Pipeline pre-embedding clamp
By designing pipeline embedded clamps and connecting bent round steel mountings with steel bars, the problem of easy deviation of traditional embedded pipelines is solved, ensuring construction quality and efficiency.
Patent Information
- Application Number
- CN202420923228.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-29
AI Technical Summary
In the process of pre-embedding of traditional roof hydropower pipelines, the wire binding method is prone to shift the pipeline position due to concrete impact force and vibration operations, affecting the construction quality and increasing costs.
Design a pipeline embedded clamp, including embedded pipe fixtures, first and second mounting parts, the mounting parts are round steel, and are connected to longitudinal and transverse steel bars through bending to form a stable system to ensure the positioning of embedded pipes. No offset.
The stable positioning and reinforcement of the embedded pipe is achieved, avoiding deviations during the pouring process, and improving construction quality and efficiency.
Smart Images

Figure CN222085332U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a pipeline pre-buried fixture. Background Art
[0002] When pre-buried water and electricity pipelines in traditional roofs, the pipelines are usually fixed to the reserved steel bars by tying them with iron wires. However, the impact force of concrete is relatively large when pouring it, and coupled with the vibration operation, the iron wire tying is easy to loosen, causing the position of the pre-buried pipelines to shift, which does not meet the standard requirements, thus affecting the construction quality and even causing rework, increasing construction time and costs. Utility Model Content
[0003] Based on this, it is necessary to provide a pipeline pre-embedded fixture to overcome the defects mentioned in the above background technology.
[0004] A pipeline embedded clamp comprises an embedded pipe fixing piece, the bottom of which is fixedly connected to a first mounting piece perpendicular to its axial direction, the two ends of the first mounting piece are folded downward, one side of the end of the first mounting piece is fixedly connected to a second mounting piece parallel to the embedded pipe fixing piece, and the second mounting piece is folded downward away from the first mounting piece.
[0005] As a preferred embodiment of the pipeline pre-buried fixture of the utility model, the first mounting member and the second mounting member are both round steel.
[0006] As a preferred embodiment of the pipeline pre-embedded fixture in the utility model, ends of the first mounting member and the second mounting member are connected to the transverse steel bars and the longitudinal steel bars at the junction.
[0007] As a preferred embodiment of the pipeline pre-embedded fixture of the utility model, the length of the first mounting member is greater than the spacing between adjacent longitudinal steel bars.
[0008] As a preferred embodiment of the pipeline pre-embedded fixture in the utility model, the length of the second mounting member is greater than the distance between the bottom of the first mounting member and the bottom of the transverse reinforcement.
[0009] As a preferred embodiment of the embedded pipe fixture of the utility model, the embedded pipe fixing piece is a thin-walled steel pipe, and its inner diameter is 1 to 2 mm larger than the outer diameter of the embedded pipe.
[0010] Beneficial effects of the utility model:
[0011] The utility model has a simple structure and is easy to install. The embedded pipe can be connected to the steel bars in the main structure to form a stable system, and the embedded pipe can be effectively positioned and reinforced. The embedded pipe will not be offset during the pouring process, thereby ensuring the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0013] Figure 1 This is one of the structural schematic diagrams of the clamp in the embodiment of the present application;
[0014] Figure 2 This is the second structural diagram of the clamp in the embodiment of the present application;
[0015] Description of reference numerals:
[0016] 1. Pre-buried pipe fixing part; 2. First mounting part; 3. Second mounting part. DETAILED DESCRIPTION
[0017] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0018] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0019] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0020] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0021] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0022] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0023] Example
[0024] This embodiment provides a pipeline pre-embedded fixture for fixing the pre-embedded pipe, which is arranged on the top of the steel mesh, and is located between adjacent longitudinal steel bars and close to the transverse steel bars. Figure 1 and Figure 2 As shown, it includes a pre-buried pipe fixing part 1, a first mounting part 2 and a second mounting part 3. The pre-buried pipe fixing part 1 is sleeved with the pre-buried pipe; the first mounting part 2 is fixedly connected to the bottom of the pre-buried pipe fixing part 1 and is perpendicular to the axial direction of the pre-buried pipe fixing part 1, and its two ends are folded down to connect with the longitudinal steel bars on both sides of the pre-buried pipe; the second mounting part 3 is arranged parallel to the pre-buried pipe fixing part 1, and is fixedly connected to the end of the first mounting part 2 close to the transverse steel bar side, and is folded down away from the first mounting part 2 to connect with the transverse steel bar. The ends of the first mounting part 2 and the second mounting part 3 are connected to the transverse steel bars and the longitudinal steel bars at the junction, connecting the pre-buried pipe and the steel mesh as a whole.
[0025] In this embodiment, the first mounting member 2 and the second mounting member 3 are both round steels, so that after the construction personnel place the fixture at the specified position, they can use a bending tool to bend the ends of the first mounting member 2 and the second mounting member 3 to connect the two to the steel mesh.
[0026] In this embodiment, the length of the first mounting member 2 is greater than the spacing between adjacent longitudinal steel bars, and its end needs to be folded at least 180 degrees around the longitudinal steel bars before being connected to the longitudinal steel bars, and the end is provided with a second mounting member 3 side to abut against the transverse steel bars; the length of the second mounting member 3 shown is greater than the spacing between the bottom of the first mounting member 2 and the bottom of the transverse steel bars, and it needs to be folded at least 180 degrees around the transverse steel bars before being connected to the transverse steel bars away from the first mounting member 2. Folding at least 180 degrees can ensure the tightness of the connection between the two and the steel mesh, and avoid the two from offsetting during the concrete pouring process.
[0027] In this embodiment, the embedded pipe fixing member 1 is a thin-walled steel pipe, and its inner diameter is 1 to 2 mm larger than the outer diameter of the embedded pipe, so as to facilitate the installation of the embedded pipe and ensure that the embedded pipe will not have a large deviation compared to the embedded pipe fixing member 1 when pouring concrete.
[0028] The utility model has a simple structure and is easy to install. The embedded pipe can be connected to the steel mesh in the main structure to form a stable system, which can effectively position and reinforce the embedded pipe. The embedded pipe will not deviate during the pouring process, thereby ensuring the construction quality.
[0029] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0030] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A pipeline pre-buried fixture, Features: The invention comprises a pre-buried pipe fixing member (1), wherein a first mounting member (2) perpendicular to the axial direction of the pre-buried pipe fixing member (1) is fixedly connected to the bottom of the pre-buried pipe fixing member (1), both ends of the first mounting member (2) are folded downwards, a second mounting member (3) parallel to the pre-buried pipe fixing member (1) is fixedly connected to one side of the end of the first mounting member (2), and the second mounting member (3) is folded downwards away from the first mounting member (2).
2. According to the pipeline pre-buried fixture of claim 1, It is characterized in that The first mounting member (2) and the second mounting member (3) are both round steel.
3. According to claim 2, the pipeline pre-buried fixture, It is characterized in that The ends of the first mounting member (2) and the second mounting member (3) are connected to the transverse steel bars and the longitudinal steel bars at the junction.
4. According to claim 3, the pipeline pre-buried fixture, It is characterized in that The length of the first mounting member (2) is greater than the spacing between adjacent longitudinal steel bars.
5. According to claim 3, the pipeline pre-buried fixture, It is characterized in that The length of the second mounting member (3) is greater than the distance between the bottom of the first mounting member (2) and the bottom of the transverse reinforcement.
6. According to claim 1, the pipeline pre-buried fixture, It is characterized in that The embedded pipe fixing member (1) is a thin-walled steel pipe, and its inner diameter is 1 to 2 mm larger than the outer diameter of the embedded pipe.