Underarch temporary pontoon for dismantling two-way curved arch bridge
By designing the arch rib steel pipe bracket platform and unit integrated temporary floating boat, the problems of high risks and instability in the demolition process of hyperbolic arch bridges are solved, safe, environmentally friendly and economical construction results are achieved, and environmental protection and construction stability are ensured.
Patent Information
- Application Number
- CN202420372237.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-02-28
AI Technical Summary
There are high risks and instability in the demolition process of hyperbolic arch bridges, and it is difficult for the existing technology to effectively support and maintain the arch bridge structure to ensure project safety and environmental protection.
A hyperbolic arch bridge removal system including an arch rib steel pipe bracket platform, a unit integral temporary floating boat and a temporary floating boat slag platform was designed. The steel pipe column, arcuate support plate, lifting rod, lifting jack and floating oil barrel were connected by connection. The screw forms an integral frame, adapting to the special shape and height changes of the arch bridge, ensuring a stable working platform and slag collection.
It improves the safety and environmental protection of the demolition process, reduces environmental pollution, realizes green construction and economic benefits, and ensures the controllability and stability of construction.
Smart Images

Figure CN222083358U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of civil engineering, in particular to a temporary floating boat under the arch of a hyperbolic arch bridge for dismantling. Background Art
[0002] The demolition of a hyperbolic arch bridge is a complex and high-risk project, and the temporary floating boat under the arch plays a key role as a background technology. At this stage, engineers need to face the particularity of the arch bridge structure and the instability that may occur during the demolition process. Therefore, the use of temporary floating boats under the arch becomes an effective technical option to ensure the stability of the demolition process and the safety of the engineering personnel.
[0003] Temporary arch pontoons are usually floating platforms specially designed to support and maintain the substructure of arch bridges. These pontoons are designed to take into account the special curved shape of arch bridges and the height changes that may be involved during the demolition process. The design of the pontoon usually includes an adjustable support structure to ensure that it can adapt to the height differences at different locations of the arch bridge and provide a stable working platform.
[0004] In the design of temporary floating boats under arches, engineers need to take into account factors such as tides, currents, and possible weather changes. Through reasonable floating boat design, the engineering team can maintain relatively constant working conditions during the demolition process, improving the controllability and safety of the project. Therefore, temporary floating boats under arches, as a technology for the demolition of hyperbolic arch bridges, provide a feasible and effective solution for this type of project. Utility Model Content
[0005] The utility model aims to provide a temporary floating boat under the arch of a hyperbolic arch bridge for solving the above technical problems.
[0006] In order to solve the above technical problems, the utility model provides a temporary floating boat under the arch of a hyperbolic arch bridge for dismantling, including an arch rib steel pipe support platform, a unit integral temporary floating boat and a temporary floating boat slag dropping platform;
[0007] The arch rib steel pipe support platform is used to support the dismantled arch rib, and comprises: a distribution beam, an arc-shaped support plate, a lifting rod, a lifting jack, a steel plate, a steel pipe column, a side connecting beam, a diagonal brace, and an upper cross beam; a steel plate is provided on the top of the steel pipe column, and an arc-shaped support plate is provided on the top of the steel plate;
[0008] The unit integral temporary floating boat is arranged on the water below the arch rib, and comprises: a connecting beam, a bottom cross beam, a middle connecting beam, a middle cross beam, a bottom longitudinal beam, a floating oil drum, a side connecting beam, and an upper cross beam. Two adjacent unit integral temporary floating boats are connected as a whole by connecting screws; bottom cross beams are symmetrically arranged at the top end of the bottom longitudinal beam, and a connecting beam is arranged between the centers of the outer sides of two adjacent side connecting beams; side connecting beams are arranged at the ends of the bottom cross beam, the middle cross beam, and the upper cross beam; a middle connecting beam is arranged at the top of the bottom cross beam, and an upper cross beam is arranged at the top of the middle connecting beam;
[0009] The temporary floating ship debris platform is used for collecting debris during the demolition of a hyperbolic arch bridge, and comprises a unit-integrated temporary floating ship, bamboo plywood, and longitudinal wooden boards; the bamboo plywood and longitudinal wooden boards are laid on the top of the unit-integrated temporary floating ship.
[0010] Furthermore, a diagonal brace is provided between two adjacent steel pipe columns, a distribution beam is provided on the top of the steel pipe column, a steel plate is provided on the top of the distribution beam, and a lifting jack is provided on the top of the steel plate; a lifting rod is connected to the top of the lifting jack, and an arc-shaped support plate is provided on the top of the lifting rod, and the arc-shaped support plate matches the shape of the arch rib.
[0011] Furthermore, a bottom crossbeam, a middle crossbeam and an upper crossbeam are provided between the inner sides of the side connecting beams; the bottom crossbeam, the middle crossbeam and the upper crossbeam are connected by the middle connecting beam.
[0012] Furthermore, the connecting beam, bottom cross beam, middle connecting beam, middle cross beam, bottom longitudinal beam, side connecting beam and upper cross beam form an overall frame, and a plurality of floating oil drums are connected to form an overall temporary floating boat, and the overall temporary floating boat is placed on the longitudinal beam so that the overall frame wraps the overall temporary floating boat.
[0013] Furthermore, the inner sides of the side connecting beams are connected by connecting screws, and the ends of the floating oil drums are stabilized by the connecting beams.
[0014] The beneficial effects of the utility model are:
[0015] 1. The utility model relates to a temporary floating boat under the arch of a hyperbolic arch bridge for demolition. The floating boat is used to receive the fallen debris during the demolition process, which causes less pollution to the environment, conforms to the concept of green construction, and has good economic benefits.
[0016] 2. The arch rib steel pipe support platform involved in the utility model is used to support the dismantled arch ribs, thereby ensuring the safety of dismantling the hyperbolic arch bridge.
[0017] 3. The temporary floating ship debris platform involved in the utility model is used to collect debris when dismantling a hyperbolic arch bridge, thereby preventing river water from being polluted and protecting the surrounding environment.
[0018] 4. The unit-integrated temporary floating boat involved in the utility model is exquisitely designed. The floating oil drums are assembled into an integral unit by using a frame frame, and then the unit bodies are connected into a whole by connecting screws, which ensures the overall stability of the temporary floating boat and ensures construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional schematic diagram of the temporary floating boat erected under the arch of the hyperbolic arch bridge;
[0020] Figure 2 It is a three-dimensional schematic diagram of the assembly of temporary floating boats under the arch and the erection of steel pipe support platforms;
[0021] Figure 3 It is a three-dimensional schematic diagram of the construction of temporary floating boats and steel pipe columns;
[0022] Figure 4 It is a three-dimensional schematic diagram of the assembly of a unit-integrated temporary floating boat;
[0023] Figure 5 It is a three-dimensional schematic diagram of the erection of the arch rib steel pipe support platform;
[0024] Figure 6 This is a schematic diagram of the erection of the arch rib steel pipe support platform;
[0025] In the figure: 1-abutment foundation, 2-abutment, 3-bridge deck, 19-arch upper column, 20-arch rib, 27-cap beam, 28-bridge pier, 36-bamboo plywood, 37-distribution beam, 38-connecting screw, 39-arc support plate, 40-longitudinal wooden board, 41-lifting rod, 42-lifting jack, 43-steel plate, 44-connecting beam, 45-bottom cross beam, 46-middle connecting beam, 47-middle cross beam, 48-bottom longitudinal beam, 49-floating oil drum, 50-steel pipe column, 51-side connecting beam, 52-diagonal brace, 53-upper cross beam, 88-integral frame. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the utility model.
[0027] Those skilled in the art should understand that, in the disclosure of the present invention, the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.
[0028] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.
[0029] like Figure 1-6 As described, the utility model provides a temporary floating boat under the arch of a hyperbolic arch bridge for dismantling, including an arch rib 20 steel pipe support platform, a unit integral temporary floating boat and a temporary floating boat slag dropping platform;
[0030] The arch rib 20 steel pipe support platform is used to support the dismantled arch rib 20, which includes: a distribution beam 37, an arc-shaped support plate 39, a lifting rod 41, a lifting jack 42, a steel plate 43, a steel pipe column 50, a side connecting beam 51, a diagonal brace 52, and an upper cross beam 53; a steel plate 43 is provided on the top of the steel pipe column 50, and an arc-shaped support plate 39 is provided on the top of the steel plate 43;
[0031] The unit integral temporary floating boat is arranged on the water below the arch rib 20, and comprises: a connecting beam 44, a bottom cross beam 45, a middle connecting beam 46, a middle cross beam 47, a bottom longitudinal beam 48, a floating oil drum 49, a side connecting beam 51, and an upper cross beam 53. Two adjacent unit integral temporary floating boats are connected as a whole by connecting screws 38; bottom cross beams 45 are symmetrically arranged at the top end of the bottom longitudinal beam 48, and a connecting beam 44 is arranged between the centers of the outer sides of the two adjacent side connecting beams 51; side connecting beams 51 are arranged at the ends of the bottom cross beam 45, the middle cross beam 47, and the upper cross beam 53; the middle connecting beam 46 is arranged at the top of the bottom cross beam 45, and the upper cross beam 53 is arranged at the top of the middle connecting beam 46;
[0032] In one embodiment of the present scheme, the bottom crossbeam 45, the middle crossbeam 47 and the upper crossbeam 53 are arranged in sequence along the height direction, the middle connecting beam 46 passes through the middle crossbeam 47 and is used to connect the bottom crossbeam 45 and the upper crossbeam 53, and the end of the bottom crossbeam 45 and the end of the upper crossbeam 53 are connected with a side connecting beam 51, so that the bottom crossbeam 45, the middle crossbeam 47, the upper crossbeam 53, the middle connecting beam 46 and the side connecting beam 51 form a side frame, the bottoms of two adjacent side frames are connected by a plurality of bottom longitudinal beams 48, and the ends of two adjacent side frames are connected by a connecting beam 44, so that the two adjacent side frames form an integral frame 88.
[0033] The temporary floating ship debris platform is used for collecting debris during the demolition of a hyperbolic arch bridge, and comprises a unit-integrated temporary floating ship, a bamboo plywood 36, and a longitudinal wooden board 40; the bamboo plywood 36 and the longitudinal wooden board 40 are laid on the top of the unit-integrated temporary floating ship.
[0034] Preferably, a diagonal brace 52 is provided between two adjacent steel pipe columns 50, a distribution beam 37 is provided on the top of the steel pipe column 50, a steel plate 43 is provided on the top of the distribution beam 37, and a lifting jack 42 is provided on the top of the steel plate 43; a lifting rod 41 is connected to the top of the lifting jack 42, and an arc-shaped support plate 39 is provided on the top of the lifting rod 41, and the arc-shaped support plate 39 matches the shape of the arch rib 20.
[0035] Among them, the steel pipe column 50 is placed at the bottom of the water, the tops of two adjacent steel pipe columns 50 are connected by a distribution beam 37, and the tops of two adjacent distribution beams 37 are connected by a steel plate 43. A number of lifting jacks 42 are arranged on the steel plate 43. By adjusting the different heights of each lifting jack 42, the inclination angle of the arc-shaped support plate 39 is made to fit the bottom of the arch rib 20, so that the steel pipe column 50 supports the arch rib 20.
[0036] Preferably, a bottom cross beam 45 , a middle cross beam 47 , and an upper cross beam 53 are provided between the inner sides of the side connecting beams 51 ; the bottom cross beam 45 , the middle cross beam 47 , and the upper cross beam 53 are connected by a middle connecting beam 46 .
[0037] Preferably, the connecting beam 44, the bottom cross beam 45, the middle connecting beam 46, the middle cross beam 47, the bottom longitudinal beam 48, the side connecting beam 51, and the upper cross beam 53 form an integral frame 88, and a plurality of floating oil drums 49 are connected to form an integral temporary floating boat, and the integral temporary floating boat is placed on the longitudinal beam 48 so that the integral frame 88 wraps the integral temporary floating boat, and the integral frame (88) is used for stabilization.
[0038] Preferably, the inner sides of the side connecting beams 51 are connected by connecting screws 38, the ends of the floating oil barrels 49 are stabilized by connecting beams 44, and the sides of the floating oil barrels (49) are stabilized by an integral frame (88).
[0039] The present utility model is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present utility model. However, no matter what changes are made in the shape or structure, all those having the same or similar technical solutions as the present application fall within the protection scope of the present utility model.
Claims
1. A temporary floating boat under the arch for dismantling a hyperbolic arch bridge, characterized by: It includes an arch rib (20) steel pipe support platform, a unit integral temporary floating ship and a temporary floating ship slag dropping platform; The arch rib (20) steel pipe support platform is used to support the dismantled arch rib (20), and comprises: a distribution beam (37), an arc-shaped support plate (39), a lifting rod (41), a lifting jack (42), a steel plate (43), a steel pipe column (50), a side connecting beam (51), a diagonal brace (52), and an upper cross beam (53); a steel plate (43) is provided on the top of the steel pipe column (50), and an arc-shaped support plate (39) is provided on the top of the steel plate (43); The unit integral temporary floating boat is arranged on the water below the arch rib (20), and comprises: a connecting beam (44), a bottom cross beam (45), a middle connecting beam (46), a middle cross beam (47), a bottom longitudinal beam (48), a floating oil drum (49), a side connecting beam (51), and an upper cross beam (53). Two adjacent unit integral temporary floating boats are connected as a whole by connecting screws (38); the top end of the bottom longitudinal beam (48) is symmetrically provided with a bottom cross beam (45), and the center of the outer side surface of the two adjacent side connecting beams (51) is provided with a connecting beam (44); the ends of the bottom cross beam (45), the middle cross beam (47), and the upper cross beam (53) are provided with a side connecting beam (51); the top of the bottom cross beam (45) is provided with a middle connecting beam (46), and the top of the middle connecting beam (46) is provided with an upper cross beam (53); The temporary floating ship debris platform is used for collecting debris during the demolition of a hyperbolic arch bridge, and comprises a unit-integrated temporary floating ship, a bamboo plywood (36), and a longitudinal wooden board (40); the bamboo plywood (36) and the longitudinal wooden board (40) are laid on the top of the unit-integrated temporary floating ship.
2. The temporary floating boat under the arch of a hyperbolic arch bridge for dismantling according to claim 1 is characterized by: A diagonal brace (52) is provided between two adjacent steel pipe columns (50), a distribution beam (37) is provided on the top of the steel pipe column (50), a steel plate (43) is provided on the top of the distribution beam (37), and a lifting jack (42) is provided on the top of the steel plate (43); The top of the lifting jack (42) is connected to a lifting rod (41), and the top of the lifting rod (41) is provided with an arc-shaped support plate (39), and the arc-shaped support plate (39) is matched with the shape of the arch rib (20).
3. The temporary floating boat under the arch of a hyperbolic arch bridge for dismantling according to claim 1 is characterized by: A bottom crossbeam (45), a middle crossbeam (47), and an upper crossbeam (53) are arranged inside the side connecting beams (51); the bottom crossbeam (45), the middle crossbeam (47), and the upper crossbeam (53) are connected by a middle connecting beam (46).
4. The temporary floating boat under the arch of a hyperbolic arch bridge for dismantling according to claim 1 is characterized by: The connecting beam (44), the bottom cross beam (45), the middle connecting beam (46), the middle cross beam (47), the bottom longitudinal beam (48), the side connecting beam (51), and the upper cross beam (53) form an integral frame (88), and a plurality of floating oil drums (49) are connected to form an integral temporary floating boat. The integral temporary floating boat is placed on the longitudinal beam (48) so that the integral frame (88) wraps the integral temporary floating boat.
5. The temporary floating boat under the arch for dismantling a hyperbolic arch bridge according to claim 1 is characterized by: The inner sides of the side connecting beams (51) are connected via connecting screws (38), and the ends of the floating oil barrels (49) are stabilized via connecting beams (44).