EPP foaming particle pre-pressing device

By introducing wheels and baffle structures into the EPP foam granule pre-compression device, the problems of device movement and fixation were solved, achieving convenient use and efficient production.

CN222079880UActive Publication Date: 2024-11-29CGN BOFAN NEW MATERIALS (SUZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323007635.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-08
Publication Date
2024-11-29
Estimated Expiration
2033-11-08

AI Technical Summary

Technical Problem

Existing EPP foam granule pre-compression devices are inconvenient to move and lack machine protection and fixing functions, resulting in inconvenience in use and low production efficiency.

Method used

An EPP foam granule pre-compression device with wheels and baffles was designed. The wheels enable mobility, the baffles fix the machine, and the fully automatic control system improves production efficiency.

Benefits of technology

This allows for convenient movement and fixation of the equipment, reducing labor intensity and improving production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222079880U_ABST
    Figure CN222079880U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of foaming particles, in particular to an EPP foaming particle pre-pressing device which comprises an air storage tank, a material pressing tank and a forming machine material barrel, an air freezing dryer and an air filter are sequentially arranged on a pipeline between an air compressor and the air storage tank, and the air storage tank is connected to the top of the material pressing tank through a pipeline. The fan is also connected to the top of the material pressing tank through a pipeline, the control box is connected with a sensor arranged in the material pressing tank, the bottom of the material storage tank is connected with the top of the material pressing tank through a pipeline, the bottom of the material pressing tank is communicated with the top of the forming machine charging basket, and a metering tank is arranged on the pipeline connecting the material storage tank and the material pressing tank. And the control box is connected with the gravity sensor in the metering tank. According to the EPP foaming particle pre-pressing device, the metering tank is arranged at the bottom of the material pressing tank, full-automatic control over the EPP foaming particle pre-pressing device can be achieved through the control box, production efficiency is greatly improved, and labor intensity is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foamed particles, in particular to an EPP foamed particle pre-pressing device. Background Art

[0002] Polypropylene foam (EPP) is a kind of polypropylene after foaming, which consists of two phases, solid and gas, in the form of black, gray or white particles, and the diameter is generally between 2 and 7 mm. The outer wall of EPP particles is closed and the inside is filled with gas. Usually, its solid phase component accounts for only 2% to 10% of the total weight, and the rest is gas. The foam material has the advantages of light specific gravity, strong temperature resistance, good cushioning performance, and 100% recycling. Compared with other foam materials, EPP is a pure hydrocarbon and does not contain any other chemical substances such as plasticizers or foaming agents that are not conducive to recycling. Therefore, it can be digested after heating, and only water and carbon dioxide are left after burning. Therefore, EPP has been widely used in the field of automobile manufacturing and has become a new favorite of energy absorption and shock absorption materials. Its application potential is very broad.

[0003] EPP can be processed into various shapes, and the processing of its molded products mainly includes: material pre-pressing, foam molding, foam drying and shaping, inspection and packaging, etc. Before processing EPP, it is necessary to change the pressure inside the raw material particles through loading pressure to produce molded parts with different densities. The raw materials after loading pressure can realize the production of molded parts with various densities. At the same time, loading pressure can also reduce the shrinkage of the molded parts after demolding and improve the surface effect. During EPP pre-pressing, the loading pressure can be adjusted by changing parameters such as time, pressure, and temperature. The current EPP pre-pressing device has the defects of inaccurate raw material metering and difficult control of process parameters.

[0004] An EPP foaming particle pre-pressing device disclosed in the Chinese utility model patent application disclosure CN203063024U includes an air storage tank, a pressure tank and a molding machine barrel, an air dryer and an air filter are arranged in sequence on the pipeline between the air compressor and the air storage tank, the air storage tank is connected to the top of the pressure tank through a pipeline, the fan is also connected to the top of the pressure tank through a pipeline, the control box is connected to the sensor arranged in the pressure tank, the bottom of the storage tank is connected to the top of the pressure tank through a pipeline, the bottom of the pressure tank is connected to the top of the molding machine barrel, a metering tank is arranged on the pipeline connecting the storage tank and the pressure tank, and the control box is connected to the gravity sensor in the metering tank. The utility model is provided with a metering tank at the bottom of the pressure tank, and the control box can realize full automatic control of the EPP foaming particle pre-pressing device, which greatly improves production efficiency and reduces labor intensity.

[0005] However, the device has no wheels, which makes it inconvenient to move when it is needed in other places. Moreover, the device has no function of protecting part of the machine and the function of fixing the machine. Utility Model Content

[0006] The utility model aims to provide an EPP foaming particle pre-pressing device to solve the problems raised in the above background technology.

[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0008] An EPP foam particle pre-pressing device comprises a baffle D, a wheel is clamped at the bottom of the baffle D, and the top of the baffle D is fixedly connected to legs A, B, and C, the top of leg A is fixedly connected to an air storage tank, the top of leg B is fixedly connected to a pressure tank, and the top of leg C is fixedly connected to a molding machine barrel.

[0009] Preferably, a connecting pipe A is plugged into the top of the barrel of the molding machine, a pressure tank is plugged into the other end of the connecting pipe A, a connecting pipe B is plugged into the top of the pressure tank, and an air storage tank is plugged into the other end of the connecting pipe B.

[0010] Preferably, the top of the baffle D is fixedly connected to baffles A, E and C, the top of the baffle C is fixedly connected to a sliding rod, and the outer surface of the sliding rod is slidably connected to baffle B.

[0011] Preferably, a connecting pipe G is connected at the center of the baffle C, an air filter is connected to one end of the connecting pipe G, an air dryer is connected to the other end of the connecting pipe G, a connecting pipe F is connected to the top of the air dryer, and an air compressor is connected to the other end of the connecting pipe F.

[0012] Preferably, a connecting pipe C is plugged into the top of the pressure tank, a fan is plugged into the other end of the connecting pipe C, a connecting pipe D is plugged into the outer surface of the pressure tank, and a control box is plugged into the other end of the connecting pipe D.

[0013] Preferably, a connecting pipe E is connected to one side of the control box, a metering tank is connected to the other end of the connecting pipe E, a connecting pipe H is connected to the top of the metering tank, a storage tank is connected to the other end of the connecting pipe H, and a storage tank cover is movably connected to the top of the storage tank.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. The EPP foaming particle pre-pressing device can fix the machine when in use through the arrangement of baffle A, baffle B, baffle C and baffle D, so that the machine is more convenient and easier for the staff to use.

[0016] 2. The EPP foamed particle pre-pressing device can move the entire machine when in use through the setting of wheels, so that the staff can move the machine more conveniently when in use. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional overall structural schematic diagram of the utility model;

[0018] Figure 2 It is a three-dimensional internal structure schematic diagram of the utility model;

[0019] Figure 3 This is a schematic diagram of the control box connection structure of the utility model;

[0020] Figure 4 For the utility model Figure 2 A is an enlarged schematic diagram of the structure.

[0021] In the figure: 1. air compressor; 2. air dryer; 3. air filter; 4. air storage tank; 5. fan; 6. pressure tank; 7. control box; 8. storage tank; 9. metering tank; 10. forming machine barrel; 11. wheel; 12. support leg A; 13. support leg B; 14. support leg C; 15. connecting pipe A; 16. connecting pipe B; 17. connecting pipe C; 18. storage tank cover; 19. connecting pipe D; 20. connecting pipe E; 21. connecting pipe F; 22. connecting pipe G; 23. baffle A; 24. baffle B; 25. sliding rod; 26. baffle E; 27. baffle C; 28. baffle D; 29. ​​sealant; 30. connecting pipe H. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-Figure 4 As shown, a technical solution provided by the utility model:

[0024] An EPP foam particle pre-pressing device comprises a baffle D, a wheel is clamped at the bottom of the baffle D, a support leg A, a support leg B and a support leg C are fixedly connected to the top of the baffle D, an air storage tank is fixedly connected to the top of the support leg A, a material pressing tank is fixedly connected to the top of the support leg B, and a material barrel of a molding machine is fixedly connected to the top of the support leg C;

[0025] Reference Figure 4 One end of the connecting pipe B is connected with a press tank, and the connection is sealed with sealant during the connection.

[0026] In this embodiment, preferably, a connecting pipe A is plugged into the top of the material barrel of the molding machine, a material pressure tank is plugged into the other end of the connecting pipe A, a connecting pipe B is plugged into the top of the material pressure tank, and an air storage tank is plugged into the other end of the connecting pipe B. Through the setting of the connecting pipe A and the connecting pipe B, when in use, the material barrel of the molding machine, the material pressure tank and the air storage tank are connected to each other, so that it is more convenient for the staff to use this machine without having to reinstall it;

[0027] In this embodiment, preferably, the top of the baffle D is fixedly connected with baffle A, baffle E, and baffle C, the top of the baffle C is fixedly connected with a sliding rod, and the outer surface of the sliding rod is slidably connected with the baffle B. Through the arrangement of the sliding rod and the baffle B, when in use, the bottom of the baffle B is connected to the sliding rod, and the baffles can enclose a closed space to facilitate the staff to perform later maintenance on the internal machine;

[0028] In this embodiment, preferably, a connecting pipe G is plugged into the center of the baffle C, one end of the connecting pipe G is plugged into an air filter, the other end of the connecting pipe G is plugged into an air dryer, the top of the air dryer is plugged into a connecting pipe F, the other end of the connecting pipe F is plugged into an air compressor, and through the setting of the connecting rod G, the connecting rod F, the air dryer, and the air compressor, when in use, the connecting rod G and the connecting rod F are plugged into the air dryer and the air compressor, so that the air dryer and the air compressor of the machine are connected to each other by the connecting pipe, so that the staff can activate the machine more conveniently and quickly without the need to reinstall;

[0029] In this embodiment, preferably, a connecting pipe C is plugged into the top of the pressurizing tank, a fan is plugged into the other end of the connecting pipe C, a connecting pipe D is plugged into the outer surface of the pressurizing tank, and a control box is plugged into the other end of the connecting pipe D. Through the setting of the connecting pipe C, the connecting pipe D, the fan, and the control box, when in use, the fan and the control box are connected to each other, so that the staff can use the machine more conveniently without having to reinstall it;

[0030] In this embodiment, preferably, a connecting pipe E is connected to one side of the control box, a metering tank is connected to the other end of the connecting pipe E, a connecting pipe H is connected to the top of the metering tank, a storage tank is connected to the other end of the connecting pipe H, and a storage tank is movably connected to the top of the storage tank with a storage tank cover. Through the arrangement of the connecting pipe E, the connecting pipe H, the metering tank and the storage tank, the metering tank and the storage tank are connected to each other when in use, so that the staff can use the machine more conveniently without reinstalling, thereby realizing full automatic control.

[0031] When in use, an EPP foaming particle pre-pressing device of the present embodiment comprises an air storage tank 4, and a pressure tank 6 and a molding machine barrel 10 which are sequentially connected to the air storage tank 4. An air dryer 2 and an air filter 3 are sequentially arranged on the pipeline between the air compressor 1 and the air storage tank 4. The air storage tank 4 is connected to the top of the pressure tank 6 through a pipeline, and the fan 5 is also connected to the top of the pressure tank 6 through a pipeline. The control box 7 is connected to the sensor arranged in the pressure tank 6, and the bottom of the storage tank 8 is connected to the top of the pressure tank 6 through a pipeline. The bottom of the pressure tank 6 is connected to the top of the molding machine barrel 10. A metering tank 9 is arranged on the pipeline connecting the storage tank 8 and the pressure tank 6, and the control box 7 is connected to the gravity sensor arranged in the metering tank 9. All devices of the utility model are connected to each other, and a metering tank is arranged at the bottom of the pressure tank. The control box can realize full-automatic control of the EPP foaming particle pre-pressing device, which greatly improves production efficiency and reduces labor intensity.

[0032] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. An EPP foamed particle pre-pressing device, characterized in that: The invention comprises a baffle D (28), the bottom of which is clamped with a wheel (11), the top of which is fixedly connected with a leg A (12), a leg B (13), and a leg C (14), the top of which is fixedly connected with an air storage tank (4), the top of which is fixedly connected with a press tank (6), and the top of which is fixedly connected with a molding machine barrel (10).

2. The EPP foamed particle pre-pressing device according to claim 1, characterized in that: A connecting pipe A (15) is plugged into the top of the molding machine barrel (10), a pressure tank (6) is plugged into the other end of the connecting pipe A (15), a connecting pipe B (16) is plugged into the top of the pressure tank (6), and an air storage tank (4) is plugged into the other end of the connecting pipe B (16).

3. The EPP foamed particle pre-pressing device according to claim 1, characterized in that: The top of the baffle D (28) is fixedly connected to baffle A (23), baffle E (26), and baffle C (27); the top of the baffle C (27) is fixedly connected to a sliding rod (25); and the outer surface of the sliding rod (25) is slidably connected to baffle B (24).

4. The EPP foamed particle pre-pressing device according to claim 3, characterized in that: A connecting pipe G (22) is plugged into the center of the baffle C (27), one end of the connecting pipe G (22) is plugged into an air filter (3), the other end of the connecting pipe G (22) is plugged into an air dryer (2), a connecting pipe F (21) is plugged into the top of the air dryer (2), and the other end of the connecting pipe F (21) is plugged into an air compressor (1).

5. The EPP foamed particle pre-pressing device according to claim 1, characterized in that: A connecting pipe C (17) is plugged into the top of the pressurizing tank (6), and a fan (5) is plugged into the other end of the connecting pipe C (17). A connecting pipe D (19) is plugged into the outer surface of the pressurizing tank (6), and a control box (7) is plugged into the other end of the connecting pipe D (19).

6. The EPP foamed particle pre-pressing device according to claim 5, characterized in that: A connecting pipe E (20) is plugged into one side of the control box (7), a metering tank (9) is plugged into the other end of the connecting pipe E (20), a connecting pipe H (30) is plugged into the top of the metering tank (9), a material storage tank (8) is plugged into the other end of the connecting pipe H (30), and a material storage tank cover (18) is movably connected to the top of the material storage tank (8).