity, cohesion and water retention. The workability of concrete when leaving the factory is checked by the quality inspectors of the production plant. However, for the concrete transported to the construction site, when there are too few quality inspectors to follow the concrete mixer truck, the quality inspectors cannot monitor the workability of the concrete when it is discharged in real time.

[0004] The above-mentioned prior art solutions have the following defects: the discharge of the concrete mixer truck cannot be monitored in real time, which results in the quality inspector being unable to obtain real-time data. Utility Model Content

[0005] The utility model aims to provide a real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete, which has the effect of facilitating quality inspectors to obtain real-time data.

[0006] The above-mentioned purpose of the utility model is achieved through the following technical solutions:

[0007] A real-time monitoring device for unloading ultra-long structure highly crack-resistant and shrinkage-compensating concrete comprises a guide chute arranged below a discharging hopper, a camera arranged on a side wall of the discharging hopper and used for photographing the guide chute, wherein the camera is electrically connected to a control device on a vehicle body.

[0008] By adopting the above technical solution, when discharging, the camera is turned on to record the concrete flowing through the guide chute, and then the control device sends the signal recorded by the camera back to the production plant for analysis and processing by the quality inspector. By setting up a camera to take real-time photos of the concrete flowing through the guide chute, it is convenient for the quality inspector to obtain real-time data on the flow state of the concrete during the discharging process.

[0009] The utility model is further configured as follows: a side wall of the discharge hopper is provided with a transparent protective cover located at the periphery of the camera.

[0010] By adopting the above technical solution, a protective cover is set around the camera to prevent concrete from splashing onto the camera, which would affect the camera's shooting function. It can ensure the accuracy of information transmission and also protect the camera from damage.

[0011] The utility model is further configured as follows: the protective cover is semicircular, and the opening end of the protective cover is detachably fixedly connected to the discharge hopper.

[0012] By adopting the above technical solution and setting the protective cover in a semicircular shape, it is possible to avoid the edges and corners of the protective cover affecting the shooting line of sight of the camera.

[0013] The utility model is further configured as follows: a cleaning assembly is provided on the protective cover, and the symmetry axis of the protective cover perpendicular to the side wall of the discharge hopper is assumed to be line A. The cleaning assembly includes a support frame provided on the discharge hopper, a rotating seat rotatably connected to the support frame with line A as the center axis, a motor for driving the rotating seat to rotate, and a flexible scraper cotton fixed to the rotating seat and in contact with the outer wall of the protective cover.

[0014] By adopting the above technical solution, when concrete splashes on the protective cover or dust attached to the protective cover affects the shooting line of sight, the cleaning component cleans the outer wall of the protective cover. During cleaning, the motor drives the rotating seat to rotate, and the rotating seat drives the scraper cotton to rotate synchronously during the rotation process. The scraper cotton can clean the outer wall of the protective cover when it rotates along the outer wall of the protective cover for one circle. This cleaning method has a simple structure, good working effect, and low cost.

[0015] The utility model is further configured to include: a control component connected to the motor, the control component includes a sensing block fixed to the side wall of the rotating seat, a sensor arranged on the side of the protective cover away from the material guide trough, and a controller electrically connected to the sensor and the motor respectively, and the controller is electrically connected to the control device on the vehicle body.

[0016] By adopting the above technical solution, after cleaning, the motor drives the rotating seat to rotate continuously, and the control component is turned on. When the sensing block rotates to a position that the sensor can sense, the sensor transmits a signal to the controller, and the controller controls the motor to stop rotating, so that the rotating seat can be fixed to the side of the protective cover away from the material guide trough, thereby preventing the rotating seat from affecting the camera's shooting line of sight.

[0017] The utility model is further configured as follows: a flange abutting against the side wall of the discharge hopper is fixedly connected along the edge of the opening end of the protective cover, and a plurality of fasteners for fixing the flange to the discharge hopper are provided on the protective cover.

[0018] By adopting the above technical solution, when the camera needs to be inspected and repaired, the fastener is first loosened, and then the protective cover is removed. After the protective cover is removed, the camera can be inspected and maintained. After the inspection is completed, the protective cover is installed back to the original position and fixed with fasteners. By setting the protective cover to be detachably connected to the discharge hopper, it is convenient for operators to inspect and maintain the camera.

[0019] The utility model is further configured as follows: a side of the flange close to the side wall of the discharge hopper is provided with an annular embedding groove, and the side wall of the discharge hopper is fixedly connected with an embedding ring which can be embedded in the embedding groove.

[0020] By adopting the above technical solution, when the protective cover is installed on the side wall of the discharge hopper, the embedded ring is embedded in the embedded groove. By setting the embedded ring and the embedded groove, the protective cover can be accurately and conveniently installed in place. At the same time, the embedded ring can also prevent rainwater from entering the protective cover on rainy days, which can protect the camera.

[0021] The utility model is further configured as follows: a sealing ring is sandwiched between the embedding groove and the embedding ring.

[0022] By adopting the above technical solution and providing a sealing ring, rainwater can be further prevented from entering the protective cover, thereby further improving the protective effect of the camera.

[0023] In summary, the beneficial technical effects of the utility model are:

[0024] 1. By setting up a camera, quality inspectors can monitor the concrete flow condition in the guide chute in real time;

[0025] 2. The camera can be protected by setting a protective cover;

[0026] 3. The protective cover can be cleaned by setting the cleaning component. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0028] Figure 2 yes Figure 1 Partial schematic diagram of the middle AA surface.

[0029] In the figure, 1, discharge hopper; 11, guide trough; 2, camera; 03, protective cover; 031, flange; 032, embedded groove; 033, embedded ring; 034, sealing ring; 035, fastener; 3, cleaning component; 31, A line; 32, support frame; 33, rotating seat; 34, motor; 35, scraper cotton; 4, control component; 41, induction block; 42, sensor; 43, controller. DETAILED DESCRIPTION

[0030] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0031] Reference Figure 1 and Figure 2 , is a real-time monitoring device for unloading ultra-long structure highly crack-resistant and shrinkage-compensating concrete disclosed by the utility model, comprising a guide chute 11 welded below a discharge hopper 1, and a camera 2 arranged on a side wall of the discharge hopper 1 and used for photographing the guide chute 11, the camera 2 being electrically connected to a control device on a vehicle body, and the camera 2 being fixed to the side wall of the discharge hopper 1 by screws.

[0032] Reference Figure 1 and Figure 2 The side wall of the discharging hopper 1 is provided with a transparent protective cover 03 located at the periphery of the camera 2. In this embodiment, the material of the protective cover 03 is colorless and transparent acrylic, and the protective cover 03 is semicircular. The open end of the protective cover 03 is detachably fixed to the discharging hopper 1; a flange 031 abutting against the side wall of the discharging hopper 1 is integrally fixed along the edge of the open end of the protective cover 03, and a ring 033 that can be embedded in the groove 032 is formed on the side of the flange 031 close to the side wall of the discharging hopper 1. The side wall of the discharging hopper 1 is welded with a ring 033 that can be embedded in the groove 032; a sealing ring 034 is sandwiched between the groove 032 and the ring 033, and the material of the sealing ring 034 is soft silicone; a plurality of fasteners 035 for fixing the flange 031 to the discharging hopper 1 are provided on the protective cover 03, and the fasteners 035 are bolts that pass through the flange 031 and can be threadedly connected to the discharging hopper 1.

[0033] Reference Figure 1 and Figure 2A cleaning assembly 3 is provided on the protective cover 03, and the symmetry axis of the protective cover 03 perpendicular to the side wall of the discharge hopper 1 is assumed to be line A 31. The cleaning assembly 3 includes an L-shaped support frame 32 welded to the side wall of the discharge hopper 1, a rotating seat 33 rotatably connected to the side wall of the support frame 32 with line A 31 as the center axis, a motor 34 for driving the rotating seat 33 to rotate, and a flexible scraper cotton 35 fixed to the inner wall of the rotating seat 33 and in contact with the outer wall of the protective cover 03. The motor 34 is a servo motor 34, which is fixed to the side wall of the support frame 32 by screws and the output shaft of the motor 34 passes through the side wall of the support frame 32 and is fixed to the rotating seat 33 by a key. The scraper cotton 35 is made of sponge, and the inner wall of the scraper cotton 35 is in contact with the outer wall of the protective cover 03. The semicircle formed when the scraper cotton 35 rotates one circle with line A 31 as the center axis coincides with the outer wall of the protective cover 03.

[0034] Reference Figure 1 and Figure 2 A control component 4 is provided in communication with the motor 34, and the control component 4 includes a sensing block 41 fixed to the side wall of the rotating seat 33 by screws, a sensor 42 fixed to the side of the protective cover 03 away from the material guide groove 11 by screws, and a controller 43 electrically connected to the sensor 42 and the motor 34 respectively. The controller 43 is fixedly connected to the support frame 32 by screws, and the controller 43 is electrically connected to the control device on the vehicle body. The sensor 42 is fixed to the side wall of the support frame 32 by screws. In this embodiment, the sensing block 41 is an iron block, and the sensor 42 is a near-iron sensor.

[0035] The implementation principle of this embodiment is: when discharging, the camera 2 transmits the captured video to the quality inspector in real time through the control device, so that the quality inspector can monitor the state of concrete flowing out of the material guide chute 11 in real time.

[0036] During the detection process, if there are a lot of impurities on the protective cover 03, the motor 34 will drive the scraper cotton 35 to rotate by driving the rotating seat 33, so that the impurities on the surface of the protective cover 03 can be cleaned. After the impurities on the surface of the protective cover 03 are cleaned, the motor 34 continues to rotate, and then the control device sends a signal to the control component 4, and the sensor 42 is turned on. When the sensing block 41 rotates with the rotating seat 33 to the sensing position of the sensor 42, the sensor 42 sends a signal to the controller 43, and the controller 43 can control the motor 34 to stop rotating.

[0037] When the camera 2 needs to be inspected and maintained, unscrew the screws used to fix the flange 031, and then pull the ring 033 out of the groove 032, and then the camera 2 can be inspected and maintained. After the inspection and maintenance is completed, the protective cover 03 is installed back to its original position and fixed with bolts.

[0038] The embodiments of this specific implementation method are all preferred embodiments of the utility model, and are not intended to limit the protection scope of the utility model. Therefore, all equivalent changes made based on the structure, shape, and principle of the utility model should be included in the protection scope of the utility model.

Claims

1. A real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete, characterized in that: It comprises a material guide chute (11) arranged below a material discharge hopper (1), and a camera (2) arranged on a side wall of the material discharge hopper (1) and used for photographing the material guide chute (11); the camera (2) is electrically connected to a control device on a vehicle body.

2. According to claim 1, a real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete is characterized by: The side wall of the discharge hopper (1) is provided with a transparent protective cover (03) located on the periphery of the camera (2).

3. A real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 2, characterized in that: The protective cover (03) is semicircular in shape, and the open end of the protective cover (03) is detachably connected to the discharge hopper (1).

4. The real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 2 is characterized by: The protective cover (03) is provided with a cleaning assembly (3), and the symmetry axis of the protective cover (03) perpendicular to the side wall of the discharge hopper (1) is assumed to be line A (31). The cleaning assembly (3) comprises a support frame (32) provided on the discharge hopper (1), a rotating seat (33) rotatably connected to the support frame (32) with line A (31) as the central axis, a motor (34) for driving the rotating seat (33) to rotate, and a flexible scraper cotton (35) fixed to the rotating seat (33) and in contact with the outer wall of the protective cover (03).

5. A real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 4, characterized in that: It also includes a control component (4) connected to the motor (34), the control component (4) includes a sensing block (41) fixed to the side wall of the rotating seat (33), a sensor (42) arranged on the side of the protective cover (03) away from the material guide trough (11), and a controller (43) electrically connected to the sensor (42) and the motor (34), respectively, and the controller (43) is electrically connected to a control device on the vehicle body.

6. The real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 2 is characterized by: A flange (031) abutting against the side wall of the discharge hopper (1) is fixedly connected along the edge of the opening end of the protective cover (03), and a plurality of fasteners (035) for fixing the flange (031) and the discharge hopper (1) are provided on the protective cover (03).

7. A real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 6, characterized in that: An annular embedding groove (032) is provided on one side of the flange (031) close to the side wall of the discharge hopper (1), and an embedding ring (033) which can be embedded in the embedding groove (032) is fixedly connected to the side wall of the discharge hopper (1).

8. A real-time monitoring device for unloading ultra-long structure high crack resistance compensating shrinkage concrete according to claim 7, characterized in that: A sealing ring (034) is sandwiched between the embedding groove (032) and the embedding ring (033).