Flexible connecting structure of steel structure gallery bridge
By designing the soft connection structure of the steel structure corridor bridge, and using the combination of sliding bolts and guide grooves, the external inclination problem of elevators in old communities is solved, the safety of the stair structure is protected, and construction risks and costs are reduced.
Patent Information
- Application Number
- CN202420622954.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-28
AI Technical Summary
When installing elevators in old communities, the elevator was not reserved for the building, which caused the elevator to be external and tilted due to environmental factors, which affected the safety of the stair structure. The construction time of the existing steel structure bridge was long, costly and safety risks.
Design a flexible connecting structure of steel structure bridge. Through the support structure and connection structure, including steel frame, movable connecting plate, guide components and carrier, bolts slide on the inner wall of the guide groove to avoid the elevator tilting directly pulling the bridge, protecting Stair structure stability.
Effectively prevent the elevator from pulling the corridor bridge when it slightly tilts, protecting the stability of the stair structure, and fixing the elevator and the corridor bridge through the connecting structure, judging the elevator inclination angle, and reducing construction risks and costs.
Smart Images

Figure CN222065753U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of elevator gallery bridges, in particular to a soft connection structure of a steel structure gallery bridge. Background Art
[0002] At present, for the installation of elevators in old communities, since the existing buildings generally do not have space reserved for elevator shafts, and considering fire protection, lighting, structural safety and other reasons, the location for installing elevators is usually chosen on the open space near the building and connected to the original stairs of the building through a corridor bridge.
[0003] For example, a Chinese utility model patent (CN218815416U) discloses a steel structure corridor bridge, which records: "The steel structure corridor bridge described in the utility model is entirely made of steel structure. Even if it is prefabricated in a factory, if its size cannot meet the on-site design requirements, the construction personnel can adjust the size of the steel structure corridor bridge according to the design requirements, for example, cutting the main beams of the corridor bridge or increasing the number of main beams of the corridor bridge, so that the length of the steel structure corridor bridge meets the actual on-site construction needs." It also records: "This type of corridor bridge generally transports steel, steel plates and other materials to the site, sets up scaffolding, and then welds them. After welding, anti-rust paint is applied, and the construction personnel use electric welding equipment to fix the corridor bridge. This method will result in a long construction time, high cost, and great environmental pollution. In addition, there are safety risks in the current installation." Technical problems.
[0004] In summary, the above-mentioned device still has the following technical problems: when renovating elevators in old communities, the elevators are generally placed externally and connected to the building through a corridor. At present, external elevators may tilt due to environmental factors and other factors when in use. Although the tilt angle is within the allowable range, the corridor is fixedly connected to the building and the elevator, the tilt of the elevator will pull the stairs, which will have a certain impact on the structural safety of the stairs. For this reason, it is necessary to propose a steel structure corridor with a soft connection structure to provide a new technical solution to solve the technical problems mentioned in the above patent. Utility Model Content
[0005] Based on this, it is necessary to provide a soft connection structure for a steel structure corridor bridge to address the above-mentioned technical problems. By setting a supporting structure, when the elevator is tilted due to external factors, the bolts can slide on the inner wall of the guide groove through the soft connection between the bearing member and the steel frame. As a result, the corridor bridge will not be directly pulled after the elevator is slightly tilted, thereby protecting the structural stability of the stairs.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A soft connection structure of a steel structure corridor bridge, which is applied to a soft connection structure of an external elevator.
[0008] The steel structure corridor soft connection structure specifically includes a building, an elevator and a corridor, and is characterized in that it also includes a support structure and a connection structure, the two ends of the corridor are respectively connected to the elevator and the building, the middle of the building and the elevator are connected to the corridor through the connection structure, and the surface of the building and the elevator is connected with a support structure for supporting the corridor;
[0009] The supporting structure comprises a steel frame, an active connection plate, a guide assembly and a supporting assembly; the bottom surface of the corridor bridge is fixedly connected to the steel frame; the middle part of the corridor bridge is fixedly connected to the active connection plate; and one end of the active connection plate away from the corridor bridge is movably connected to the middle part of the elevator.
[0010] As a preferred embodiment of the soft connection structure of the steel structure corridor provided by the utility model, the supporting assembly includes an angle steel and a bearing member, the angle steel is fixedly connected to the surface of the elevator, the middle part of the angle steel is fixedly connected with the bearing member, and the top surface of the bearing member is in contact with the bottom surface of the steel frame.
[0011] As a preferred embodiment of the soft connection structure of the steel structure corridor provided by the utility model, the guide assembly includes a guide groove and a bolt, the surface of the bearing member is symmetrically provided with guide grooves, the bearing member is threadedly connected to the steel frame by bolts, and the bolts are slidably connected to the inner wall of the guide groove.
[0012] As a preferred embodiment of the soft connection structure of the steel structure corridor provided by the utility model, the connection structure includes a first fixing member, a first connecting member, a first through groove, a second fixing member, a second connecting member, a second through groove and a connecting assembly, the surface of the corridor is fixedly connected with the first fixing member, the middle part of the first fixing member is rotatably connected with the first connecting member, the surface of the first connecting member is provided with a first through groove, the middle part of the elevator is fixedly connected with the second fixing member, the middle part of the second fixing member is rotatably connected with the second connecting member, and the surface of the second connecting member is provided with a second through groove.
[0013] As a preferred embodiment of the soft connection structure of the steel structure corridor provided by the utility model, the connection assembly includes a sleeve and a plug rod, the second through slot and the extended end of the first through slot are slidably connected with a sleeve, and two plug rods are fixedly connected to the middle part of the sleeve, and the two plug rods are respectively slidably connected to the inner walls of the first through slot and the second through slot.
[0014] As a preferred embodiment of the soft connection structure of the steel structure corridor provided by the utility model, a soft rubber sleeve is fixedly connected to the surface of the elevator, and one end of the soft rubber sleeve away from the elevator is fixedly connected to the surface of the corridor.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] The soft connection structure of the steel structure corridor bridge provided by the utility model is provided with a supporting structure. When the elevator is tilted due to external factors, the bolts can slide on the inner wall of the guide groove through the soft connection between the bearing member and the steel frame. Therefore, the corridor bridge will not be directly pulled after a slight tilt of the elevator, thereby protecting the structural stability of the stairs.
[0017] The utility model provides a soft connection structure for a steel structure corridor bridge. By setting the connection structure, after the elevator body tilts, the connection structure set between the corridor bridge and the middle part of the elevator can assist in fixing the elevator and the corridor bridge. At the same time, when the elevator tilts, the tilt angle of the elevator can be determined by observing the distance between the sleeve and the middle parts of the first through groove and the second through groove. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the scheme in the utility model, a brief introduction is given below to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 The overall structural diagram of the soft connection structure of the steel structure covered bridge provided by the utility model;
[0020] Figure 2 A schematic diagram of the structure inside the steel structure covered bridge with a flexible connection structure provided by the utility model;
[0021] Figure 3 The utility model provides a soft connection structure of a steel structure covered bridge Figure 2 A schematic diagram of the enlarged structure at A in the middle;
[0022] Figure 4 A structural schematic diagram of the soft connection structure support structure of the steel structure covered bridge provided by the utility model;
[0023] Figure 5 The utility model provides a structural schematic diagram of the connection structure of the steel structure corridor bridge soft connection structure.
[0024] The markings in the figure are as follows:
[0025] 1. Building; 2. Elevator; 3. Corridor; 4. Support structure; 5. Connection structure; 6. Steel frame; 7. Bolts; 8. Bearing member; 9. Guide groove; 10. Angle steel; 11. First fixing member; 12. First connecting member; 13. First through groove; 14. Second fixing member; 15. Second connecting member; 16. Second through groove; 17. Casing; 18. Insert rod; 19. Soft rubber sleeve; 20. Movable connecting plate. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.
[0027] As described in the background technology, elevators in old communities are generally renovated by placing them externally and connecting them to the building through a corridor. Currently, external elevators may tilt due to environmental factors and other factors when in use. Although the tilt angle is within the allowable range, the corridor is fixedly connected to the building and the elevator, the tilt of the elevator will pull the stairs, which will have a certain impact on the structural safety of the stairs.
[0028] In order to solve this technical problem, the utility model provides a steel structure corridor flexible connection structure, which is applied to the external elevator flexible connection structure.
[0029] Specifically, please refer to Figure 1-Figure 5 The steel structure corridor soft connection structure specifically includes a building 1, an elevator 2 and a corridor 3, and is characterized in that it also includes a support structure 4 and a connection structure 5, the two ends of the corridor 3 are respectively connected to the elevator 2 and the building 1, the middle of the building 1 and the elevator 2 are connected to the corridor 3 through the connection structure 5, and the surfaces of the building 1 and the elevator 2 are connected with a support structure 4 for supporting the corridor 3;
[0030] The supporting structure 4 includes a steel frame 6, a movable connecting plate 20, a guide assembly and a supporting assembly. The bottom surface of the corridor bridge 3 is fixedly connected to the steel frame 6, the middle part of the corridor bridge 3 is fixedly connected to the movable connecting plate 20, and the end of the movable connecting plate 20 away from the corridor bridge 3 is movably connected to the middle part of the elevator 2.
[0031] The soft connection structure of the steel structure corridor bridge provided by the utility model is provided with a supporting structure 4. When the elevator is tilted due to external factors, the bolts 7 can slide on the inner wall of the guide groove 9 through the soft connection between the bearing member 8 and the steel frame 6. Therefore, the corridor bridge 3 will not be directly pulled after a slight tilt of the elevator, thereby protecting the structural stability of the stairs.
[0032] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings.
[0033] Embodiment 1:
[0034] Please refer to Figure 1-Figure 4A steel structure corridor soft connection structure, comprising a building 1, an elevator 2 and a corridor 3, characterized in that it also comprises a support structure 4 and a connection structure 5, the two ends of the corridor 3 are respectively connected to the elevator 2 and the building 1, the middle of the building 1 and the elevator 2 are connected to the corridor 3 through the connection structure 5, and the surfaces of the building 1 and the elevator 2 are connected to the support structure 4 for supporting the corridor 3;
[0035] The supporting structure 4 includes a steel frame 6, a movable connecting plate 20, a guide assembly and a supporting assembly. The bottom surface of the corridor bridge 3 is fixedly connected to the steel frame 6, the middle part of the corridor bridge 3 is fixedly connected to the movable connecting plate 20, and the end of the movable connecting plate 20 away from the corridor bridge 3 is movably connected to the middle part of the elevator 2.
[0036] Specifically, the support assembly includes an angle steel 10 and a bearing member 8 . The angle steel 10 is fixedly connected to the surface of the elevator 2 . The middle part of the angle steel 10 is fixedly connected to the bearing member 8 . The top surface of the bearing member 8 is in contact with the bottom surface of the steel frame 6 .
[0037] Specifically, the guide assembly includes a guide groove 9 and a bolt 7 . The guide groove 9 is symmetrically provided on the surface of the bearing member 8 . The bearing member 8 is threadedly connected to the steel frame 6 through the bolt 7 , and the bolt 7 is slidably connected to the inner wall of the guide groove 9 .
[0038] Through the above structural design, when the elevator 2 tilts, since the bearing member 8 is fixedly connected to the elevator 2 through the angle steel 10, the elevator 2 will pull the bearing member 8 to move after it tilts. Since the steel frame 6 and the bearing member 8 are connected by bolts 7, and the bolts 7 are slidably connected to the inner wall of the guide groove 9, when the elevator 2 tilts, it will not directly pull the corridor bridge 3, thereby ensuring the structural stability of the building 1 and the elevator 2.
[0039] Embodiment 2:
[0040] The soft connection structure of the steel structure covered bridge provided in Example 1 is further optimized. Specifically, Figure 2-Figure 5 As shown, the connection structure 5 includes a first fixing member 11, a first connecting member 12, a first through groove 13, a second fixing member 14, a second connecting member 15, a second through groove 16 and a connecting assembly. The first fixing member 11 is fixedly connected to the surface of the corridor bridge 3, the middle part of the first fixing member 11 is rotatably connected to the first connecting member 12, the surface of the first connecting member 12 is provided with a first through groove 13, the middle part of the elevator 2 is fixedly connected to the second fixing member 14, the middle part of the second fixing member 14 is rotatably connected to the second connecting member 15, and the surface of the second connecting member 15 is provided with a second through groove 16.
[0041] Specifically, the connecting assembly includes a sleeve 17 and an insertion rod 18. The second through groove 16 and the extended end of the first through groove 13 are slidably connected with the sleeve 17. The middle part of the sleeve 17 is fixedly connected with two insertion rods 18. The two insertion rods 18 are slidably connected to the inner walls of the first through groove 13 and the second through groove 16 respectively.
[0042] Specifically, a soft rubber sleeve 19 is fixedly connected to the surface of the elevator 2 , and one end of the soft rubber sleeve 19 away from the elevator 2 is fixedly connected to the surface of the gallery 3 .
[0043] With the above structural design, when the elevator 2 tilts, since the second fixing member 14 is fixedly connected to the elevator 2, the second fixing member 14 slides outward in the middle of the sleeve 17 through the second connecting member 15 and the second through groove 16. If the tilt angle is large, the elevator 2 can be supported by the insertion rod 18 in the middle of the sleeve 17 in cooperation with the first through groove 13 and the second through groove 16, so that the elevator 2 will not directly tip over.
Claims
1. A steel structure corridor bridge flexible connection structure, comprising a building (1), an elevator (2) and a corridor bridge (3), characterized in that: It also comprises a supporting structure (4) and a connecting structure (5), wherein the two ends of the corridor bridge (3) are respectively connected to the elevator (2) and the building (1), the middle parts of the building (1) and the elevator (2) are connected to the corridor bridge (3) via the connecting structure (5), and the surfaces of the building (1) and the elevator (2) are connected to a supporting structure (4) for supporting the corridor bridge (3); The support structure (4) comprises a steel frame (6), a movable connecting plate (20), a guide assembly and a support assembly; the bottom surface of the gallery bridge (3) is fixedly connected to the steel frame (6); the middle part of the gallery bridge (3) is fixedly connected to the movable connecting plate (20); and one end of the movable connecting plate (20) away from the gallery bridge (3) is movably connected to the middle part of the elevator (2).
2. The flexible connection structure of the steel structure covered bridge according to claim 1 is characterized in that: The support assembly comprises an angle steel (10) and a bearing member (8), wherein the angle steel (10) is fixedly connected to the surface of the elevator (2), the middle part of the angle steel (10) is fixedly connected to the bearing member (8), and the top surface of the bearing member (8) is in contact with the bottom surface of the steel frame (6).
3. The flexible connection structure of the steel structure covered bridge according to claim 2 is characterized in that: The guide assembly comprises a guide groove (9) and a bolt (7); the guide groove (9) is symmetrically provided on the surface of the bearing member (8); the bearing member (8) is threadedly connected to the steel frame (6) through the bolt (7), and the bolt (7) is slidably connected to the inner wall of the guide groove (9).
4. The flexible connection structure of the steel structure covered bridge according to claim 3 is characterized in that: The connection structure (5) comprises a first fixing member (11), a first connecting member (12), a first through groove (13), a second fixing member (14), a second connecting member (15), a second through groove (16) and a connection assembly; the first fixing member (11) is fixedly connected to the surface of the corridor bridge (3); the first connecting member (12) is rotatably connected to the middle of the first fixing member (11); the first through groove (13) is provided on the surface of the first connecting member (12); the second fixing member (14) is fixedly connected to the middle of the elevator (2); the second connecting member (15) is rotatably connected to the middle of the second fixing member (14); the second through groove (16) is provided on the surface of the second connecting member (15).
5. The flexible connection structure of the steel structure covered bridge according to claim 4 is characterized in that: The connection assembly comprises a sleeve (17) and an insertion rod (18); the second through groove (16) and the extended end of the first through groove (13) are slidably connected with the sleeve (17); the middle part of the sleeve (17) is fixedly connected with two insertion rods (18); the two insertion rods (18) are slidably connected to the inner walls of the first through groove (13) and the second through groove (16), respectively.
6. The flexible connection structure of the steel structure covered bridge according to claim 5 is characterized in that: A soft rubber sleeve (19) is fixedly connected to the surface of the elevator (2), and one end of the soft rubber sleeve (19) away from the elevator (2) is fixedly connected to the surface of the gallery bridge (3).