Simple installer for bridge support

The design of the simplified bridge bearing installer solves the problems of time-consuming, labor-intensive, and inaccurate bridge bearing installation, achieving an efficient and precise installation process, protecting the appearance of the bearing, and has broad application prospects.

CN222065185UActive Publication Date: 2024-11-26THE THIRD ENG OF CHINA RAILWAY 12TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323494861.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-11-26
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

The installation of existing bridge bearings is time-consuming and labor-intensive, has poor installation accuracy, and is prone to damage to the appearance, especially during manual installation.

Method used

A simple bridge bearing installer is used, which includes a base rail, a longitudinal moving trolley, and a lateral moving trolley. The bridge bearing is precisely positioned and fixed through sliding installation.

Benefits of technology

It improves installation efficiency, reduces worker workload, ensures installation accuracy, and protects the appearance of the support, making it widely applicable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065185U_ABST
    Figure CN222065185U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of bridge support installation, and particularly relates to a simple installer for a bridge support. Comprising a base rail, a longitudinal moving trolley and a transverse moving trolley, the longitudinal moving trolley slides on the base rail along a straight line, a moving rail perpendicular to the base rail is constructed on the longitudinal moving trolley, the transverse moving trolley is assembled on the moving rail and slides along a straight line, and a bridge support supporting platform is constructed on the transverse moving trolley; the simple installer for the bridge support is easy to manufacture, consumes few materials and can effectively control the installation accuracy of the bridge support, reduce the labor amount of workers and prevent the appearance of the bridge support from being damaged. The mounting efficiency of the bridge support is improved, mounting and dismounting are convenient and fast, and wide popularization value is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge support installation, and in particular relates to a simple installer for a bridge support. Background Art

[0002] The bridge bearing is an important structural component connecting the superstructure and the substructure of the bridge. It can reliably transmit the reaction force and deformation of the superstructure of the bridge to the substructure of the bridge. The bearing is an important force transmission device of the bridge. In addition to considering that it should have sufficient strength, rigidity and free rotation or movement performance, it should also be easy to repair and replace. Anti-seismic measures should be considered in earthquake zones. It can transmit the support reaction force of the superstructure, including the vertical and horizontal forces caused by dead loads and live loads, and can ensure the self-deformation of the structure under the action of live loads, temperature changes, concrete shrinkage and creep, so that the actual force conditions of the upper and lower structures meet the specifications. Compared with bridge bearings, the installation of bridge bearings is also an extremely important link. As the saying goes, "three parts of production and seven parts of installation" reflects the importance of bearing installation. Good bearings require good installation technology. Only when the bridge bearings are installed well can the maximum effect of the bridge bearings be played and the bridge can be made safer and more stable.

[0003] At present, most bridge bearings are installed manually, and the bridge bearings are heavy and inconvenient to install. Taking the railway simply supported beam spherical bearing (TJQZ-2-2500-ZX-0.1g-i8) as an example, a single weight is about 174 kg, and the following problems often exist: First, the space between the lower part of the beam and the flat plate is small, requiring at least 2-3 workers to cooperate throughout the process, and it takes about 30 minutes to complete the installation, which is time-consuming and laborious; second, the bearing is not stable during installation, and the installation accuracy is poor, which easily leads to difficulty in bolting the upper seat plate of the bearing and the embedded plate at the lower part of the beam; third, the appearance of the bearing is easily damaged during the installation process. Utility Model Content

[0004] The utility model aims to solve the problems of the current bridge support installation process being time-consuming and labor-intensive, difficulty in connecting bolts, poor installation accuracy, and easy damage to the support appearance.

[0005] The utility model provides the following technical solutions: a simple installer for a bridge bearing, comprising a base track, a longitudinal movable trolley and a transverse movable trolley, the longitudinal movable trolley slides in a straight line on the base track, the longitudinal movable trolley is constructed with a movable track perpendicular to the base track, the transverse movable trolley is assembled on the movable track and slides in a straight line, and the transverse movable trolley is constructed with a bridge bearing supporting platform.

[0006] Furthermore, the base track includes two parallel first round steels, which serve as guides and supports for the track of the longitudinally movable trolley. The two first round steels are connected by a crossbeam; the longitudinally movable trolley is slidably mounted on the first round steels via a first groove wheel.

[0007] Furthermore, the longitudinal moving trolley includes a first frame, and two parallel second round steels are fixed on the top of the first frame. The two second round steels serve as guides and supports for moving tracks of the transverse moving trolley. The transverse moving trolley is slidably mounted on the second round steels through second groove wheels, and anti-slip limiters are provided at both ends of the second round steels.

[0008] Furthermore, the first frame includes two first channel steels and a first vehicle body, the two first channel steels are fixed at two ends of the first vehicle body, the first channel steels are buckled, and the first groove wheel is installed in the first channel steels.

[0009] Furthermore, the transversely movable trolley includes a second frame, the second frame includes two second channel steels and a second body, the two second channel steels are fixed at both ends of the second body, the second channel steel is buckled, the second groove wheel is installed in the second channel steel, and the top surface of the second channel steel and the second body are flush to form a bridge bearing support platform.

[0010] Compared with the prior art, the advantages of the present invention are:

[0011] The utility model provides a simple bridge bearing installer, which is simple to manufacture and consumes less materials. It can effectively control the installation accuracy of the bridge bearing, reduce the workload of workers, and avoid damage to the appearance of the bridge bearing. It improves the installation efficiency of the bridge bearing, and the installation and disassembly are convenient and quick, and has wide promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is the main view of the simple installer for bridge bearings;

[0013] Figure 2 It is a side view of the simple installer for bridge bearings;

[0014] Figure 3 This is a top view of the simple installer for bridge bearings.

[0015] In the figure: 1-base track; 1.1-first round steel; 1.2-crossbeam; 2-longitudinal moving trolley; 2.1-first groove wheel; 2.2-first frame; 2.3-second round steel; 2.4-anti-slip limiter; 3-lateral moving trolley; 3.1-second groove wheel; 3.2-second frame; 4-bridge bearing support platform. DETAILED DESCRIPTION

[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] like Figure 1 , Figure 2 , Figure 3 As shown: a simple installer for a bridge bearing, comprising a base rail 1, a longitudinal moving trolley 2 and a transverse moving trolley 3, the longitudinal moving trolley 2 slides in a straight line on the base rail 1, the longitudinal moving trolley 2 is constructed with a moving rail perpendicular to the base rail 1, the transverse moving trolley 3 is assembled on the moving rail and slides in a straight line, and the transverse moving trolley 3 is constructed with a bridge bearing supporting platform 4.

[0018] When installing the bridge bearing, place the base track 1 in advance to the middle position below the flatbed truck and the beam bearing installation position, place the longitudinal moving trolley 2 on the base track 1, and then place the transverse moving trolley 3 on the longitudinal moving trolley 2. Pad the sleepers on the bridge bearing support platform 4 according to the site height, place the bridge bearing on the sleepers, and adjust the bearing position by longitudinal pushing and transverse movement, so as to facilitate the bolt connection between the bearing and the embedded plate. The installer is simple to make, has less construction consumables, and is cost-effective, and has a wide range of promotion value.

[0019] The base track 1 includes two parallel first round steels 1.1, which serve as guides and supports for the longitudinally movable trolley 2. The two first round steels 1.1 are connected via a crossbeam 1.2; the longitudinally movable trolley 2 is slidably mounted on the first round steels 1.1 via a first groove wheel 2.1.

[0020] The longitudinal moving trolley 2 includes a first frame 2.2, and two parallel second round steels 2.3 are fixed on the top of the first frame 2.2. The two second round steels 2.3 serve as guides to support the moving tracks of the transverse moving trolley 3. The transverse moving trolley 3 is slidably installed on the second round steels 2.3 through second groove wheels 3.1. Anti-slip limiters 2.4 are provided at both ends of the second round steels 2.3 to prevent the transverse moving trolley 3 from sliding off the longitudinal moving trolley 2.

[0021] The first vehicle frame 2.2 comprises two first channel steels and a first vehicle body. The two first channel steels are fixed at two ends of the first vehicle body. The first channel steels are buckled, and the first sheave 2.1 is installed in the first channel steels.

[0022] The transversely movable trolley 3 includes a second frame 3.2, which includes two second channel steels and a second body. The two second channel steels are fixed at both ends of the second body. The second channel steel is buckled, and the second groove wheel 3.1 is installed in the second channel steel. The top surface of the second channel steel and the second body are flush to form a bridge bearing support platform 4.

[0023] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A simple bridge support installer, characterized in that: The invention comprises a base track (1), a longitudinal movable trolley (2) and a transverse movable trolley (3), wherein the longitudinal movable trolley (2) slides along a straight line on the base track (1), a movable track perpendicular to the base track (1) is constructed on the longitudinal movable trolley (2), the transverse movable trolley (3) is assembled on the movable track and slides along a straight line, and a bridge bearing support platform (4) is constructed on the transverse movable trolley (3).

2. A simple bridge support installer according to claim 1, characterized in that: The base track (1) comprises two parallel first round steels (1.1), the two first round steels (1.1) serving as tracks for guiding and supporting the longitudinally movable trolley (2), the two first round steels (1.1) being connected via a crossbeam (1.2); the longitudinally movable trolley (2) is slidably mounted on the first round steels (1.1) via a first groove wheel (2.1).

3. A simple bridge support installer according to claim 2, characterized in that: The longitudinal moving trolley (2) comprises a first frame (2.2), two parallel second round steels (2.3) are fixed on the top of the first frame (2.2), the two second round steels (2.3) serve as guides to support the moving tracks of the transverse moving trolley (3), the transverse moving trolley (3) is slidably mounted on the second round steels (2.3) via second groove wheels (3.1), and anti-slip limit stops (2.4) are provided at both ends of the second round steels (2.3).

4. The simple bridge support installer according to claim 3 is characterized in that: The first vehicle frame (2.2) comprises two first channel steels and a first vehicle body, the two first channel steels are fixed at two ends of the first vehicle body, the first channel steels are buckled, and the first grooved wheel (2.1) is installed in the first channel steels.

5. The simple bridge support installer according to claim 3 is characterized in that: The transversely movable trolley (3) comprises a second frame (3.2), the second frame (3.2) comprises two second channel steels and a second vehicle body, the two second channel steels are fixed at both ends of the second vehicle body, the second channel steels are buckled, the second groove wheel (3.1) is installed in the second channel steel, and the top surface of the second channel steel and the second vehicle body are flush, forming a bridge bearing support platform (4).