Pre-point marking equipment for building construction
By using an annular array bracket and a pneumatic suspension mechanism in the pre-point marking equipment for construction, the offset problem caused by the marking device due to ground stones or protrusions is solved, and smooth movement and high-precision marking are achieved.
Patent Information
- Application Number
- CN202323509257.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In construction sites, the marking device is easily deviated due to stones or protrusions on the ground during movement, resulting in the marking lines being uneven and affecting the construction accuracy.
A pre-point marking equipment for construction construction is designed, and the connecting bracket arranged in an annular array supports the arc plate. Combined with the pneumatic suspension mechanism, the arc plate can be moved up and down independently to avoid the device caused by stones or protrusions. Incline, adjust the support force through the air chamber and the air guide rod to ensure the stability of the marking mechanism.
It effectively avoids scribing offset caused by stones or ground bulges, ensures the stability and accuracy of the scribing mechanism during movement, and improves the accuracy of construction.
Smart Images

Figure CN222065129U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pre-marking of construction sites, in particular to a pre-point marking device for construction. Background Art
[0002] Road marking machines are road construction machines widely used in roads, parking lots and construction sites to mark different restrictions, guidance and warning signs on the ground. Road marking machines have played a huge role in urban planning and construction with their advantages of speed, efficiency and accuracy, saving construction time and economic investment to the greatest extent.
[0003] In the prior art, however, during the marking process at a construction site, the marking device may be easily offset during movement due to ground stones or ground protrusions, resulting in marking deviation when dividing the ground at the construction site, making the lines drawn on the ground uneven, which may easily affect the construction accuracy during construction. Utility Model Content
[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a pre-point marking device for construction, so as to solve the technical problems mentioned in the above background technology.
[0005] The above technical objectives of the utility model are achieved through the following technical solutions:
[0006] A pre-point marking device for construction includes a marking mechanism, a rotating shaft is provided at the bottom of the marking mechanism, mounting shafts are provided at both ends of the rotating shaft, connecting brackets arranged in a circular array are provided at both ends of the circumferential side of the mounting shaft, an arc plate is provided at one end of the connecting bracket away from the mounting shaft, and a pneumatic suspension mechanism connected to the mounting shaft is provided on one side of the connecting bracket.
[0007] By adopting the above technical solution, the arc plates are supported and arranged by connecting brackets arranged in a circular array, so that the arc plates are formed into a circle, so as to facilitate pushing the marking mechanism, so that the marking mechanism can mark the ground during the movement, and through the setting of the pneumatic suspension mechanism, each arc plate can be independently moved up and down, and then when encountering road stones or uneven road surfaces, the arc plate at the position in contact with the stones moves upward under the influence of the stones, so as to avoid the effect of the stones causing the device to tilt.
[0008] In a preferred example, the utility model can be further configured as follows: the connecting bracket includes a mounting plate connected to the mounting shaft, one end of the mounting plate is provided with a movable bracket connected by an axle rod, and the end of the movable bracket away from the mounting plate is provided with a fixed plate connected to the arc plate.
[0009] By adopting the above technical solution, the curved plate is connected to the mounting shaft through the arrangement of the movable bracket in coordination with the fixed plate and the mounting plate, and the curved plate can be moved up and down through the arrangement of the movable bracket.
[0010] In a preferred example, the utility model can be further configured as follows: the pneumatic suspension mechanism includes a guide cylinder connected to the fixing plate, an air guide rod connected to the mounting shaft is arranged inside the guide cylinder, and the outer wall of the air guide rod is in contact with the inner wall of the guide cylinder.
[0011] By adopting the above technical solution, the air guide rod is supported by the air in the guide tube to push the arc plate to contact the ground, so as to support the device through the arc plate.
[0012] In a preferred example, the utility model can be further configured as follows: an air chamber is opened on one side of the mounting shaft, the inner cavity of the air chamber is connected to the air guide rod, a threaded barrel is arranged inside the air chamber, and a hexagonal shaft is arranged at one end of the threaded barrel.
[0013] By adopting the above technical solution and changing the position of the threaded tube in the air chamber, the air inside the air chamber is pushed into the interior of the air guide rod, so that the air pressure inside the guide tube changes, so as to achieve the effect of changing the supporting force of the arc plate.
[0014] In a preferred example, the utility model can be further configured as follows: the arc-shaped plate is made of rubber material, and a through hole is provided in the middle of the arc-shaped plate.
[0015] By adopting the above technical solution, the friction between the ground and the curved plate made of rubber material is increased, so that the circular wheel pusher composed of the curved plate can be easily moved, and the shock resistance of the curved plate is improved by setting the through holes.
[0016] In a preferred example, the utility model can be further configured as follows: the movable bracket is two extension rods connected by a movable shaft, and the length of the two extension rods is greater than the length of the air guide rod and the guide tube.
[0017] By adopting the above technical solution, by setting the sum of the lengths of the two extension rods to be greater than the sum of the lengths of the air guide rod and the guide cylinder, there is always an angle between the two extension rods, so that a triangle is formed between the two extension rods, the air guide rod and the guide cylinder, thereby achieving the effect of improving the stability of the curved plate.
[0018] In summary, the present invention includes at least one of the following beneficial technical effects:
[0019] 1. The pre-point marking device for construction uses an air chamber to interconnect the air guide rods, so that after one of the arc-shaped plates contacts a stone and moves upward, the air pressure in the guide cylinder here is transferred to the inside of the remaining guide cylinders, so that when the device encounters a stone or a ground protrusion, the supporting force provided to the marking mechanism remains unchanged, thereby avoiding the situation where the stone or the ground protrusion lifts the device, so as to achieve the effect of improving the stability of the device when moving;
[0020] 2. This kind of pre-point marking equipment for construction can change the angle in the movable bracket through the supporting force generated by the stones on the movable bracket after the arc plate contacts the ground stones, so as to achieve the effect of enabling the arc plate to move up and down, and then achieve the upward movement of the arc plate to avoid the stone lifting the whole device, so as to achieve the effect of allowing the device to pass smoothly through the stones or raised ground, so as to avoid the marking deviation caused by stones or raised ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0022] Figure 1 The utility model is a structural schematic diagram of a pre-point marking device for building construction.
[0023] Figure 2 This is a schematic diagram of the structure of a pre-point marking device for construction of the utility model. Figure 2 .
[0024] Figure 3 The utility model is a structural schematic diagram of a connecting bracket and a guide cylinder of a pre-point marking device for construction.
[0025] In the figure, 1. marking mechanism; 2. rotating shaft; 3. installing rotating shaft; 4. connecting bracket; 41. mounting plate; 42. movable bracket; 421. movable shaft; 422. extension rod; 43. fixing plate; 5. arc plate; 6. pneumatic suspension mechanism; 61. guide cylinder; 62. air guide rod; 7. air chamber; 8. threaded cylinder; 9. hexagonal shaft; 10. through hole. DETAILED DESCRIPTION
[0026] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0027] Example:
[0028] Reference Figure 1-Figure 3 The utility model discloses a pre-point marking device for construction, including a marking mechanism 1, a rotating shaft 2 is arranged at the bottom of the marking mechanism 1, both ends of the rotating shaft 2 are provided with mounting shafts 3, both ends of the circumferential side of the mounting shaft 3 are provided with connecting brackets 4 arranged in a ring array, an end of the connecting bracket 4 away from the mounting shaft 3 is provided with an arc plate 5, and one side of the connecting bracket 4 is provided with a pneumatic suspension mechanism 6 connected to the mounting shaft 3.
[0029] In this embodiment, the arc plates 5 are supported and arranged by connecting brackets 4 arranged in a circular array, so that the arc plates 5 form a circular wheel shape, so as to facilitate pushing the marking mechanism 1, so that the marking mechanism 1 marks the ground during the movement, and through the setting of the pneumatic suspension mechanism 6, each arc plate 5 can be independently moved up and down. When moving on flat ground, each arc plate 5 in contact with the ground jointly supports the marking mechanism 1, and when encountering road stones or uneven road surfaces, the arc plates 5 in contact with the stones or ground protrusions move upward under the influence of the stones, while the remaining positions that are not in contact with the stones or ground protrusions still support the marking mechanism 1, so as to prevent the stones from causing the device to tilt.
[0030] In a further preferred embodiment of the present invention, Figure 1-3 As shown, the connecting bracket 4 includes a mounting plate 41 connected to the mounting shaft 3, one end of the mounting plate 41 is provided with a movable bracket 42 connected by an axle rod, and the end of the movable bracket 42 away from the mounting plate 41 is provided with a fixing plate 43 connected to the arc plate 5.
[0031] In this embodiment, the two ends of the movable bracket 42 are respectively connected to the arc plate 5 and the mounting shaft 3 through the fixing plate 43 and the mounting plate 41, and then through the setting of the movable bracket 42, after the arc plate 5 contacts the stones on the ground, the angle in the movable bracket 42 can be changed by pressure, so that the arc plate 5 can be moved up and down, and then the upward movement of the arc plate 5 can be achieved to avoid the stone from lifting the entire device, so as to achieve the effect of allowing the device to smoothly pass through the stone or the raised ground, so as to avoid the marking line deviation caused by the stone or the raised ground.
[0032] In a further preferred embodiment of the present invention, Figure 1-3 As shown, the pneumatic suspension mechanism 6 includes a guide cylinder 61 connected to the fixing plate 43, an air guide rod 62 connected to the mounting shaft 3 is arranged inside the guide cylinder 61, and the outer wall of the air guide rod 62 fits with the inner wall of the guide cylinder 61.
[0033] In this embodiment, the air guide rod 62 is supported by the air in the guide cylinder 61, so that the arc plates 5 are in contact with the ground, and then the weight of the device itself makes multiple arc plates 5 in contact with the ground, so as to achieve the effect of jointly supporting the device. When encountering stones, the arc plates 5 in contact with the stones are lifted up by the stones, while the remaining arc plates 5 are still in contact with the ground, so as to achieve the effect of allowing the device to pass smoothly through the stones and the raised ground, thereby achieving the effect of improving the stability of the device during movement.
[0034] In a further preferred embodiment of the present invention, Figure 1-3 As shown, an air chamber 7 is opened on one side of the mounting shaft 3, the inner cavity of the air chamber 7 is connected to the air guide rod 62, a threaded tube 8 is arranged inside the air chamber 7, and a hexagonal shaft 9 is arranged at one end of the threaded tube 8.
[0035] In this embodiment, the air guide rods 62 are interconnected through the air chamber 7, and then after one of the curved plates 5 contacts the stone and moves upward, the air pressure in the guide tube 61 here is transferred to the inside of the remaining guide tubes 61, so that when the device encounters stones or ground protrusions, the supporting force provided to the marking mechanism 1 remains unchanged, thereby avoiding the situation where the device is lifted by stones or ground protrusions, so as to achieve the effect of improving the stability of the device when moving, and by changing the position of the threaded tube 8 in the air chamber 7, the air inside the air chamber 7 can be pushed into the inside of the air guide rod 62, so that the air pressure inside the guide tube 61 changes, so as to achieve the effect of changing the supporting force for the curved plate 5.
[0036] In a further preferred embodiment of the present invention, Figure 1-3 As shown, the arc plate 5 is made of rubber material, and a through hole 10 is provided in the middle of the arc plate 5.
[0037] In this embodiment, the friction between the arc plate 5 and the ground is increased by the arc plate 5 made of rubber material, so as to facilitate the movement of the circular wheel pushing device formed by the arc plate 5, and the shock resistance of the arc plate 5 is improved by the provision of the through hole 10.
[0038] In a further preferred embodiment of the present invention, Figure 1-3 As shown, the movable bracket 42 is two extension rods 422 connected by a movable shaft 421, and the length of the two extension rods 422 is greater than the length of the air guide rod 62 and the guide cylinder 61.
[0039] In this embodiment, by setting the sum of the lengths of the two extension rods 422 to be greater than the sum of the lengths of the air guide rod 62 and the guide tube 61, there is always an angle between the two extension rods 422, so that a triangle is formed between the two extension rods 422, the air guide rod 62 and the guide tube 61, so as to achieve the effect of improving the stability of the curved plate 5.
[0040] The embodiments of this specific implementation method are all preferred embodiments of the utility model, and are not intended to limit the protection scope of the utility model. Therefore, all equivalent changes made based on the structure, shape, and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A pre-point marking device for construction, comprising a marking mechanism (1), characterized in that: A rotating shaft (2) is arranged at the bottom of the marking mechanism (1), and mounting shafts (3) are arranged at both ends of the rotating shaft (2). Connecting brackets (4) arranged in a circular array are arranged at both ends of the circumferential side of the mounting shaft (3), and an arc plate (5) is arranged at one end of the connecting bracket (4) away from the mounting shaft (3). A pneumatic suspension mechanism (6) connected to the mounting shaft (3) is arranged on one side of the connecting bracket (4).
2. A pre-point marking device for construction according to claim 1, characterized in that: The connecting bracket (4) comprises a mounting plate (41) connected to the mounting shaft (3); a movable bracket (42) connected via an axle rod is disposed at one end of the mounting plate (41); and a fixing plate (43) connected to the arc plate (5) is disposed at one end of the movable bracket (42) away from the mounting plate (41).
3. A pre-point marking device for construction according to claim 2, characterized in that: The pneumatic suspension mechanism (6) comprises a guide cylinder (61) connected to the fixing plate (43), an air guide rod (62) connected to the mounting shaft (3) is arranged inside the guide cylinder (61), and an outer wall of the air guide rod (62) is in contact with an inner wall of the guide cylinder (61).
4. A pre-point marking device for construction according to claim 3, characterized in that: An air chamber (7) is provided on one side of the mounting shaft (3), the inner cavity of the air chamber (7) is connected to the air guide rod (62), a threaded barrel (8) is provided inside the air chamber (7), and a hexagonal shaft (9) is provided at one end of the threaded barrel (8).
5. A pre-point marking device for construction according to claim 4, characterized in that: The arc-shaped plate (5) is made of rubber material, and a through hole (10) is provided in the middle of the arc-shaped plate (5).
6. A pre-point marking device for construction according to claim 5, characterized in that: The movable bracket (42) is two extension rods (422) connected by a movable shaft (421), and the length of the two extension rods (422) is greater than the length of the air guide rod (62) and the guide tube (61).