Closed reinjection system for water in oil and gas fields

By using sealed structures and inert gas-filled membrane bags in the oil and gas field water treatment systems, the closed circulation of gas in the oil and gas field pools is achieved, solving the problems of environmental pollution and safety hazards, saving costs and improving the system Environmental protection and safety.

CN222066706UActive Publication Date: 2024-11-26PETROCHINA CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323661382.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

In the existing oil and natural gas mining, the treatment methods of oil and gas field water pose environmental pollution and safety risks, and the closed treatment methods require supplementing natural gas or inert gas to balance pressure, which increases costs and energy consumption.

Method used

A closed return injection system for oil and gas fields is designed, and a clean water tank, membrane bag and gas field pool with sealed structure is connected and filled with inert gas through pipelines. The water transfer pump and return pump are used to achieve mutual conversion of gases, balance pressure, and avoid Replenishment needs for natural gas and inert gases.

Benefits of technology

The closed circulation of gas in oil and gas fields is achieved, which prevents harmful gas emissions and explosion hazards, saves pipeline laying and gas production costs, and ensures the safety and environmental protection of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066706U_ABST
    Figure CN222066706U_ABST
Patent Text Reader

Abstract

The utility model discloses an oil and gas field water closed reinjection system which comprises a clean water tank, a gas field water pool, a film bag, a water transfer pump and a reinjection pump, the clean water tank, the film bag and the gas field water pool are all of a sealed structure, the film bag is connected with the clean water tank and the gas field water pool through a pipeline, and inert gas is filled in the film bag. A water inlet pipe and a water outlet pipe of the water transfer pump are respectively connected with the gas field water tank and the clean water tank, and a water inlet pipe and a water outlet pipe of the reinjection pump are respectively connected with the clean water tank and the reinjection well. The device has the advantages that mutual conversion and circulating operation of gas in oil and gas field pools and gas in the film bag and the clean water tank are achieved, pressure balance inside and outside the closed gas field pools is achieved, natural gas and inert gas do not need to be supplemented for pressure balance, and a large amount of pipeline laying cost and inert gas production cost can be saved. The oil and gas field water reinjection system is isolated from the atmosphere, air is prevented from entering the water pool, and gas in the water pool is also prevented from entering the atmospheric environment to cause pollution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil and natural gas exploitation, in particular to a closed water reinjection system for oil and gas fields. Background Art

[0002] Most of the formation water reinjection treatment in my country's oil and gas industry adopts an open treatment method, which has the following problems: 1. Toxic and harmful gases overflowing from oil and gas field water are directly discharged into the atmosphere, causing environmental pollution. 2. External air enters the oil and gas field water pool and may form an explosive mixture with the flammable gas in the oil and gas field water pool, causing explosion and other unsafe hidden dangers. 3. There is no effective research on the amount of gas overflowed from oil and gas field water under atmospheric pressure.

[0003] At present, the closed treatment method adopts the technology of closed reinjection of formation water in steel tanks. The technology of closed reinjection of formation water in steel tanks has the following problems: 1. It is necessary to circulate and supplement natural gas or inert gas in the steel tank to achieve gas pressure balance in the tank and ensure the normal reinjection of oil and gas field water. Therefore, it is necessary to lay natural gas pipelines and add inert gas filling devices, which requires the circulation of natural gas and inert gas, and the equipment cost and the cost of supplementary gas increase. 2. It increases the amount of natural gas and toxic and harmful gases discharged into the atmosphere, which is not conducive to environmental protection and energy conservation and emission reduction. Summary of the invention

[0004] The utility model aims to provide a closed water reinjection system for oil and gas fields, which does not need to supplement natural gas and inert gas to balance the pressure, and can save a lot of pipeline laying costs and inert gas production costs.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme.

[0006] A closed reinjection system for oil and gas field water comprises a clean water tank, a gas field water pool, a membrane bag, a water transfer pump and a reinjection pump. The clean water tank, the membrane bag and the gas field water pool all adopt a sealed structure. The membrane bag is connected to the clean water tank and the gas field water pool through a pipeline. The membrane bag is filled with an inert gas. The water inlet pipe and the water outlet pipe of the water transfer pump are respectively connected to the gas field water pool and the clean water tank. The water inlet pipe and the water outlet pipe of the reinjection pump are respectively connected to the clean water tank and the reinjection well.

[0007] The utility model adopting the above scheme prevents harmful gases overflowing from the gas field water pool from entering the ambient air by adopting a sealing structure for the clean water tank, the membrane bag and the gas field water pool, and also prevents ambient air from entering the gas field water pool and causing an explosion. The membrane bag is also connected to the clean water tank and the gas field water pool through a pipeline. The membrane bag is filled with inert gas, so that the top of the clean water tank and the top of the gas field water pool are in contact with the inert gas. When the water transfer pump transfers the water in the gas field water pool to the clean water tank, the gas in the clean water tank enters the gas field water pool to balance the pressure in the gas field water pool. When the reinjection pump transfers the water in the clean water tank to the reinjection well, the atmospheric pressure squeezes the membrane bag, and the inert gas in the membrane bag flows into the clean water tank to supplement the air pressure and balance the pressure in the clean water tank. When water is injected into the gas field water pool, the gas in the gas field water pool enters the membrane bag. In this way, the gas in the oil and gas field water pools and the gas in the membrane bag and the clean water tank are converted into each other and circulated, so that the oil and gas field water reinjection system is isolated from the atmosphere, air is prevented from entering the water pool, and gas in the water pool is prevented from entering the atmospheric environment to cause pollution, and a large amount of pipeline laying costs and inert gas production costs can be saved.

[0008] Preferably, a clean water tank connecting pipe controlling a battery valve is installed on the pipeline connecting the clean water tank and the gas field water tank.

[0009] In this way, a clean water tank connecting pipe control battery valve is installed on the pipeline connecting the clean water tank and the gas field water tank. The clean water tank connecting pipe control battery valve is opened and closed to control the pipeline connection between the clean water tank and the gas field water tank.

[0010] Preferably, a membrane bag connecting pipe controlling solenoid valve is connected to one end of the membrane bag near the membrane bag of the pipeline connecting the membrane bag to the clean water tank and the gas field water pool.

[0011] In this way, it is convenient to control the on and off of the solenoid valve by controlling the membrane bag connecting pipe, control the on and off of the pipeline connecting the membrane bag to the clean water tank and the gas field water pool, and then control the membrane bag air pressure to prevent the membrane bag pressure from being too high and ensure that the gas in the gas field water pool leaks out when the membrane bag is replaced and repaired.

[0012] Preferably, water purification materials are arranged in the clean water tank, a clean water tank level gauge is sealed and installed in the clean water tank, and the clean water tank level gauge is electrically connected to the control terminal.

[0013] In this way, by arranging water purification materials in the clean water tank, the water entering the clean water tank from the gas field water pool is purified into clean water, and a clean water pool liquid level gauge is sealed and installed in the clean water tank, so that the water level in the clean water tank can be measured by the liquid level gauge, and the real-time data can be transmitted to the control terminal. The water level in the clean water tank can be controlled by the control terminal to prevent the water level from exceeding the maximum water level and falling below the minimum water level.

[0014] Preferably, a gas field water pool level gauge is sealed and installed in the gas field water pool, and the gas field water pool level gauge is electrically connected to the control terminal.

[0015] In this way, a clear water tank level gauge is sealed and installed in the gas field water pool, which is convenient for measuring the water level in the gas field water pool through the level gauge and transmitting real-time data to the control terminal. The water level in the gas field water pool is controlled by the control terminal to prevent the water level from exceeding the maximum water level and falling below the minimum water level.

[0016] Preferably, it also includes a water inlet pipeline, through which the water in the single well station is sent into the gas field water pool.

[0017] By setting up a water inlet pipeline and cooperating with a water pump, it is convenient to send the water produced in the single well station where gas is being produced into the gas field water pool.

[0018] Preferably, the top of the gas field water pool is also connected in sequence to a water pool gas control solenoid valve and a harmful gas treatment device through a connecting pipe.

[0019] By sequentially connecting a water pool gas control solenoid valve and a harmful gas treatment device at the top of the gas field water pool, when the membrane bag reaches the maximum volume and the liquid levels of the gas field water pool and the clean water tank are at the lowest value, the control terminal determines through calculation that the gas in the water pool has reached the maximum volume, and then the control terminal sends a valve opening command to the water pool gas control solenoid valve to transport the gas in the water pool to the treatment device through a pipeline for harmless treatment, and controls the closing of the pipeline through the water pool gas control solenoid valve. Under the condition of the same volume of the membrane bag, the cumulative water inflow into the gas field water pool and the change in the effective liquid level of the water pool are calculated by a computer, and the amount of gas overflowed from a unit volume of oil and gas field water under atmospheric pressure can be calculated, and used as research data on the changing law of the amount of gas overflowed from oil and gas field water.

[0020] Preferably, an explosion-proof contact switch is designed on the inner side of the membrane bag tank, and the explosion-proof contact switch serves as a backup circuit switch for forcibly opening the reinjection pump.

[0021] In this way, by designing an explosion-proof contact switch on the inside of the membrane bag tank, when the volume of the membrane bag increases to the maximum value, the membrane bag touches the explosion-proof contact switch, and the explosion-proof contact switch starts the reinjection pump to inject the water in the clean water tank into the reinjection well.

[0022] Preferably, it also includes a membrane bag mounting tank, the top of which is formed with an opening, the opening constituting an exhaust port, a mounting ring is connected to the side wall of the exhaust port, the membrane bag is connected to the mounting ring, a shielding shed is installed above the exhaust port, and a vent is formed at the bottom of the membrane bag mounting tank.

[0023] In this way, the membrane bag is further protected by providing a membrane bag installation tank to protect the membrane bag, providing a mounting ring to install the membrane bag, and providing an exhaust port and a vent on the membrane bag installation tank.

[0024] Preferably, the clean water tank connecting pipe controlling the battery valve, the membrane bag connecting pipe controlling the solenoid valve, the water transfer pump and the reinjection pump are all electrically connected to the control terminal.

[0025] In this way, by electrically connecting the clean water tank connecting pipe controlling the battery valve, the membrane bag connecting pipe controlling the solenoid valve, the water transfer pump and the reinjection pump to the control terminal, it is convenient to control the clean water tank connecting pipe controlling the battery valve, the membrane bag connecting pipe controlling the solenoid valve, the water transfer pump and the reinjection pump to open and close through the control terminal.

[0026] The beneficial effect of the utility model is that the clean water tank, the membrane bag and the gas field water pool are all sealed to prevent harmful gases overflowing from the gas field water pool from entering the ambient air, and also prevent ambient air from entering the gas field water pool to cause an explosion. The membrane bag is also connected to the clean water tank and the gas field pool through a pipeline. The membrane bag is filled with inert gas, so that the top of the clean water tank and the top of the gas field pool are in contact with the inert gas. When the water transfer pump transfers the water in the gas field pool to the clean water tank, the gas in the clean water tank enters the gas field pool to balance the pressure in the gas field pool. When the reinjection pump transfers the water in the clean water tank to the reinjection well, the atmospheric pressure squeezes the membrane bag, and the inert gas in the membrane bag flows into the clean water tank to supplement the air pressure and balance the pressure in the clean water tank. When water is injected into the gas field pool, the gas in the gas field pool enters the membrane bag, thereby realizing the mutual conversion between the gas in the oil and gas field pool and the gas in the membrane bag and the clean water tank, and circulating operation, realizing the pressure balance inside and outside the closed gas field pool, and no natural gas and inert gas are needed to balance the pressure, which can save a lot of pipeline laying costs and inert gas production costs. And the oil and gas field water reinjection system is isolated from the atmosphere, preventing air from entering the pool, and also preventing the gas in the pool from entering the atmospheric environment to cause pollution. The control terminal calculates the amount of gas overflowing from the water pool according to the changes in the liquid level of the oil and gas field water pool and the volume of the membrane bag, and determines whether to open the solenoid valve, thereby realizing the centralized and automatic harmless treatment of the gas overflowing from the oil and gas field water. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the utility model;

[0028] Figure 2 This is a structural diagram of the membrane bag installation tank of the utility model. DETAILED DESCRIPTION

[0029] The present invention will be further described below in conjunction with the accompanying drawings, but the present invention is not limited to the scope of the embodiments described.

[0030] The figure marks in the drawings of the specification include: a shelter 4, a membrane bag installation tank 5, a vent 6, an exhaust port 7, a membrane bag connecting pipe control solenoid valve 8, a membrane bag 9, a clean water tank level gauge 10, a clean water tank connecting pipe control battery valve 11, a membrane bag vent 12, a water transfer pump 13, a reinjection pump 14, a clean water tank 15, a reinjection well pipeline 16, a water pool gas control solenoid valve 17, a harmful gas treatment device 18, a purified gas discharge pipeline 19, a gas field water pool level gauge 20, a water inlet pipeline 21, and a gas field water pool 22.

[0031] like Figure 1 and Figure 2 As shown; a closed reinjection system for oil and gas field water, including a clean water tank 15, a gas field water pool 22, a membrane bag 9, a water transfer pump 13 and a reinjection pump 14, the clean water tank 15, the membrane bag 9 and the gas field water pool 22 all adopt a sealed structure, the membrane bag 9 is connected to the clean water tank 15 and the gas field water pool 22 through a pipeline, the membrane bag 9 is filled with an inert gas, the water inlet pipe and the water outlet pipe of the water transfer pump 13 are respectively connected to the gas field water pool 22 and the clean water tank 15, the water inlet pipe and the water outlet pipe of the reinjection pump 14 are respectively connected to the clean water tank 15 and the reinjection well.

[0032] See also Figure 1 and Figure 2 , a clear water tank connecting pipe control battery valve 11 is installed on the pipeline connecting the clear water tank 15 and the gas field water pool 22. In this way, a clear water tank connecting pipe control battery valve 11 is installed on the pipeline connecting the clear water tank 15 and the gas field water pool 22, and the pipeline between the clear water tank 15 and the gas field water pool 22 is opened and closed by opening and closing the clear water tank connecting pipe control battery valve 11.

[0033] See also Figure 1 and Figure 2 The membrane bag 9 is connected to the clean water tank 15 and the gas field water pool 22 by connecting the membrane bag 9 with a membrane bag connecting pipe to control the electromagnetic valve 8 at one end close to the membrane bag 9. In this way, it is convenient to control the on and off of the electromagnetic valve 8 by controlling the membrane bag connecting pipe, control the on and off of the pipeline connecting the membrane bag 9 with the clean water tank 15 and the gas field water pool 22, and then control the air pressure of the membrane bag 9, prevent the membrane bag 9 from being over-pressured, and ensure that the gas in the gas field water pool 22 is leaked when the membrane bag 9 is replaced and repaired.

[0034] See also Figure 1 and Figure 2, the clean water tank 15 is provided with water purification materials, the clean water tank 15 is sealed with a clean water tank level gauge 10, and the clean water tank level gauge 10 is electrically connected to the control terminal. In this way, by providing water purification materials in the clean water tank 15, the water entering the clean water tank 15 from the gas field water pool 22 is purified into clean water, and the clean water tank level gauge 10 is sealed and installed in the clean water tank 15, so that the water level in the clean water tank 15 can be measured by the level gauge, and the real-time data can be transmitted to the control terminal, and the water level in the clean water tank 15 can be controlled by the control terminal to prevent the water level from exceeding the maximum water level and falling below the minimum water level.

[0035] See also Figure 1 and Figure 2 The gas field water pool 22 is sealed with a gas field water pool level meter 20, and the gas field water pool level meter 20 is electrically connected to the control terminal. In this way, the clean water pool level meter 10 is sealed and installed in the gas field water pool 22, so that the water level in the gas field water pool 22 can be measured by the level meter, and the real-time data can be transmitted to the control terminal. The water level in the gas field water pool 22 can be controlled by the control terminal to prevent the water level from exceeding the maximum water level and falling below the minimum water level.

[0036] See also Figure 1 and Figure 2 , and also includes a water inlet pipeline 21, through which the water in the single well station is sent to the gas field water pool 22. By setting the water inlet pipeline 21 and cooperating with a water pump, it is convenient to send the water produced in the single well station that is producing gas to the gas field water pool 22.

[0037] See also Figure 1 , the top of the gas field pool 22 is also connected to the pool gas control solenoid valve 17 and the harmful gas treatment device 18 in sequence through a connecting pipe. By connecting the pool gas control solenoid valve 17 and the harmful gas treatment device 18 in sequence at the top of the gas field pool 22, when the membrane bag 9 reaches the maximum volume, and the liquid levels of the gas field pool 22 and the clean water tank 15 are at the lowest value, the control terminal determines through calculation that the gas in the pool reaches the maximum volume, and then the control terminal sends a valve opening instruction to the pool gas control solenoid valve 17, and the gas in the pool is transported to the treatment device through the pipeline for harmless treatment, and the pipeline is closed by the pool gas control solenoid valve 17. Under the condition of the same volume of the membrane bag 9, the cumulative water inflow of the gas field pool 22 and the change in the effective liquid level of the water pool can be calculated by computer, and the gas overflow per unit volume of oil and gas field water under atmospheric pressure can be calculated, and used as research data on the change law of the gas overflow of oil and gas field water.

[0038] See also Figure 1The membrane bag 9 is designed with an explosion-proof contact switch inside the tank, and the explosion-proof contact switch is used as a backup circuit switch for forcibly opening the reinjection pump 14. In this way, by designing an explosion-proof contact switch inside the membrane bag 9, when the volume of the membrane bag 9 increases to the maximum value, the membrane bag 9 touches the explosion-proof contact switch, and the explosion-proof contact switch starts the reinjection pump 14 to inject the water in the clean water tank 15 into the reinjection well.

[0039] See also Figure 2 , and further includes a film bag installation tank 5, the top of which is formed with an opening, the opening constituting an exhaust port 7, a mounting ring connected to the side wall of the exhaust port 7, the film bag 9 connected to the mounting ring, a shielding shed 4 installed above the exhaust port 7, and a vent 6 formed at the bottom of the film bag installation tank 5. In this way, the film bag 9 is further protected by providing the film bag installation tank 5 to protect the film bag 9, providing a mounting ring to install the film bag 9, and providing the exhaust port 7 and the vent 6 on the film bag installation tank 5.

[0040] See also Figure 2 , the clean water tank connecting pipe control battery valve 11, the membrane bag connecting pipe control solenoid valve 8, the water transfer pump 13 and the reinjection pump 14 are all electrically connected to the control terminal. In this way, by electrically connecting the clean water tank connecting pipe control battery valve 11, the membrane bag connecting pipe control solenoid valve 8, the water transfer pump 13 and the reinjection pump 14 to the control terminal, it is convenient to control the clean water tank connecting pipe control battery valve 11, the membrane bag connecting pipe control solenoid valve 8, the water transfer pump 13 and the reinjection pump 14 to open and close through the control terminal.

[0041] The membrane bag 9 in the utility model is a thin cylindrical design, and is made of materials such as chloroprene rubber with good electrical conductivity, corrosion resistance, radiation resistance, softness, toughness and elasticity.

[0042] During operation, the water levels of the gas field pool 22 and the clean water tank 15 are both brought to the highest water level, and the empty height of the gas field pool 22, the empty height of the clean water tank 15 and the membrane bag 9 are replaced with inert gas to replace the gas in the gas field pool 22 and the clean water tank 15. At the same time, the membrane bag 9 is injected with inert gas to reach the maximum expansion volume. After completion, the gas field pool 22 is sealed to isolate the system from air. The control valve of the pipeline connecting the gas field pool 22 and the membrane bag 9 is opened, the control valve of the pipeline connecting the clean water tank 15 is opened, and the reinjection pump 14 is started to reinject gas field water. As the liquid level of the clean water tank 15 drops, the atmospheric pressure squeezes the membrane bag 9, and the inert gas in the membrane bag 9 flows into the clean water tank 15 through the connecting pipeline to supplement the air pressure and balance the pressure in the water tank. When the liquid level in the clean water tank 15 drops to the set minimum liquid level, the control terminal sends a pump stop command to the reinjection pump 14 to stop reinjecting oil and gas field water. After stopping the reinjection of water, the control terminal sends a pump start command to the water transfer pump 13 to transfer the gas field water in the gas field water pool 22 into the clean water tank 15. At the same time, the gas in the clean water tank 15 enters the gas field water pool 22 through the connecting pipeline for pressure replenishment. When the liquid level in the clean water tank 15 reaches the maximum water level, the control terminal sends a pump stop command to the water transfer pump 13 to stop water transfer. When the liquid level of the gas field pool 22 is below the highest water level, the control terminal sends a pump start command to the water pump connected to the water inlet pipeline 21, and transfers water from the single well station to the gas field pool 22. At the same time, the gas in the gas field pool 22 controls the solenoid valve 8 to enter the membrane bag 9 through the connecting pipe and the membrane bag connecting pipe, and the volume of the membrane bag 9 expands and increases. When it increases to the set volume, the control terminal sends a pump start command to the reinjection pump 14, and water is reinjected into the reinjection well through the reinjection pump 14. The gas in the membrane bag 9 enters the clean water tank 15, and the volume of the membrane bag 9 decreases. When the liquid level in the pool drops to the set value and the volume of the membrane bag 9 shrinks to the set value, the control terminal sends a water transfer command to the water pump connected to the single well station, and starts the water pump to transfer water to the gas field pool 22. When the membrane bag 9 reaches the maximum volume, and the liquid levels of the gas field pool 22 and the clean water tank 15 are at the lowest value, the computer determines through calculation that the gas in the pool has reached the maximum volume, and then the computer sends a valve opening command to the pool gas control solenoid valve 17, and the gas in the pool is transported to the harmful gas treatment device 18 through the pipeline for harmless treatment. At the same time, a pump start command is sent to the single well station water pump, and the single well station transfers water to the gas field pool 22. The control terminal calculates the volume of the membrane bag 9 and the empty height of the pool, and when it is determined that the liquid level of the pool is at the maximum height, a valve closing command is sent to the overflow pool gas control solenoid valve 17, and the gas field pool 22 reaches a closed state. When the single well station transfers water, the empty height gas of the pool and the overflow gas of the gas field water enter the membrane bag 9. When the volume of the membrane bag 9 reaches the maximum value, oil and gas field water are injected back into the formation, and the cycle repeats.

[0043] The preferred specific embodiments of the utility model are described in detail above. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.

Claims

1. A closed water reinjection system for oil and gas fields, characterized in that: It comprises a clean water tank (15), a gas field water pool (22), a membrane bag (9), a water transfer pump (13) and a reinjection pump (14); the clean water tank (15), the membrane bag (9) and the gas field water pool (22) all adopt a sealed structure; the membrane bag (9) is connected to the clean water tank (15) and the gas field water pool (22) through a pipeline; the membrane bag (9) is filled with an inert gas; the water inlet pipe and the water outlet pipe of the water transfer pump (13) are respectively connected to the gas field water pool (22) and the clean water tank (15); the water inlet pipe and the water outlet pipe of the reinjection pump (14) are respectively connected to the clean water tank (15) and the reinjection well.

2. The closed oil and gas field water reinjection system according to claim 1 is characterized in that: A clean water tank connecting pipe control battery valve (11) is installed on the pipeline connecting the clean water tank (15) and the gas field water tank (22).

3. The closed water reinjection system for oil and gas fields according to claim 2 is characterized in that: The end of the pipeline connecting the membrane bag (9) to the clean water tank (15) and the gas field water pool (22) close to the membrane bag (9) is connected to a membrane bag connecting pipe control solenoid valve (8).

4. The closed oil and gas field water reinjection system according to claim 3 is characterized in that: The clean water tank (15) is provided with water purification materials, and a clean water tank level meter (10) is sealed and installed in the clean water tank (15), and the clean water tank level meter (10) is electrically connected to the control terminal.

5. The closed water reinjection system for oil and gas fields according to claim 3 is characterized in that: A gas field water pool liquid level meter (20) is sealed and installed in the gas field water pool (22), and the gas field water pool liquid level meter (20) is electrically connected to the control terminal.

6. The closed water reinjection system for oil and gas fields according to claim 3 is characterized in that: It also includes a water inlet pipeline (21), through which the water in the single well station is sent into the gas field water pool (22).

7. The closed oil and gas field water reinjection system according to any one of claims 1 to 6, characterized in that: The top of the gas field water pool (22) is also connected in sequence to a water pool gas control electromagnetic valve (17) and a harmful gas treatment device (18) via a connecting pipe.

8. The closed water reinjection system for oil and gas fields according to claim 1 is characterized in that: An explosion-proof contact switch is designed on the inner side of the membrane bag (9) tank, and the explosion-proof contact switch serves as a backup circuit switch for forcibly opening the reinjection pump (14).

9. The closed water reinjection system for oil and gas fields according to claim 1 is characterized in that: It also includes a membrane bag installation tank (5), the top of which is formed with an opening, the opening constituting an exhaust port (7), a mounting ring being connected to the side wall of the exhaust port (7), the membrane bag (9) being connected to the mounting ring, a shielding shed (4) being installed above the exhaust port (7), and a vent (6) being formed at the bottom of the membrane bag installation tank (5).

10. The closed water reinjection system for oil and gas fields according to claim 3, characterized in that: The clean water tank connecting pipe controlling the battery valve (11), the membrane bag connecting pipe controlling the electromagnetic valve (8), the water transfer pump (13) and the re-injection pump (14) are all electrically connected to the control terminal.

Citation Information

Cited By

  • Novel water well mouth gas collecting device

    CN121803227A