Fabricated building guardrail

By designing prefabricated building guardrails, using hollow columns, cross rods, vertical rods and nozzle structures, combined with servo motors and hanging rod connection blocks, the problem of existing guardrails being unable to adjust and dust reduction is solved, and the adaptability to bending routes is achieved and Cleaning effect at the construction site.

CN222084202UActive Publication Date: 2024-11-29RUOQIANG COUNTY MINGHE MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420329211.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-11-29
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

The existing building guardrails cannot be adjusted to adapt to bending routes and lack dust reduction functions, which affects the use effect and environmental pollution control at the construction site.

Method used

A prefabricated building guardrail is designed, adopting hollow columns, cross rods, vertical rods and nozzle structures. The gear drives the gears to drive the gears to adjust the direction of the nozzles, and the hanging rods and connecting blocks are used to achieve flexible connection and stability of the guardrail. , spray water mist with water supply pipes to reduce dust.

Benefits of technology

It realizes flexible adjustment and stability of the guardrail, improves adaptability to curved routes and dust reduction effects, and ensures the environment at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084202U_ABST
    Figure CN222084202U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building guardrails, in particular to an assembly type building guardrail which comprises two hollow columns, the bottom of each hollow column is fixedly connected with a base, transverse rods are fixed between the two hollow columns up and down, and a plurality of evenly-distributed vertical rods are fixed between the upper transverse rod and the lower transverse rod. A transverse pipe is arranged on the upper side of the transverse rod located on the upper side, the two ends of the transverse pipe are fixedly sleeved with bearings, the bearings are fixed to the tops of the transverse rods, and one side wall of each transverse rod fixedly communicates with a plurality of evenly-distributed spray heads. The horizontal pipe is arranged at the top of the cross rod, the external water pipe is connected with the corresponding hollow column in the using process, so that water can be guided into the hollow column and then enters the horizontal pipe, and then water mist is sprayed by the spray head, so that dust falling on a construction site can be realized, and the using effect of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building guardrails, in particular to an assembled building guardrail. Background Art

[0002] During the construction process, in order to prevent passers-by from mistakenly entering the construction area, the construction area needs to be protected, so it is necessary to use building guardrails to protect the construction area;

[0003] In actual use, the existing building guardrail is composed of multiple separate guardrail monomers, which are connected by locking. After the connection, the multiple guardrail monomers are fixed, so they are not adjustable and cannot adapt to the curved route of the protection area, thus affecting the use effect. At the same time, dust will also appear at the construction site, and the device does not have the function of dust reduction. Therefore, we propose an assembled building guardrail. Utility Model Content

[0004] The purpose of the utility model is to provide an assembled building guardrail, which solves the problems raised in the background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled building guardrail, comprising a hollow column, wherein the number of the hollow columns is two, the bottom of the hollow column is fixedly connected to a base, cross bars are fixed above and below the two hollow columns, a plurality of evenly distributed vertical bars are fixed between the upper and lower cross bars, a cross tube is arranged on the upper side of the upper cross bar, both ends of the cross tube are fixedly fitted with bearings and the bearings are fixed to the top of the cross bar, a side wall of the cross tube is fixedly connected to a plurality of evenly distributed nozzles, one end of the cross tube is fixedly connected to a swivel joint, and the outer end of the swivel joint is fixedly connected to the corresponding hollow column.

[0006] By adopting the above technical solution, multiple devices are connected to form a guardrail, so as to protect the construction area. At the same time, the water supply pipe and the corresponding hollow column are connected, so that water can be introduced into the hollow column and then into the inner cavity of the horizontal pipe, so that the nozzle can be used for spray dust reduction, thereby avoiding the pollution of the surrounding environment caused by dust overflowing from the construction site.

[0007] As a preferred embodiment of the utility model, a gear ring is fixedly mounted on the outer wall of one end of the transverse tube, a gear is meshed on the outer wall of the gear ring, the gear is fixed to the outer end of the transmission shaft of the servo motor, and the servo motor is fixed to the corresponding outer wall of the bearing.

[0008] By adopting the above technical solution, starting the servo motor can drive the gear to rotate, thereby driving the gear ring to rotate, and then driving the cross pipe to rotate, so as to adjust the direction of the nozzle, thereby adjusting the direction of spraying water mist and ensuring the accuracy of dust reduction.

[0009] As a preferred embodiment of the utility model, a connecting block is fixed to the outer wall of one of the hollow columns, a hanging rod is fixed to the outer wall of the other hollow column, and through holes matching the hanging rod are provided on both sides of the top of the connecting block.

[0010] By adopting the above technical solution, in actual use, the hanging rod of a guardrail unit is connected with the through hole on the connecting block. When the guardrail needs to be able to rotate after connection to adapt to the arc area for protection, the hanging rod and the through hole on the outside are hung, so that the hanging rod and the connecting block can rotate, so that they can be adjusted to meet the position requirements. At the same time, when the guardrail needs to be stabilized after connection, the hanging rod and the through hole on the inner side of the top of the connecting block are hung, so that the inner wall of the connecting block and the hanging rod is limited, so that it cannot rotate, thereby ensuring stability during use.

[0011] As a preferred embodiment of the present utility model, a connecting valve is fixedly connected to the outer wall of the hollow column corresponding to the rotary joint.

[0012] By adopting the above technical solution and setting of the connecting valve, it is convenient to connect with the water supply pipe, thereby improving the convenience of operation.

[0013] As a preferred embodiment of the present invention, mounting holes are provided at the four corners of the top of the base.

[0014] By adopting the above technical solution, the setting of the installation hole makes it convenient to use the stabilizing pile to penetrate the installation hole and insert into the soil, thereby ensuring the overall stability of the device.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0016] The assembled building guardrail of the technical solution of the present application is provided with a horizontal pipe on the top of the horizontal bar. During use, an external water pipe is connected to the corresponding hollow column, so that water can be introduced into the hollow column and enter the horizontal pipe, and then the water mist is sprayed by the nozzle, so that dust can be reduced on the construction site, thereby improving the use effect of the device;

[0017] The servo motor drives the gear to rotate, thereby driving the gear ring to rotate, which can drive the horizontal pipe to rotate, so that the angle of the nozzle can be adjusted, thereby improving the spraying effect and ensuring the accuracy of dust reduction;

[0018] When the hanging rod is hung in the through hole on the outside of the top of the connecting block, the connection can be achieved and the guardrail units on both sides can be relatively rotated, so that it can adapt to different areas for protection, making the device adjustable. At the same time, the hanging rod is hung with the through hole on the inside, so that the fixed block and the connecting block on the inside of the hanging rod can be fitted and limited, so that they cannot rotate. At the same time, it is ensured that the guardrail is straight and stable after connection and cannot rotate, thereby improving the adaptability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0020] Figure 1 It is a schematic diagram of the overall structure of the assembled building guardrail of the utility model;

[0021] Figure 2 This is a schematic diagram of the base structure of the assembled building guardrail of the utility model;

[0022] Figure 3 This is a schematic diagram of the connecting block structure of the assembled building guardrail of the utility model.

[0023] In the figure:

[0024] 1. Hollow column; 11. Base; 12. Crossbar; 13. Vertical bar; 14. Connecting block; 15. Hanging rod; 16. Mounting hole;

[0025] 2. Horizontal pipe; 21. Bearing; 22. Rotary joint; 23. Gear ring; 24. Gear; 25. Servo motor; 26. Nozzle. DETAILED DESCRIPTION

[0026] See also Figure 1-3 The utility model provides a technical solution: an assembled building guardrail, comprising a hollow column 1, the number of the hollow columns 1 is two, the bottom of the hollow column 1 is fixedly connected with a base 11, a cross bar 12 is fixed between the two hollow columns 1, and a plurality of evenly distributed vertical bars 13 are fixed between the upper and lower cross bars 12, a cross tube 2 is arranged on the upper side of the upper cross bar 12, both ends of the cross tube 2 are fixedly sleeved with bearings 21 and the bearings 21 are fixed to the top of the cross bar 12, a side wall of the cross tube 2 is fixedly connected with a plurality of evenly distributed nozzles 26, one end of the cross tube 2 is fixedly connected with a swivel joint 22, and the outer end of the swivel joint 22 is fixedly connected with the corresponding hollow column 1;

[0027] In actual use, multiple devices are connected to form a guardrail, so as to protect the construction area. At the same time, the water supply pipe is connected to the corresponding hollow column 1, so that water can be introduced into the hollow column 1, and then into the inner cavity of the horizontal pipe 2, so that the nozzle 26 can be used to spray dust, so as to avoid the dust overflowing from the construction site and polluting the surrounding environment;

[0028] Furthermore, the outer wall of the hollow column 1 corresponding to the rotary joint 22 is fixedly connected with a connecting valve, and the setting of the connecting valve makes it convenient to connect with the water supply pipe, thereby improving the convenience of operation;

[0029] Furthermore, mounting holes 16 are provided at the four corners of the top of the base 11. The arrangement of the mounting holes 16 makes it convenient to use a stabilizing pile to penetrate the mounting holes 16 and insert it into the soil, thereby ensuring the overall stability of the device.

[0030] like Figure 1 As shown; a gear ring 23 is fixedly mounted on the outer wall of one end of the transverse tube 2, and a gear 24 is meshed on the outer wall of the gear ring 23. The gear 24 is fixed to the outer end of the transmission shaft of the servo motor 25, and the servo motor 25 is fixed to the outer wall of the corresponding bearing 21;

[0031] In actual use, starting the servo motor 25 can drive the gear 24 to rotate, thereby driving the gear ring 23 to rotate, and then driving the horizontal pipe 2 to rotate, so that the direction of the nozzle 26 can be adjusted, thereby adjusting the direction of spraying water mist to ensure the accuracy of dust reduction;

[0032] like Figure 1 and 2 As shown; a connecting block 14 is fixed to the outer wall of one of the hollow columns 1, and a hanging rod 15 is fixed to the outer wall of the other hollow column 1. Through holes that are compatible with the hanging rod 15 are opened on both sides of the top of the connecting block 14. In actual use, the hanging rod 15 of a guardrail unit is hung with the through hole on the connecting block 14. When the guardrail needs to be able to rotate after connection to adapt to the arc area for protection, the hanging rod 15 and the through hole located on the outside are hung, so that the hanging rod and the connecting block 14 can rotate, so that they can be adjusted to meet the position requirements. At the same time, when the guardrail needs to be stable after connection, the hanging rod 15 and the through hole on the inner side of the top of the connecting block 14 are hung, so that the inner wall of the connecting block 14 and the hanging rod 15 is limited, so that they cannot rotate, thereby ensuring stability during use.

[0033] The implementation principle of the assembled building guardrail of the present application is as follows: in actual use, multiple devices are connected, and the hanging rod 15 of a guardrail unit is used to hang with the through hole on the connecting block 14. When the guardrail needs to be able to rotate after connection to adapt to the arc area for protection, the hanging rod 15 is hung with the through hole located on the outside, so that the hanging rod 15 and the connecting block 14 can rotate, so that they can be adjusted to meet the position requirements. At the same time, when the guardrail needs to be stable after connection, the hanging rod 15 is hung with the through hole on the inner side of the top of the connecting block 14, so that the inner wall of the connecting block 14 and the hanging rod 15 is limited. It cannot rotate, ensuring stability during use and protecting the construction area. At the same time, the water supply pipe and the corresponding hollow column 1 are connected, so that water can be introduced into the hollow column 1, and then into the inner cavity of the horizontal tube 2, so that the nozzle 26 can be used for spray dust reduction, so as to avoid the pollution of the surrounding environment caused by dust overflowing at the construction site, and at the same time, starting the servo motor 25 can drive the gear 24 to rotate, so as to drive the gear ring 23 to rotate, and then drive the horizontal tube 2 to rotate, so as to adjust the direction of the nozzle 26, so as to adjust the direction of spraying water mist and ensure the accuracy of dust reduction.

[0034] In addition, the components included in the assembled building guardrail of the utility model are all universal standard parts or components known to technical personnel in this field. The structure and principle can be known to technical personnel through technical manuals or through conventional experimental methods. In the idle part of the device, all the above-mentioned electrical components, which refer to power elements, electrical components, and compatible monitoring computers and power supplies are connected through wires. The specific connection means should refer to the following working principle. The electrical connection is completed in the order of working in sequence. The detailed connection means are well-known technologies in this field. The following mainly introduces the working principles and processes, and no explanation of electrical control is given.

Claims

1. An assembled building guardrail, comprising a hollow column (1), characterized in that: The number of the hollow columns (1) is two, the bottom of the hollow column (1) is fixedly connected to a base (11), a cross bar (12) is fixedly provided between the two hollow columns (1) at the top and bottom, a plurality of evenly distributed vertical bars (13) are fixedly provided between the upper and lower cross bars (12), a cross tube (2) is arranged on the upper side of the upper cross bar (12), both ends of the cross tube (2) are fixedly sleeved with bearings (21) and the bearings (21) are fixed to the top of the cross bar (12), a side wall of the cross tube (2) is fixedly connected to a plurality of evenly distributed nozzles (26), one end of the cross tube (2) is fixedly connected to a rotary joint (22), and the outer end of the rotary joint (22) is fixedly connected to the corresponding hollow column (1).

2. The assembled building guardrail according to claim 1, characterized in that: A gear ring (23) is fixedly mounted on the outer wall of one end of the transverse tube (2), a gear (24) is meshed on the outer wall of the gear ring (23), the gear (24) is fixed to the outer end of the transmission shaft of the servo motor (25), and the servo motor (25) is fixed to the outer wall of the corresponding bearing (21).

3. The assembled building guardrail according to claim 1, characterized in that: A connecting block (14) is fixed to the outer wall of one of the hollow columns (1), and a hanging rod (15) is fixed to the outer wall of the other hollow column (1). Through holes matching the hanging rod (15) are provided on both sides of the top of the connecting block (14).

4. The assembled building guardrail according to claim 1, characterized in that: The outer wall of the hollow column (1) corresponding to the rotary joint (22) is fixedly connected with a connecting valve.

5. The assembled building guardrail according to claim 1, characterized in that: The four corners of the top of the base (11) are all provided with mounting holes (16).