Test platform special for director

By designing a special test platform for commanders, using multiple test stations and accurate pressure gauge measurements, the cumbersome problem of indirect-acting voltage regulator commanders in the existing technology is solved, and efficient and simplified commander performance testing is achieved. .

CN222070098UActive Publication Date: 2024-11-26BEIJING XINGUANGJIN GAS DEVICE RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420096689.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-15
Publication Date
2024-11-26
Estimated Expiration
2034-01-15

AI Technical Summary

Technical Problem

The prior art lacks a special performance testing platform for indirectly acting voltage regulator commanders, resulting in cumbersome testing, low efficiency, and the problem of the commander and the main valve of the voltage regulator are not determined separately.

Method used

A special test platform for commanders was designed, including a bench and air supply branch pipe, and multiple test stations were set up, using three-way air splitter blocks, single-headed cocks, double-headed cocks, pressure gauge and ball control valve, through The mount is removed to secure the commander to be tested, enabling separate tests and continuous testing of multiple commanders.

Benefits of technology

It realizes the performance test of the commander with simple structure, easy to use, high testing efficiency and strong practicality, and can quickly judge the qualification of the commander, simplify the test process and improve efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222070098U_ABST
    Figure CN222070098U_ABST
Patent Text Reader

Abstract

The utility model relates to a special test platform for a director, which comprises a rack and an air supply branch pipe arranged on the rack, a plurality of test stations are arranged on the rack, each test station comprises a mounting seat and a three-way air distribution block which are fixed on the rack, the director to be tested is detachably fixed on the mounting seat, and the three-way air distribution block is fixed on the rack. A single-head cock and a double-head cock are correspondingly installed on a first connector and a second connector of the three-way gas distribution block, the double-head cock is connected with a first pressure gauge and a water column gauge, a third connector of the three-way gas distribution block is connected with a gas port P2 of the director through a first hose, and a second pressure gauge is installed on a gas port P3 of the director. Branch control ball valves in one-to-one correspondence with the test stations are mounted on the air supply branch pipes through three-way pipe fittings; and the branch control ball valves are connected with the air ports P1 of the corresponding directors through second hoses. The device has the advantages of being simple in structure, convenient to use, high in testing efficiency and high in practicability, and performance testing can be conducted on multiple directors at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a pressure regulator testing device, in particular to a special testing platform for a pilot of an axial flow gas pressure regulator. Background Art

[0002] The pressure regulator is a special valve on the gas pipeline that can automatically adjust the outlet pressure. Pressure regulators are divided into two types: direct-acting and indirect-acting according to different working principles. The indirect-acting pressure regulator consists of two parts: the pressure regulator main valve and the pilot. The function of the pilot is to amplify the outlet pressure change signal of the pressure regulator main valve and drive the valve port of the pressure regulator main valve to move, thereby achieving the technical purpose of automatic pressure regulation and voltage stabilization. The performance of the pilot directly affects the overall performance of the indirect-acting pressure regulator. At present, there is no tooling or platform specifically for performance testing of the pilot in this field. Usually, the pilot is connected to the pressure regulator main valve and then tested as a whole. Not only is the operation cumbersome and the test efficiency low, but when performance problems occur, it is impossible to determine whether the problem is with the pilot or the pressure regulator main valve, and multiple disassembly and repeated testing are required. Utility Model Content

[0003] The utility model aims to provide a special test platform for commanders, which has the advantages of simple structure, convenient use, high test efficiency and strong practicability, and can perform performance tests on multiple commanders at the same time.

[0004] In order to solve the above-mentioned problems existing in the prior art, the utility model provides a special test platform for a commander, including a test bench and an air supply branch arranged on the test bench, the test bench is provided with multiple test stations, the test stations include a mounting base and a three-way air distributor block fixed on the test bench, the commander to be tested is detachably fixed on the mounting base, the first interface and the second interface of the three-way air distributor are correspondingly installed with a single-head cock and a double-head cock, the double-head cock is connected to a first pressure gauge and a water column gauge, the third interface of the three-way air distributor is connected to the air port P2 of the commander through a first hose, the air port P3 of the commander is installed with a second pressure gauge, and the air supply branch is installed with a sub-control ball valve corresponding to the test station one by one through a three-way pipe fitting, and the sub-control ball valve is connected to the air port P1 of the corresponding commander through a second hose.

[0005] Furthermore, the utility model provides a special test platform for a commander, wherein two gas supply branches are arranged in parallel and at intervals, the front ends of the two gas supply branches are interconnected and connected to the gas source through a gas supply main pipe, and a main control ball valve and a third pressure gauge are arranged on the gas supply main pipe.

[0006] Furthermore, the utility model provides a special test platform for a commander, wherein the ten test stations are provided, and the ten test stations are divided into two rows corresponding to two gas supply branches, and each row includes five test stations.

[0007] Furthermore, the utility model provides a special test platform for a commander, wherein the frame includes a frame welded from square steel, and a table plate is fixed to the top and bottom of the frame respectively.

[0008] Furthermore, the utility model provides a special test platform for a commander, wherein the mounting seat comprises a channel steel and a bracket plate, the channel steel is welded to the frame, the bracket plate is L-shaped and fixed to the channel steel by bolts, and the commander is fixed to the L-shaped bracket plate by bolts.

[0009] Furthermore, the utility model provides a special test platform for a controller, wherein the two ends of the first hose are respectively connected to the controller and the three-way air distributor through quick connectors, and the two ends of the second hose are respectively connected to the controller and the sub-control ball valve through quick connectors.

[0010] Compared with the prior art, the utility model discloses a special test platform for a controller, which has the following advantages: the utility model discloses a test platform for a controller, which has the following advantages: a test bench and an air supply branch pipe arranged on the test bench are provided, and a plurality of test stations are provided on the test bench, so that the test stations are provided with a mounting base and a three-way air distributor block fixed on the test bench, and the controller to be tested is detachably fixed on the mounting base, and a single-head cock and a double-head cock are installed correspondingly on the first interface and the second interface of the three-way air distributor, and the double-head cock is connected to a first pressure gauge and a water column gauge, and the third interface of the three-way air distributor is connected to the air port P2 of the controller through a first hose, and a second pressure gauge is installed at the air port P3 of the controller, and a sub-control ball valve corresponding to each test station is installed on the air supply branch pipe through a three-way pipe fitting, and the sub-control ball valve is connected to the air port P1 of the corresponding controller through a second hose. Thus, a pilot-specific test platform with simple structure, convenient use, high test efficiency and strong practicality is formed. In practical application, the air supply branch pipe is connected to the air source. For the pilot of a certain test station, first open the corresponding sub-control ball valve, then slowly open the corresponding single-head cock until its opening reaches 1 / 4, then observe the pressure of the air port P2 of the pilot through the corresponding first pressure gauge and water column gauge, and adjust the pressure of the air port P2 to 2.5kPa through the pressure regulating bolt on the pilot, then fully open the corresponding single-head cock, and observe the pressure of the air port P3 of the pilot through the corresponding second pressure gauge. The pressure of the air port P3 shall not be lower than 10kPa, otherwise the pilot is judged to be unqualified, then slowly close the corresponding single-head cock, and observe the Pb pressure (closing pressure) of the pilot through the corresponding first pressure gauge and water column gauge. If the Pb pressure does not rise after 15 minutes of observation, the pilot is judged to be qualified, otherwise the pilot is judged to be unqualified. After the pilot of a certain test station is tested, it can be removed and a new pilot can be installed for performance testing. Compared with the prior art, the utility model achieves the technical purpose of testing the performance of a controller individually, simplifies the testing process, improves the testing efficiency, and can perform simultaneous and continuous testing on a large number of controllers by setting up multiple testing stations.

[0011] The following is a detailed description of a special test platform for commanders of the utility model in conjunction with the specific implementation modes shown in the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is the working principle diagram of the indirect acting voltage regulator;

[0013] Figure 2 This is a front view of a special test platform for a controller according to the utility model;

[0014] Figure 3 This is an axonometric diagram of a special test platform for a controller of the utility model;

[0015] Figure 4 for Figure 3A partial enlarged view of position A in the middle. DETAILED DESCRIPTION

[0016] First of all, it should be explained that the directional words such as up, down, left, right, front and back described in the present invention are only described according to the drawings for the convenience of understanding, and are not intended to limit the technical solution of the present invention and the scope of protection requested.

[0017] like Figures 1 to 4 The utility model is a specific implementation of a dedicated test platform for a controller, comprising a test bench 1 and a gas supply branch pipe 2 arranged on the test bench 1. A plurality of test stations are arranged on the test bench 1, and the test stations are provided with a mounting seat 11 and a three-way gas distributor block 12 fixed on the test bench 1, and a controller 3 to be tested is detachably fixed on the mounting seat 11, and a single-head cock 13 and a double-head cock 14 are correspondingly installed on the first interface and the second interface of the three-way gas distributor block 12, so that the double-head cock 14 is connected to the first pressure gauge and the water column gauge 15, and the third interface of the three-way gas distributor block 12 is connected to the gas port P2 of the controller 3 through the first hose 16, and the second pressure gauge 31 is installed at the gas port P3 of the controller 3, and a sub-control ball valve 22 corresponding to each test station is installed on the gas supply branch pipe 2 through a three-way pipe fitting 21, and the sub-control ball valve 22 is connected to the gas port P1 of the corresponding controller 3 through a second hose 23.

[0018] The above arrangement constitutes a special test platform for controllers with simple structure, convenient use, high test efficiency and strong practicality. In practical application, the gas supply branch pipe 2 is connected to the gas source. For a controller 3 at a certain test station, first open the corresponding sub-control ball valve 22, and then slowly open the corresponding single-head cock 13 until its opening reaches 1 / 4; then observe the pressure of the gas port P2 of the controller 3 through the corresponding first pressure gauge (not shown in the figure) and the water column gauge 15, and adjust the pressure of the gas port P2 through the pressure regulating bolt on the controller 3. The pressure is adjusted to 2.5kPa, then the corresponding single-head cock 13 is fully opened, and the pressure of the air port P3 of the controller 3 is observed through the corresponding second pressure gauge 31. The pressure of the air port P3 must not be lower than 10kPa, otherwise the controller 3 is judged to be unqualified, and then the corresponding single-head cock 13 is slowly closed, and the Pb pressure (closing pressure) of the controller 3 is observed through the corresponding first pressure gauge and water column gauge 15. If the Pb pressure does not rise after 15 minutes of observation, the controller 3 is judged to be qualified, otherwise the controller 3 is judged to be unqualified. After the test of the controller 3 at a certain test station is completed, it can be removed and a new controller 3 can be installed for testing. Compared with the prior art, the utility model achieves the technical purpose of individually testing the performance of the controller 3, simplifies the test process, improves the test efficiency, and a large number of controllers 3 can be tested simultaneously and continuously by setting up multiple test stations. It should be noted that Figure 1The component marked as 100 in the figure is the main valve of the pressure regulator, and its structure and the connection method with the controller 3 are well known to technical personnel and will not be repeated here; the double-head cock 14 is connected to the water column meter 15 through a pipeline; in order to improve the convenience of disassembly and assembly, the utility model allows the two ends of the first hose 16 to be connected to the controller 3 and the three-way air distributor 12 respectively through quick connectors. Similarly, the two ends of the second hose 23 are also connected to the controller 3 and the sub-control ball valve 22 respectively through quick connectors.

[0019] As a specific implementation, the utility model sets two gas supply branches 2 in parallel and at intervals, and makes the front ends of the two gas supply branches 2 communicate with each other and are connected to the gas source through the gas supply main pipe 24, wherein the gas supply main pipe 24 is provided with a main control ball valve 25 and a third pressure gauge (not shown in the figure). Correspondingly, the present specific implementation sets ten test stations, and divides the ten test stations into two rows corresponding to the two gas supply branches 2, wherein each row includes five test stations. This setting is not only conducive to the structural layout, but also improves the structural stability and test efficiency. The main control ball valve 25 can be used to conveniently and quickly cut off the gas supply pipeline for inspection and maintenance, and the third pressure gauge can be used to intuitively understand the gas supply pressure. However, it should be pointed out that the test stations are not limited to ten, and can also be set to other numbers as needed; the rear ends of the two gas supply branches 2 should be closed by plugs to prevent air leakage. As a specific implementation, the utility model provides the stand 1 with a frame 17 welded with square steel to ensure structural and support stability, and respectively fixes a table 18 on the top and bottom of the frame 17 to place the commander 3 and related tools to be tested or removed. As a specific implementation, the utility model provides the mounting seat 11 with a channel steel 111 and a bracket plate 112, wherein the channel steel 111 is welded to the frame 17, the bracket plate 112 is L-shaped and fixed to the channel steel 111 by bolts, and the commander 3 is fixed to the L-shaped bracket plate 112 by bolts. The mounting seat 11 with this configuration has the characteristics of simple structure and convenient assembly and disassembly.

[0020] The above embodiments are only descriptions of the preferred implementation modes of the present invention, and are not intended to limit the protection scope of the present invention. Without departing from the design concept of the present invention, various modifications made by those skilled in the art based on the technical solution of the present invention should fall within the protection scope determined by the claims of the present invention.

Claims

1. A special test platform for commander, characterized in that: The invention comprises a bench (1) and a gas supply branch pipe (2) arranged on the bench (1), wherein the bench (1) is provided with a plurality of test stations, wherein the test stations comprise a mounting seat (11) and a three-way gas distributor block (12) fixed on the bench (1), a controller (3) to be tested is detachably fixed on the mounting seat (11), a single-head cock (13) and a double-head cock (14) are installed on a first interface and a second interface of the three-way gas distributor block (12) respectively, and the double-head cock (14) is connected to There are a first pressure gauge and a water column gauge (15); the third interface of the three-way gas distribution block (12) is connected to the gas port P2 of the controller (3) through a first hose (16); the gas port P3 of the controller (3) is installed with a second pressure gauge (31); a sub-control ball valve (22) corresponding to each test station is installed on the gas supply branch pipe (2) through a three-way pipe fitting (21); the sub-control ball valve (22) is connected to the corresponding gas port P1 of the controller (3) through a second hose (23).

2. A commander-specific test platform according to claim 1, characterized in that: Two gas supply branch pipes (2) are arranged in parallel and at intervals, the front ends of the two gas supply branch pipes (2) are interconnected and connected to the gas source through a gas supply main pipe (24), and a main control ball valve (25) and a third pressure gauge are arranged on the gas supply main pipe (24).

3. A commander-specific test platform according to claim 2, characterized in that: The ten test stations are arranged, and the ten test stations are divided into two rows corresponding to the two gas supply branch pipes (2), and each row includes five test stations.

4. A commander-specific test platform according to claim 3, characterized in that: The stand (1) comprises a frame (17) welded from square steel, and a table plate (18) is fixed to the top and bottom of the frame (17) respectively.

5. A commander-specific test platform according to claim 4, characterized in that: The mounting seat (11) comprises a channel steel (111) and a bracket plate (112), the channel steel (111) is welded to the frame (17), the bracket plate (112) is L-shaped and is fixed to the channel steel (111) by bolts, and the controller (3) is fixed to the L-shaped bracket plate (112) by bolts.

6. A commander-specific test platform according to claim 5, characterized in that: The two ends of the first hose (16) are respectively connected to the controller (3) and the three-way gas distributor (12) through quick connectors, and the two ends of the second hose (23) are respectively connected to the controller (3) and the control ball valve (22) through quick connectors.