Anti-freezing and anti-thawing structure for concrete crack

By installing a mortar layer, retaining wall, medium-coarse sand layer, composite geomembrane, and soil cover layer at the expansion joints of concrete hydraulic structures, the freeze-thaw problem at the expansion joints is solved, and the safety and economy of the structure are improved.

CN222083456UActive Publication Date: 2024-11-29SHANDONG XUNSHAN AQUATIC PROD GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420589542.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-29
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

Existing concrete hydraulic structures are prone to water seepage and freeze-thaw cycles in winter, leading to structural damage. Current chemical grouting methods have failed to effectively solve this problem.

Method used

Design a freeze-thaw protection structure, including a mortar layer, a retaining wall, a medium-coarse sand layer, a composite geomembrane, and a soil cover layer. Combined with a temperature probe, it forms a freeze-thaw protection mechanism to protect expansion joints and prevent freeze-thaw phenomena.

Benefits of technology

It effectively prevents freeze-thaw cycles at expansion joints, ensures structural safety, reduces project investment, shortens construction time, and yields significant results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083456U_ABST
    Figure CN222083456U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of hydraulic structure water supply facilities, and particularly discloses a concrete crack anti-freezing-thawing structure which comprises an anti-freezing-thawing mechanism and a water-passing culvert, an expansion joint is arranged on the water-passing culvert, the anti-freezing-thawing mechanism is arranged outside the water-passing culvert and at the position of the expansion joint, and the anti-freezing-thawing mechanism comprises a mortar layer and an enclosing wall. The enclosing wall is filled with a medium-coarse sand layer and an overburden layer; the concrete crack freeze thawing prevention structure is simple, convenient to use, free of environmental damage, short in construction period and capable of preventing the two sides of an expansion joint from being frozen and thawed in winter, saves engineering investment, and is proved by practice to be obvious in effect. The implementation process is simple, the timeliness is high, and the effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water supply facilities for hydraulic structures, in particular to a concrete crack anti-freezing and thawing structure. Background Art

[0002] With the rapid development of my country's economy, there are many types of water supply buildings. Many of the original expansion joints and settlement joints between concrete have uneven settlement on both sides of the expansion joints due to foundation sinking, long operation time, and low water temperature in winter, causing the concrete on both sides of the expansion joints to shrink and the expansion joints to enlarge. Water seepage often occurs. After water seepage, when the temperature is extremely low in winter, ice forms on both sides of the expansion joints, and melts in spring, forming freeze-thaw, causing continuous damage to the concrete surface, directly affecting the safety of hydraulic structures, and causing unforeseen huge economic losses and social impacts.

[0003] This is the case with the expansion joint between the water supply pump station intake gate and the reservoir discharge culvert. In winter, the expansion joint leaks and freezes. Once it melts during the Spring Festival, freeze-thaw damage occurs. Chemical grouting has been used many times to address the freeze-thaw situation at the expansion joint, but it has not been effective. Therefore, after repeated research by technical personnel, a sand pool insulation facility was finally developed. Specifically for the situation where the gap between two concrete buildings is prone to freeze-thaw damage, a controllable flow distillation device was designed to solve the problem of freeze-thaw damage caused by water seepage at the existing concrete expansion joints. Utility Model Content

[0004] In view of the problems existing in the prior art, the utility model aims to provide a device for preventing water seepage in the gap between two concrete hydraulic structures from forming freeze-thaw in winter.

[0005] The technical solution adopted by the utility model to solve the technical problem is: a concrete crack anti-freeze-thaw structure, including an anti-freeze-thaw mechanism and a water culvert, the water culvert is provided with an expansion joint, the anti-freeze-thaw mechanism is arranged outside the water culvert and at the expansion joint, the anti-freeze-thaw mechanism includes a mortar layer and a wall, and the interior of the wall is filled with a medium-coarse sand layer and a covering soil layer.

[0006] Specifically, the enclosure is provided with four rectangular walls, and the inner side of the enclosure wraps around the upper part of the expansion joint.

[0007] Specifically, the enclosure wall is built with bricks.

[0008] Specifically, mortar is applied to the inner bottom of the wall to form a mortar layer, medium-dry medium-coarse sand is filled on the upper part of the mortar layer to form a medium-coarse sand layer, and a composite geomembrane is laid on the upper part of the medium-coarse sand layer.

[0009] Specifically, soil is laid on the top of the composite geomembrane to form a covering layer.

[0010] Specifically, two temperature measuring probes are pre-buried at the bottom and the middle upper part of the medium-coarse sand layer, and communication lines of the temperature measuring probes are passed through the holes in the wall to connect to a collector or a display.

[0011] Specifically, the bottom of the water culvert is connected to the reservoir dam body, a water intake valve is installed at the wellhead of the water culvert, and the water culvert draws water from the reservoir to the water intake valve.

[0012] The utility model has the following beneficial effects:

[0013] The concrete crack anti-freezing and thawing structure designed by the utility model is simple in structure and easy to use, and can prevent and treat freeze-thawing phenomenon on both sides of the expansion joint in winter, without causing environmental damage, with a short construction period and saving on engineering investment. Practice has proved that the effect is obvious.

[0014] The concrete crack anti-freezing and thawing structure designed by the utility model has simple construction process, strong timeliness and good effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the concrete crack anti-freeze-thaw structure.

[0016] Figure 2 It is a structural diagram of the anti-freeze-thaw mechanism.

[0017] In the figure: 1-freeze-thaw protection mechanism, 1.1-mortar layer, 1.2-wall, 1.3-medium-coarse sand layer, 1.4-composite civil membrane, 1.5-covering soil layer, 1.6-temperature measuring probe;

[0018] 2-water culvert; 3-water intake valve; 4-water surface; 5-reservoir dam body; 6-expansion joint. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely further describe the technical solutions in the embodiments of the utility model. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] Embodiment 1:

[0021] like Figure 1-2 As shown, a concrete crack anti-freezing and thawing structure includes an anti-freezing and thawing mechanism 1 and a water culvert 2. The bottom of the water culvert 2 is connected to a reservoir dam body 5. A water intake valve 3 is installed at the wellhead of the water culvert 2. The water culvert 2 draws water from the reservoir to the water intake valve 3.

[0022] An expansion joint 6 is provided on the water culvert 2 . The expansion joint 6 freezes and thaws at the upper part of the water culvert 2 . An anti-freeze-thaw mechanism 1 is provided outside the water culvert 2 and at the expansion joint 6 .

[0023] The anti-freezing and thawing mechanism 1 comprises a mortar layer 1.1, a wall 1.2, a medium-coarse sand layer 1.3, a composite geomembrane 1.4, a covering soil layer 1.5 and a temperature measuring probe 1.6. The wall 1.2 is filled with the medium-coarse sand layer 1.3 and the covering soil layer 1.5.

[0024] The enclosure 1.2 is provided with four rectangular walls, and the enclosure 1.5 is built with bricks. The inner side of the enclosure 1.2 wraps around the upper part of the expansion joint 6.

[0025] The inner bottom of the enclosure wall 1.2 is coated with mortar to form a mortar layer 1.1, the upper part of the mortar layer 1.1 is filled with medium-dry medium-coarse sand to form a medium-coarse sand layer 1.3, a composite geomembrane 1.4 is laid on the upper part of the medium-coarse sand layer 1.3, and soil is laid on the upper part of the composite geomembrane 1.4 to form a covering soil layer 1.5.

[0026] Two temperature probes 1.6 are pre-buried at the bottom and the middle upper part of the medium-coarse sand layer 1.3. The communication lines of the temperature probes 1.6 are passed through the holes of the fence 1.2 to connect to the collector or display, so as to remotely transmit the temperature data to the mobile terminal, or directly display the upper and lower temperature values ​​on site.

[0027] Embodiment 2: Specific implementation process of the concrete crack anti-freezing and thawing structure using the structural form of embodiment 1:

[0028] 1. According to the actual situation of the pipeline, first clean the frozen and thawed area of ​​the expansion joint 6, and deal with the damaged parts on both sides of the gap.

[0029] 2. After cleaning, lay high-grade mortar to repair the frozen-thaw damaged areas to form mortar layer 1.1.

[0030] 3. After the repair mortar solidifies, build an insulation wall around the freeze-thaw area of ​​expansion joint 6 with a height of 1 meter to form a wall 1.2 structure.

[0031] 4. After the wall reaches a certain strength, fill the wall 1.2 with dry medium-coarse sand to form a sand pool.

[0032] 5. A set of temperature measuring probes 1.6 are buried at the bottom and the upper middle part of the sand pool to observe the actual temperature in the sand pool in winter.

[0033] 6. Lay a layer of impermeable composite geomembrane 1.4 on the upper layer of the sand pool to prevent rainwater from seeping into the sand pool.

[0034] 7. Cover the composite geomembrane 1.4 with a 20 cm thick soil layer to form a covering soil layer 1.5 for covering protection.

[0035] After actual operation and observation at the expansion joint between the water intake gate of the Donglian Water Supply Pump Station and the original Queshan Reservoir spillway culvert, it was found that the minimum temperature at the bottom of the sand pool (i.e. the expansion joint) using this technical solution was always above 3°C above zero, and there was no freeze-thaw problem. This achieved the insulation effect and prevented freeze-thaw hazards, thus ensuring safe water supply.

[0036] The present utility model is not limited to the above-mentioned implementation modes, and anyone should be aware of the structural changes made under the inspiration of the present utility model. Any technical solutions that are the same or similar to the present utility model fall within the protection scope of the present utility model.

[0037] The technology, shape and structure parts not described in detail in the present invention are all known technologies.

[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A concrete crack anti-freezing and thawing structure, characterized in that: It comprises an anti-freeze-thaw mechanism and a water culvert. The water culvert is provided with an expansion joint. The anti-freeze-thaw mechanism is arranged outside the water culvert and at the expansion joint. The anti-freeze-thaw mechanism comprises a mortar layer and a wall. The interior of the wall is filled with a medium-coarse sand layer and a covering soil layer.

2. The concrete crack anti-freezing and thawing structure according to claim 1, characterized in that: The enclosure is provided with four rectangular walls, and the inner side of the enclosure wraps the upper part of the expansion joint.

3. The concrete crack anti-freezing and thawing structure according to claim 2, characterized in that: The surrounding wall is built with bricks.

4. The concrete crack anti-freezing and thawing structure according to claim 1, characterized in that: The inner bottom of the enclosure wall is coated with mortar to form a mortar layer, the upper part of the mortar layer is filled with medium-dry medium-coarse sand to form a medium-coarse sand layer, and a composite geomembrane is laid on the upper part of the medium-coarse sand layer.

5. The concrete crack anti-freezing and thawing structure according to claim 4, characterized in that: Soil is laid on the top of the composite geomembrane to form a covering layer.

6. The concrete crack anti-freezing and thawing structure according to claim 4, characterized in that: Two temperature measuring probes are pre-buried at the bottom and the middle upper part of the medium-coarse sand layer, and communication lines of the temperature measuring probes are passed through the holes punched in the wall to connect with a collector or a display.

7. The concrete crack anti-freezing and thawing structure according to claim 1, characterized in that: The bottom of the water culvert is connected to the reservoir dam body, a water intake valve is installed at the wellhead of the water culvert, and the water culvert draws water from the reservoir to the water intake valve.