Filling device for crack pouring adhesive production
By designing the filling device for filling and filling of asphalt glue, using existing rubber and plastic asphalt equipment, combined with pneumatic valves and insulation pipelines, efficient filling is achieved, solving the problem of high temperature treatment and filling costs of asphalt filling and filling, and meeting the problem of high temperature treatment and filling costs of asphalt filling and filling. Highway maintenance needs and reduce construction costs.
Patent Information
- Application Number
- CN202323617544.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-27
AI Technical Summary
In the production process of asphalt joint glue, the high-temperature treatment and filling process have problems of high cost and low production efficiency, and are more common with rubber and plastic asphalt products, making it difficult to quickly meet the maintenance needs of highways.
A filling and filling device for filling glue is designed, using existing rubber and plastic asphalt product production equipment, and the combination of production tanks, buffer tanks, conveying pumps and filling machines is combined with pneumatic valves and insulation pipes to realize the filling glue. High temperature transmission and quantitative filling reduce construction costs.
It realizes efficient filling of seam filling glue, reduces production costs, simplifies equipment structure, meets the maintenance needs of highways, and saves construction costs due to common transformation.
Smart Images

Figure CN222062352U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of asphalt product production, in particular to a device for producing and filling joint glue. Background Art
[0002] Asphalt caulking glue is a material used to fill ground cracks on roads. It has excellent durability and anti-aging properties, and can effectively prevent moisture and debris from penetrating into cracks, thereby extending the service life of the road. Through detailed analysis, the applicant found that the temperature of asphalt caulking glue products during production will be 180-200 degrees. When filling as a product, it is usually in units of 15kg, packaged in resin packaging bags that can withstand high temperatures of 130 degrees, and then packaged in cartons. When used for road maintenance, it will be removed from the carton and placed into the pavement equipment together with the resin packaging bag. The pavement equipment will then heat the caulking glue product to about 200 degrees for road repair. Therefore, the single production volume of the asphalt caulking glue product developed by the applicant will not be very high, usually not exceeding ten tons, and there is no need for finished product tank storage. It is directly filled into the resin packaging set in the carton as finished product packaging storage. In addition, the asphalt caulking glue products developed by the applicant have many similarities with the rubber-plastic asphalt products that the applicant has been producing for a long time, that is, the admixtures required in the production process are similar or even overlapping. Therefore, if the applicant's existing rubber-plastic asphalt production line can be modified (for details, please refer to the applicant's previously obtained utility model patent ZL 2018213523792 "A rubber-plastic asphalt preparation device"), it can greatly save construction costs on the one hand, and quickly form production capacity on the other hand to meet the needs of highway maintenance work in Guizhou Province. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide a production and filling device for caulking glue to reduce or avoid the above-mentioned problems.
[0004] In order to solve the above technical problems, the utility model proposes a caulking glue production and filling device, which includes a production tank and a cache tank, the production tank and the cache tank are connected by a first connecting pipe, the cache tank is connected to a delivery pump through a second connecting pipe and a second loop pipe, the second connecting pipe is connected to the inlet of the delivery pump, the second loop pipe is connected to the outlet of the delivery pump, the outlet of the delivery pump is connected to a filler through a third connecting pipe, and the first connecting pipe, the second connecting pipe and the second loop pipe are all provided with pneumatic valves to control opening and closing.
[0005] Preferably, the third connecting pipeline includes interconnected rigid pipes and flexible pipes, the rigid pipes include parallel arranged delivery pipes and hot oil pipes, insulation materials and an outermost steel pipe, and the flexible pipes include parallel arranged delivery pipes and hot oil pipes, insulation materials and an outermost flexible steel wire mesh.
[0006] Preferably, the delivery pump is a cam rotor pump.
[0007] Preferably, a circulation pipe is further provided between the third connecting pipe and the second connecting pipe.
[0008] The production and filling device of the caulking glue provided by the utility model fully utilizes the existing production equipment, has a simple structure, and greatly reduces the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] The following drawings are only intended to illustrate and explain the present invention, and do not limit the scope of the present invention.
[0010] Figure 1 It is a schematic diagram of the structural principle of a joint filling glue production and filling device according to a specific embodiment of the utility model;
[0011] Figure 2 for Figure 1 A schematic diagram of the partial three-dimensional structure principle of the pipeline connected to the transmission pump;
[0012] Figure 3 for Figure 1 A schematic diagram of a partial structural principle of a third connecting pipeline;
[0013] Figure 4 for Figure 3 Schematic diagram of the cross-sectional structure principle of a rigid tube;
[0014] Figure 5 for Figure 3 Schematic diagram of the cross-sectional structure principle of the flexible pipe. DETAILED DESCRIPTION
[0015] In order to have a clearer understanding of the technical features, purpose and effect of the utility model, the specific implementation of the utility model is now described with reference to the accompanying drawings. Among them, the same components are marked with the same numbers.
[0016] Figure 1 FIG. 1 is a schematic diagram of the structural principle of a joint filling glue production and filling device according to a specific embodiment of the utility model; see Figure 1As shown, the caulking glue production and filling device provided by the utility model includes a production tank 1 and a buffer tank 2, the production tank 1 and the buffer tank 2 are connected by a first connecting pipe 51, the buffer tank 2 is connected to a delivery pump 3 through a second connecting pipe 52 and a second loop pipe 53, the second connecting pipe 52 is connected to the inlet of the delivery pump 3, the second loop pipe 53 is connected to the outlet of the delivery pump 3, the outlet of the delivery pump 3 is connected to a filler 4 through a third connecting pipe 54, and the first connecting pipe 51, the second connecting pipe 52 and the second loop pipe 53 are all provided with pneumatic valves to control opening and closing.
[0017] The production tank 1 and the buffer tank 2 are the applicant's existing rubber-plastic asphalt product production equipment. For details, please refer to the technical solution described in the utility model patent ZL 2018213523792 "A rubber-plastic asphalt preparation device" previously obtained by the applicant. Since the feeding, insulation and other structures are all described in detail in the original technical solution, and are not the newly added distinguishing technical features involved in this application, they will not be repeated in this application. The original connection method of the production tank 1 and the buffer tank 2 is a parallel connection method. In order to produce caulking glue products, a first connecting pipe 51 is added between the production tank 1 and the buffer tank 2. The caulking glue product of about 200 degrees produced by the production tank 1 can be transmitted to the buffer tank 2 through the first connecting pipe 51 for storage and natural cooling. When the temperature of the caulking glue product in the buffer tank 2 drops to below 130 degrees (not less than 110 degrees), the delivery pump 3 can be started, and the pneumatic valves of the second connecting pipe 52 and the second loop pipe 53 can be opened, so that the caulking glue product is delivered to the delivery pump 3 through the second connecting pipe 52, and then refluxed to the buffer tank 3 through the second loop pipe 53, so that the working temperature in the delivery pump 3 can be consistent with the temperature of the caulking glue product in the buffer tank 2. Afterwards, the pneumatic valve of the second loop pipe 53 is closed, and the canning device 4 is started, so that the caulking glue product can be delivered to the filler 4 through the third connecting pipe 54, and then the product can be filled into the resin packaging bag placed in the carton through the filler 4 to make a caulking glue product that is easy to transport.
[0018] The filling machine 4 can set parameters according to packaging needs, and each time it is started, it releases and fills the fluid according to preset quantities such as 10 kg and 15 kg. The commercially available fluid filling machines are mainly used for filling normal temperature fluids such as beverages. In order to ensure the fluidity of the caulking glue product, the caulking glue product passing through the filling machine 4 also needs to ensure a temperature of not less than 110 degrees. Therefore, the applicant has carried out targeted modifications to the third connecting pipe 54 to ensure thermal insulation performance and ensure the fluidity of the caulking glue product. Figure 3 for Figure 1A schematic diagram of the partial structural principle of the third connecting pipeline, Figure 4 for Figure 3 Schematic diagram of the cross-sectional structure principle of a rigid tube; Figure 5 for Figure 3 Schematic diagram of the cross-sectional structure principle of the flexible pipe; see Figures 3 to 5 As shown, the third connecting pipeline 54 includes a rigid pipe 541 and a flexible pipe 542 connected to each other, wherein the rigid pipe 541 includes a delivery pipe and a hot oil pipe arranged in parallel, a heat preservation material, and an outermost steel pipe. The flexible pipe 542 includes a delivery pipe and a hot oil pipe arranged in parallel, a heat preservation material, and an outermost flexible steel wire mesh. Both the delivery pipe and the hot oil pipe can be made of high temperature resistant resin materials, such as solid wall pipes composed of thermoplastic polymers and fiber reinforced composite tapes produced by Weihai Nachuan Pipe Co., Ltd.
[0019] As described in the background technology section, because the caulking glue product is usually filled in units of 15kg, and considering that the filling pipe of the filling machine 4 does not need to be very thick (usually the pipe diameter is only 4 points, that is, about 12.7mm), the delivery pipe and the hot oil pipe can be arranged in parallel, and the overall temperature can be maintained by using insulation materials. The insulation materials used for the rigid pipe 541 and the flexible pipe 542 can be asbestos or other resin granular materials with insulation function. The difference mainly lies in the outer layer material. The rigid pipe 541 uses a rigid steel pipe, and the flexible pipe 542 uses a flexible steel wire mesh, so that the flexible pipe 542 can easily move with the filling machine 4. The flexible pipe 542 is connected to the filling machine 4 through a flange (not shown in the figure), so that a hot oil return pipe interface (not shown in the figure) can be set on the flange (not shown in the figure), so that the hot oil can circulate with the original hot oil system to ensure heat supply. By providing the rigid tube 541 , the flexible tube 542 can be brought closer to the filling machine 4 , thereby better packaging the moving range of the flexible tube 542 .
[0020] Since the adhesive for caulking is relatively sticky, the transmission pump 3 is a cam rotor pump produced by Dandong Chenyang Pump Industry Co., Ltd. As mentioned above, the filling machine 4 can realize quantitative filling function. Therefore, in order to ensure the working pressure of the transmission pump 3, Figure 2 for Figure 1 Schematic diagram of the partial three-dimensional structure principle of the pipeline connected to the transfer pump, see Figure 2 As shown, a circulation pipe 55 is further provided between the third connecting pipe 54 and the second connecting pipe 52. When the filling machine 4 is not performing filling work, the circulation pipe 55 can connect the outlet and the inlet of the delivery pump 3 to form a circulation, thereby ensuring that the pressure of the delivery pump 3 is not too high.
[0021] The production and filling device of the caulking glue provided by the utility model fully utilizes the existing production equipment, has a simple structure, and greatly reduces the construction cost.
[0022] Those skilled in the art should understand that although the present invention is described in the form of multiple embodiments, not every embodiment contains only one independent technical solution. Such description in the specification is only for the sake of clarity. Those skilled in the art should understand the specification as a whole and regard the technical solutions involved in each embodiment as being able to be combined into different embodiments to understand the scope of protection of the present invention.
[0023] The above description is only an illustrative embodiment of the present invention and is not intended to limit the scope of the present invention. Any equivalent changes, modifications and combinations made by any technician in the field without departing from the concept and principle of the present invention shall fall within the scope of protection of the present invention.
Claims
1. A filling device for producing caulking glue, characterized in that: It includes a production tank and a cache tank, the production tank and the cache tank are connected by a first connecting pipe, the cache tank is connected to a transfer pump via a second connecting pipe and a second loop pipe, the second connecting pipe is connected to the inlet of the transfer pump, the second loop pipe is connected to the outlet of the transfer pump, the outlet of the transfer pump is connected to a filler via a third connecting pipe, and the first connecting pipe, the second connecting pipe and the second loop pipe are all provided with pneumatic valves to control opening and closing.
2. The caulking glue production and filling device according to claim 1 is characterized in that: The third connecting pipeline includes a rigid pipe and a flexible pipe connected to each other, the rigid pipe includes a delivery pipe and a hot oil pipe arranged in parallel, as well as insulation materials and an outermost steel pipe, and the flexible pipe includes a delivery pipe and a hot oil pipe arranged in parallel, as well as insulation materials and an outermost flexible steel wire mesh.
3. The production and filling device of caulking glue according to claim 1 is characterized in that: The transmission pump is a cam rotor pump.
4. The production and filling device of the caulking glue according to claim 3 is characterized in that: A circulation pipe is also arranged between the third connecting pipe and the second connecting pipe.