Wet-joint-free main beam connecting structure
Patent Information
- Application Number
- CN202420232959.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The use of wet joints in the construction of existing bridges leads to extended construction cycles, high costs and difficult maintenance.
The main beam connection structure is adopted without wet joints, including rubber pads, galvanized steel plates and bolts, combined with the bridge deck elastic paving structure and steel spacer beam structure, and the elastic connection is used through the combination of rubber pads and galvanized steel plates. The parts and welding technology enables connection between beams, reducing the need for wet joints during construction.
It significantly shortens the bridge construction period, reduces maintenance costs, improves construction efficiency and maintenance convenience, and reduces damage and maintenance difficulties of the bridge deck system.
Smart Images

Figure CN222065148U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction structures, in particular to a main beam connection structure without wet joints. Background Art
[0002] With the rapid development of the times, my country has become the world's largest bridge country. Among them, prefabricated and assembled beam bridges are characterized by standardization, factory production and assembly. Their cross-sections are composed of multiple beams, which are easy to transport and assemble. Due to their simple structure, clear and reasonable force, and relatively low project cost, they are widely used in engineering. At present, the splicing methods between beams mostly use the gluing method of concrete adhesive bonding or the wet connection method of reserving reinforced concrete between segments.
[0003] During the construction of the conventional superstructure of a bridge, cast-in-place wet joints are required to connect the beam sections. On the one hand, cast-in-place wet joints will extend the construction period and increase the construction cost. On the other hand, the construction quality of cast-in-place construction joints is greatly affected by the environment, and it is difficult to repair and maintain them after defects occur.
[0004] Therefore, connecting the beam ends through a new structure can effectively improve construction efficiency and reduce maintenance costs. Utility Model Content
[0005] The purpose of the utility model is to provide a connection structure between the main beams of an assembled beam bridge to solve the problems of long construction period and many defects caused by wet joint construction and actual use proposed in the above-mentioned background technology. These problems will increase the user's use cost, make operation inconvenient, and have high maintenance costs, making the user inefficient in dealing with defects and accidents.
[0006] The utility model is realized by adopting the following technical solutions:
[0007] A main beam connection structure without wet joints, including an inter-beam connection structure and a steel cross beam structure arranged below the inter-beam connection structure and connected to the inter-beam connection structure, the inter-beam connection structure includes a rubber pad, a galvanized steel plate and bolts, the rubber pads are respectively affixed to corresponding positions on the upper and lower parts of the main beam, the galvanized steel plate is affixed to the rubber pads, and the bolts are penetrated through the galvanized steel plates on the upper and lower parts of the main beam.
[0008] Furthermore, a main beam connection structure without wet joints also includes a bridge deck paving structure, including an asphalt concrete paving layer and an ECC elastic concrete paving layer, wherein the ECC elastic concrete paving layer is paved above the main beam joint to adapt to the deflection difference of the main beams on both sides, and the asphalt concrete paving layer is paved on the bridge deck on both sides of the ECC elastic concrete paving layer. Furthermore, the paving thickness of the asphalt concrete paving layer and the ECC elastic concrete paving layer is the same.
[0009] Furthermore, the steel cross beam structure includes a top angle plate, a bottom angle plate one, a connecting steel pipe, a bottom angle plate two and a fixed steel plate. The three connecting steel pipes are distributed in a triangle. The top angle plate, the bottom angle plate one and the bottom angle plate two are respectively arranged at the top and two bottom corners of the triangle. The top angle plate is fixedly connected to the galvanized steel plate at the bottom of the main beam, and the bottom angle plate one and the bottom angle plate two are respectively fixedly connected to the main beam through fixed steel plates.
[0010] Furthermore, the top angle plate is welded and fixed to the galvanized steel plate at the bottom of the main beam.
[0011] Furthermore, the rubber pad and the galvanized steel plate are respectively provided with at least two through holes, and the positions of the through holes on the rubber pad and the galvanized steel plate correspond to each other.
[0012] Furthermore, the rubber pad is a chloroprene rubber pad.
[0013] Furthermore, the bolt includes a screw rod and a nut matched with the screw rod, and the screw rod adopts an elastic connecting piece.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1) The utility model realizes the main beam connection without wet joints by combining the elastic pavement structure of the bridge deck, the connection structure between beams and the steel cross beam structure, which significantly shortens the construction period of the bridge.
[0016] 2) The utility model lays rubber pads and galvanized steel plates on the top and bottom of the joints, and connects the middle part to the steel plates on both sides with bolts through elastic connectors, so as to generate vertical displacement difference between the main beams on both sides. The rubber pads, elastic connectors and galvanized steel plates reduce the damage to the bridge deck system, and the rubber pads and galvanized steel plates are easier to repair and replace than wet joints.
[0017] 2) The inter-beam connection structure and steel cross beams of the utility model are all prefabricated in the factory and bolted or welded on site, which increases the proportion of assembly construction, eliminates the process of casting the main beam wet joints and cross beams during construction, and greatly shortens the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 This is a schematic diagram of the overall front structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the overall side structure of the utility model;
[0021] In the figure: 1. Asphalt concrete; 2. ECC elastic concrete; 3. Nut; 4. Galvanized steel plate; 5. Rubber pad; 6. Main beam; 7. Screw; 8. Top angle plate; 9. Bottom angle plate one; 10. Connecting steel pipe; 11. Bottom angle plate two; 12. Fixed steel plate. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution of the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0023] like Figure 1-Figure 2 As shown, this embodiment proposes a main beam connection structure without wet joints, including a bridge deck elastic paving structure, an inter-beam connection structure and a steel cross beam structure.
[0024] The inter-beam connection structure includes a rubber pad 5, a galvanized steel plate 4 and a bolt. The rubber pad 5 is respectively attached to the corresponding positions of the upper and lower parts of the main beam 6. The galvanized steel plate 4 is attached to the rubber pad 5. The two ends of the bolt are respectively passed through the galvanized steel plate 4 at the upper and lower parts of the main beam 6. The rubber pad 5 at the joint adopts a neoprene pad so that when the structure is initially deformed, the rubber damping undergoes extrusion deformation to adapt to the deflection difference of the main beam. The galvanized steel plate 4 is installed above the rubber pad 5, and the galvanized steel plates 4 on both sides are connected by bolts. The bolt includes a screw rod 7 and a nut 3 matched with the screw rod 7. The screw rod 7 adopts an elastic connector, which is specifically a polyurethane elastic material and can be quickly positioned, installed, and disassembled and maintained later.
[0025] The steel cross beam structure includes a top angle plate 8, a bottom angle plate 1 9, a connecting steel pipe 10, a bottom angle plate 2 11 and a fixed steel plate 12. The three connecting steel pipes 10 are distributed in a triangle. The top angle plate 8, the bottom angle plate 1 9 and the bottom angle plate 2 11 are respectively arranged at the top and two bottom corners of the triangle. The three connecting steel pipes 10 are respectively arranged between the top angle plate 8 and the bottom angle plate 1 9, the top angle plate 8 and the bottom angle plate 2 11, and the bottom angle plate 1 9 and the bottom angle plate 2 11; the top angle plate 8 is welded and fixed to the galvanized steel plate 4 at the lower part of the main beam, and the bottom angle plate 1 9 and the bottom angle plate 2 11 are fixedly connected to the main beam 6 through the fixed steel plate 12.
[0026] The bridge deck pavement includes asphalt concrete pavement layer 1 and ECC elastic concrete pavement layer 2. Asphalt concrete pavement layer 1 is laid on the main beam, and ECC elastic concrete pavement layer 2 is laid on the joint to adapt to the deflection difference of the main beams on both sides. Asphalt concrete is laid in other places on the bridge deck. Asphalt elastic concrete material belongs to asphalt mixture, which is made by hot mixing modified asphalt material and high-quality diabase stone at a high temperature of 190°C. It has strong bonding force, elasticity and thermal stability. Its mechanical characteristics are as follows: it shows elasticity when subjected to load and high-frequency vibration, and shows plasticity under the action of low-frequency endurance. When the high-frequency vibration of the bridge is caused by the running of wheels, the elastic concrete can completely eliminate the influence of the different deflections on both sides of the longitudinal joint, and its certain paving width eliminates the sudden change of the height difference.
[0027] Construction process:
[0028] 1. Clean the main beam flange, stick rubber pads on the upper and lower parts of the entire flange, and set galvanized steel plates on the upper and lower parts of the flange, anchor them with bolts, and complete the construction of the inter-beam connection structure;
[0029] 2. The top angle plate is welded and fixed to the galvanized steel plate. The bottom angle plates 1 and 2 are installed at the corresponding positions of the main beams on both sides through the fixing steel plates. Connecting steel pipes are set between the top angle plate, the bottom angle plate 1 and the bottom angle plate 2, and they are connected and fixed with bolts to form a triangular structure, thus completing the construction of the steel cross beam structure;
[0030] 3. Lay an asphalt concrete pavement layer on the main beam, and lay an ECC elastic concrete pavement layer on the joints, and ensure that the laying thickness of the asphalt concrete pavement layer and the ECC elastic concrete pavement layer are the same to complete the construction of the bridge deck pavement structure.
Claims
1. A main beam connection structure without wet joints, characterized in that: The invention comprises an inter-beam connection structure and a steel cross beam structure arranged below the inter-beam connection structure and connected to the inter-beam connection structure, wherein the inter-beam connection structure comprises a rubber pad (5), a galvanized steel plate (4) and bolts, wherein the rubber pad (5) is respectively attached to corresponding positions of the upper and lower parts of the main beam (6), the galvanized steel plate (4) is attached to the rubber pad (5), and the bolts are passed through the galvanized steel plates (4) at the upper and lower parts of the main beam (6).
2. A main beam connection structure without wet joints according to claim 1, characterized in that: The steel cross beam structure comprises a top angle plate (8), a bottom angle plate 1 (9), a connecting steel pipe (10), a bottom angle plate 2 (11) and a fixing steel plate (12). The three connecting steel pipes (10) are distributed in a triangular shape. The top angle plate (8), the bottom angle plate 1 (9) and the bottom angle plate 2 (11) are respectively arranged at the top and two bottom corners of the triangle. The top angle plate (8) is fixedly connected to the galvanized steel plate (4) at the bottom of the main beam. The bottom angle plate 1 (9) and the bottom angle plate 2 (11) are respectively fixedly connected to the main beam (6) via the fixing steel plate (12).
3. The main beam connection structure without wet joints according to claim 1, characterized in that: It also includes a bridge deck pavement structure, including an asphalt concrete pavement layer (1) and an ECC elastic concrete pavement layer (2), wherein the ECC elastic concrete pavement layer (2) is arranged above the joint of the main beam (6) to accommodate the deflection difference of the main beams on both sides, and the asphalt concrete pavement layer (1) is arranged on the bridge deck on both sides of the ECC elastic concrete pavement layer (2).
4. The main beam connection structure without wet joints according to claim 2 is characterized in that: The top angle plate (8) is welded and fixed to the galvanized steel plate (4) at the bottom of the main beam (6).
5. The main beam connection structure without wet joints according to claim 3 is characterized in that: The asphalt concrete paving layer (1) and the ECC elastic concrete paving layer (2) have the same paving thickness.
6. The main beam connection structure without wet joints according to claim 1, characterized in that: The rubber pad (5) and the galvanized steel plate (4) are respectively provided with at least two through holes, and the positions of the through holes on the rubber pad (5) and the galvanized steel plate (4) correspond to each other.
7. The main beam connection structure without wet joints according to claim 1, characterized in that: The rubber pad (5) is a chloroprene rubber pad.
8. The main beam connection structure without wet joints according to claim 1, characterized in that: The bolt comprises a screw rod (7) and a nut (3) matched with the screw rod (7), and the screw rod (7) adopts an elastic connecting piece.