Land leveler for road construction
By designing the structure of the installation box and placing plates on the leveling machine for road construction, effective crushing and dust control of soil blocks and position adjustment of scrapers are achieved, and the crushing in the prior art affects the driver's work and scrapers are vulnerable to the scrapers. question.
Patent Information
- Application Number
- CN202420002037.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-02
AI Technical Summary
Existing road construction graders are prone to dust when crushing soil blocks, which affects drivers' work, and cannot adjust the scraper according to the level of the ground, resulting in the scraper being easily damaged.
A structure including a mounting box, a placing plate, a support table, a motor, a rotary rod, a gear missing, a rack and a crushing rod are designed to facilitate the crushing of soil blocks and reduce dust; at the same time, through a second motor, a threaded rod, The threaded plate, sleeve rod and sleeve block are arranged to adjust the upper and lower position of the scraper.
It effectively prevents dust during breaking, improves the working environment, and allows the scraper to be adjusted according to the level of the ground to avoid scraper damage.
Smart Images

Figure CN222083310U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road construction, in particular to a grader for road construction. Background Art
[0002] Earth-moving machinery that uses a scraper to level the ground. The scraper is installed between the front and rear axles of the machine and can be raised and lowered, tilted, rotated and extended. It has flexible and accurate movements, is easy to operate, and has a high degree of precision in leveling the ground. It is suitable for building roadbeds and pavements, building slopes, and digging ditches. It can also stir road mixtures, remove snow, push bulk materials, and maintain dirt and gravel roads.
[0003] A road construction grader disclosed in the Chinese utility model patent application disclosure CN216006527U can break up larger soil blocks, but it can only be broken by rotation during breaking. However, it is easy to generate large dust during breaking and cannot work well. Therefore, there is a problem that the breaking affects the driver's work. Moreover, when the road surface is uneven, the utility model can only work on flat ground and cannot be adjusted according to the flatness of the ground. Therefore, there is a problem that the scraper is easily damaged during work. In summary, the utility model has the problems of affecting the driver's work during breaking and easily causing damage to the scraper when the road surface is uneven. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides a motor grader for road construction, which solves the problems raised in the above-mentioned background technology.
[0006] (II) Technical solution
[0007] To achieve the above purpose, the utility model is implemented by the following technical scheme: comprising an installation box and a placement plate, the bottom of the installation box is fixedly connected to the placement plate, and one side of the placement plate is fixedly connected to the cockpit;
[0008] The inner bottom wall of the installation box is fixedly connected to a support platform, the top of the support platform is fixedly connected to a first motor, the output shaft of the first motor is fixedly connected to a rotating rod, one side of the rotating rod is fixedly connected to a missing gear, and a rack is rotatably connected to the gap of the missing gear;
[0009] A second motor is fixedly connected to one side of the top of the placement plate, a threaded rod is fixedly connected to the output shaft of the second motor, a threaded plate is rotatably connected to the axis of the threaded rod, a sleeve block is fixedly connected to the front surface of the threaded plate, and a sleeve rod is fixedly connected to one side of the top of the placement plate.
[0010] Optionally, the bottom of the rack is fixedly connected to a first set of plates, and the bottom of the first set of plates passes through the placement plate and is fixedly connected to a bottom plate.
[0011] Optionally, a crushing rod is fixedly connected to the bottom of the base plate, and a limiting plate is fixedly connected to the top of the front surface of the rack.
[0012] Optionally, a limiting groove is provided on an inner wall of the installation box, and an inner wall of the limiting groove is slidably connected to a limiting plate.
[0013] Optionally, a sleeve block is sleeved at the axis of the sleeve rod, and a second sleeve plate is fixedly connected to the bottom of the threaded plate.
[0014] Optionally, the bottom of the second set of plates passes through the placement plate and is fixedly connected with a scraper, and wheels are provided at the bottom of the placement plate.
[0015] Optionally, an engine that cooperates with the wheel is fixedly connected to one side of the bottom of the placement plate, and an oil box that cooperates with the engine is fixedly connected to one side of the bottom of the placement plate.
[0016] (III) Beneficial effects
[0017] The utility model provides a grader for road construction, which has the following beneficial effects:
[0018] 1. The road construction grader, through the arrangement of the first motor, the gear, the rack, the breaker rod and the first set of plates, has the advantages of being able to conveniently break up larger clods of soil and preventing dust from being raised during breaking, thus avoiding the problem of only being able to break up by rotation, but easily generating large dust during breaking and failing to work well, thus causing the problem of the breaking affecting the driver's work.
[0019] 2. The motor grader for road construction, through the arrangement of the second motor, the threaded rod, the threaded plate, the sleeve rod and the sleeve block, enables the motor grader for road construction to adjust the upper and lower positions of the scraper, thereby avoiding the problem that the scraper can only work on flat ground and cannot be adjusted according to the flatness of the ground, so there is a problem that the scraper is easily damaged during work. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0021] Figure 2 This is a schematic diagram of the front view structure of the utility model;
[0022] Figure 3 This is a side view of the structure of the utility model;
[0023] Figure 4 This is a schematic diagram of the structure of the utility model when viewed from above;
[0024] Figure 5 This is a schematic diagram of the side cross-sectional structure of the installation box of the utility model;
[0025] Figure 6 It is a schematic diagram of the cross-sectional structure of the installation box of the utility model from top view.
[0026] In the figure: 1. placement plate; 2. wheels; 3. cockpit; 4. installation box; 5. threaded rod; 6. threaded plate; 7. sleeve rod; 8. sleeve block; 9. scraper; 10. bottom plate; 11. breaking rod; 12. engine; 13. second motor; 14. second set of plates; 15. first set of plates; 16. oil box; 17. missing gear; 18. rack; 19. support table; 20. limit plate; 21. limit groove; 22. first motor; 23. rotating rod. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0028] Example 1
[0029] See also Figures 1 to 6 The utility model provides a technical solution: a road construction grader, comprising an installation box 4 and a placement plate 1, the bottom of the installation box 4 is fixedly connected to the placement plate 1, the inner bottom wall of the installation box 4 is fixedly connected to a support platform 19, the top of the support platform 19 is fixedly connected to a first motor 22, the output shaft of the first motor 22 is fixedly connected to a rotating rod 23, one side of the rotating rod 23 is fixedly connected to a missing gear 17, a rack 18 is rotatably connected at the gap of the missing gear 17, the bottom of the rack 18 is fixedly connected to a first set plate 15, the bottom of the first set plate 15 passes through the placement plate 1 and is fixedly connected to a bottom plate 10, the bottom plate 1 0 is fixedly connected with a breaker rod 11 at the bottom, a top of the front surface of the rack 18 is fixedly connected with a limit plate 20, an inner wall of the installation box 4 is provided with a limit groove 21, and the inner wall of the limit groove 21 is slidably connected with the limit plate 20. Through the arrangement of the first motor 22, the missing gear 17, the rack 18, the breaker rod 11 and the first set of plates 15, the road construction grader has the advantages of being able to conveniently crush larger clods of soil and preventing dust from being raised during crushing, avoiding the problem of only being able to rotate and crush, but easily generating larger dust during crushing, and not being able to work well, so there is a problem that the crushing affects the driver's work.
[0030] When in use, first a person enters the cockpit 3 and turns on the engine 12 to drive the wheel 2 to rotate. At this time, the whole is driven by the wheel 2 to start moving, and then the first motor 22 is turned on. The first motor 22 drives the rotating rod 23 to rotate, and the rotating rod 23 drives the missing gear 17 to rotate. The missing gear 17 is engaged with the rack 18 to drive the rack 18 to rise. The rack 18 drives the bottom plate 10 to rise by driving the first set of plates 15. After the missing gear 17 rotates half a circle, the missing gear 17 and the rack 18 are disengaged, and the rack 18 falls down in free fall. The rack 18 drives the breaker rod 11 to fall down by driving the bottom plate 10. The larger soil blocks are broken by the falling breaker rod 11. The rack 18 is set to be longer in length. When the rack 18 falls, the missing gear 17 rotates half a circle again at this time, and the missing gear 17 is engaged with the rack 18 again, and drives the rack 18 to move upward again. Through the cooperation of the missing gear 17 and the rack 18, the bottom plate and the breaker rod 11 are continuously raised and lowered to break the soil blocks.
[0031] Example 2
[0032] See also Figures 1 to 6 The utility model provides a technical solution: a road construction grader, comprising an installation box 4 and a placement plate 1, a cab 3 is fixedly connected to one side of the placement plate 1, a second motor 13 is fixedly connected to one side of the top of the placement plate 1, a threaded rod 5 is fixedly connected to the output shaft of the second motor 13, a threaded plate 6 is rotatably connected to the axis of the threaded rod 5, a sleeve block 8 is fixedly connected to the front surface of the threaded plate 6, a sleeve rod 7 is fixedly connected to one side of the top of the placement plate 1, a sleeve block 8 is sleeved at the axis of the sleeve rod 7, a second sleeve plate 14 is fixedly connected to the bottom of the threaded plate 6, and the bottom of the second sleeve plate 14 The placing plate 1 passes through the placing plate 1 and is fixedly connected with a scraper 9, a wheel 2 is provided at the bottom of the placing plate 1, an engine 12 matched with the wheel 2 is fixedly connected to one side of the bottom of the placing plate 1, and an oil box 16 matched with the engine 12 is fixedly connected to one side of the bottom of the placing plate 1. Through the arrangement of the second motor 13, the threaded rod 5, the threaded plate 6, the sleeve rod 7 and the sleeve block 8, the road construction grader has the function of adjusting the upper and lower positions of the scraper, avoiding the problem of only being able to work on flat ground and not being able to adjust according to the flatness of the ground, so there is a problem that the scraper is easily damaged during work.
[0033] When in use, the personnel first enters the cockpit 3 and turns on the engine 12 to drive the wheels 2 to rotate. At this time, the whole is driven by the wheels 2 to start moving. Because the construction road surface is a dirt road and the road surface is highly uneven, when leveling is not required, first the second motor 13 is turned on for forward rotation, the second motor 13 drives the threaded rod 5 to rotate, the threaded rod 5 drives the threaded plate 6 to move upward, and the threaded plate 6 is limited by the cooperation of the threaded plate 6 with the sleeve block 8 and the sleeve rod 7. The threaded plate 6 drives the second set of plates 14 connected at the bottom to move upward, and the second set of plates 14 drives the scraper 9 connected at the bottom to move upward to prevent the scraper 9 from hitting some larger stones and causing damage due to the uneven road surface during walking.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A road construction grader, comprising a mounting box (4) and a placement plate (1), characterized in that: The bottom of the installation box (4) is fixedly connected to a placement plate (1), and one side of the placement plate (1) is fixedly connected to a cockpit (3); The inner bottom wall of the installation box (4) is fixedly connected to a support platform (19), the top of the support platform (19) is fixedly connected to a first motor (22), the output shaft of the first motor (22) is fixedly connected to a rotating rod (23), one side of the rotating rod (23) is fixedly connected to a missing gear (17), and a rack (18) is rotatably connected to the gap of the missing gear (17); A second motor (13) is fixedly connected to one side of the top of the placement plate (1); a threaded rod (5) is fixedly connected to the output shaft of the second motor (13); a threaded plate (6) is rotatably connected to the axis of the threaded rod (5); a sleeve block (8) is fixedly connected to the front surface of the threaded plate (6); and a sleeve rod (7) is fixedly connected to one side of the top of the placement plate (1).
2. A road construction grader according to claim 1, characterized in that: The bottom of the rack (18) is fixedly connected to a first set of plates (15), and the bottom of the first set of plates (15) passes through the placement plate (1) and is fixedly connected to a bottom plate (10).
3. A road construction grader according to claim 2, characterized in that: The bottom of the bottom plate (10) is fixedly connected to a crushing rod (11), and the top of the front surface of the rack (18) is fixedly connected to a limiting plate (20).
4. A road construction grader according to claim 1, characterized in that: The inner wall of the installation box (4) is provided with a limiting groove (21), and the inner wall of the limiting groove (21) is slidably connected to a limiting plate (20).
5. A road construction grader according to claim 1, characterized in that: A sleeve block (8) is sleeved at the axis of the sleeve rod (7), and a second sleeve plate (14) is fixedly connected to the bottom of the threaded plate (6).
6. A road construction grader according to claim 5, characterized in that: The bottom of the second set of plates (14) passes through the placement plate (1) and is fixedly connected to a scraper (9), and the bottom of the placement plate (1) is provided with a wheel (2).
7. A road construction grader according to claim 6, characterized in that: An engine (12) that cooperates with the wheel (2) is fixedly connected to one side of the bottom of the placement plate (1), and an oil box (16) that cooperates with the engine (12) is fixedly connected to one side of the bottom of the placement plate (1).
Citation Information
Cited By
Land leveler for road construction
CN224078273U
