Prefabricated cast-in-place combined type river landscape trestle structure

By installing connecting parts on the preset grooves and column main body of the river landscape trench, the rotation and movement of the columns are restricted, the problem of concrete columns pouring during solidification is solved, and the construction efficiency and process are improved.

CN222065168UActive Publication Date: 2024-11-26JINZHONGTIAN GRP GANGHANG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420397254.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-11-26
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

During the construction of the river landscape trest, concrete columns are prone to dump during solidification, resulting in slow and troublesome construction progress.

Method used

Using a prefabricated cast-in-place combined structure, by setting preset grooves and column bodies at the edge of the trest bridge, the design of the first and second connecting parts, including connecting sleeves, limiting grooves and sliders, limiting the rotation of the columns and Move to achieve temporary fixation and avoid waiting for concrete to solidify.

Benefits of technology

The construction cycle of the trest columns has been reduced, construction efficiency and process optimization have been improved, and construction time has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065168U_ABST
    Figure CN222065168U_ABST
Patent Text Reader

Abstract

The utility model provides a prefabricated cast-in-place combined type riverway landscape trestle structure, and relates to the technical field of riverway landscape trestles, the prefabricated cast-in-place combined type riverway landscape trestle structure comprises a preset groove formed in the edge of a trestle and a stand column body, a first connecting piece is installed in the preset groove, and a second connecting piece is installed in the stand column body. A second connecting piece is installed at the bottom of the stand column body, the first connecting piece comprises a first connecting plate, a plurality of connecting sleeves are arranged on the top of the first connecting plate in an array mode, two vertical guide grooves are symmetrically formed in the surface of each connecting sleeve, and a longitudinal limiting groove is formed in the middle of one side of each vertical guide groove; according to the trestle stand column, rotation of the connecting column relative to the connecting sleeve is limited through the second limiting pin and the horizontal limiting groove, vertical movement of the stand column in the axial direction of the connecting sleeve is limited through the vertical limiting groove, and therefore the construction period of the trestle stand column is shortened, the construction efficiency of the trestle stand column is improved, and meanwhile the construction process of the trestle stand column is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of river landscape trestle bridges, in particular to a prefabricated cast-in-place combined river landscape trestle bridge structure. Background Art

[0002] Nowadays, the landscape function of the river is a very important aspect of the comprehensive management of the river. Among the landscape elements of the river, the pier plays an indispensable role. Its functions mainly include: a traffic passage on the water surface; a hydrophilic medium; a carrier of viewing sights; a waterfront cultural place for entertainment, leisure, fitness, and communication; a river maintenance and viewing platform built between the water body and the water surface space. The location of the pier gives it its own unique architectural shape.

[0003] In order to prevent pedestrians on the pier from falling into the water, it is necessary to build a guardrail at the edge of the pier. The guardrail usually consists of staggered columns and railings. Before installing the railings, it is necessary to erect multiple equidistant columns on the pier. Common concrete columns are mostly prefabricated components. After the columns are installed on the pier, it is necessary to pour concrete between the columns and the pier to form a whole. However, during the concrete solidification process, the columns are prone to tipping over, and the columns need to be supported and wait for the concrete to solidify, which brings about the problems of slow progress in column construction and troublesome construction process.

[0004] In summary, the utility model provides a prefabricated cast-in-place combined river landscape trestle structure to solve the above problems. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a prefabricated cast-in-place combined river landscape trestle structure to solve the problems in the prior art.

[0006] A prefabricated cast-in-situ combined river landscape trestle structure, comprising a preset groove and a column body opened at the edge of the trestle, a first connecting member is installed in the preset groove, a second connecting member is installed at the bottom of the column body, the first connecting member comprises a first connecting plate, a plurality of connecting sleeves are arranged in an array on the top of the first connecting plate, two vertical guide grooves are symmetrically arranged on the surface of the connecting sleeve, a longitudinal limit groove is arranged in the middle of one side of the vertical guide groove, an oblique guide groove is arranged at the bottom of the vertical guide groove on the same side as the longitudinal limit groove, and a vertical horizontal limit groove is arranged at the top of the oblique guide groove away from one end of the vertical guide groove, the second connecting member comprises a second connecting plate, a plurality of connecting columns are arranged in an array on the bottom of the second connecting plate, two first limit pins are symmetrically arranged on the surface of the connecting column, a slide groove is opened inside the connecting column, a slider is slidably installed inside the slide groove, a connecting rod is connected to the bottom of the slider, the bottom end of the connecting rod passes through the bottom end of the connecting column, and a movable block is connected to the end passing through, and two second limit pins corresponding to the position of the first limit pin are symmetrically arranged on the surface of the movable block.

[0007] Furthermore, the positions of the connecting column and the connecting sleeve correspond one to one.

[0008] Furthermore, the top end of the horizontal limiting groove corresponds to the end position of the longitudinal limiting groove, and the height of the top end of the horizontal limiting groove is flush with the height of the bottom end of the vertical guide groove.

[0009] Furthermore, the top end of the connecting column passes through the second connecting plate, and one end that passes through is fixedly connected to a rotating block.

[0010] Furthermore, a fastening sleeve is provided at the bottom of the second connecting plate on the outer side of the connecting column, the fastening sleeve is arranged concentrically with the connecting column, and the inner size of the fastening sleeve is matched with the outer size of the connecting sleeve.

[0011] Furthermore, a spring is mounted on the surface of the connecting rod in the slide groove, and two ends of the spring are respectively against the bottom surface of the slider and the bottom inner wall of the slide groove.

[0012] Furthermore, a plurality of embedded steel bars are arranged in an array at the bottom of the first connecting plate and the top of the second connecting plate, and the embedded steel bars on the first connecting plate and the second connecting plate are respectively inserted into the trestle and the column.

[0013] Furthermore, a penetrating grouting hole is provided on the surface of the first connecting plate.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] The utility model limits the connection column from rotating relative to the connection sleeve by the second limit pin and the horizontal limit groove, and limits the vertical movement of the column along the axis of the connection sleeve by the vertical limit groove, thereby reducing the construction period of the trestle column, improving the construction efficiency of the trestle column, and optimizing the construction process of the trestle column. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional schematic diagram of the utility model;

[0017] Figure 2 It is a connection diagram of the first connecting member and the second connecting member in the utility model;

[0018] Figure 3 It is a three-dimensional schematic diagram of the first connecting member in the utility model;

[0019] Figure 4 It is a three-dimensional schematic diagram of the second connecting member in the utility model;

[0020] Figure 5 It is a partial cross-sectional schematic diagram of the second connecting member in the utility model.

[0021] In the figure:

[0022] 1. Preset groove; 2. Column body; 3. First connecting plate; 4. Connecting sleeve; 5. Vertical guide groove; 6. Longitudinal limit groove; 7. Oblique guide groove; 8. Horizontal limit groove; 9. Second connecting plate; 10. Connecting column; 11. First limit pin; 12. Slide groove; 13. Sliding block; 14. Connecting rod; 15. Movable block; 16. Second limit pin; 17. Rotating block; 18. Fastening sleeve; 19. Spring; 20. Embedded steel bar; 21. Grouting hole. DETAILED DESCRIPTION

[0023] The following is a further detailed description of the implementation of the present utility model in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present utility model, but cannot be used to limit the scope of the present utility model.

[0024] like Figure 1-5As shown, the utility model provides a prefabricated cast-in-place combined river landscape trestle structure, including a preset groove 1 and a column body 2 opened at the edge of the trestle, a first connecting piece is installed in the preset groove 1, and a second connecting piece is installed at the bottom of the column body 2, the first connecting piece includes a first connecting plate 3, and a plurality of connecting sleeves 4 are arranged in an array on the top of the first connecting plate 3, and two vertical guide grooves 5 are symmetrically arranged on the surface of the connecting sleeve 4, the top of the vertical guide groove 5 is through, and a longitudinal limit groove 6 is arranged in the middle of one side of the vertical guide groove 5, and the longitudinal limit groove 6 is used to limit the axial movement of the connecting column 10 along the connecting sleeve 4, and the vertical guide groove 5 is provided with an oblique guide groove 7 at the bottom on the same side as the longitudinal limit groove 6, and the oblique guide groove 7 is provided with a vertical horizontal limit groove 8 at the top away from one end of the vertical guide groove 5, and the horizontal limit groove 8 is used to limit the connection column 10 from rotating along the axis of the connecting sleeve 4, and the second connecting piece It includes a second connecting plate 9, and a plurality of connecting columns 10 are installed in an array at the bottom of the second connecting plate 9. The outer size of the connecting column 10 is adapted to the inner size of the connecting sleeve 4. Two first limit pins 11 are symmetrically arranged on the surface of the connecting column 10. The first limit pin 11 can enter the vertical limit groove to limit the axial movement of the connecting column 10 along the connecting sleeve 4. A slide groove 12 is provided inside the connecting column 10, and a slider 13 is slidably installed inside the slide groove 12. A connecting rod 14 is connected to the bottom of the slider 13. The bottom end of the connecting rod 14 passes through the bottom end of the connecting column 10, and a movable block 15 is connected to the end passing through. Two second limit pins 16 corresponding to the position of the first limit pin 11 are symmetrically arranged on the surface of the movable block 15. The second limit pin 16 is kept in the horizontal limit groove 8 under the action of the spring 19, thereby limiting the rotation of the connecting column 10 along the axis of the connecting sleeve 4.

[0025] The positions of the connecting posts 10 and the connecting sleeves 4 correspond one to one, and each connecting post 10 is connected to each connecting sleeve 4 respectively.

[0026] The top end of the horizontal limiting groove 8 corresponds to the end position of the longitudinal limiting groove 6 , and the top end height of the horizontal limiting groove 8 is flush with the bottom end height of the vertical guide groove 5 .

[0027] The top end of the connecting column 10 passes through the second connecting plate 9, and one end thereof is fixedly connected with a rotating block 17, which is hexagonal in shape and can be rotated using a wrench.

[0028] Among them, a fastening sleeve 18 is arranged at the outside of the connecting column 10 at the bottom of the second connecting plate 9. The fastening sleeve 18 is arranged concentrically with the connecting column 10, and the inner size of the fastening sleeve 18 is adapted to the outer size of the connecting sleeve 4. After the first connecting piece and the second connecting piece are connected, the fastening sleeve 18 can be sleeved on the outer side of the top end of the connecting sleeve 4, thereby improving the strength of the top end of the connecting sleeve 4.

[0029] The surface of the connecting rod in the slide groove 12 is provided with a spring 19 , and the two ends of the spring 19 are respectively against the bottom surface of the slider 13 and the bottom inner wall of the slide groove 12 , and the spring 19 is used to realize the reset of the movable block 15 .

[0030] Among them, a plurality of embedded steel bars 20 are arranged in an array at the bottom of the first connecting plate 3 and the top of the second connecting plate 9. The embedded steel bars 20 are used for connecting the first connecting piece and the pier, and the second connecting piece and the column, and the embedded steel bars 20 on the first connecting plate 3 and the second connecting plate 9 are respectively inserted into the pier and the column.

[0031] A penetrating grouting hole 21 is provided on the surface of the first connecting plate 3 , and after the first connecting member and the second connecting member are connected, concrete can be poured into the preset groove 1 through the grouting hole 21 .

[0032] Specific working principle:

[0033] Before installing the center column of the utility model, first open a plurality of equidistant preset grooves 1 on the edge of the pier, and install the first connecting piece at the bottom of the preset groove 1. When installing the center column of the utility model, align each connecting column 10 on the first connecting plate 3 with each connecting sleeve 4 on the second connecting plate 9, and rotate the rotating block 17 at the same time to align the first limit pin 11 and the second limit pin 16 with the two vertical guide grooves 5 on the surface of the connecting sleeve 4, and then insert the connecting column 10 into the connecting sleeve 4. After the second limit pin 16 moves to the bottom of the vertical groove guide groove, the first limit pin 11 just moves to the position corresponding to the vertical limit groove. At this time, the connecting column 10 is rotated by the rotating block 17 so that the first limit pin 11 is stuck in the vertical limit groove. The vertical limit groove limits the column from moving up and down along the axial direction of the connecting sleeve 4. When the connecting column 10 is rotated At the same time, the movable block 15 will rotate with the connecting column 10. During the rotation of the movable block 15, the second limit pin 16 moves along the oblique guide groove 7, and the second limit pin 16 drives the movable block 15 away from the connecting sleeve 4 through the oblique guide groove 7 until the second limit pin 16 moves below the horizontal limit groove 8. Under the action of the spring 19, the second limit pin 16 bounces into the horizontal limit groove 8, and the second limit pin 16 and the horizontal limit groove 8 limit the connection column 10 from rotating relative to the connecting sleeve 4. Finally, concrete is poured into the preset groove 1 from the grouting hole 21. Through the above-mentioned connection structure, the first connecting member and the second connecting member can temporarily fix the column without waiting for the concrete to solidify, thereby reducing the construction period of the pier column, improving the construction efficiency of the pier column, and optimizing the construction process of the pier column.

[0034] The implementation modes of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A prefabricated cast-in-place combined river landscape trestle structure, characterized by: The utility model comprises a preset groove (1) and a column body (2) provided at the edge of a trestle, wherein a first connecting member is installed in the preset groove (1), and a second connecting member is installed at the bottom of the column body (2), wherein the first connecting member comprises a first connecting plate (3), and a plurality of connecting sleeves (4) are arranged in an array on the top of the first connecting plate (3), and two vertical guide grooves (5) are symmetrically arranged on the surface of the connecting sleeve (4), and a longitudinal limit groove (6) is arranged in the middle of one side of the vertical guide groove (5), and an oblique guide groove (7) is arranged at the bottom of the vertical guide groove (5) on the same side as the longitudinal limit groove (6), and a vertical horizontal limit groove is arranged at the top of the oblique guide groove (7) away from the end of the vertical guide groove (5). (8), the second connecting member comprises a second connecting plate (9), a plurality of connecting columns (10) are installed in an array at the bottom of the second connecting plate (9), two first limit pins (11) are symmetrically arranged on the surface of the connecting column (10), a slide groove (12) is provided inside the connecting column (10), a slider (13) is slidably installed inside the slide groove (12), a connecting rod (14) is connected to the bottom of the slider (13), the bottom end of the connecting rod (14) passes through the bottom end of the connecting column (10), and one end of the passing end is connected to a movable block (15), and two second limit pins (16) corresponding to the positions of the first limit pins (11) are symmetrically arranged on the surface of the movable block (15).

2. The prefabricated cast-in-place combined river landscape trestle structure as claimed in claim 1, characterized in that: The positions of the connecting column (10) and the connecting sleeve (4) correspond one to one.

3. The prefabricated cast-in-place combined river landscape trestle structure as claimed in claim 1, characterized in that: The top end of the horizontal limit groove (8) corresponds to the end position of the longitudinal limit groove (6), and the height of the top end of the horizontal limit groove (8) is flush with the height of the bottom end of the vertical guide groove (5).

4. The prefabricated cast-in-place combined river landscape trestle structure as claimed in claim 1, characterized in that: The top end of the connecting column (10) passes through the second connecting plate (9), and the end that passes through is fixedly connected to a rotating block (17).

5. The prefabricated cast-in-place combined river landscape trestle structure as claimed in claim 1, characterized in that: A fastening sleeve (18) is arranged at the bottom of the second connecting plate (9) on the outside of the connecting column (10); the fastening sleeve (18) is arranged concentrically with the connecting column (10), and the inner size of the fastening sleeve (18) matches the outer size of the connecting sleeve (4).

6. The prefabricated cast-in-place combined river landscape trestle structure according to claim 1, characterized in that: A spring (19) is sleeved on the surface of the connecting rod located in the slide groove (12), and two ends of the spring (19) respectively abut against the bottom surface of the sliding block (13) and the bottom inner wall of the slide groove (12).

7. The prefabricated cast-in-place combined river landscape trestle structure according to claim 1, characterized in that: A plurality of embedded steel bars (20) are arranged in an array at the bottom of the first connecting plate (3) and the top of the second connecting plate (9), and the embedded steel bars (20) on the first connecting plate (3) and the second connecting plate (9) are respectively inserted into the trestle and the column.

8. The prefabricated cast-in-place combined river landscape trestle structure as claimed in claim 1, characterized in that: The surface of the first connecting plate (3) is provided with penetrating grouting holes (21).