Prefabricated pier column concrete pouring operation platform
By introducing an adjustment mechanism and a movable door into the precast pier concrete pouring platform, the problems of long installation and dismantling time and poor versatility of the existing platform have been solved, enabling rapid adaptation to piers of different sizes and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202323390600.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-13
AI Technical Summary
The existing precast pier concrete pouring operation platform has a long installation and dismantling time and low turnover rate. Different platforms need to be erected or made for piers of different sizes, resulting in low work efficiency.
A concrete pouring platform was designed, comprising a first base, a second base, an adjustment mechanism, a retaining mechanism, and a movable door. The base spacing can be adjusted by the adjustment mechanism to accommodate piers with different cross-sectional dimensions, and a movable door is installed on the retaining mechanism to improve installation and dismantling efficiency.
It enables rapid installation and dismantling, improves the versatility and safety of the work platform, reduces manufacturing costs, and enhances construction efficiency and safety.
Smart Images

Figure CN222079618U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a prefabricated pier column concrete pouring operation platform. Background Art
[0002] A pier is a component in a building structure. Its main function is to support beams or serve as a support for beams, thereby bearing the weight of beams and slabs. The characteristic of this structure is that it combines the structural characteristics of columns and beams to form an overall structural system. The cross-sectional shapes of piers are diverse and can be round, oval, square, curved or other special shapes.
[0003] Prefabricated piers are factory-constructed with a short construction period and have a large number of cross-sectional sizes. The existing pier concrete pouring technology usually adopts a method of setting up a ladder cage, installing a pouring platform, and gradually dismantling the platform after the pouring is completed to construct the next pier. When this method is used to pour pier concrete, the installation and dismantling of the concrete pouring work platform takes a long time, and the turnover rate is relatively low. Different sizes of piers need to set up or make different platforms, and the work efficiency is low. Therefore, a new work platform is urgently needed to solve the above problems. Utility Model Content
[0004] The utility model aims to provide a prefabricated pier column concrete pouring work platform to solve the problems of the prior art concrete pouring work platform having a long installation and dismantling time, a relatively low turnover rate, and the need to set up or manufacture different platforms for piers of different sizes.
[0005] To achieve the above object, the utility model provides the following technical solution: a prefabricated pier column concrete pouring operation platform, comprising a first base and a second base, wherein the first base is connected to the second base, and further comprising:
[0006] An adjusting mechanism, the adjusting mechanism is arranged between the first base and the second base, and the adjusting mechanism can adjust the relative movement between the first base and the second base;
[0007] A protective mechanism, wherein the first base and the second base are provided with a protective mechanism, and
[0008] A movable door is arranged on the enclosure mechanism.
[0009] Preferably, the adjustment mechanism comprises an adjustment screw, and the adjustment screw is connected to the first base and the second base.
[0010] Preferably, the enclosure mechanism comprises a guardrail, and the guardrail is arranged on the first base and the second base.
[0011] Preferably, the first base includes a plurality of first circular tubes, a first patterned steel plate is fixedly connected between the first circular tubes, a first square tube is fixedly connected between the first circular tubes, the first square tube is fixedly connected to the first patterned steel plate, a first hanging plate is fixedly connected to the inner side of the joint of two first circular tubes, and a first guardrail flange is fixedly connected to the top of the first circular tube.
[0012] Preferably, the second base includes a plurality of second circular tubes, a second patterned steel plate is fixedly connected between the second circular tubes, a second square tube is fixedly connected between the second circular tubes, the second square tube is fixedly connected to the second patterned steel plate, a second hanging plate is fixedly connected to the inner side of the joint of two second circular tubes, and a second guardrail flange is fixedly connected to the top of the second circular tube.
[0013] Preferably, the second round tube can be inserted into the first round tube.
[0014] Preferably, the adjusting screw is threadedly connected to the first square passage and the second square passage.
[0015] Preferably, the guardrail is formed by a plurality of square tubes that are arranged vertically and horizontally and fixedly connected, and a square tube flange is fixedly connected to the bottom of the square tubes vertically arranged on the guardrail.
[0016] Preferably, the square tube flange is bolted to the first guardrail flange and the second guardrail flange.
[0017] Preferably, the movable door is rotatably connected to the guardrail.
[0018] It can be seen from the above technical solution that the utility model has the following beneficial effects:
[0019] The prefabricated pier column concrete pouring work platform is provided with an adjustment mechanism for adjusting the relative movement of the first base and the second base between the first base and the second base, a protective mechanism is provided on the first base and the second base, and a movable door is provided on the protective mechanism, and a movable door is provided in each direction. The platform is easy to install and remove, and the work efficiency is improved. At the same time, the size can be adjusted by adjusting the screw rod, and the platform can be suitable for square pier columns with different cross-sectional sizes. The platform has good versatility and saves the cost of making multiple work platforms. The platform is provided with a movable door in each direction, which is convenient for personnel to get on and off the aerial platform, greatly improving safety, and solving the problems of long installation and removal time, low turnover rate, the need to set up or make different platforms for pier columns of different sizes, and low work efficiency of the prior art concrete pouring work platform. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2It is a side schematic diagram of the overall structure of the utility model;
[0022] Figure 3 It is a plan view of the first base of the utility model;
[0023] Figure 4 It is a schematic plan view of the second base of the utility model;
[0024] Figure 5 This is a schematic diagram of the guardrail structure of the utility model;
[0025] Figure 6 This is a schematic diagram of the structure of the movable door of the utility model.
[0026] In the figure: 1. first base; 11. first round tube; 12. first patterned steel plate; 13. first square tube; 14. first hanging plate; 15. first guardrail flange; 2. second base; 21. second round tube; 22. second patterned steel plate; 23. second square tube; 24. second hanging plate; 25. second guardrail flange; 3. adjusting mechanism; 31. adjusting screw; 4. enclosure mechanism; 41. guardrail; 5. movable door; 6. square tube flange. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] like Figure 1-Figure 6 As shown, a prefabricated pier column concrete pouring work platform includes a first base 1, a second base 2, an adjusting mechanism 3, a enclosure mechanism 4 and a movable door 5. The first base 1 is connected to the second base 2, the adjusting mechanism 3 is arranged between the first base 1 and the second base 2, the first base 1 and the second base 2 are provided with an enclosure mechanism 4, and a plurality of movable doors 5 are arranged on the enclosure mechanism 4. The adjusting mechanism 3 can adjust the relative movement of the first base 1 and the second base 2. The work platform is hoisted as a whole to the top of the pier column formwork, and the installation and removal are extremely convenient, which improves the work efficiency. At the same time, the size can be adjusted by adjusting the screw 31, and it can be suitable for square pier columns of different cross-sectional sizes. It has good versatility and saves the cost of making multiple work platforms. A movable door 5 is provided in each direction to facilitate personnel to get on and off the aerial platform, which greatly improves safety.
[0029] like Figure 1-Figure 6As shown, the adjustment mechanism 3 includes an adjustment screw 31, which is connected to the first base 1 and the second base 2, and the enclosure mechanism 4 includes a guardrail 41, which is arranged on the first base 1 and the second base 2. The first base 1 and the second base 2 are butt-connected, and the adjustment screw 31 is arranged at the connection. The guardrail 41 is installed around the first base 1 and the second base 2. The adjacent square tubes of the first base 1 and the second base 2 are spliced with positive and negative thread nuts matching the adjustment screw 31. The first base 1 includes a plurality of first round tubes 11, a first patterned steel plate 12, and a first square tube 13, a first hanging plate 14 and a first guardrail flange 15, a first patterned steel plate 12 is welded between the first round tubes 11, a first square tube 13 is fixedly welded between the first round tubes 11, the first square tube 13 is welded to the first patterned steel plate 12, a first hanging plate 14 is welded on the inner side of the junction of the two first round tubes 11, a first guardrail flange 15 is welded on the top of the first round tube 11, and the second base 2 includes a plurality of second round tubes 21, a second patterned steel plate 22, a second square tube 23, a second hanging plate 24 and a second guardrail flange 25, and the second patterned steel plate 22 is welded on the second The second square tube 23 is welded between the second round tubes 21, the second square tube 23 is welded to the second patterned steel plate 22, the second hanging plate 24 is welded to the inner side of the junction of the two second round tubes 21, the second guardrail flange 25 is welded to the top of the second round tube 21, the second round tube 21 can be inserted into the first round tube 11, the adjusting screw 31 is threadedly connected with the first square tube 13 and the second square tube 23, the guardrail 41 is welded by a plurality of vertically and horizontally arranged square tubes, the bottom of the vertically arranged square tube on the guardrail 41 is welded with a square tube flange 6, and the guardrail 41 is welded to the bottom of the vertically arranged square tube. The square tube flange 6 in the fence 41 is bolted to the first guardrail flange 15 and the second guardrail flange 25 in the first base 1 and the second base 2. The square tube flange 6 is used to connect the first base 1 and the second base 2. The square tube flange 6 is bolted to the first guardrail flange 15 and the second guardrail flange 25. The movable door 5 is rotatably connected to the guardrail 41. Each side of the guardrail 41 is provided with a movable door 5. The movable door 5 is welded by a plurality of vertical and horizontal round tubes. Pulleys are welded on the upper and lower vertical round tubes on one side, and a pin is placed on the top of the other side. The slideway is welded to the guardrail 41 by angle steel.
[0030] When in use, after adjusting the required size by adjusting the screw rod 31, the whole is hoisted to the pier column template, and after use, the whole is moved away, and after the size is adjusted, it is used for the next one.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A prefabricated pier column concrete pouring operation platform, comprising a first base (1) and a second base (2), wherein the first base (1) is connected to the second base (2), and is characterized in that: Also includes: An adjustment mechanism (3), the adjustment mechanism (3) being arranged between the first base (1) and the second base (2), and the adjustment mechanism (3) being capable of adjusting the relative movement of the first base (1) and the second base (2); A protective mechanism (4), wherein the first base (1) and the second base (2) are provided with the protective mechanism (4), and A movable door (5), wherein a plurality of the movable doors (5) are arranged on the enclosure mechanism (4).
2. A prefabricated pier column concrete pouring operation platform according to claim 1, characterized in that: The adjusting mechanism (3) comprises an adjusting screw (31), and the adjusting screw (31) is connected to the first base (1) and the second base (2).
3. A prefabricated pier column concrete pouring operation platform according to claim 2, characterized in that: The enclosure mechanism (4) comprises a guardrail (41), and the guardrail (41) is arranged on the first base (1) and the second base (2).
4. A prefabricated pier column concrete pouring operation platform according to claim 3, characterized in that: The first base (1) comprises a plurality of first circular tubes (11), first patterned steel plates (12) are fixedly connected between the first circular tubes (11), first square tubes (13) are fixedly connected between the first circular tubes (11), the first square tubes (13) are fixedly connected to the first patterned steel plates (12), a first hanging plate (14) is fixedly connected to the inner side of the junction of two first circular tubes (11), and a first guardrail flange (15) is fixedly connected to the top of the first circular tube (11).
5. A prefabricated pier column concrete pouring operation platform according to claim 4, characterized in that: The second base (2) comprises a plurality of second circular tubes (21), second patterned steel plates (22) are fixedly connected between the second circular tubes (21), second square tubes (23) are fixedly connected between the second circular tubes (21), the second square tubes (23) are fixedly connected to the second patterned steel plates (22), a second hanging plate (24) is fixedly connected to the inner side of the junction of two second circular tubes (21), and a second guardrail flange (25) is fixedly connected to the top of the second circular tube (21).
6. A prefabricated pier column concrete pouring operation platform according to claim 5, characterized in that: The second round tube (21) can be inserted into the first round tube (11).
7. The prefabricated pier column concrete pouring operation platform according to claim 5, characterized in that: The adjusting screw (31) is threadedly connected to the first square tube (13) and the second square tube (23).
8. The prefabricated pier column concrete pouring operation platform according to claim 5, characterized in that: The guardrail (41) is formed by a plurality of square tubes arranged vertically and horizontally and fixedly connected, and the bottom of the square tubes arranged vertically on the guardrail (41) is fixedly connected to a square tube flange (6).
9. A prefabricated pier column concrete pouring operation platform according to claim 8, characterized in that: The square tube flange (6) is bolted to the first guardrail flange (15) and the second guardrail flange (25).
10. The prefabricated pier column concrete pouring operation platform according to claim 3, characterized in that: The movable door (5) is rotatably connected to the guardrail (41).