High bearing platform steel pipe column tower crane foundation

Through the design of the tower crane foundation of the high-bearing steel pipe column, the combination of drilled piles and steel pipe columns has solved the problem of difficult and long construction period of the traditional tower crane foundation, and achieved the early commissioning of the tower crane and the improvement of construction efficiency.

CN222065539UActive Publication Date: 2024-11-26CHINA GEZHOUBA GRP CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420020893.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-11-26
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

The construction of traditional tower crane foundations is difficult, has a long construction period and is costly. Especially under complex geology, it is difficult to meet the needs of early commissioning of tower cranes.

Method used

The tower crane foundation of the high-bearing steel pipe column is adopted. Through the combination of drilled piles and steel pipe columns, the steel pipe column is anchored in the drilled piles, passing through the basement base, passing through the floor slab in the middle, connecting the support stadium at the top, and passing through the support poles and water stop The sheet enhances structural stability and realizes the installation of the tower crane before earth excavation.

Benefits of technology

It significantly shortens the construction period, reduces construction difficulty and cost, improves the bearing capacity and stability of the tower crane foundation, and ensures the early entry of underground structures into use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065539U_ABST
    Figure CN222065539U_ABST
Patent Text Reader

Abstract

A high bearing platform steel pipe column tower crane foundation comprises a cast-in-situ bored pile, the lower portion of a steel pipe column is anchored in the cast-in-situ bored pile and penetrates through a basement bottom plate, the middle of the steel pipe column upwards penetrates through a basement floor or a basement top plate, and the top of the steel pipe column is connected with a bearing platform used for fixing a tower crane foundation section. A bearing platform supporting plate is welded to the position, located at the lower end of the bearing platform, of the steel pipe column and comprises an annular supporting plate, and batten plates are evenly welded to the lower end of the annular supporting plate in the circumferential direction. According to the high bearing platform steel pipe column tower crane foundation provided by the utility model, the operation efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a tower crane foundation, in particular to a high-cap steel pipe column tower crane foundation, which is suitable for deep foundation pit tower crane foundations in crushed stone soil, weathered soil, silty soil layers, and rock layers with complex geological conditions, many interlayers, uneven weathering, and large soft and hard changes. Background Art

[0002] When a basement is designed in the construction site and the tower crane is located in the basement foundation, it is of great significance to the basement and foundation pit support construction if the tower crane is put into use as soon as possible. The tower crane foundation structure must meet the performance and bearing capacity of the tower crane itself, and should try to meet the design requirements of simple structure and simple construction. The traditional flat-plate tower crane foundation and punched concrete pile foundation first excavate the earthwork of the tower crane foundation, and then place the tower crane foundation on the basement floor. The earthwork excavation is deep, the geology is complex, the construction risk is high, and the construction period is long. Summary of the invention

[0003] The technical problem to be solved by the utility model is to provide a high-cap steel pipe column tower crane foundation, the construction of which can be carried out simultaneously with the construction of the early stage engineering piles, without occupying the construction period, the tower crane installation can be completed before the earth excavation, the underground structure construction can be put into use in advance, and the construction period can be significantly shortened, thus solving the technical problems of the existing tower crane foundation construction being difficult, the construction period being long, and the cost being high.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0005] A high-cap steel pipe column tower crane foundation, comprising bored cast-in-place piles, the lower part of the steel pipe column is anchored in the bored cast-in-place piles and passes through the basement floor, the middle part of the steel pipe column passes upward through the basement floor or roof, and the top of the steel pipe column is connected to a cap for fixing the tower crane foundation section;

[0006] A cap support plate is welded on the steel pipe column at the lower end of the cap, and the cap support plate includes an annular support plate, and a gusset plate is uniformly welded on the lower end of the annular support plate in a circumferential direction.

[0007] The full weld of the support plate is hf≥8mm.

[0008] The steel pipe column is made of Q345, with a diameter of at least 530mm and a wall thickness of at least 10mm. The top of the steel pipe column is anchored into the base for at least 750mm.

[0009] The four steel pipe columns are welded to the steel cages of the four bored piles respectively, and the bottom of the steel pipe column is embedded in the bored piles by at least 3000mm.

[0010] A support rod is connected in the middle between adjacent steel pipe columns. The support rod includes a horizontal support, an oblique support and a horizontal scissor support connected between two opposite horizontal supports. The support rod is welded to the steel pipe column through a support rod gusset plate.

[0011] The support rod is made of 16# channel steel.

[0012] A plurality of steel bars are evenly arranged in a circumferential direction on the top of the steel pipe column, and the anchorage length thereof is at least 35d, where d is the diameter of the steel bar.

[0013] The steel pipe column is fully welded with water stop plates around the basement floor slab, and the steel pipe column is integrally cast at this location with the basement floor slab.

[0014] The cap is composed of top surface reinforcement, bottom surface reinforcement, tie bars and foundation concrete.

[0015] The utility model provides a high-cap steel pipe column tower crane foundation, which has the following technical effects:

[0016] 1) This device consists of bored cast-in-place piles and a concrete cap connected to the top of the steel pipe column. It mainly plays the role of receiving and transmitting. The upper load is transferred to the steel pipe column under the concrete cap through the concrete cap, and then the load is transferred to the pile foundation through the steel pipe column.

[0017] 2) By setting an annular support plate and a tie plate at the upper end of the steel pipe column and inserting the top of the steel pipe column into the pedestal for fixing, the high pedestal of the steel pipe column itself has the characteristics of high bearing capacity and small vertical settlement.

[0018] 3) The concrete cap is constructed on the ground surface, which reduces the difficulty of the overall construction. The tower crane is overall stable in terms of anti-overturning, the foundation cap is stable, the free end of the steel pipe column is overall stable, and the pile foundation is stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0020] Figure 1 It is the front view of the utility model.

[0021] Figure 2 This is the installation front view of the support plate of the middle support platform of the utility model.

[0022] Figure 3 It is a top view of the installation of the support plate of the middle support platform of the utility model.

[0023] Figure 4 It is a top view of the steel pipe column in the utility model located in the bored cast-in-place pile.

[0024] Figure 5 It is a schematic diagram of the connection between the steel pipe column and the support rod in the utility model.

[0025] Figure 6 It is a top view of the water stop sheet of the utility model.

[0026] Figure 7 It is the front view of the support platform in the utility model.

[0027] In the figure: bored cast-in-place piles 1, basement floor slab 2, water stop 3, steel pipe column 4, support rod 5, horizontal brace 5.1, diagonal brace 5.2, horizontal scissors brace 5.3, basement top slab 6, tie plate 7, support rod tie plate 7.1, annular support plate 8, pedestal 9, face reinforcement 9.1, bottom reinforcement 9.2, tie reinforcement 9.3, foundation concrete 9.4, annular anchor reinforcement 10, tower crane embedded parts 11, tower crane foundation section 12. DETAILED DESCRIPTION

[0028] like Figure 1-2 As shown, a high cap steel pipe column tower crane foundation includes bored cast-in-place piles 1, and there are four bored cast-in-place piles 1 as foundation piles. The bored cast-in-place piles 1 and the cap 9 are connected by four steel pipe columns 4. The lower part of the steel pipe column 4 is anchored in the bored cast-in-place pile 1 and passes through the basement floor 2. The middle part of the steel pipe column 4 passes upward through the basement floor or top plate 6, and the top of the steel pipe column 4 is connected to the cap 9 for fixing the tower crane foundation section.

[0029] The steel pipe column 4 is welded with a cap support plate at the lower end of the cap 9, and the cap support plate includes an annular support plate 8, and a gusset plate 7 is evenly welded to the lower end of the annular support plate 8. The cap support plate increases the load-bearing surface of the steel pipe column and stabilizes the whole.

[0030] The full weld hf of the cap support plate is ≥8mm. If the weld hf is less than 8mm, it will affect the anti-shear bearing capacity of the concrete cap.

[0031] The steel pipe column 4 is made of Q345, with a diameter of at least 530 mm and a wall thickness of at least 10 mm. The top of the steel pipe column 4 is anchored at least 750 mm into the cap 9. If the length of the steel pipe column 4 extending into the cap 9 is less than the design value of 750 mm, the overall stability of the free end of the steel pipe column will be affected.

[0032] Four steel pipe columns 4 are welded to the steel cages of four bored piles 1 respectively, and the bottom of the steel pipe column 4 is embedded in the bored pile 1 by at least 3000mm to ensure that the bottom of the steel pipe column has a sufficient and safe embedding length to ensure the stability of the foundation cap.

[0033] A support rod 5 is connected between adjacent steel pipe columns 4, and the support rod 5 includes a horizontal support 5.1, an oblique support 5.2, and a horizontal scissor support 5.3 connected between two opposite horizontal supports 5.1; the support rod 5 is welded to the steel pipe column 4 through a support rod gusset plate 7.1. The benefit of the support rod 5 is to prevent the tower crane from generating a large bending moment due to uneven force during the rotation process, which further affects the anti-overturning stability.

[0034] The support rod 5 is made of 16# channel steel.

[0035] Six HRB400Ф25 steel bars 10 are evenly arranged in the annular direction on the top of the steel pipe column 4, with a welding length of 10d, a weld height of 8mm, and an anchoring length of at least 35d (d is the diameter of the steel bar). The benefit of setting the steel bars 10 is to increase the bond strength and friction between the steel pipe column and the concrete, ensuring that the steel pipe column and the concrete cap are connected as a whole.

[0036] The steel pipe column 4 is fully welded with a water stop 3 around the basement floor 2. The water stop 3 is a 12mm thick steel plate. The steel pipe column 4 is integrally cast with the basement floor 2 at this location. The function of the water stop 3 is to prevent leakage from the basement floor, which affects the use function of the structure.

[0037] The cap 9 is composed of top reinforcement 9.1, bottom reinforcement 9.2, tie bars 9.3 and foundation concrete 9.4.

Claims

1. A high cap steel pipe column tower crane foundation, characterized in that: It comprises a bored cast-in-place pile (1), the lower part of a steel pipe column (4) is anchored in the bored cast-in-place pile (1) and passes through the basement floor (2), the middle part of the steel pipe column (4) passes upward through the basement floor or top plate (6), and the top of the steel pipe column (4) is connected to a cap (9) for fixing a tower crane foundation section; A cap support plate is welded to the lower end of the cap (9) on the steel pipe column (4), the cap support plate comprising an annular support plate (8), and a gusset plate (7) is uniformly welded to the lower end of the annular support plate (8) in the circumferential direction.

2. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: The full weld of the support plate is hf≥8mm.

3. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: The steel pipe column (4) is made of Q345, has a diameter of at least 530 mm, a wall thickness of at least 10 mm, and the top of the steel pipe column (4) is anchored into the cap (9) for at least 750 mm.

4. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: The four steel pipe columns (4) are respectively welded to the steel cages of the four bored cast-in-place piles (1), and the bottom of the steel pipe column (4) is embedded in the bored cast-in-place piles (1) by at least 3000 mm.

5. The high cap steel pipe column tower crane foundation according to claim 4, characterized in that: A support rod (5) is connected in the middle between adjacent steel pipe columns (4), and the support rod (5) comprises a horizontal brace (5.1), an oblique brace (5.2), and a horizontal scissor brace (5.3) connected between two opposite horizontal braces (5.1); the support rod (5) is welded to the steel pipe column (4) via a support rod gusset plate (7.1).

6. The high cap steel pipe column tower crane foundation according to claim 5, characterized in that: The support rod (5) is made of 16# channel steel.

7. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: A plurality of steel bars (10) are evenly arranged in a circumferential direction at the top of the steel pipe column (4), and their anchorage length is at least 35d, where d is the diameter of the steel bar.

8. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: The steel pipe column (4) is fully welded with water stop plates (3) at the periphery of the place where it passes through the basement floor slab (2), and the steel pipe column (4) is integrally cast at this place with the basement floor slab (2).

9. The high cap steel pipe column tower crane foundation according to claim 1, characterized in that: The cap (9) is composed of top surface reinforcement (9.1), bottom surface reinforcement (9.2), tie bars (9.3) and foundation concrete (9.4).