Novel fire-fighting leakage training experiment device
By designing a new fire leakage training device with simple and easy maintenance, using multiple leakage ports and output pipes in the tank, combined with solenoid valves and quick connectors, the existing device has been solved with complex structure and difficult maintenance problems, and multi-position leakage has been achieved The need for training improves the practicality of training.
Patent Information
- Application Number
- CN202420572478.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-20
AI Technical Summary
The existing fire leakage training experimental equipment has complex structure, inconvenient maintenance, and cannot quickly replace leakage points, making it difficult to meet the firefighters' leak plugging training needs in different locations.
A new fire leakage training experimental device including a tank body, input pipe, conveying pump, pipe, solenoid valve and quick joint was designed. Multiple leakage ports and output pipes were installed in the tank body, and different positions were achieved through solenoid valve and quick joint. Leak simulation, simple structure, easy maintenance and quick replacement of leak points.
It realizes a fire leakage training device with reasonable structure and convenient maintenance, which can simulate the leakage leakage environment of the tank, meets the leakage plugging training needs in different locations, and improves the practicality of the training.
Smart Images

Figure CN222088181U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fire-fighting auxiliary facilities, in particular to a novel fire-fighting leakage training experimental device. Background Art
[0002] In real life, sometimes there are various complex leakage situations such as leakage of dangerous gases and dangerous liquids. In order to improve the leak-stopping ability of firefighters when dealing with these leaks, a Chinese invention patent application with publication number CN103810916A discloses a fire leakage training experimental device, which includes a steel frame trailer, a transverse steel pressure vessel, a longitudinal steel pressure vessel and a series of piping components to simulate various possible leakage situations, thereby achieving the purpose of training firefighters. However, the disadvantages of this experimental device are that it has a complex structure, is inconvenient to maintain and cannot quickly replace the leakage point. Utility Model Content
[0003] In view of the above-mentioned defects in the prior art, the utility model provides a new fire leakage training experimental device with simple and reasonable structural design, convenient maintenance and quick connection. The specific technical scheme is as follows:
[0004] A novel fire leakage training experimental device comprises a tank body, wherein an input pipe, a delivery pump, a delivery pipe, a branch pipe, a solenoid valve, an output pipe, and a quick connector are installed inside the tank body, external gas or liquid enters from one end of the input pipe, the other end of the input pipe is connected to the delivery pump, the output port of the delivery pump is connected to the delivery pipe, the delivery pipe is connected to the branch pipe, the branch pipe is provided with a plurality of branch outlets, each branch outlet is connected to an output pipe, each output pipe is provided with a solenoid valve for controlling the conduction or closing of the output pipe, the tank body is provided with a plurality of leakage ports, a pipe connector is installed inside each leakage port, and the output pipe is connected to the pipe connector via a quick connector.
[0005] As a preferred solution of the utility model, the delivery pump is a hydraulic pump or an air pump.
[0006] As a preferred solution of the utility model, the connection between the branch pipe and the output pipe is close to the side wall of the tank body, the solenoid valve is close to the side wall of the tank body, and an openable maintenance door is provided on the side wall of the tank body.
[0007] As a preferred solution of the utility model, a manual valve is installed in the output pipe.
[0008] As a preferred solution of the utility model, the output pipe is connected to the first port of the three-way joint, the second port of the three-way joint is connected to the pressure sensor, and the third port of the three-way joint is connected to the quick connector.
[0009] As a preferred solution of the utility model, the quick connector includes a main body shell, a movable sleeve, a clamping bead, a spring and a movable valve core. A threaded port is provided at one end of the main body shell, a quick connector is provided inside the other end of the main body shell, a movable sleeve and a spring are mounted on the outside of the other end of the main body shell, the spring presses against the movable sleeve, a step is provided on the inner side of the movable sleeve, and a plurality of clamping beads are installed on the inner circumference of the quick connector. When the step presses against the clamping bead, the clamping bead contracts and clamps the pipe connector, and the movable valve core moves when under pressure to connect the threaded port to the quick connector.
[0010] As a preferred solution of the utility model, a limiting ring for limiting the movable sleeve from falling out is installed at the other end of the main body shell.
[0011] As a preferred solution of the utility model, an electric control box is also installed inside the tank body.
[0012] Beneficial effects: The fire leakage training experimental device of the utility model has a reasonable structural design. The input pipe, delivery pump, delivery pipe, branch pipe, solenoid valve, output pipe and quick connector are all installed in the tank body, which can well simulate the situation environment when the tank body leaks. In addition, multiple output pipes and the tank body are provided with multiple leakage ports, which can realize leakage of multiple leakage points at different positions of the tank body, meet the needs of leak plugging training at different positions, and have strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is an overall three-dimensional diagram of the utility model viewed from the outside;
[0014] Figure 2 It is the internal structure diagram of the utility model;
[0015] Figure 3 This is a structural diagram of the utility model after the tank body is hidden;
[0016] Figure 4 It is a three-dimensional diagram of the delivery pipe, branch pipe, solenoid valve and output pipe of the utility model;
[0017] Figure 5 It is a stereoscopic diagram of the output pipe, quick connector and pipe connector of the utility model when they are connected together;
[0018] Figure 6 It is a three-dimensional diagram of the output pipe, quick connector and pipe connector of the utility model when they are disassembled;
[0019] Figure 7 It is a cross-sectional view of the quick connector of the utility model. DETAILED DESCRIPTION
[0020] The following is a further description of the specific implementation of the present invention in conjunction with the accompanying drawings:
[0021] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the positions or elements referred to must have specific directions, be constructed and operated in specific directions. Therefore, they cannot be understood as limitations on the present invention.
[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0023] like Figures 1 to 3 As shown, a novel fire leakage training experimental device comprises a tank body 1, wherein an input pipe 2, a delivery pump 3, a delivery pipe 4, a branch pipe 5, a solenoid valve 6, an output pipe 7, a quick connector 8 and an electric control box 15 are installed inside the tank body 1, external gas or liquid enters from one end of the input pipe 2, and the other end of the input pipe 2 is connected to the delivery pump 3, the output port of the delivery pump 3 is connected to the delivery pipe 4, the delivery pipe 4 is connected to the branch pipe 5, the branch pipe 5 is provided with a plurality of branch outlets, each branch outlet is connected to an output pipe 7, in this embodiment, there are 4 output pipes 7, and the actual number can be flexibly increased or decreased according to usage, each output pipe 7 is installed with a solenoid valve 6 for controlling the output pipe 7 to be turned on or off, the tank body 1 is provided with a plurality of leakage ports 1a, each leakage port 1a is installed with a pipe connector 9, the output pipe 4 is connected to the pipe connector 9 through a quick connector 8, and the electric control box 15 controls the operation of the electrical appliances of the entire device.
[0024] Specifically, the delivery pump 3 is a hydraulic pump or an air pump, which can be used to deliver liquid or gas.
[0025] In one embodiment, the connection between the branch pipe 5 and the output pipe 7 is close to the side wall of the tank body 1, and the solenoid valve 6 is close to the side wall of the tank body 1. An openable maintenance door 10 is provided on the side wall of the tank body 1. The maintenance door 10 is hingedly installed on the side wall of the tank body 1. After opening the maintenance door 10, the branch pipe 5, the output pipe 7, and the solenoid valve 6 can be seen for easy inspection and maintenance.
[0026] like Figure 4 As shown, a manual valve 11 is installed in the output pipe 7. The function of the manual valve 11 is to close the output pipe 7 when the solenoid valve 6 fails or other situations occur.
[0027] like Figure 5and 6 As shown, the output pipe 7 is connected to the first port of the three-way joint 12, the second port of the three-way joint 12 is connected to the pressure sensor 13, the pressure sensor 13 detects the pressure in the pipeline, and the third port of the three-way joint is connected to the quick connector 8.
[0028] like Figure 7 As shown, the quick connector 8 includes a main body shell 81, a movable sleeve 82, a clamping bead 83, a spring 84 and a movable valve core 85. A threaded port 81a is provided at one end of the main body shell 81, and a quick connector 81b is provided inside the other end of the main body shell 81. A movable sleeve 82 and a spring 84 are mounted on the outside of the other end of the main body shell 81. The spring 84 presses against the movable sleeve 82. A step 82a is provided on the inner side of the movable sleeve 82. A plurality of clamping beads 83 are installed on the inner circumference of the quick connector 81b. When the step 82a presses against the clamping bead 83, the clamping bead 83 contracts and clamps the pipe connector 9. When the quick connector 8 and the pipe connector 9 are to be separated, When the pipe joint 9 is connected; the movable sleeve 82 is pushed so that the step 82a no longer presses the tightening bead 83, and the pipe joint 9 can be easily pulled out, thereby realizing the quick installation and removal of the quick joint 8. The movable valve core 85 is installed inside the main body shell 81, and the movable valve core 85 is located between the threaded port 81a and the quick interface 81b. After the pipe joint 9 is inserted into the quick interface 81b, it can move against the movable valve core 85. When the movable valve core 85 is pressurized, it moves to connect the threaded port 81a to the quick interface 81b. In addition, a limit ring 86 is installed at the other end of the main body shell 81 to limit the movable sleeve 82 from coming out.
[0029] The above content is a further detailed description of the utility model in combination with specific preferred implementation methods. It cannot be determined that the specific implementation of the utility model is limited to these descriptions. For ordinary technicians in the technical field to which the utility model belongs, without departing from the concept of the utility model, they can also make several simple deductions or substitutions, which should be regarded as belonging to the protection scope of the utility model.
Claims
1. A novel fire leakage training experimental device, comprising a tank body, characterized in that: An input pipe, a delivery pump, a delivery pipe, a branch pipe, a solenoid valve, an output pipe, and a quick connector are installed inside the tank body. External gas or liquid enters from one end of the input pipe, and the other end of the input pipe is connected to the delivery pump. The output port of the delivery pump is connected to the delivery pipe, and the delivery pipe is connected to the branch pipe. The branch pipe is provided with a plurality of branch outlets, each of which is connected to an output pipe. A solenoid valve for controlling the conduction or closing of the output pipe is installed in each output pipe. The tank body is provided with a plurality of leakage ports, and a pipe connector is installed on the inner side of each leakage port. The output pipe is connected to the pipe connector via a quick connector.
2. A novel fire leakage training experimental device according to claim 1, characterized in that: The delivery pump is a hydraulic pump or an air pump.
3. A novel fire leakage training experimental device according to claim 1, characterized in that: The connection between the branch pipe and the output pipe is close to the side wall of the tank body, the solenoid valve is close to the side wall of the tank body, and an openable maintenance door is arranged on the side wall of the tank body.
4. A novel fire leakage training experimental device according to claim 1 or 3, characterized in that: A manual valve is installed in the output pipe.
5. A novel fire leakage training experimental device according to claim 1, characterized in that: The output pipe is connected to the first port of the three-way connector, the second port of the three-way connector is connected to the pressure sensor, and the third port of the three-way connector is connected to the quick connector.
6. A novel fire leakage training experimental device according to claim 1 or 5, characterized in that: The quick connector includes a main body shell, a movable sleeve, a clamping bead, a spring and a movable valve core. A threaded port is provided at one end of the main body shell, a quick connector is provided inside the other end of the main body shell, a movable sleeve and a spring are mounted on the outside of the other end of the main body shell, the spring presses against the movable sleeve, a step is provided on the inner side of the movable sleeve, and a plurality of clamping beads are installed on the inner circumference of the quick connector. When the step presses against the clamping bead, the clamping bead contracts and clamps the pipe connector, and when the movable valve core is pressurized, it moves to connect the threaded port to the quick connector.
7. A novel fire leakage training experimental device according to claim 6, characterized in that: A limiting ring for limiting the movable sleeve from falling out is installed at the other end of the main body shell.
8. A novel fire leakage training experimental device according to claim 1, characterized in that: An electric control box is also installed inside the tank body.