Water conservancy construction piling equipment

By designing water conservancy construction pile driving equipment with support components and fixed components, the problem of poor stability of equipment on uneven ground is solved, and the hammering depth and accurate placement are adjusted according to soil conditions, which improves the stability and accuracy of pile driving.

CN222084440UActive Publication Date: 2024-11-29SHANDONG JIANGXIN CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420948644.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2024-11-29
Estimated Expiration
2034-05-06

AI Technical Summary

Technical Problem

The existing water conservancy construction pile driving equipment has poor stability when fixed and placed on uneven ground, resulting in low accuracy and difficulty in adapting to the requirements of hammering depth of different soil softness.

Method used

A water conservancy construction pile driving equipment including support components, drilling components, fixing components, folding plates and horizontal detection boxes is designed. The ground is fixed by fixing the plug rods and fastening knobs of the fixing components. The folding plate increases stability and the horizontal detection box is calibrated. Place horizontally, enter the pipe and lubricate the lubricating bucket to meet the needs of different soil conditions.

Benefits of technology

Improves the stability and accuracy of the equipment, enables the hammering depth to be adjusted according to the degree of soil softness, and performs pile driving operations accurately through lubrication and horizontal calibration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084440U_ABST
    Figure CN222084440U_ABST
Patent Text Reader

Abstract

The utility model discloses water conservancy construction piling equipment, which comprises a supporting assembly, a drilling assembly, a fixing assembly, a folding plate and a horizontal detection box, the supporting assembly comprises a rack, a driving motor arranged at the top end of the rack and a screw rod fixed with the output end of the driving motor, the drilling assembly is arranged on the rack, and the fixing assembly is arranged on the rack. The fixing assembly comprises an insertion rod inserted into the bottom of the rack and a fastening knob in threaded connection with the insertion rod, the folding plate is hinged to the rack, and the horizontal detection box is in threaded connection with the rack. The hammering depth of the inserting rod can be selected according to the actual soil softness degree, the fastening knob is rotated after hammering so as to be fixed, the arranged folding plate can be rotatably unfolded, a heavy object can be placed on the folding plate after the folding plate is unfolded so as to improve the stability, meanwhile, clear water can be poured into the arranged horizontal detection box, and the detection accuracy is improved. After pouring, whether the liquid level is horizontal with the scale marks can be checked, so that piling equipment can be horizontally placed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of piling equipment, in particular to a piling equipment for water conservancy construction. Background Art

[0002] Water conservancy construction piling equipment is an indispensable and important tool in water conservancy project construction. It is mainly used to complete the construction of pile foundations and improve the efficiency and quality of construction projects. These equipment can share the weight of the building, resist external forces, and avoid problems such as building settlement. In water conservancy construction, commonly used piling equipment includes bored pile drivers and pipe-sinking pile drivers. Bored pile drivers, such as spiral drills, can drill holes on site and pour concrete to form piles. However, during construction, the ground is often uneven, which is not easy to fix and place, and the poor stability leads to low accuracy when drilling. There are certain shortcomings. Therefore, we propose a water conservancy construction piling equipment. Utility Model Content

[0003] The utility model aims to solve the problems existing in the prior art or related technologies.

[0004] To this end, the technical solution adopted by the utility model is: a water conservancy construction piling equipment, including a supporting assembly, a drilling assembly, a fixing assembly, a folding plate and a horizontal detection box, the supporting assembly includes a set frame, a driving motor arranged at the top of the frame and a screw fixed to the output end of the driving motor, the drilling assembly is arranged on the frame, the fixing assembly includes an insertion rod inserted into the bottom of the frame and a fastening knob threadedly connected to the insertion rod, the folding plate is hingedly connected to the frame, and the horizontal detection box is threadedly connected to the frame.

[0005] Preferably, a limit rod is provided on the inner side of the frame.

[0006] Preferably, the drilling assembly includes a movable seat threadedly connected to the screw rod, a rotary motor disposed at the front end of the movable seat, and a drill rod fixed to the output end of the rotary motor.

[0007] Preferably, it also includes a first lubrication bucket and a second lubrication bucket, wherein the first lubrication bucket and the second lubrication bucket are both arranged on the top of the movable seat, and the rear sides of the first lubrication bucket and the second lubrication bucket are both provided with entry pipes, and the entry pipes are threadedly connected with tightening knobs.

[0008] Preferably, the four fixing components are distributed at the corners of the bottom of the rack.

[0009] Preferably, scale lines are provided on the outer side of the level detection box.

[0010] By adopting the above technical scheme, the beneficial effects achieved by the utility model are as follows: the insertion rod of the fixing assembly provided in the utility model can be hammered into the ground by a heavy hammer, and after hammering, the tightening knob can be rotated to block the frame, and the hammering depth can be selected according to the actual softness of the soil for use, and the provided folding plate can be rotated and unfolded, and after unfolding, the area of ​​the bottom of the frame can be increased by the folding plate, and then heavy objects can be placed on the folding plate to improve stability, and at the same time, clean water can be poured into the interior of the provided horizontal detection box, and after pouring, it can be checked whether the liquid level is level with the scale line, so as to place the piling equipment horizontally, and then the provided inlet pipe can be poured with lubricating oil, and the poured lubricating oil can enter the first lubrication bucket or the second lubrication bucket, and after entering, it can infect the screw rod and the limit rod, so as to lubricate the screw rod and the limit rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the utility model from one perspective;

[0012] Figure 2 It is a structural schematic diagram of another perspective of the utility model;

[0013] Figure 3 This is a schematic diagram of the structure of the first lubrication bucket of the utility model;

[0014] Figure 4 This is a schematic diagram of the structure of the second lubrication bucket of the utility model;

[0015] Figure 5 It is a structural schematic diagram of the fixing assembly of the utility model;

[0016] Figure 6 It is a structural schematic diagram of the level detection box of the utility model.

[0017] Reference numerals:

[0018] 100, support assembly; 101, frame; 102, drive motor; 103, lead screw; 104, limit rod;

[0019] 200, drilling assembly; 201, moving seat; 202, rotating motor; 203, drilling rod;

[0020] 300, first lubrication bucket;

[0021] 400, second lubrication bucket; 401, inlet pipe; 402, sealing cover;

[0022] 500, fixing assembly; 501, insert rod; 502, tightening knob;

[0023] 600, folding plate;

[0024] 700, level detection box; 701, scale line. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be noted that the embodiments of the utility model and the features in the embodiments can be combined with each other without conflict.

[0026] The following describes some embodiments of the utility model in conjunction with the accompanying drawings to provide a water conservancy construction piling device.

[0027] Embodiment 1:

[0028] Reference Figure 1 , Figure 2 , Figure 5 and Figure 6 , which is the first embodiment of the utility model, provides a water conservancy construction piling equipment, including a support component 100, a drilling component 200, a fixing component 500, a folding plate 600 and a horizontal detection box 700.

[0029] Specifically, the support assembly 100 includes a frame 101, a driving motor 102 arranged at the top of the frame 101, and a screw rod 103 fixed to the output end of the driving motor 102. A limit rod 104 is arranged on the inner side of the frame 101, which can drive the driving motor 102 to operate. The operation of the driving motor 102 will drive the screw rod 103 to rotate, so as to drive the drilling assembly 200 to move up and down.

[0030] Specifically, the drilling assembly 200 is arranged on the frame 101, and the drilling assembly 200 includes a moving seat 201 threadedly connected to the screw rod 103, a rotating motor 202 arranged at the front end of the moving seat 201, and a drill rod 203 fixed to the output end of the rotating motor 202. The rotating motor 202 can be controlled to operate, and the operating rotating motor 202 will drive the drill rod 203 to rotate so as to drill a hole.

[0031] Specifically, the fixing component 500 includes an insertion rod 501 inserted into the bottom of the frame 101 and a fastening knob 502 threadedly connected to the insertion rod 501. The four fixing components 500 are distributed at the corners of the bottom of the frame 101. The insertion rod 501 can be inserted into the frame 101. After insertion, the insertion rod 501 can be hammered into the ground by a heavy hammer. When hammering, the depth of hammering can be selected according to the actual softness of the soil. After hammering, the fastening knob 502 can be rotated to block the frame 101 for fixing.

[0032] Specifically, the folding plate 600 is hingedly connected to the frame 101, and the folding plate 600 can be rotated and unfolded. After unfolding, the folding plate 600 can increase the area of ​​the bottom of the frame 101, and then heavy objects can be placed on the folding plate 600 to improve stability.

[0033] Specifically, the level detection box 700 is threadedly connected to the frame 101, and a scale line 701 is set on the outside of the level detection box 700. A certain amount of clean water can be poured into the inside of the level detection box 700. After pouring, it can be checked whether the liquid level is level with the scale line 701, so as to place the piling equipment horizontally.

[0034] Embodiment 2:

[0035] Reference Figure 1-4 , which is the second embodiment of the utility model, which is different from the first embodiment in that: it also includes a first lubrication bucket 300 and a second lubrication bucket 400, the first lubrication bucket 300 and the second lubrication bucket 400 are both arranged on the top of the movable seat 201, and the rear sides of the first lubrication bucket 300 and the second lubrication bucket 400 are both provided with an inlet pipe 401, and a tightening knob 502 is threadedly connected to the inlet pipe 401, and the rotatable sealing cover 402 can be separated from the inlet pipe 401. After separation, the lubricating oil can be poured into the first lubrication bucket 300 or the second lubrication bucket 400 through the inlet pipe 401, and after entering, the screw rod 103 and the limit rod 104 can be infected so as to lubricate the screw rod 103 and the limit rod 104.

[0036] The working principle and use process of the utility model are as follows: when in use, the insertion rod 501 of the fixing assembly 500 can be inserted into the frame 101. After insertion, the insertion rod 501 can be hammered into the ground by a heavy hammer. When hammering, the depth of hammering can be selected according to the actual softness of the soil. After hammering, the tightening knob 502 can be rotated until the tightening knob 502 blocks the frame 101. At the same time, a certain amount of clean water can be poured into the interior of the level detection box 700 during fixing. After pouring, it can be checked whether the liquid level is level with the scale line 701. If it is not level, the frame 101 can be adjusted until the frame 1 01 is placed horizontally on the ground so as to place the piling equipment horizontally. After being placed horizontally, the folding plate 600 can be rotated and unfolded. After unfolding, the folding plate 600 can increase the area of ​​the bottom of the frame 101, and then heavy objects can be placed on the folding plate 600 to improve stability. During lubrication, the sealing cover 402 can be rotated to separate from the inlet pipe 401. After separation, the lubricating oil can be poured into the first lubrication bucket 300 or the second lubrication bucket 400 through the inlet pipe 401, and after entering, the screw rod 103 and the limit rod 104 can be infected to lubricate the screw rod 103 and the limit rod 104.

[0037] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and purpose of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A piling equipment for water conservancy construction, It is characterized in that include: A support assembly (100) comprises a frame (101), a drive motor (102) arranged at the top of the frame (101), and a screw rod (103) fixed to the output end of the drive motor (102); A drilling assembly (200) arranged on the frame (101); A fixing assembly (500) comprising an insertion rod (501) inserted into the bottom of the frame (101) and a fastening knob (502) threadedly connected to the insertion rod (501); A folding plate (600) hingedly connected to the frame (101); The level detection box (700) is threadedly connected to the frame (101).

2. A water conservancy construction piling equipment according to claim 1, It is characterized in that A limiting rod (104) is arranged on the inner side of the frame (101).

3. A water conservancy construction piling equipment according to claim 1, It is characterized in that The drilling assembly (200) comprises a movable seat (201) threadedly connected to the screw rod (103), a rotary motor (202) arranged at the front end of the movable seat (201), and a drilling rod (203) fixed to the output end of the rotary motor (202).

4. A water conservancy construction piling equipment according to claim 3, It is characterized in that The invention also comprises a first lubrication bucket (300) and a second lubrication bucket (400), wherein the first lubrication bucket (300) and the second lubrication bucket (400) are both arranged on the top of the movable seat (201), and the rear sides of the first lubrication bucket (300) and the second lubrication bucket (400) are both provided with an entry pipe (401), and a tightening knob (502) is threadedly connected to the entry pipe (401).

5. A water conservancy construction piling equipment according to claim 1, It is characterized in that The four fixing components (500) are distributed at the corners of the bottom of the frame (101).

6. A water conservancy construction piling equipment according to claim 1, It is characterized in that The outer side of the level detection box (700) is provided with scale lines (701).