Underground gas storage
By adopting an annular air-cave chamber structure, a closed-loop structure is formed to achieve two-way construction, which solves the problem of long construction period in the prior art, significantly shortens the construction time and reduces costs.
Patent Information
- Application Number
- CN202420875125.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-25
AI Technical Summary
The construction period of the existing underground gas storage is relatively long, mainly due to the linear gas storage chamber structure, the steel lining installation and concrete pouring need to be carried out alternately, and cannot be carried out simultaneously, which affects the construction efficiency.
The annular air storage chamber structure is adopted to connect the ends and ends of the gas storage chamber to form a closed-loop structure, and steel lining is installed and concrete poured through multiple outlets, thereby achieving two-way construction and shortening the construction period.
Through the annular air-reservoir chamber structure, steel lining installation and concrete pouring are achieved simultaneously, which significantly shortens the construction period and reduces cost and material usage.
Smart Images

Figure CN222066843U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of compressed air energy storage, in particular to an underground gas storage. Background Art
[0002] Compressed air energy storage is a method of energy storage that uses surplus electricity from the grid during low load periods to compress air, store it in a high-pressure sealed facility, and release it during peak power consumption to drive an expander to drive a generator to generate electricity. The compressed air energy storage system mainly includes a compression system, an expansion power generation system, a heat storage and exchange system, and a gas storage system. The high-pressure gas from the compression system is stored in the gas storage reservoir, and the maximum gas pressure can exceed 10MPa, which places high demands on the pressure bearing capacity and sealing of the gas storage reservoir. At present, underground artificial excavation gas storage reservoirs are gradually being widely used due to their flexible site selection, few restrictions, wide application area, large scale, and high gas storage pressure.
[0003] Underground gas storage uses artificially dug caverns in the rock at a certain depth underground to store gas, using the rock cover weight and ground stress to resist the gas pressure inside the cavern, so as to fully utilize the surrounding rock to bear the internal high pressure.
[0004] The existing construction of underground gas storage caverns includes excavation and support, steel plate installation, concrete pouring, grouting and other process flows. The current gas storage caverns mostly adopt an "I"-shaped (i.e. straight) structure. The gas storage cavern and the connecting tunnel form an exit (after the construction of the gas storage cavern is completed, a sealed door is set at the exit). It can only be constructed in one direction, which makes it impossible to carry out steel lining installation and concrete pouring at the same time. The two need to be constructed alternately, resulting in a long construction period. Utility Model Content
[0005] The utility model aims to provide an underground gas storage which can shorten the construction period of the gas storage.
[0006] The technical solution of the utility model is: an underground gas storage, comprising a plurality of gas storage caverns arranged side by side, the gas storage caverns are annular, and the plurality of gas storage caverns are connected by connecting tunnels; among the plurality of gas storage caverns, a traffic tunnel is arranged between one or two gas storage caverns, and a first construction branch tunnel is arranged between another two gas storage caverns, and the traffic tunnel and the first construction branch tunnel are both connected to the connecting tunnel.
[0007] In the above scheme, by adopting an annular gas storage cavern, the gas storage caverns are connected end to end to form a closed loop structure, so that the connecting tunnel and the same gas storage cavern form at least two exits (intersections), so that the steel lining installation and concrete pouring can enter from the at least two exits respectively and proceed in both directions at the same time without affecting each other, thereby greatly shortening the construction period.
[0008] Preferably, the gas storage chamber is elliptical or rectangular. When the gas storage chamber is rectangular, rounded corners are arranged around it.
[0009] Preferably, the underground gas storage further comprises a drainage corridor disposed above the gas storage cavern, and the drainage corridor is connected to the traffic tunnel through a second construction branch tunnel.
[0010] Preferably, the drainage corridor includes a longitudinal corridor arranged between two gas storage caverns and parallel to the length direction X of the gas storage caverns, and a transverse corridor connecting the two ends of multiple longitudinal corridors in the width direction Y of the gas storage caverns, and the second construction branch tunnel is connected to the transverse corridor at one end.
[0011] Preferably, a plurality of drainage holes are provided on one side or both sides of the longitudinal corridor, the drainage holes extend along the width direction Y, and the drainage holes are inclined upward in the height direction Z.
[0012] Preferably, the cross-section of the gas storage chamber is circular.
[0013] Preferably, the side walls of the gas storage cavern are provided with a sealing layer, concrete, a waterproof layer and surrounding rock in sequence from the inside to the outside.
[0014] Preferably, a sealing plug is provided in the connecting tunnel, a gas charging and discharging branch pipe is provided in the sealing plug, the gas charging and discharging branch pipe is connected to multiple gas storage chambers along the width direction Y, and a gas charging and discharging main pipe is provided in the traffic tunnel, one end of the gas charging and discharging main pipe is connected to the gas charging and discharging branch pipe, and the other end extends out of the outside of the cave opening.
[0015] Preferably, the sealing plug is also provided with an inspection branch corridor, and the inspection branch corridor connects a plurality of gas storage caverns along the width direction Y, and the traffic tunnel and the first construction branch tunnel are both provided with an inspection main corridor connected with the inspection branch corridor.
[0016] Preferably, a sealed door is provided between the inspection branch gallery and the gas storage cavern.
[0017] Compared with the related art, the beneficial effects of the utility model are:
[0018] 1. By adopting a circular gas storage cavern, the gas storage caverns are connected end to end to form a closed loop structure, so that the connecting tunnel and the same gas storage cavern form at least two exits (intersections), so that the steel lining installation and concrete pouring can be carried out in both directions at the same time after entering from the at least two exits, without affecting each other, greatly shortening the construction period;
[0019] Second, the gas storage caverns are connected end to end to form a closed loop structure, and there is no need to use steel heads to seal the ends of the gas storage caverns, which can shorten the construction period and reduce costs;
[0020] 3. The cross section of the gas storage cavern is designed to be circular, and a sealing layer, concrete, waterproof layer and surrounding rock are arranged from the inside to the outside in order, so that the surrounding rock can share the internal high pressure, reduce the amount of steel lining or other sealing layer materials, and reduce the cost of building the storage.
[0021] 4. During the maintenance and emptying period, the underground gas storage is kept at standard atmospheric pressure. When the groundwater level is high, the steel plate of the gas storage cavern may become unstable against external pressure. In order to improve the steel plate's ability to resist external pressure while reducing its thickness and thus reducing project investment, a drainage corridor is set above the gas storage cavern to drain water and reduce the water pressure outside the steel plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the layout of the underground gas storage provided by the utility model from a first viewing angle;
[0023] Figure 2 A schematic diagram of the layout of the underground gas storage provided by the utility model from a second viewing angle;
[0024] Figure 3 This is a schematic diagram of the cross-sectional structure of the gas storage cavern;
[0025] Figure 4 for Figure 2 A is an enlarged schematic diagram;
[0026] Figure 5 for Figure 2 The enlarged schematic diagram of point B in FIG.
[0027] Figure 6 This is a schematic diagram of the layout of the drainage corridor;
[0028] Figure 7 This is a cross-sectional schematic diagram of the underground gas storage provided by the utility model.
[0029] In the attached figure: 1. gas storage cavern; 2. connecting tunnel; 3. drainage gallery; 31. longitudinal corridor; 32. transverse corridor; 4. traffic tunnel; 5. first construction branch tunnel; 6. second construction branch tunnel; 7. tunnel entrance; 8. surrounding rock; 9. waterproof layer; 10. concrete; 11. sealing layer; 12. sealing plug; 13. charging and discharging branch pipeline; 14. maintenance branch gallery; 15. drainage hole; 16. charging and discharging main pipeline; 17. maintenance main gallery; 18. sealing door. DETAILED DESCRIPTION
[0030] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict. For the convenience of description, if the words "upper", "lower", "left" and "right" appear in the following text, they only indicate that the upper, lower, left and right directions are consistent with the drawings themselves, and do not limit the structure.
[0031] like Figure 1 , Figure 2 , Figure 6 As shown, an underground gas storage provided in this embodiment includes a gas storage cavern 1, a connecting tunnel 2, a drainage corridor 3, a traffic tunnel 4, a first construction branch tunnel 5, a second construction branch tunnel 6, a cave entrance 7, surrounding rock 8, a waterproof layer 9, concrete 10, a sealing layer 11, a sealing plug 12, a gas charging and discharging branch pipe 13, a maintenance branch corridor 14, a drainage hole 15, a gas charging and discharging main pipe 16 and a maintenance main corridor 17.
[0032] The gas storage cavern 1 is located in a hard rock mass below 100m underground and has a circular cross section (e.g. Figure 3 As shown). The gas storage caverns 1 are arranged in three parallel lines, each of which is in a ring-shaped (rounded rectangular in this embodiment) structure. The rounded corner turning radius is 3 to 5 times the cave diameter. The left and right spacing of the gas storage caverns 1 is 50m to 100m.
[0033] The gas storage cavern 1 has a length direction X, and the connecting tunnel 2 connects the three gas storage caverns 1 in the width direction Y and intersects the gas storage caverns 1 vertically. The connecting tunnel 2 serves as a traffic and transportation channel during the construction period, a charging and discharging pipeline layout channel during the operation period, and an operation and maintenance inspection channel. After the construction of the gas storage cavern 1 is completed, the sealing plug 12 (such as Figure 4 , Figure 5 As shown), to resist the high pressure inside the gas storage cavern 1. The length of the sealing plug 12 can be determined after anti-slip calculation.
[0034] like Figure 1 , Figure 2 As shown, among the multiple gas storage caverns 1, a traffic tunnel 4 is arranged between two of the gas storage caverns 1, and a first construction branch tunnel 5 is arranged between the other two gas storage caverns 1. One end of the traffic tunnel 4 and the first construction branch tunnel 5 are both connected to the connecting tunnel 2, and the other ends of the traffic tunnel 4 and the first construction branch tunnel 5 are connected to the ground hole 7, which serves as the main passage of the underground gas storage, and the hole 7 is provided with a door.
[0035] like Figure 3 As shown, the side walls of the gas storage cavern 1 are provided with a sealing layer 11, concrete 10, waterproof layer 9 and surrounding rock 8 in sequence from the inside to the outside. The high pressure of the gas inside the gas storage cavern 1 is mainly borne by the surrounding rock 8. The higher the elastic modulus of the surrounding rock 8, the higher the pressure-bearing ratio. The function of the waterproof layer 9 is to isolate the groundwater outside the gas storage cavern 1 and reduce the external water pressure of the internal sealing layer 11. The thickness of the concrete 10 is 0.5m to 1.0m, and the concrete 10 can transfer the high pressure inside the sealing layer 11 to the surrounding rock 8, so as to achieve the purpose of bearing the surrounding rock 8.
[0036] When the sealing layer 11 is made of steel plate, in order to ensure that the concrete 10 fits tightly with the steel plate and fully transmits force, the concrete 10 is backfilled after the steel plate is completed. When the sealing layer 11 is made of flexible material, the concrete 10 is poured first, and then the flexible sealing material is brushed or sprayed on the surface of the concrete 10. The sealing layer 11 can ensure the air tightness of the gas storage cavern 1. The sealing layer 11 can also be made of organic materials such as glass fiber reinforced plastics, polyurea, rubber, etc., and the thickness of the sealing layer 11 is 10mm to 30mm.
[0037] like Figure 4 , Figure 5 As shown, a sealing plug 12 is provided in the connecting tunnel 2, and a gas charging and discharging branch pipe 13 is provided in the sealing plug 12, and the gas charging and discharging branch pipe 13 is connected to multiple gas storage caverns 1 along the width direction Y. A gas charging and discharging main pipe 16 is provided in the traffic tunnel 4, and one end of the gas charging and discharging main pipe 16 is connected to the gas charging and discharging branch pipe 13, and the other end extends out of the outside of the cave opening 7.
[0038] The sealing plug 12 located in the connecting tunnel 2 is also provided with a maintenance branch gallery 14, and the maintenance branch gallery 14 is connected to multiple gas storage caverns 1 along the width direction Y. Figure 4 , Figure 5 As shown, a sealing door 18 is provided between the inspection branch gallery 14 and the gas storage cavern 1. The sealing door 18 is located at the exit of the inspection gallery 14 close to the gas storage cavern 1, and the sealing door 18 is slightly smaller than the diameter of the inspection branch gallery 14. A sealing plug 12 is provided in each of the traffic tunnel 4 and the first construction branch tunnel 5. A main inspection gallery 17 is provided in the sealing plug 12 at this position, and the main inspection gallery 17 is connected to the inspection branch gallery 14.
[0039] The diameter of the gas charging and discharging branch pipe 13 and the gas charging and discharging main pipe 16 is 400mm-800mm, which serves as the gas channel during the operation period. The cross section of the inspection branch corridor 14 and the inspection main corridor 17 is a city gate type, with a width of 1.5m-2m and a height of 2m-2.5m, which serves as the inspection and operation channel during the operation period.
[0040] During the gas storage reservoir inflation, high-pressure gas will enter the leftmost gas storage cavern 1 and the middle gas storage cavern 1 from the main gas charging and discharging pipeline 16 and the gas charging and discharging branch pipeline 13. At the same time, the gas will also enter the rightmost gas storage cavern 1 through the middle gas storage cavern 1. A main valve is installed on the main gas charging and discharging pipeline 16 to control the connection and disconnection between the main gas charging and discharging pipeline 16 and the gas charging and discharging branch pipeline 13. A sub-valve is installed on the gas charging and discharging branch pipeline 13 to control the connection and disconnection between the gas charging and discharging branch pipeline 13 and the gas storage cavern 1.
[0041] During deflation, the corresponding valve is opened, and the gas in the leftmost gas storage cavern 1 and the gas in the rightmost gas storage cavern 1 respectively enter the gas charging and discharging main pipeline 16 through the corresponding gas charging and discharging branch pipelines 13, and then discharged from the hole 7.
[0042] During the emptying and maintenance of the gas storage, personnel and equipment can enter the leftmost and middle gas storage caverns 1 from the traffic tunnel 4, the main maintenance corridor 17, and the maintenance branch corridor 14. They can also enter the rightmost gas storage cavern 1 from the first construction branch tunnel 5.
[0043] like Figure 6 , Figure 7 As shown, the drainage gallery 3 above the gas storage cavern 1 is connected to the traffic tunnel 4 through the second construction branch tunnel 6. The second construction branch tunnel 6 serves as a drainage channel during the construction period and the operation period.
[0044] The drainage corridor 3 includes a longitudinal corridor 31 arranged between two gas storage caverns 1 and parallel to the length direction X of the gas storage caverns 1, and a transverse corridor 32 connecting the two ends of the plurality of longitudinal corridors 31 in the width direction Y of the gas storage caverns 1, and the second construction branch tunnel 6 is connected to the transverse corridor 32 at one end. A plurality of drainage holes 15 are arranged on one or both sides of the longitudinal corridor 31, and the drainage holes 15 extend along the width direction Y, and the drainage holes 15 are inclined upward in the height direction Z.
[0045] The drainage gallery 3 covers the entire range of the gas storage cavern 1 below (such as Figure 6 For the convenience of drainage, the longitudinal slope of the bottom plate of the drainage corridor 3 is about 0.3% to 0.5%.
[0046] The drainage hole 15 is driven obliquely upward along the arch line of the longitudinal corridor 31 into the rock mass above the gas storage cavern 1, with an angle of about 20° to 30° with the horizontal line. The length of the drainage hole 15 is about 50m to 100m, the hole diameter is about 76mm to 110mm, and the hole spacing is about 3m to 5m. The seepage water in the drainage hole 15 is collected to the second construction branch hole 6 through the drainage ditch arranged on the bottom plate of the drainage corridor 3, and then flows to the outside of the cave through the traffic tunnel 4. The second construction branch hole 6 and the traffic tunnel 4 are both positive slopes to achieve self-retention drainage and reduce the groundwater pressure of the gas storage cavern.
[0047] The construction method of the underground gas storage of the utility model comprises the following steps:
[0048] S1, in order to increase the construction progress, the traffic tunnel 4 and the first construction branch tunnel 5 are excavated first, and after the excavation and support of the traffic tunnel 4 or the first construction branch tunnel 5 are completed, the connecting tunnel 2 is excavated in two working faces on both sides until the connecting tunnel 2 is connected.
[0049] S2, during the excavation of the connecting tunnel 2, multiple working surfaces are successively opened on its side wall to carry out the excavation and support of the gas storage cavern 1 until it is completed.
[0050] S3, construct the sealing structure in the gas storage cavern 1: when steel plates are used for sealing, the steel plates are transported from the outside of the cavern through the traffic tunnel 4 or the first construction branch tunnel 5 to the connecting tunnel 2, and after being assembled and welded, they are pushed to the far end turning section for installation and construction. After completing 2-3 sections of the pipe, backfill concrete between the steel plates and the surrounding rock 8 is constructed. Since each gas storage cavern 1 has two exits at both ends connected to the connecting tunnel 2, during the backfilling concrete construction, the steel plates can be installed from the other side, and the working surfaces on both sides can be operated alternately to speed up the construction progress.
[0051] When a flexible material is used for sealing, the sealing layer 11 and the concrete 10 of the surrounding rock 8 are first poured, and then the sealing layer 11 is bonded and painted on the inner side of the concrete 10 .
[0052] S4, concrete pouring is performed in the connecting tunnel 2 to form a sealing plug 12. The gas charging and discharging branch pipes 13, the gas charging and discharging main pipes 16, the maintenance branch corridors 14 and the maintenance main corridors 17 are pre-buried and reserved.
[0053] S5, while performing the above steps, the drainage corridor 3 above the gas storage cavern 1 is constructed simultaneously. When the traffic tunnel 4 is excavated to a certain length, a working surface is added to its side wall to excavate the second construction branch tunnel 6. Then, the transverse corridor 32 is excavated on both sides of the Y direction, and the longitudinal corridor and the transverse corridor 32 at the other end are excavated in the process. Finally, the drainage hole 15 is drilled on the side wall of the longitudinal beam 31. The construction is completed.
[0054] The annular (rounded rectangular) gas storage cavern 1 adopted in the utility model has the following advantages: ① After the excavation of the connecting tunnel 2, the gas storage cavern 1 and the connecting tunnel 2 have multiple intersections, and then there are multiple construction working surfaces, which can speed up the excavation of the gas storage cavern 1 and the construction progress of the steel lining; ② In order to evenly bear the force at both ends of the linear gas storage cavern, spherical or elliptical steel heads need to be set, but the production and installation of the steel heads are relatively complicated, the construction period is long, and the cost is also high. Therefore, when the rounded rectangular gas storage cavern 1 is adopted, there is no need to use steel heads, which can shorten the construction period and reduce costs; ③ The two ends of the linear gas storage cavern can only be constructed in one direction, so the steel lining installation and concrete pouring cannot be carried out at the same time, and the two need to be constructed alternately, and the construction period is long, while the rounded rectangular gas storage cavern is connected head to tail, and the steel lining installation and concrete pouring can be carried out in both directions from the front and back at the same time, without affecting each other, shortening the construction period.
[0055] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. An underground gas storage, characterized in that: The invention comprises a plurality of gas storage caverns (1) arranged side by side, wherein the gas storage caverns (1) are annular and the plurality of gas storage caverns (1) are connected via a connecting tunnel (2); among the plurality of gas storage caverns (1), a traffic tunnel (4) is arranged between one or two gas storage caverns (1), and a first construction branch tunnel (5) is arranged between another two gas storage caverns (1); the traffic tunnel (4) and the first construction branch tunnel (5) are both connected to the connecting tunnel (2).
2. The underground gas storage according to claim 1, characterized in that: The gas storage chamber is oval or rectangular. When the gas storage chamber is rectangular, rounded corners are arranged around it.
3. The underground gas storage according to claim 1, characterized in that: It also comprises a drainage gallery (3) disposed above the gas storage cavern (1), wherein the drainage gallery (3) is connected to the traffic tunnel (4) via a second construction branch tunnel (6).
4. The underground gas storage according to claim 3, characterized in that: The drainage corridor (3) comprises a longitudinal corridor (31) arranged between the two gas storage caverns (1) and parallel to the length direction X of the gas storage caverns (1), and a transverse corridor (32) connecting the two ends of the plurality of longitudinal corridors (31) in the width direction Y of the gas storage caverns (1), and the second construction branch tunnel (6) is connected to the transverse corridor (32) at one end.
5. The underground gas storage according to claim 4, characterized in that: A plurality of drainage holes (15) are provided on one or both sides of the longitudinal corridor (31), the drainage holes (15) extending along the width direction Y, and the drainage holes (15) are inclined upward in the height direction Z.
6. The underground gas storage according to claim 1, characterized in that: The cross section of the gas storage cavern (1) is circular.
7. The underground gas storage according to claim 1, characterized in that: The side wall of the gas storage cavern (1) is provided with a sealing layer (11), concrete (10), a waterproof layer (9) and surrounding rock (8) in sequence from the inside to the outside.
8. The underground gas storage according to claim 1, characterized in that: A sealing plug (12) is provided in the connecting tunnel (2), and a gas charging and discharging branch pipe (13) is provided in the sealing plug (12). The gas charging and discharging branch pipe (13) is connected to a plurality of gas storage caverns (1) along a width direction Y. A gas charging and discharging main pipe (16) is provided in the traffic tunnel (4), and one end of the gas charging and discharging main pipe (16) is connected to the gas charging and discharging branch pipe (13), and the other end extends out of the cave opening (7).
9. The underground gas storage according to claim 8, characterized in that: The sealing plug (12) is also provided with a maintenance branch gallery (14), the maintenance branch gallery (14) being connected to a plurality of gas storage caverns (1) along a width direction Y, and the traffic tunnel (4) and the first construction branch tunnel (5) are both provided with a maintenance main gallery (17) connected to the maintenance branch gallery (14).
10. The underground gas storage according to claim 9, characterized in that: A sealed door (18) is provided between the inspection branch gallery (14) and the gas storage cavern (1).
Citation Information
Cited By
Underground gas storage drainage system and drainage method thereof
CN120889623A
Sealing structure of compressed gas storage
CN121183796A
Sealing structure of compressed gas storage
CN121183796B