Jacking device for hanging basket construction
By using clamping components and guide rods in the hoisting device for hanging basket construction, the problem of steel rods being sheared is solved, ensuring the load-bearing capacity of steel rods, avoiding deviation and slippage, and improving the stability of construction .
Patent Information
- Application Number
- CN202420630652.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-29
AI Technical Summary
During the construction of the hanging basket, as the nut is tightened, the steel rod drives the wedge block to rotate, causing dislocation with the concrete inclined surface, reducing the load-bearing capacity of the steel rod.
By using a clamping assembly to cooperate with the clamping member in the hoisting device, the circumferential limit of the steel rod is carried out and prestressed to avoid rotation of the wedge block, and install nuts under the action of the clamping assembly to ensure that the steel rod does not rotate , thereby improving the bearing capacity of steel rods.
It effectively avoids the steel rod being sheared, ensures the load-bearing capacity of the steel rod, and prevents the steel rod from being offset and slipped during installation and hoisting through the coordination of the clamping assembly and guide rod.
Smart Images

Figure CN222082357U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of cantilever construction, in particular to a jacking device used for hanging basket construction. Background Art
[0002] The hanging basket is the main equipment in cantilever construction. The hanging basket construction has the characteristics of light weight, simple structure, firmness and stability, easy forward movement and assembly and disassembly, strong reusability, and small deformation after being stressed. During the construction process, in order to stabilize the hanging basket, the steel rod is inserted into the poured concrete. Since there is an inclined surface at the position where the steel rod is set on the poured concrete, a wedge block matching the inclined surface needs to be installed on the steel rod and fixed with a nut, so that the steel rod is vertically stressed, and then the hanging basket is fixed on the poured concrete, which can reduce the deformation of the hanging basket during the pouring process.
[0003] The existing construction process has the following problems: as the nut is gradually tightened, the steel rod will drive the wedge block to rotate. After the wedge block rotates, it will be misaligned with the inclined surface on the poured concrete, causing the steel rod to be sheared, thereby reducing the bearing capacity of the steel rod.
[0004] Based on the above situation, there is an urgent need for a jacking device for hanging basket construction to solve the problem of shearing of steel bars. Utility Model Content
[0005] The purpose of the utility model is to solve the problem of shearing of the steel rod by gradually tightening the nut during the existing construction process, in which the steel rod drives the wedge block to rotate. After the wedge block rotates, it will be misaligned with the inclined surface on the poured concrete, causing the steel rod to be sheared, thereby reducing the bearing capacity of the steel rod and solving the problem of shearing of the steel rod.
[0006] The technical solution of the utility model is as follows:
[0007] A jacking device for hanging basket construction, characterized by comprising:
[0008] A base, disposed on a horizontal surface;
[0009] A lifting piece, installed on the base and used to lift the steel rod upward;
[0010] The clamping assembly is installed on the lifting member and is used for clamping the steel rod.
[0011] In the existing construction process, as the nut is gradually tightened, the steel rod will drive the wedge block to rotate. After the wedge block rotates, it will be misaligned with the inclined surface on the poured concrete, causing the steel rod to be sheared. In this solution, after the wedge block is installed, the clamping assembly cooperates with the jacking piece to limit the steel rod circumferentially and jack it upward to apply prestress, and then a nut is installed on the end of the steel rod away from the wedge block. During the tightening of the nut, the clamping assembly can prevent the steel rod from rotating, thereby preventing the wedge block from rotating, thereby solving the problem of the steel rod being sheared and ensuring the bearing capacity of the steel rod.
[0012] Furthermore, the present solution does not limit the specific structure of the clamping assembly. One feasible solution is that the clamping assembly includes at least two mutually cooperating jaws, and the jaws are formed with a limiting groove that cooperates with the steel rod. When this solution is adopted, the steel rod is fixed by the limiting groove, which can prevent the steel rod from being offset during the installation of the wedge block.
[0013] Furthermore, in order to limit the steel rod circumferentially, one feasible solution is that the clamping assembly also includes a hydraulic telescopic rod for driving the clamping claws. When this solution is adopted, the hydraulic telescopic rod provides sufficient clamping force to increase the friction between the clamping claws and the steel rod, thereby limiting the steel rod circumferentially to prevent the steel rod from rotating.
[0014] Furthermore, in order to prevent the steel rod from shifting during the jacking process, one feasible solution is: a guide rod is formed on the base, and the guide rod cooperates with the jacking member and is used to guide the jacking member. When this solution is adopted, under the action of the guide rod, the movement of the jacking member is restricted to the vertical direction, thereby preventing the steel rod from shifting during the jacking process.
[0015] Furthermore, the present solution does not limit the specific structure of the lifting member. One feasible solution is that the lifting member includes a cross structure and the guide rod is used to guide the cross structure. When this solution is adopted, the cross structure is guided from four different positions by the guide rod.
[0016] Furthermore, in order to prevent the lifting device from slipping during the lifting process, one feasible solution is that an anti-slip pad is installed on the base. When this solution is adopted, the lifting device can be prevented from slipping during the lifting process.
[0017] Compared with the existing technology, the beneficial effects of the utility model are:
[0018] 1. After the installation of the wedge block is completed, the steel bar is circumferentially limited and lifted upward to apply prestress through the cooperation of the clamping assembly and the lifting piece, and a nut is installed at one end of the steel bar away from the wedge block. During the tightening process of the nut, the steel bar can be prevented from rotating under the action of the clamping assembly, thereby preventing the wedge block from rotating, thereby solving the problem of shearing of the steel bar and ensuring the bearing capacity of the steel bar;
[0019] Second, since the clamping assembly includes at least two mutually cooperating clamping jaws, the clamping jaws are formed with a limiting groove cooperating with the steel rod, and the steel rod is fixed by the limiting groove, which can prevent the steel rod from being offset during the installation of the wedge block;
[0020] 3. Since a guide rod is formed on the base, the guide rod cooperates with the jacking member and is used to guide the jacking member. Under the action of the guide rod, the movement of the jacking member is restricted in the vertical direction to prevent the steel rod from being offset during the jacking process. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model;
[0022] Figure 2 This is a schematic diagram of the structure of the lifting member of the embodiment of the utility model;
[0023] Figure 3 for Figure 2 A in the enlarged view;
[0024] Figure 4 This is a schematic diagram of the steel rod structure of an embodiment of the utility model.
[0025] Reference numerals:
[0026] 1. Base; 2. Lifting parts; 3. Steel rod; 4. Clamping components;
[0027] 11. Guide rod;
[0028] 21. Cross structure;
[0029] 31. Wedge block; 32. Nut;
[0030] 41. Clamping claw; 42. Hydraulic telescopic rod;
[0031] 411. Limiting groove. DETAILED DESCRIPTION
[0032] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0033] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.
[0034] Example:
[0035] Please refer to Figure 1 and Figure 4 A lifting device for hanging basket construction, characterized in that it includes:
[0036] A base 1 is arranged on a horizontal plane;
[0037] A lifting member 2 is installed on the base 1 and is used to lift the steel rod 3 upward;
[0038] The clamping assembly 4 is installed on the lifting member 2 and is used to clamp the steel rod 3.
[0039] In the existing construction process, as the nut is gradually tightened, the steel rod will drive the wedge block to rotate. After the wedge block rotates, it will be misaligned with the inclined surface on the poured concrete, causing the steel rod to be sheared. In this solution, after the wedge block 31 is installed, the clamping assembly 4 cooperates with the jacking piece 2 to limit the steel rod 3 circumferentially and lift it upward to apply prestress, and then the nut 32 is installed at the end of the steel rod 3 away from the wedge block. During the tightening process of the nut 32, the clamping assembly 4 can prevent the steel rod 3 from rotating, thereby preventing the wedge block 31 from rotating, thereby solving the problem of the steel rod being sheared and ensuring the bearing capacity of the steel rod 3.
[0040] Reference Figure 3 This solution does not limit the specific structure of the clamping assembly 4. One feasible solution is: the clamping assembly 4 includes at least two mutually cooperating jaws 41, and the jaws 41 are formed with a limiting groove 411 that cooperates with the steel rod 3. When this solution is adopted, the steel rod 3 is fixed by the limiting groove 411, which can prevent the steel rod 3 from being offset during the installation process of the wedge block 31.
[0041] In order to limit the steel rod 3 circumferentially, one feasible solution is: the clamping assembly 4 also includes a hydraulic telescopic rod 42 for driving the clamping jaws 41. When this solution is adopted, the hydraulic telescopic rod 42 provides sufficient clamping force to increase the friction between the clamping jaws 41 and the steel rod 3, thereby limiting the steel rod 3 circumferentially to prevent the steel rod 3 from rotating.
[0042] Reference Figure 1 and Figure 2 In order to prevent the steel rod 3 from deflecting during the lifting process, one feasible solution is: a guide rod 11 is formed on the base 1, and the guide rod 11 cooperates with the lifting member 2 and is used to guide the lifting member 2. When this solution is adopted, under the action of the guide rod 11, the movement of the lifting member 2 is limited to the vertical direction, thereby preventing the steel rod 3 from deflecting during the lifting process.
[0043] This solution does not limit the specific structure of the lifting member 2. One feasible solution is that the lifting member 2 includes a cross structure 21 and the guide rod 11 is used to guide the cross structure 21. When this solution is adopted, the cross structure 21 is guided from four different positions by the guide rod 11.
[0044] In order to prevent the lifting device from slipping during the lifting process, one feasible solution is: an anti-skid pad is installed on the base 1. When this solution is adopted, the lifting device can be prevented from slipping during the lifting process.
[0045] The working principle of this embodiment:
[0046] The hanging basket is placed on the poured concrete and the steel rod 3 is passed through and installed in this embodiment. A wedge block 31 matching the steel rod 3 is installed on the inclined surface on the poured concrete and fixed with a nut 32. After the hydraulic telescopic rod 42 drives the clamping claw 41 to clamp the steel rod 3, the jacking member 2 moves upward to apply prestress, and another nut 32 is installed at the end of the steel rod 3 away from the wedge block 31, thereby anchoring the hanging basket on the poured concrete.
[0047] In order to solve the problem of shearing of the steel rod, in the present solution, after the installation of the wedge block 31, the steel rod 3 is circumferentially limited and lifted upward to apply prestress by cooperating with the clamping assembly 4 and the lifting member 2, and then a nut 32 is installed at the end of the steel rod 3 away from the wedge block. During the tightening process of the nut 32, the steel rod 3 can be prevented from rotating under the action of the clamping assembly 4, thereby preventing the wedge block 31 from rotating, thereby solving the problem of shearing of the steel rod and ensuring the bearing capacity of the steel rod 3.
[0048] In order to prevent the steel rod 3 from being offset during the installation of the wedge block 31, secondly, since the clamping assembly 4 includes at least two mutually cooperating jaws 41, a limiting groove 411 cooperating with the steel rod 3 is formed on the jaw 41, and the steel rod 3 is fixed by the limiting groove 411, the steel rod 3 can be prevented from being offset during the installation of the wedge block 31.
[0049] In order to prevent the steel rod 3 from shifting during the lifting process, in the present embodiment, a guide rod 11 is formed on the base 1, and the guide rod 11 cooperates with the lifting member 2 and is used to guide the lifting member 2. Under the action of the guide rod 11, the movement of the lifting member 2 is restricted in the vertical direction, thereby preventing the steel rod 3 from shifting during the lifting process.
[0050] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A lifting device for hanging basket construction, characterized in that: include: A base (1) is arranged on a horizontal plane; A lifting member (2) is installed on the base (1) and is used to lift the steel rod (3) upwards; A clamping assembly (4) mounted on the lifting member (2) and used for clamping the steel rod (3); A guide rod (11) is formed on the base (1), and the guide rod (11) cooperates with the lifting member (2) and is used to guide the lifting member (2); The lifting member (2) comprises a cross structure (21), and the guide rod (11) is used to guide the cross structure (21).
2. A lifting device for hanging basket construction according to claim 1, characterized in that: The clamping assembly (4) comprises at least two clamping jaws (41) that cooperate with each other, and a limiting groove (411) that cooperates with the steel rod (3) is formed on the clamping jaw (41).
3. A jacking device for hanging basket construction according to claim 2, characterized in that: The clamping assembly (4) further comprises a hydraulic telescopic rod (42) for driving the clamping claw (41).
4. The jacking device for hanging basket construction according to claim 1 is characterized in that: An anti-slip pad is installed on the base (1).
