Erosion-resistant ditch protection slope for water conservancy project
By combining the design of soil base, base plate, impermeable board, side plate and fixing mechanism, the problem of easy damage of traditional slope protection is solved, and the stability, impermeability and durability are improved. It is highly adaptable, easy to construct and environmentally friendly.
Patent Information
- Application Number
- CN202420749618.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-10
AI Technical Summary
Traditional ditch slope protection materials are easily damaged by long-term water erosion and scouring, affecting their safety and stability.
It adopts a multi-layered structure consisting of soil base, base plate, impermeable board, side plate, crushed stone concrete and anchor rods, combined with the fixed mechanism design to form a stable support system, and the connection is strengthened by the impermeable board and anchor rods to adapt to different geological conditions.
It enhances the stability, impermeability, and durability of slope protection, reduces construction difficulty, is environmentally friendly, highly adaptable, and extends service life.
Smart Images

Figure CN222083465U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy projects, in particular to an erosion-resistant ditch slope protection for water conservancy projects. Background Art
[0002] In water conservancy projects, the stability and durability of ditch slope protection are crucial. However, traditional ditch slope protection materials such as concrete and stone often suffer from problems such as breakage and falling off under long-term water scouring and erosion, which not only affects the normal use of the ditch, but also may cause safety hazards. Therefore, how to improve the erosion resistance of ditch slope protection has become an urgent problem to be solved in the current field of water conservancy projects. Utility Model Content
[0003] In order to solve the problems existing in the background technology, the utility model provides an erosion-resistant ditch slope protection for a water conservancy project.
[0004] To achieve the above purpose, the utility model adopts the following technical scheme: an erosion-resistant ditch slope protection for a water conservancy project, comprising a soil base, a base plate, an anti-seepage plate, a sand and gravel layer, crushed stone concrete, two side plates, a plurality of anchor rods, a plurality of fixing mechanisms 1 and a plurality of fixing mechanisms 2;
[0005] A foundation trench is opened on the soil base layer, the base plate is arranged on the bottom surface of the foundation trench and is fixed by a plurality of fixing mechanisms 1, an anti-seepage plate is provided on the upper end surface of the base plate, the anti-seepage plate is fixed by a plurality of anchor rods, side plates are fixed at both ends of the anti-seepage plate, a plurality of fixing mechanisms 2 are fixed in parallel on the outer wall of each side plate along the length direction, each of the fixing mechanisms 2 is fixedly connected to the soil base layer, crushed stone concrete is laid between each side plate and the soil base layer, and a sand and gravel layer is provided on the upper end surface of the anti-seepage plate.
[0006] Compared with the prior art, the beneficial effects of the utility model are:
[0007] 1. Enhanced stability: The slope protection structure forms a stable support system through multiple structures such as base plate, anti-seepage plate, side plate and crushed stone concrete. In particular, the design of fixing mechanism 1 and fixing mechanism 2 ensures the stability of the slope protection under different geological conditions.
[0008] 2. Good anti-seepage performance: The setting of the anti-seepage board effectively prevents the erosion of the soil base by water flow. At the same time, the fixation of the anchor rod further strengthens the connection between the anti-seepage board and the base plate and the soil base, thereby improving the anti-seepage capacity of the entire slope protection.
[0009] 3. Flexible adaptability: The horizontal fixing rod 1 and the horizontal fixing rod 2 are designed with different lengths, which enables the slope protection to adapt to different geological conditions and engineering requirements, enhancing its practicality and versatility.
[0010] 4. Enhanced durability: The laying of the sand and gravel layer not only enhances the erosion resistance of the slope protection, but also filters impurities and prevents them from entering the interior of the slope protection structure, thereby extending the service life of the slope protection.
[0011] 5. Easy construction: The various components of the slope protection are reasonably designed and easy to install, which greatly reduces the construction difficulty and time and improves the construction efficiency.
[0012] 6. Environmentally friendly: The entire slope protection structure is made of environmentally friendly materials, which is harmless to the environment. At the same time, its design also helps to maintain water and soil, reduce soil erosion, and has a positive effect on the ecological environment.
[0013] To sum up, the erosion-resistant ditch slope protection for water conservancy projects of the utility model achieves a perfect combination of stability, impermeability, durability, ease of construction and environmental friendliness of the slope protection through reasonable structural design and material selection, providing a strong guarantee for the long-term safe operation of water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a front view of the utility model. DETAILED DESCRIPTION
[0015] The technical solution of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0016] This embodiment describes an erosion-resistant ditch slope protection for a water conservancy project, comprising a soil base layer 1, a base plate 2, an anti-seepage plate 6, a sand and gravel layer 12, crushed stone concrete 13, two side plates 8, a plurality of anchor rods 7, a plurality of fixing mechanisms 1 and a plurality of fixing mechanisms 2;
[0017] A foundation trench is opened on the soil base layer 1, the base plate 2 is arranged on the bottom surface of the foundation trench and is fixed by multiple fixing mechanisms 1, an anti-seepage plate 6 is provided on the upper end surface of the base plate 2, the anti-seepage plate 6 is fixed by multiple anchor rods 7, side plates 8 are fixed at both ends of the anti-seepage plate 6, multiple fixing mechanisms 2 are fixed in parallel on the outer wall of each side plate 8 along the length direction, each of the fixing mechanisms 2 is fixedly connected to the soil base layer 1, crushed stone concrete 13 is laid between each side plate 8 and the soil base layer 1, and a sand and gravel layer 12 is provided on the upper end surface of the anti-seepage plate 6.
[0018] Each of the fixing mechanisms comprises a fixing anchor 3, a boss 4 and a drill bit 5;
[0019] The side wall of the fixing anchor 3 is provided with a plurality of bosses 4 in sequence along the length direction. The lower end of the fixing anchor 3 is fixedly connected to the drill bit 5 . The base plate 2 is fixed on the soil base 1 through the fixing anchor 3 .
[0020] Each of the fixing mechanisms 2 includes a transverse fixing rod 1 9, a transverse fixing rod 2 10 and a reinforcement rod 11;
[0021] The transverse fixing rod 1 9, transverse fixing rod 2 10 and reinforcement rod 11 are all arranged in the crushed stone concrete 13, one end of the transverse fixing rod 1 9 and transverse fixing rod 2 10 are fixedly connected to the outer wall of the corresponding side plate 8, and the other end of the transverse fixing rod 1 9 and transverse fixing rod 2 10 are fixedly connected to the soil base layer 1, and the reinforcement rod 11 passes through the transverse fixing rod 1 9 and transverse fixing rod 2 10 from top to bottom in sequence and is fixedly connected.
[0022] When using the utility model, first, a foundation trench adapted to the size of the substrate 2 is excavated on the soil base layer 1. Then, the substrate 2 is laid in the foundation trench and fixed by a plurality of fixing mechanisms 1. The drill bit 5 of the fixing mechanism 1 rotates and penetrates into the soil base layer 1, and the substrate 2 is firmly fixed on the soil base layer 1 by the fixing anchor 3. The provision of the boss 4 increases the contact area between the fixing anchor 3 and the soil base layer 1, further improving the stability of the substrate 2. Next, the anti-seepage plate 6 is laid on the upper end surface of the substrate 2 and fixed by a plurality of anchor rods 7. The anchor rods 7 penetrate the substrate 2 and the soil base layer 1 in turn to ensure the stability and anti-seepage performance of the anti-seepage plate 6. At both ends of the substrate 2, the side plates 8 are fixed by welding or the like. Then, one end of the horizontal fixing rod 1 9 and the horizontal fixing rod 2 10 is fixedly connected to the outer wall of the corresponding side plate 8. The other end is penetrated into the soil base layer 1 for fixing, increasing the connection strength between the side plate 8 and the soil base layer 1. The reinforcement rod 11 passes through the horizontal fixing rod 1 9 and the horizontal fixing rod 2 10 from top to bottom and is fixedly connected, thereby enhancing the stability of the entire fixing mechanism 2. It is worth noting that the horizontal fixing rod 1 9 and the horizontal fixing rod 2 10 are fixing rods of different lengths, so that they can adapt to different geological conditions and engineering requirements. Subsequently, the crushed stone concrete 13 is buried in the gap between the side plate 8 and the soil base layer 1, which not only increases the stability of the fixing mechanism 2, but also effectively prevents the erosion of the slope protection structure by the water flow. Finally, a layer of sand and gravel layer 12 is laid on the upper end surface of the anti-seepage plate 6, which can further enhance the erosion resistance of the slope protection, while providing a certain filtering effect to prevent impurities from entering the interior of the slope protection structure. In summary, the erosion-resistant ditch slope protection of the utility model ensures the stability and erosion resistance of the slope protection through reasonable structural design and the use of fixing mechanisms, and provides a strong guarantee for the long-term safe operation of water conservancy projects.
[0023] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other forms of assembly without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes within the meaning and scope of the equivalents of the claims be included in the present invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. An erosion-resistant ditch slope protection for a water conservancy project, characterized in that: It comprises a soil base (1), a base plate (2), an anti-seepage plate (6), a sand and gravel layer (12), crushed stone concrete (13), two side plates (8), a plurality of anchor rods (7), a plurality of fixing mechanisms 1 and a plurality of fixing mechanisms 2; A foundation trench is formed on the soil base layer (1); the base plate (2) is arranged on the bottom surface of the foundation trench and is fixed by a plurality of fixing mechanisms (1); an anti-seepage plate (6) is provided on the upper end surface of the base plate (2); the anti-seepage plate (6) is fixed by a plurality of anchor rods (7); side plates (8) are fixed at both ends of the anti-seepage plate (6); a plurality of fixing mechanisms (2) are fixed in parallel on the outer wall of each side plate (8) along the length direction; each of the fixing mechanisms (2) is fixedly connected to the soil base layer (1); crushed stone concrete (13) is laid between each side plate (8) and the soil base layer (1); and a sandstone layer (12) is provided on the upper end surface of the anti-seepage plate (6).
2. According to claim 1, the erosion-resistant ditch slope protection for water conservancy projects is characterized by: Each of the fixing mechanisms comprises a fixing anchor (3), a boss (4) and a drill bit (5); The side wall of the fixing anchor (3) is provided with a plurality of bosses (4) in sequence along the length direction; the lower end of the fixing anchor (3) is fixedly connected to the drill bit (5); and the base plate (2) is fixed to the soil base layer (1) through the fixing anchor (3).
3. According to claim 1, the erosion-resistant ditch slope protection for water conservancy projects is characterized by: Each of the second fixing mechanisms comprises a first transverse fixing rod (9), a second transverse fixing rod (10) and a reinforcement rod (11); The transverse fixing rod 1 (9), the transverse fixing rod 2 (10) and the reinforcing rod (11) are all arranged in the crushed stone concrete (13); one end of the transverse fixing rod 1 (9) and the transverse fixing rod 2 (10) are fixedly connected to the outer wall of the corresponding side plate (8); the other end of the transverse fixing rod 1 (9) and the transverse fixing rod 2 (10) are fixedly connected to the soil base layer (1); the reinforcing rod (11) passes through the transverse fixing rod 1 (9) and the transverse fixing rod 2 (10) in sequence from top to bottom and is fixedly connected.
