Pipeline system for switching operation medium of electrochemical lithium extraction equipment
By designing a pipeline system in the electrochemical lithium extraction equipment and adopting a circulation loop and a Venturi injector, the automatic switching and cleaning of the medium were realized, which solved the problems of complexity and cleaning difficulties in the scale-up process and improved production efficiency.
Patent Information
- Application Number
- CN202420622374.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-28
AI Technical Summary
Existing electrochemical lithium extraction equipment faces challenges in scaling up from pilot-scale devices to industrial production, including complex switching of operating media, low automation, difficulty in internal cleaning, inability to extract residual water, and uneven flow.
A pipeline system including a lithium extraction device was designed, comprising first and second circulation loops, a Venturi injector, and a power pump. Automated media switching and cleaning are achieved through valve control to ensure balanced flow inside the chamber.
It improves the production efficiency of electrochemical lithium extraction equipment, realizes efficient switching of media and automated cleaning of chambers, and solves the problem of uneven flow inside the equipment.
Smart Images

Figure CN222064630U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of lithium extraction equipment, in particular to a pipeline system for switching operating media of electrochemical lithium extraction equipment. Background Art
[0002] Lithium is the lightest alkali metal with good electrochemical activity and high redox potential. Lithium metal and lithium salt products have important applications in many fields, such as lithium-ion batteries, ceramic glass, nuclear industry, pharmaceuticals, adhesives, lubricants, etc. As the market for electric vehicles and electronic products gradually expands, the demand for lithium continues to grow. Lithium mainly exists in two resources, including lithium-containing ores and water resources. The traditional mining system of lithium-containing ores is mature, but faces the risk of future depletion. More than 60% of lithium resources exist in aqueous solutions such as seawater and salt lake brine. The process of extracting lithium from aqueous solutions is simpler and has lower operating costs. Developing efficient aqueous lithium recovery is a promising direction.
[0003] However, in the existing electrochemical lithium extraction system, the electrochemical lithium extraction equipment is scaled up from a small pilot device to industrial production. After each cycle of polarity reversal, it faces difficulties such as complex switching of operating media and low degree of automation, difficult internal cleaning, inability to pump out residual water inside, and uneven flow. Utility Model Content
[0004] In view of the above situation, in order to overcome the defects of the prior art, the purpose of the utility model is to provide a pipeline system for switching the operating medium of the electrochemical lithium extraction equipment, which effectively solves the problems mentioned in the background technology.
[0005] The technical solution is that the utility model comprises: a lithium extraction device, a chamber A and a chamber B placed inside the lithium extraction device;
[0006] The lithium extraction equipment is provided with a first circulation loop and a second circulation loop;
[0007] The first circulation loop is connected to a lithium-rich liquid tank, and the first circulation loop is provided with a first power pump;
[0008] The second circulation loop is provided with two parallel branch pipelines, and the second circulation loop is provided with a second power pump;
[0009] One of the branch pipelines is connected to a brine tank, and the other branch pipeline is connected to a brine cleaning tank;
[0010] Two first drainage pipes are connected between the first power pump and the lithium extraction equipment, and the water outlet ends of the two first drainage pipes are commonly connected to a first Venturi ejector;
[0011] Two second drainage pipes are connected between the second power pump and the lithium extraction equipment, and the water outlet ends of the two second drainage pipes are commonly connected to a second Venturi ejector;
[0012] The brine cleaning tank and the lithium-rich liquid tank are respectively provided with drainage outlets.
[0013] Preferably, a valve is provided on the drain outlet, and valves are respectively provided on the circulation loop, the branch pipeline and the drain pipe.
[0014] Preferably, air inlet valves are provided on the water outlet pipes of chamber A and chamber B respectively.
[0015] Preferably, the liquid outlet end of the first venturi injector is connected to the liquid inlet of the lithium-rich liquid tank, and the liquid outlet end of the second venturi injector is connected to the liquid inlet of the brine cleaning tank.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] Through the settings of the first circulation loop, the second circulation loop and two Venturi ejectors, automatic control is achieved in valves, pumps and instruments, so as to improve the switching of operating media, chamber cleaning and solution emptying inside the two chambers of the lithium extraction equipment, balance the flow inside the equipment and improve the production efficiency of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the pipeline system of the utility model.
[0019] Figure 2 It is a simplified schematic diagram of the pipeline system of the utility model.
[0020] Figure 3 It is a schematic diagram of the piping structure of the first circulation loop in the utility model.
[0021] Figure 4 It is a schematic diagram of the piping structure of the second circulation loop in the utility model.
[0022] Figure 5 It is a schematic diagram of the pipeline structure of the first Venturi ejector in the utility model.
[0023] Figure 6 It is a schematic diagram of the piping structure of the brine circulation loop in the utility model.
[0024] Figure 7 It is a schematic diagram of the pipeline structure of the second venturi ejector in the utility model.
[0025] Explanation of the symbols in the schematic diagram:
[0026] 10. Lithium extraction equipment; 101. Chamber A; 102. Chamber B; 20. Brine tank; 21. Second power pump; 30. Brine cleaning tank; 31. Second Venturi ejector; 40. Lithium-rich liquid tank; 41. First power pump; 42. First Venturi ejector. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Depend on Figures 1 to 7 Provided is a lithium extraction device 10, an A chamber 101 and a B chamber 102 disposed inside the lithium extraction device 10;
[0029] The lithium extraction device 10 is provided with a first circulation loop and a second circulation loop, and the two circulation loops alternately provide operating medium to the A chamber 101 and the B chamber 102 respectively;
[0030] The first circulation loop is connected to a lithium-rich liquid tank 40, and the first circulation loop is provided with a first power pump 41 for providing power for the lithium-rich liquid in the first circulation loop;
[0031] The second circulation loop is provided with two parallel branch pipes, and the second circulation loop is provided with a second power pump 21 for providing power for the brine or fresh water in the second circulation loop;
[0032] One of the branch pipelines is connected to a brine tank 20, and this branch pipeline is defined as a brine circulation loop. Another branch pipeline is connected to a brine cleaning tank 30, and this branch pipeline is defined as a brine cleaning loop.
[0033] Two first drainage pipes are connected between the first power pump 41 and the lithium extraction equipment 10, and the water outlet ends of the two first drainage pipes are commonly connected to the first venturi ejector 42. The two first drainage pipes are respectively connected to the inlet end and the throat end of the first venturi ejector 42. Before cleaning the two chambers, it is necessary to drain the liquid inside the two chambers, open the valve corresponding to the first venturi ejector 42, and the first power pump 41 allows the solution inside the lithium-rich liquid tank 40 to enter the first venturi ejector 42 through the first drainage pipe at the inlet end. At this time, the lithium-rich liquid in the A chamber 101 or the B chamber 102 is pumped back into the first venturi ejector 42 and finally ejected from the diffusion end;
[0034] Two second drainage pipes are connected between the second power pump 21 and the lithium extraction equipment 10. The water outlet ends of the two second drainage pipes are commonly connected to the second venturi ejector 31. The water outlet ends of the two second drainage pipes are respectively connected to the inlet end and the throat end of the second venturi ejector 31. After the valve connected to the second venturi ejector 31 is opened and the second power pump 21 is started, the brine inside the A chamber 101 or the B chamber 102 is pumped back into the second venturi ejector 31 and ejected from the diffusion end;
[0035] The brine cleaning tank 30 and the lithium-rich liquid tank 40 are respectively provided with drainage ports. When the brine or lithium-rich liquid inside the two chambers is completely pumped into the brine cleaning tank 30 and the lithium-rich liquid tank 40, all the brine is discharged and half of the lithium-rich liquid is discharged through the drainage ports, and then fresh water is filled in.
[0036] refer to Figure 1 As shown, a valve is provided on the drain outlet, and a plurality of valves are respectively provided on the circulation loop, the branch pipeline and the drain pipe. Through the coordination between the plurality of valves, it is only necessary to control the valves on the corresponding pipelines in the steps of brine circulation, lithium-rich liquid circulation, emptying the solutions inside the two chambers, chamber cleaning and operating medium switching chambers.
[0037] refer to Figure 1 , Figure 5 and Figure 7 As shown, in order to enable the two venturi ejectors to extract the solution from the two chambers, air inlet valves are respectively provided on the water outlet pipes of the A chamber 101 and the B chamber 102 .
[0038] refer to Figure 1 As shown, considering the recycling of the brine or lithium-rich liquid tank 40 and environmental pollution, the liquid outlet end of the first venturi injector 42 is connected to the liquid inlet of the lithium-rich liquid tank 40, and the liquid outlet end of the second venturi injector 31 is connected to the liquid inlet of the brine cleaning tank 30. The brine and lithium-rich liquid inside the two chambers enter the brine cleaning tank 30 and the lithium-rich liquid tank 40 respectively under the pumping of the two venturi injectors.
[0039] According to the above pipeline system, the switching process of the operating medium of the electrochemical lithium extraction equipment 10 is as follows:
[0040] Step 1: During positive cycle operation, brine is introduced into chamber A 101 and lithium-rich solution is introduced into chamber B 102;
[0041] Open the valve in the brine circulation loop connected to the A chamber 101, start the second power pump 21, and the brine circulates in the A chamber 101;
[0042] The valve in the first circulation loop connected to the B chamber 102 is opened, and the first power pump 41 is started, so that the brine circulates in the B chamber 102 .
[0043] Step 2: Empty the solutions in chambers A and B;
[0044] Open the valve connected to the A chamber 101, the air inlet valve connected to the A chamber 101 and the valve connected to the second venturi ejector 31 in the brine circulation loop, start the second power pump 21, and pump the solution in the A chamber 101 into the brine cleaning tank 30 through the second venturi ejector 31;
[0045] Open the valve connected to the B chamber 102, the air intake valve connected to the B chamber 102 and the valve connected to the first venturi ejector 42 in the first circulation loop, start the first power pump 41, and pump the solution in the B chamber 102 into the lithium-rich liquid tank 40 through the first venturi ejector 42.
[0046] Step 3: Cleaning of chambers A and B;
[0047] When cleaning chamber A 101, open the valve corresponding to the drain port of the brine cleaning tank 30, empty the tank into fresh water, then open the valve in the brine cleaning circuit connected to chamber A 101, start the second power pump 21, and the fresh water circulates in chamber A 101 to clean chamber A 101;
[0048] When cleaning chamber B 102, open the valve corresponding to the drain port of the lithium-rich liquid tank 40 to drain half of the lithium-rich liquid into fresh water, then open the valve connecting the first circulation loop with chamber B 102, and the solution circulates in chamber B 102 to achieve a cleaning effect.
[0049] Step 4: Empty the solutions in chambers A and B;
[0050] Same as the steps in step 2.
[0051] Step 5: During negative cycle operation, lithium-rich liquid is introduced into chamber A 101 and brine is introduced into chamber B 102;
[0052] Open the valve in the brine circulation loop connected to the B chamber 102, start the second power pump 21, and the brine circulates in the B chamber 102;
[0053] The valve in the first circulation loop connected to the A chamber 101 is opened, and the first power pump 41 is started, so that the lithium-rich liquid circulates in the A chamber 101 .
[0054] Step 6: Steps 1 to 5 are repeated in sequence.
[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A piping system for switching the operating medium of an electrochemical lithium extraction device, characterized in that: include: A lithium extraction device (10), and a chamber A (101) and a chamber B (102) disposed inside the lithium extraction device (10); The lithium extraction device (10) is provided with a first circulation loop and a second circulation loop; The first circulation loop is connected to a lithium-rich liquid tank (40), and the first circulation loop is provided with a first power pump (41); The second circulation loop is provided with two parallel branch pipelines, and the second circulation loop is provided with a second power pump (21); One of the branch pipelines is connected to a brine tank (20), and the other branch pipeline is connected to a brine cleaning tank (30); Two first drainage pipes are connected between the first power pump (41) and the lithium extraction device (10), and the water outlet ends of the two first drainage pipes are commonly connected to a first Venturi ejector (42); Two second drainage pipes are connected between the second power pump (21) and the lithium extraction equipment (10), and the water outlet ends of the two second drainage pipes are commonly connected to a second Venturi ejector (31); The brine cleaning tank (30) and the lithium-rich liquid tank (40) are respectively provided with drainage outlets.
2. A piping system for switching the operating medium of an electrochemical lithium extraction device according to claim 1, characterized in that: The drain outlet is provided with a valve, and the circulation loop, the branch pipeline and the drain pipe are respectively provided with valves.
3. A piping system for switching the operating medium of an electrochemical lithium extraction device according to claim 1, characterized in that: Air inlet valves are respectively provided on the water outlet pipes of the A chamber (101) and the B chamber (102).
4. A piping system for switching the operating medium of an electrochemical lithium extraction device according to claim 1, characterized in that: The liquid outlet end of the first venturi ejector (42) is in communication with the liquid inlet of the lithium-rich liquid tank (40), and the liquid outlet end of the second venturi ejector (31) is in communication with the liquid inlet of the brine cleaning tank (30).