River impact-resistant dike device for water conservancy of Yellow River

By setting up stepped gravel layers, protective nets, concrete tiles and stainless steel pipes on the river embankment, combined with waterproof layers and drainage systems, the problem of insufficient impact resistance of existing river embankment is solved, and the stability and safety of the river embankment is improved. prevents the damage to farmland and infrastructure by river waves.

CN222065337UInactive Publication Date: 2024-11-26JINAN YELLOW RIVER RIVER AFFAIRS BUREAU QING YELLOW RIVER RIVER AFFAIRS BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420669697.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing river embankment device has insufficient impact resistance, and the surface of the gravel layer is too flat, which makes the river water easily impact the river embankment and cause damage.

Method used

A shock-resistant embankment device including river embankment, stepped gravel layer, protective net, concrete trough and stainless steel pipes was designed. By setting up waterproof layer, soil covering layer, drainage channel and drainage pipe, the resistance to erosion and resistance of river embankment is improved. Permeability, and through stainless steel pipes, prevent gravel from falling into the river, reducing stone loss.

Benefits of technology

It effectively improves the anti-shrinkage and permeability of the river embankment, reduces the impact of gravel shedding and seepage flow on the river embankment, reduces the damage to farmland and infrastructure by river waves, and enhances the stability and safety of the river embankment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065337U_ABST
    Figure CN222065337U_ABST
Patent Text Reader

Abstract

The utility model discloses a Yellow River water conservancy river anti-impact dike device, and relates to the technical field of dikes, the Yellow River water conservancy river anti-impact dike device comprises a river dike, a stepped gravel layer and a protective net, the river dike is provided with a waterproof layer, and the waterproof layer is provided with an overburden layer. The stepped gravel layer can improve the anti-scouring capacity of the river levee, so that the river levee is better protected, the stepped gravel layer is protected through the protective net, and the protective net is fixed to the overburden layer through the positioning rods, so that the gravel layer can be firmly fixed to the river levee, the stability of the stepped gravel layer is improved, and the probability that the gravel layer falls off from the river levee is reduced; the concrete piers and the stainless steel pipes are arranged, the stainless steel pipes are buried on the concrete piers at equal intervals so that broken stones rolling down from a river levee can be blocked, the probability that the broken stones fall into a river is reduced, and loss of stone materials in the using process is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dikes, in particular to an anti-scour dike device for the Yellow River water conservancy river. Background Art

[0002] Levees are an important part of the flood control system in the lower reaches of the Yellow River. The levees on both sides of the river restrain the water flow and constitute the main barrier to flood control in the lower reaches of the Yellow River, maintaining the safety of people's lives and property. They are also the main transportation channels for local people's production and life, and effectively promote the progress and development of local social economy. However, the Yellow River has also brought serious floods to the coastal areas due to its huge sediment load and frequent floods over the years. In order to cope with the floods of the Yellow River and protect the safety of coastal residents, it is crucial to implement effective levee measures.

[0003] At present, in order to improve the anti-scouring ability, most of the existing river embankments have a gravel layer on the river embankment to resist the impact of the river (as shown in the attached manual). Figure 4 However, most of the gravel layers are laid directly on the river embankment at an angle. Although this improves the embankment's ability to resist impact to a certain extent, the surface of the gravel layer is too flat, and the effect of eliminating the kinetic energy of the river water that hits the embankment is poor. The river water can easily hit the embankment or even go over the embankment to cause damage to the farmland and infrastructure outside the embankment. Utility Model Content

[0004] The purpose of the utility model is to provide a Yellow River water conservancy river anti-scour embankment device to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A Yellow River water conservancy river anti-scour embankment device comprises a river bank, a stepped gravel layer and a protective net, wherein a waterproof layer is arranged on the river bank, a covering soil layer is arranged on the waterproof layer, a stepped gravel layer is arranged on the covering soil layer, a protective net is covered on the stepped gravel layer, a positioning rod is fastened to the protective net on each step, the positioning rod passes through the stepped gravel layer and is inserted into the covering soil layer, a concrete pier is arranged at the bottom of the river bank, stainless steel pipes are buried on the concrete piers at equal intervals along the length of the river, a drainage channel is arranged on the top of the covering soil layer, a drainage pipe is connected to the bottom of the drainage channel, the bottom end of the drainage pipe is buried in the second stepped gravel layer from top to bottom, and the bottom end of the drainage pipe leaks out of the stepped gravel layer.

[0007] As a further solution of the utility model: a water-permeable board is laid on the drainage channel, and the four corners of the water-permeable board are positioned by four positioning screws.

[0008] As a further solution of the utility model: the thickness of the covering soil layer is 60-70cm.

[0009] As a further solution of the utility model: the distance between two adjacent stainless steel pipes is 20-25 cm, and the height of the stainless steel pipe exposed from the concrete pier is 30-40 cm.

[0010] As a further solution of the utility model: the waterproof layer is also stepped.

[0011] As a further solution of the utility model: the stainless steel pipe is filled with concrete filler.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The utility model provides a stepped gravel layer, a protective net and a positioning rod. The stepped gravel layer can improve the anti-scouring ability of the river bank, thereby better protecting the river bank. The stepped gravel layer is protected by the protective net, and the protective net is fixed to the covering layer by the positioning rod. In this way, the gravel layer can be firmly fixed on the river bank, thereby improving the stability of the stepped gravel layer and reducing the probability of the gravel layer falling off the river bank.

[0014] 2. The utility model can block the gravel rolling down from the river bank by setting concrete piers and stainless steel pipes, and burying a number of stainless steel pipes at equal intervals on the concrete piers, thereby reducing the probability of gravel falling into the river and reducing the loss of stone during use.

[0015] 3. The utility model sets up drainage channels and drainage pipes. The drainage channels are used to collect river water hitting the river bank, and then quickly discharge it through the drainage pipes to prevent river waves from crossing the river bank and causing damage to farmland or infrastructure outside the river bank.

[0016] 4. The utility model provides a waterproof layer, which can enhance the anti-penetration ability of the river bank and effectively reduce the uplift pressure of the infiltrating water flow on the river bank, thereby improving the safety of the river bank. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a first plane cutaway view of a Yellow River water conservancy river anti-scour embankment device.

[0018] Figure 2 It is a second plane cutaway view of a Yellow River water conservancy and river anti-scour embankment device.

[0019] Figure 3 It is a three-dimensional structural schematic diagram of a Yellow River water conservancy river anti-scour embankment device.

[0020] Figure 4 This is a physical picture of the existing river anti-scouring embankment.

[0021] 1. Riverbank; 2. Topsoil layer; 3. Waterproof layer; 4. Stepped gravel layer; 5. Protective net; 6. Positioning rod; 7. Concrete pier; 8. Stainless steel pipe; 9. Drainage ditch; 10. Drainage pipe; 11. Permeable board; 12. Concrete filler. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-2 In the embodiment of the utility model, a Yellow River water conservancy river anti-scour embankment device includes a river bank 1, a stepped gravel layer 4 and a protective net 5. A waterproof layer 3 is arranged on the river bank 1, and the waterproof layer 3 is provided with a covering layer 2. The thickness of the covering layer 2 is 60-70cm. The covering layer 2 needs to be compacted, and the waterproof layer 3 is also stepped. Such a design can facilitate the covering layer 2 to press the waterproof layer 3, thereby improving the firmness of the waterproof layer 3. The waterproof layer 3 is a PET waterproof coiled material. The waterproof layer 3 can enhance the anti-penetration ability of the river bank 1, effectively reduce the uplift pressure of the infiltrating water flow on the river bank 1, thereby improving the safety of the river bank 1.

[0024] See also Figure 1-3 A stepped gravel layer 4 is provided on the covering soil layer 2, and a protective net 5 is covered on the stepped gravel layer 4. A positioning rod 6 is fastened to the protective net 5 on each step, and the positioning rod 6 passes through the stepped gravel layer 4 and is inserted into the covering soil layer 2. The stepped gravel layer 4 can improve the pit scouring ability of the river bank 1, thereby better protecting the river bank 1. The stepped gravel layer 4 is protected by the protective net 5, and the protective net 5 is fixed to the covering soil layer 2 by the positioning rod 6. In this way, the gravel layer can be firmly fixed to the river bank 1, thereby improving the stability of the stepped gravel layer 4 and reducing the probability of gravel falling off the river bank 1.

[0025] See also Figure 1-3 A concrete pier 7 is arranged at the bottom of the river bank 1, and stainless steel pipes 8 are buried on the concrete pier 7 at equal intervals along the length of the river. The interval between two adjacent stainless steel pipes 8 is 20-25 cm, and the height of the stainless steel pipe 8 exposed from the concrete pier 7 is 30-40 cm. The arrangement of the stainless steel pipe 8 can block the gravel rolling down from the river bank 1 to prevent the gravel from falling into the river and causing stone loss. The stainless steel pipe 8 is filled with concrete filler 12, which can make the stainless steel pipe 8 stronger and not easily deformed by impact.

[0026] See also Figure 1-3 A drainage channel 9 is arranged on the top of the covering soil layer 2, and a drainage pipe 10 is connected to the bottom of the drainage channel 9. The bottom end of the drainage pipe 10 is buried in the second section of the stepped gravel layer 4 from top to bottom, and the bottom end of the drainage pipe 10 leaks out of the stepped gravel layer 4. A permeable board 11 is laid on the drainage channel 9. The four corners of the permeable board 11 are positioned by four positioning screws. Permeable holes are evenly opened on the surface of the permeable board 11. The drainage channel 9 is used to collect the river water that hits the river bank 1, and then quickly discharge it through the drainage pipe 10 to prevent the river waves from crossing the river bank 1 and causing damage to the farmland or infrastructure outside the river bank 1.

[0027] The working principle of the utility model is:

[0028] When in use, the stepped gravel layer 4 arranged on the outermost layer of the river bank 1 can block the river waves hitting the river bank 1, thereby protecting the safety of the river bank 1; at the same time, the river water that penetrates into the overburden layer 2 through the stepped gravel layer 4 will be blocked by the waterproof layer 3 buried between the overburden layer 2 and the river bank 1, thereby preventing the river water from further penetrating downward into the river bank 1 and causing damage to the structure of the river bank 1; when the water level rises and the river waves pass over the stepped gravel layer 4 and hit the top of the river bank 1, the drainage channel 9 arranged above the river bank 1 will intercept the river water, and the river water will be collected in the drainage channel 9 and then flow back into the river from the drainage pipe 10, thereby preventing water from accumulating on the river bank 1 or river waves from passing over the river bank 1 and causing damage to the farmland or infrastructure outside the river bank 1.

[0029] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A Yellow River water conservancy river anti-scour embankment device, comprising a river bank (1), a stepped gravel layer (4) and a protective net (5), characterized in that: The river bank (1) is provided with a waterproof layer (3), the waterproof layer (3) is provided with a covering soil layer (2), the covering soil layer (2) is provided with a stepped gravel layer (4), the stepped gravel layer (4) is covered with a protective net (5), each step of the protective net (5) is fastened with a positioning rod (6), the positioning rod (6) passes through the stepped gravel layer (4) and is inserted into the covering soil layer (2), a concrete pier (7) is provided at the bottom of the river bank (1), stainless steel pipes (8) are buried at equal intervals on the concrete pier (7) along the length of the river, a drainage channel (9) is provided at the top of the covering soil layer (2), the bottom of the drainage channel (9) is connected to a drainage pipe (10), the bottom end of the drainage pipe (10) is buried in the second stepped gravel layer (4) from top to bottom, and the bottom end of the drainage pipe (10) is discharged outside the stepped gravel layer (4).

2. The Yellow River water conservancy river anti-scour embankment device according to claim 1 is characterized by: A water-permeable plate (11) is laid on the drainage channel (9), and the four corners of the water-permeable plate (11) are positioned by four positioning screws.

3. The Yellow River water conservancy river anti-scour embankment device according to claim 1 is characterized by: The thickness of the covering soil layer (2) is 60-70 cm.

4. The Yellow River water conservancy river anti-scour embankment device according to claim 1 is characterized by: The distance between two adjacent stainless steel pipes (8) is 20-25 cm, and the height of the stainless steel pipe (8) exposed from the concrete pier (7) is 30-40 cm.

5. The Yellow River water conservancy river anti-scour embankment device according to claim 1 is characterized by: The waterproof layer (3) is also stepped.

6. The Yellow River water conservancy river anti-scour embankment device according to claim 1, characterized in that: The stainless steel pipe (8) is filled with concrete filler (12).