CFRP (carbon fiber reinforced plastic) temporary limiting device of steel bridge deck for bridge construction
By using a temporary limiting device of carbon fiber cloth and magnetic fixing unit, the problem of insufficient material compressibility and structural stability in steel bridge deck construction is solved, and higher construction safety and equipment utilization are achieved.
Patent Information
- Application Number
- CN202420125675.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-18
AI Technical Summary
The material of the existing steel bridge deck temporary limiting device is steel, with low compressive resistance, unstable structure, and easy to corrode, resulting in construction safety hazards and waste of equipment, and poor economicality.
The carbon fiber cloth and carbon fiber cloth limiting unit are adopted, combined with the magnetic fixing unit and fixture, and temporary support is achieved through the tight state of the carbon fiber cloth and the magnet snap, fixing the fixture and floor nails, providing high strength and corrosion resistance.
It improves structural stability, reusability, economy and durability, reduces construction risks and equipment waste, and enhances construction accuracy and safety.
Smart Images

Figure CN222083339U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of bridge construction, and in particular relates to a CFRP temporary limiting device of a steel bridge deck used for bridge construction. Background Art
[0002] Steel bridge deck construction is usually prefabricated in the factory and assembled in modular form on site. Overall welding is performed after all segments are assembled. Therefore, in order to ensure the safety and reliability of construction, it is necessary to use relevant limiting devices to fix the prefabricated assembled segments of the steel bridge deck when hoisting the steel bridge deck, so that the steel bridge deck segments will not produce vertical displacement and prevent beam drop, thereby ensuring the smooth welding of the steel bridge deck and improving its construction safety. The existing steel bridge deck segment assembly limiting technology mainly supports the steel bridge deck by setting up temporary brackets, and uses construction brackets to constrain the deformation of the bridge deck segments until all are assembled and welded as a whole, and then remove the temporary brackets. The defects of the prior art are: 1. The temporary limit device of the steel bridge deck currently used in the construction of steel bridges is a construction bracket, but this kind of temporary bracket also has many disadvantages. This kind of temporary bracket mainly uses steel as the material, and the compressive performance of steel is significantly lower than the tensile performance. The main function of the temporary bracket is to bear the pressure of the upper structure, so high-strength steel must be used as the material of the temporary bracket, or the number of brackets must be increased and the layout of the temporary bracket must be changed, which significantly increases the project cost and is not economically reasonable; 2. The stability of the temporary bracket as a compressive structure is an important issue. The structural instability of the temporary bracket will cause the upper structure to deviate or even fall, resulting in the inability to smoothly carry out the construction and a greater safety hazard in the construction. In addition, after the temporary bracket is removed, its individual components are very likely to be unable to be used again due to excessive local plastic stress loss, which also causes waste of construction equipment, and the economic efficiency of the project needs to be improved; 3. The temporary bracket with steel as the main material is easily affected by the environment and corroded. Corrosion is one of the main factors for the reduction of steel strength and damage, which greatly reduces the mechanical properties and working durability of the temporary bracket, and will have an adverse effect on the secondary use of the temporary bracket. Summary of the invention
[0003] The problem to be solved by the utility model is to provide a CFRP temporary limiting device for a steel bridge deck used in bridge construction, which overcomes the shortcomings of the prior art.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a CFRP temporary limiting device for a steel bridge deck used in bridge construction, comprising a carbon fiber cloth and a carbon fiber cloth limiting unit, wherein two opposite edge portions on the carbon fiber cloth are detachably connected to the carbon fiber cloth limiting unit, and after the carbon fiber cloth is fixed to the carbon fiber cloth limiting unit, the carbon fiber cloth can remain in a taut state.
[0005] After being tightened, the carbon fiber cloth can be used to temporarily support the steel bridge deck.
[0006] Optionally, a plurality of adsorption and fixing units are further included, wherein the adsorption and fixing units include a magnet that can be adsorbed to the bottom of the steel bridge deck, and the magnet has a buckle that allows the carbon fiber cloth to pass through. The adsorption and fixing units can further limit the steel bridge deck to prevent it from shifting on the carbon fiber cloth.
[0007] Optionally, the carbon fiber cloth limiting unit includes multiple groups of clamps for clamping the edge portion of the carbon fiber cloth and ground nails corresponding to the clamps one by one, the ground nails are connected to the clamps, and the multiple groups of clamps are arranged at intervals along the edge of the carbon fiber cloth.
[0008] Fixing the carbon fiber cloth with a clamp facilitates the disassembly of the carbon fiber cloth limiting unit, and the ground nails are provided for fixing the carbon fiber cloth limiting unit.
[0009] Optionally, the clamp includes an upper clamping plate and a lower clamping plate, and the upper clamping plate and the lower clamping plate are connected by a plurality of bolts, and after the upper clamping plate and the lower clamping plate are clamped, the edge portion of the carbon fiber cloth is fixed between the upper clamping plate and the lower clamping plate.
[0010] Optionally, the ground nail is connected to the clamp via two steel cables, and the two steel cables are respectively connected to the upper clamping plate and the lower clamping plate.
[0011] The utility model has the advantages and positive effects of simpler structure, can be repeatedly used, has more economical comprehensive cost, better durability and mechanical properties, and is convenient for loading and unloading. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic front view of the overall structure of a specific implementation method of the utility model;
[0013] Figure 2 yes Figure 1 A top view schematic diagram of
[0014] Figure 3 yes Figure 1 Schematic diagram of the middle fixture structure;
[0015] Figure 4 yes Figure 1 Schematic diagram of the structure of the middle magnetic limit unit;
[0016] In the figure: 1. lower clamping plate; 2. bolt; 3. upper clamping plate; 4. ground nail; 5. carbon fiber cloth; 6. magnetic fixing unit; 6-1. buckle; 7. steel cable. DETAILED DESCRIPTION
[0017] The utility model is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the utility model. In the description of the utility model, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the utility model. In the description of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood by specific circumstances.
[0018] like Figures 1 to 3 As shown, the utility model provides a CFRP temporary limiting device for a steel bridge deck for bridge construction, comprising a lower clamping plate 1, bolts 2, an upper clamping plate 3, ground nails 4, a carbon fiber cloth 5, a magnetic fixing unit 6, and a steel cable 7. The lower clamping plate 1 and the upper clamping plate 3 are connected by bolts 2, and the carbon fiber cloth 5 passes through the middle of the lower clamping plate 1 and the upper clamping plate 3. The nut of the bolt 2 is tightened so that the clamp clamps the carbon fiber cloth 5, and the ground nails 4 and the lower clamping plate 1 and the upper clamping plate 3 are connected by steel cables 7.
[0019] like Figure 4 As shown, the magnetic fixing unit 6 is magnetically attracted to the bottom of the steel bridge deck by a magnet, and the lower buckle 6-1 allows the carbon fiber cloth 5 to pass through, thereby limiting the position of the carbon fiber cloth 5 so that the carbon fiber cloth 5 can be stably stressed.
[0020] Working principle: The CFRP temporary limit device of the steel bridge deck used for bridge construction is used to support the prefabricated steel bridge deck before the splicing is completed. The installation process is as follows: first, drive the ground nails 4 at both ends into the ground to fix the position of the clamp, then install the clamps at both ends, do not tighten the bolts 2, use the steel cable 7 to connect the ground nails 4 with the upper clamp 3 and the lower clamp 1 of the clamp, and at the same time, the carbon fiber cloth passes through the buckle 6-1 on the magnetic fixing unit 6, and then the carbon fiber cloth 5 passes through the clamp, the carbon fiber cloth 5 is tensioned to make it tight, and the bolts 2 are tightened to fix the carbon fiber cloth 5. The number of clamps and magnetic fixing units 6 used needs to be determined according to the specific project conditions. Finally, the construction personnel need to carefully check the connection of each component to ensure the safety of the construction. If the limit device needs to be disassembled, just operate in reverse order. The process is simple and fast, and it greatly reduces the workload of the engineering personnel and ensures the accuracy and safety of the construction process.
[0021] Compared with the prior art, the CFRP temporary limit device for steel bridge deck used in bridge construction has the following advantages:
[0022] 1. The two-end clamps in the utility model are composed of upper and lower clamps and bolts 2. The upper and lower clamps are connected by bolts 2. The clamps and ground nails 4 are connected by steel cables 7. Compared with traditional temporary brackets, installation and removal are more convenient, construction efficiency is accelerated, construction period is shortened, and it is more economical and reasonable.
[0023] 2. The load-bearing structure in the utility model is carbon fiber cloth (CFRP). CFRP material is light, high-strength, and has high fracture toughness, fatigue resistance, and creep resistance. This means that the use of carbon fiber cloth as a temporary support for the assembly of steel bridge decks has better working performance, and the performance loss is less after the bridge deck construction is completed and dismantled, which can fully meet the requirements of secondary use, making the carbon fiber cloth temporary limit device more economical than the traditional temporary bracket;
[0024] 3. The carbon fiber cloth in the utility model has better toughness and fatigue resistance than steel, so the CFRP temporary limiter of the steel bridge deck used in bridge construction will produce smaller deformation during the steel bridge deck hoisting construction process. The CFRP temporary limiter of the steel bridge deck used in bridge construction can more accurately control the position of the steel bridge deck, thereby improving the accuracy and safety of construction;
[0025] 4. The carbon fiber cloth in the utility model has excellent corrosion resistance. Traditional temporary brackets are easily corroded by the environment. The excellent corrosion resistance makes the durability of the CFRP temporary limiting device of the steel bridge deck for bridge construction higher than that of traditional temporary brackets. Therefore, the CFRP temporary limiting device of the steel bridge deck for bridge construction proposed by the utility model is more economical and reasonable.
[0026] The above is a detailed description of the embodiments of the utility model, but the contents are only preferred embodiments of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. A CFRP temporary limiter for a steel bridge deck used in bridge construction, characterized in that: It comprises a carbon fiber cloth and a carbon fiber cloth limiting unit, wherein two opposite edge parts of the carbon fiber cloth are detachably connected to the carbon fiber cloth limiting unit, and after the carbon fiber cloth is fixed to the carbon fiber cloth limiting unit, the carbon fiber cloth can be kept in a taut state.
2. The CFRP temporary limiting device for steel bridge deck used in bridge construction according to claim 1 is characterized in that: It also includes a plurality of adsorption and fixing units, wherein the adsorption and fixing units include magnets that can be adsorbed to the bottom of the steel bridge deck, and the magnets are provided with buckles that can allow the carbon fiber cloth to pass through.
3. The CFRP temporary limiting device for steel bridge deck used in bridge construction according to claim 1 or 2, characterized in that: The carbon fiber cloth limiting unit includes multiple groups of clamps for clamping the edge portion of the carbon fiber cloth and ground nails corresponding to the clamps one by one, the ground nails are connected to the clamps, and the multiple groups of clamps are arranged at intervals along the edge of the carbon fiber cloth.
4. The CFRP temporary limiting device for steel bridge deck used in bridge construction according to claim 3 is characterized in that: The clamp comprises an upper clamping plate and a lower clamping plate, wherein the upper clamping plate and the lower clamping plate are connected by a plurality of bolts, and after the upper clamping plate and the lower clamping plate are clamped, the edge portion of the carbon fiber cloth is fixed between the upper clamping plate and the lower clamping plate.
5. The CFRP temporary limiting device for steel bridge deck used in bridge construction according to claim 4 is characterized in that: The ground nail is connected to the clamp via two steel cables, and the two steel cables are respectively connected to the upper clamping plate and the lower clamping plate.