Municipal sewage drainage pipeline

By using sewage inlet components of built-in cement leakage tank, permeable brick and permeable barrier pad in municipal sewage removal pipelines, the problem of pipeline blockage caused by garbage and leaves in sewage is solved, and efficient filtration and discharge of sewage is achieved , reducing the complexity of cleaning work and increasing the municipal greening area.

CN222083707UActive Publication Date: 2024-11-29YUNNAN AOYUAN MUNICIPAL CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420059033.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-11-29
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

During use, existing municipal sewage removal pipelines are prone to blockage due to mixed garbage and leaves in the sewage, and staff need to go into the pipeline for cleaning, which is cumbersome and time-consuming.

Method used

A municipal sewage removal pipeline was designed, and a sewage inlet assembly is used to combine underground cement leakage pools, permeable bricks, planting soil and permeable barrier pads. The garbage and leaves in the sewage are intercepted through multiple leakages of these materials. The ground position is to prevent it from entering the pipeline and achieve efficient filtration and discharge of sewage.

Benefits of technology

It effectively avoids blockage of sewage pipes, reduces the complexity and labor costs of cleaning work, improves sewage discharge efficiency, and increases the municipal greening area through green plants to improve the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083707U_ABST
    Figure CN222083707U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of sewage drainage pipes, and particularly relates to a municipal sewage drainage pipeline which comprises a road drainage pipeline and a pipeline sealing cover, a drainage connecting pipeline is arranged on one side of the road drainage pipeline, and a sewage inlet assembly is arranged above the drainage connecting pipeline. The sewage inlet assembly comprises a buried cement leakage pool, water permeable bricks, planting soil and a water permeable barrier pad, the water permeable bricks are laid on the inner wall of the bottom end of the buried cement leakage pool, the planting soil is filled in the buried cement leakage pool, and the water permeable barrier pad is arranged between the water permeable bricks and the planting soil; sewage is subjected to multiple leakage through cooperation of the water permeable bricks, the planting soil and the water permeable blocking pad, then is discharged into the drainage connecting pipeline and is discharged outwards through the sewage pipeline, so that garbage, leaves and the like mixed in the sewage are intercepted at the ground position, and people can clean the garbage on the ground; and the garbage does not need to be cleaned in a sewage pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of sewage discharge pipes, and in particular relates to a municipal sewage discharge pipe. Background Art

[0002] Municipal drainage pipes are an important part of municipal engineering. The drainage pipes installed on both sides of the road play the role of draining road surface water. At present, the drainage pipes on both sides of the road are connected to the road sewage outlet and the underground sewage discharge pipe through vertical pipes. The water enters the underground sewage pipe through the vertical pipe. In actual use, the sewage will carry garbage and leaves on the road into the pipe. After a certain period of use, the garbage will accumulate in the pipe, causing the pipe to be blocked. Workers are required to go down into the pipe to clean up the garbage. The maintenance work is complicated and time-consuming, and requires a lot of manpower. Utility Model Content

[0003] The utility model provides a municipal sewage discharge pipe, which can intercept garbage, leaves and the like mixed in sewage at a ground position, so that personnel do not need to go down into the sewage pipe to clean up the garbage, and garbage, leaves and the like can be prevented from entering the sewage pipe and causing pipe blockage.

[0004] The utility model provides the following technical solution: a municipal sewage discharge pipeline, including a road drainage pipeline and a pipeline closing cover, a drainage connecting pipeline is arranged on one side of the road drainage pipeline, a sewage inlet assembly is arranged above the drainage connecting pipeline, the sewage inlet assembly includes an underground cement seepage pool, permeable bricks, planting soil and a permeable barrier pad, the permeable bricks are laid on the inner wall of the bottom end of the underground cement seepage pool, the planting soil is filled in the underground cement seepage pool, and the permeable barrier pad is arranged between the permeable bricks and the planting soil.

[0005] Wherein, a sewer pipe connecting vertical pipe is provided on one side of the drainage connecting pipe, and the drainage connecting pipe is arranged obliquely.

[0006] Wherein, green plants are planted on the top of the planting soil to tighten the planting soil, and a leakage hole is opened at the bottom of the buried cement leakage pool.

[0007] Among them, the bottom end of the buried cement seepage pool is fixedly connected to a support connection pool, the support connection pool is fixedly connected to the drainage connection pipe, and the road drainage pipe, the drainage connection pipe and the support connection pool are connected.

[0008] Wherein, a support frame is placed in the support connection pool, and the top of the support frame is flush with the top of the support connection pool.

[0009] The beneficial effect of the utility model is that the sewage is discharged into the drainage connecting pipe after multiple infiltrations through the cooperation of permeable bricks, planting soil and permeable barrier pads, and is discharged outwardly through the sewage pipe, so that garbage, leaves, etc. mixed in the sewage are intercepted at the ground position, so that personnel can clean up the garbage on the ground, and there is no need to go down into the sewage pipe to clean up the garbage, and it is avoided that garbage, leaves, etc. enter the sewage pipe and cause pipe blockage, which is convenient for the smooth use of the sewage pipe, and the efficiency of sewage entering the drainage connecting pipe for discharge can be improved by filtering the sewage through a large area of ​​sewage inlet components.

[0010] The parts not involved in the device are the same as those in the prior art or can be implemented by using the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the utility model;

[0012] Figure 2 It is a schematic diagram of the structure of the road drainage pipeline and the drainage connecting pipeline in the utility model;

[0013] Figure 3 It is a schematic diagram of the disassembly and assembly state of the support frame in the utility model.

[0014] In the figure: 1. Road drainage pipe; 11. Pipe closing cover; 2. Drainage connecting pipe; 21. Sewer pipe connecting vertical pipe; 3. Sewage inlet assembly; 31. Buried cement seepage pool; 32. Permeable brick; 33. Planting soil; 34. Permeable barrier pad; 35. Green plants; 36. Seepage hole; 4. Support connection pool; 5. Support frame. DETAILED DESCRIPTION

[0015] See also Figure 1-Figure 3 The utility model provides the following technical solutions: a municipal sewage discharge pipeline, including a road drainage pipeline 1 and a pipeline closing cover 11, a drainage connecting pipeline 2 is provided on one side of the road drainage pipeline 1, a sewage inlet assembly 3 is provided above the drainage connecting pipeline 2, the sewage inlet assembly 3 includes an underground cement seepage pool 31, permeable bricks 32, planting soil 33 and a permeable barrier pad 34, the permeable bricks 32 are laid on the inner wall of the bottom end of the buried cement seepage pool 31, the planting soil 33 is filled in the buried cement seepage pool 31, and the permeable barrier pad 34 is arranged between the permeable bricks 32 and the planting soil 33.

[0016] In this implementation scheme: the staff digs a pit on the ground that matches the buried cement seepage pool 31 and the support connection pool 4, then applies concrete on the inner wall of the pit to form the buried cement seepage pool 31 and the support connection pool 4, then fills the support frame 5 in the support connection pool 4, then lays permeable bricks 32 at the bottom of the buried cement seepage pool 31, spreads the permeable barrier pad 34 flatly on the top of the permeable brick 32, and fills the top of the permeable brick 32 with planting soil 33, plants green plants 35 on the planting soil 33, and the sewage flows into the buried cement seepage pool 31 through the surrounding ground, and after multiple infiltrations of the sewage by the permeable brick 32, the planting soil 33 and the permeable barrier pad 34 are discharged into the drainage connection pipe 2, and then through the sewage pipe Discharge outward to intercept garbage, leaves, etc. mixed in sewage at the ground level, so that personnel can clean up the garbage on the ground without going down into the sewage pipe to clean up the garbage, and avoid garbage, leaves, etc. entering the sewage pipe to cause pipe blockage, which is convenient for the smooth use of the sewage pipe. The area of ​​the buried cement seepage pool 31 is larger than the area of ​​the supporting connection pool 4. The large-area sewage inlet component 3 is used to filter the sewage, which can improve the efficiency of sewage entering the drainage connecting pipe 2 for discharge. In the process of permeable bricks 32, planting soil 33 and permeable barrier pads 34 filtering sewage, the permeable bricks 32 and the permeable barrier pads 34 can intercept sediment to prevent sediment from entering the supporting connection pool 4 and causing pipe blockage.

[0017] A sewer connection vertical pipe 21 is provided on one side of the drainage connecting pipe 2, and the drainage connecting pipe 2 is arranged at an angle; when relying on the original sewer setting, the discharge end of the drainage connecting pipe 2 is connected to the existing sewer road drainage pipe 1, and the water body is discharged into the road drainage pipe 1 through the drainage connecting pipe 2. When the existing conditions are insufficient, the drainage connecting pipe 2 is connected to the sewer connection vertical pipe 21, and the sewer connection vertical pipe 21 is connected to the road drainage pipe 1. The sewage enters the sewer connection vertical pipe 21 through the drainage connecting pipe 2, and then enters the road drainage pipe 1.

[0018] Green plants 35 are planted on the top of the planting soil 33 to fasten the planting soil 33, and a leakage hole 36 is opened at the bottom of the buried cement seepage pool 31; by arranging the green plants 35, the planting soil 33 can be fully utilized, the municipal greening area can be increased, and the surrounding environment can be improved. At the same time, the roots of the green plants 35 can fasten and improve the planting soil 33 to prevent the planting soil 33 from being exposed for a long time and damaged by the wind. By arranging the leakage hole 36, the buried cement seepage pool 31 can be connected with the supporting connection pool 4, so that the water body can enter the supporting connection pool 4 through the buried cement seepage pool 31.

[0019] The bottom end of the buried cement seepage pool 31 is fixedly connected to a support connection pool 4, which is fixedly connected to the drainage connection pipe 2, and the road drainage pipe 1, the drainage connection pipe 2 and the support connection pool 4 are connected; the support connection pool 4 plays a role in receiving sewage and supports the support frame 5 at the same time.

[0020] A support frame 5 is placed in the support connection pool 4, and the top of the support frame 5 is flush with the top of the support connection pool 4; by setting the support frame 5, the permeable bricks 32 located at the opening position of the support connection pool 4 can be supported, so that the permeable bricks 32 can be laid neatly and flatly, and the grid structure of the support frame 5 can facilitate the circulation of water.

[0021] The working principle and use process of the utility model are as follows: the staff digs a pit on the ground that matches the buried cement seepage pool 31 and the support connection pool 4, then applies concrete on the inner wall of the pit to form the buried cement seepage pool 31 and the support connection pool 4, then fills the support frame 5 in the support connection pool 4, and then lays permeable bricks 32 at the bottom of the buried cement seepage pool 31, spreads the permeable barrier pad 34 flatly on the top of the permeable brick 32, and fills the top of the permeable brick 32 with planting soil 33, plants green plants 35 on the planting soil 33, and the sewage flows into the buried cement seepage pool 31 through the surrounding ground, and is discharged into the drainage connection pipe 2 after multiple infiltrations by the permeable bricks 32, planting soil 33 and permeable barrier pad 34, and is discharged outwardly through the sewage pipe to intercept garbage, leaves, etc. mixed in the sewage at the ground position.

Claims

1. A municipal sewage drainage pipeline, comprising a road drainage pipeline (1) and a pipeline closing cover (11), characterized in that: A drainage connection pipe (2) is provided on one side of the road drainage pipe (1), a sewage inlet assembly (3) is provided above the drainage connection pipe (2), the sewage inlet assembly (3) comprises an underground cement seepage pool (31), permeable bricks (32), planting soil (33) and a permeable barrier pad (34), the permeable bricks (32) are laid on the inner wall of the bottom end of the underground cement seepage pool (31), the planting soil (33) is filled in the underground cement seepage pool (31), and the permeable barrier pad (34) is arranged between the permeable bricks (32) and the planting soil (33).

2. A municipal sewage drainage pipeline according to claim 1, characterized in that: A sewer pipe connection vertical pipe (21) is provided on one side of the drainage connection pipe (2), and the drainage connection pipe (2) is arranged at an angle.

3. A municipal sewage drainage pipeline according to claim 1, characterized in that: Green plants (35) are planted on the top of the planting soil (33) to fasten the planting soil (33), and a seepage hole (36) is opened at the bottom of the buried cement seepage pool (31).

4. A municipal sewage drainage pipeline according to claim 1, characterized in that: The bottom end of the buried cement seepage pool (31) is fixedly connected to a support connection pool (4), the support connection pool (4) is fixedly connected to the drainage connection pipe (2), and the road drainage pipe (1), the drainage connection pipe (2) and the support connection pool (4) are in communication.

5. A municipal sewage drainage pipeline according to claim 4, characterized in that: A support frame (5) is placed in the support connection pool (4), and the top of the support frame (5) is flush with the top of the support connection pool (4).