Vertical main shaft and vertical glass processing equipment
By adopting a multi-layer maze sealing structure and high-pressure air-sealing technology in glass processing equipment, combined with the steel ball broach sleeve and dual-cylinder structure, the problem of low operating performance of the vertical electric spindle is solved, and higher processing efficiency and accuracy are achieved.
Patent Information
- Application Number
- CN202322938848.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-10-24
AI Technical Summary
The neutral electric spindle of traditional glass processing equipment is easily affected by fine chips, dust and cutting fluid during processing, resulting in increased rotational friction, accelerated damage speed, and lower operating performance.
A vertical spindle is designed, adopting a multi-layer maze seal structure and an air-sealed ring groove, and using high-pressure air to form an air-seal seal to prevent cutting fluid and debris from entering the interior of the spindle, and the tool is tightened and secured through steel balls, tie rods and piston structures. Loosen, combining angular contact bearings and dual cylinder structure to ensure stable operation of the spindle.
It effectively avoids the impact of impurities on the spindle, improves operating performance, extends the service life of the spindle, and further improves processing efficiency and accuracy through internal cooling function and dynamic balance design.
Smart Images

Figure CN222094740U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of glass processing, and in particular to a vertical spindle and vertical glass processing equipment. Background Art
[0002] With the development of society, people have diversified demands for glass products. With the emergence and use of tempered glass, laminated glass, etc., traditional glass processing methods can no longer meet the current requirements for glass production efficiency and processing quality.
[0003] The processing of glass involves production processes such as glass slicing, edging, cleaning, tempering, and hollowing. These production processes are inseparable from the electric spindle, which is the abbreviation of "High Frequency Spindle" (High Frequency Spindle), sometimes also called "Direct Drive Spindle" (Direct Drive Spindle), which is a built-in motor spindle unit. The electric spindle shortens the length of the main transmission chain of the machine tool to zero, realizing the "zero transmission" of the machine tool. It has the advantages of compact structure, high mechanical efficiency, extremely high rotation speed, high rotation accuracy, low noise, and low vibration. Therefore, it has been more and more widely used in modern machine tools, especially CNC machine tools. It is particularly widely used in the bearing manufacturing industry.
[0004] The vertical electric spindle (abbreviated as vertical spindle) is a new technology that integrates the machine tool spindle and the spindle motor in the field of CNC machine tools. Together with the linear motor technology and high-speed tool technology, it has pushed high-speed machining into a new era. Inside the electric spindle, there is still a certain gap between the high-speed rotating shaft and the bearing. In the actual machining process, the fine shavings cut from the workpiece are relatively common at the machining site. These tiny particles, together with the dust in the air and the cutting fluid that cools the tool and the workpiece, will fall into the gap between the spindle and the bearing, increase the rotational friction, damage the joint surface between the rotating shaft and the bearing, reduce the running performance of the electric spindle, and accelerate the damage rate of the electric spindle.
[0005] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0006] The embodiments of the present application provide a vertical spindle and a vertical glass processing device to at least solve the technical problem of low operating performance of the vertical electric spindle in the related art.
[0007] According to one aspect of an embodiment of the present application, a vertical spindle is provided, comprising: a spindle and a sleeve mounted on the spindle; a multi-layer labyrinth sealing structure and a plurality of air-sealing ring grooves are formed at the front end of the spindle, the labyrinth sealing structure is connected to the air-sealing ring grooves, the rear end of the spindle has an air inlet end for high-pressure air, and internal through holes respectively connected to the air inlet end and the air-sealing ring grooves are formed inside the spindle; high-pressure air flows in from the air inlet end, flows through the internal through holes and the air-sealing ring grooves, and flows out from the air outlet hole of the labyrinth sealing structure to form an airtight seal.
[0008] Optionally, the spindle includes: a steel ball that can move forward and backward, a pull rod, a broach sleeve installed on the pull rod, a spring connected to the pull rod, and a piston drivingly connected to the pull rod; when installing the tool, high-pressure air drives the piston through the internal through hole of the spindle to push the pull rod to stretch the spring, and drives the broach sleeve to move toward the front end of the spindle to tighten the tool handle through the broach sleeve and the steel ball; when unloading the tool, the high-pressure air is disconnected, and the pull rod drives the broach sleeve to move toward the rear end of the spindle under the drive of the reset tension of the spring, thereby loosening the tool handle.
[0009] Optionally, the spindle further includes a rotating sleeve and a rotating joint, wherein the rotating sleeve is used to connect the rear end of the pull rod and the rotating joint, and cooling water enters the central through hole of the pull rod through the rotating joint to achieve an internal cooling function of the tool.
[0010] Optionally, the vertical spindle also includes a fixed seat, the rotating joint is installed on the fixed seat, and a proximity switch is installed on each side of the fixed seat. The proximity switch identifies the three states of loose tool, tool present and no tool for the equipment system by sensing the raised ring of the rotating sleeve.
[0011] Optionally, a group of tie rod bearings for maintaining stable operation of the tie rod are installed near the rear end of the main shaft.
[0012] Optionally, the piston includes two pistons, a front piston and a rear piston, to form a dual-cylinder structure.
[0013] Optionally, a group of angular contact bearings are installed at the front end bearing sleeve of the main shaft, and a group of angular contact bearings are installed at the adapter plate of the main shaft. The group of angular contact bearings installed at the front end bearing sleeve of the main shaft and the group of angular contact bearings installed at the adapter plate of the main shaft are used to maintain stable operation of the main shaft.
[0014] Optionally, a set of matching dynamic balancing sleeves and locking nuts are installed at both ends of the motor rotor of the main shaft, and the dynamic balancing sleeves and the locking nuts are respectively formed with top screw thread holes for dynamic balancing, which are used for adding material balance when the main shaft is dynamically balanced.
[0015] According to another aspect of an embodiment of the present application, a vertical glass processing device is also provided, comprising the vertical spindle mentioned above.
[0016] In an embodiment of the present application, a vertical spindle includes a spindle and a sleeve mounted on the spindle; a multi-layer labyrinth sealing structure and a plurality of air-sealing ring grooves are formed at the front end of the spindle, the labyrinth sealing structure is connected to the air-sealing ring grooves, the rear end of the spindle has an air inlet end for high-pressure air, and internal through holes that are respectively connected to the air inlet end and the air-sealing ring grooves are formed inside the spindle; high-pressure air flows in from the air inlet end, flows through the internal through holes and the air-sealing ring grooves, and flows out from the air outlet holes of the labyrinth sealing structure, forming an air seal, preventing cutting fluid, debris, etc. from entering the interior of the spindle, thereby preventing these entering impurities from affecting the operating performance of the spindle, thereby solving the technical problem of low operating performance of the vertical electric spindle in the related art. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1 is a schematic diagram of an optional vertical spindle according to an embodiment of the present application;
[0019] Figure 2 is a schematic diagram of an optional vertical spindle according to an embodiment of the present application;
[0020] Figure 3 It is a schematic diagram of an optional vertical spindle according to an embodiment of the present application.
[0021] In the figure:
[0022] 1-spindle, 2-jacket, 3-fixed seat, 101-labyrinth seal structure, 102-gas seal ring groove, 103-inlet end, 104-steel ball, 105-pull rod, 106-broach sleeve, 107-spring, 108-piston (including front piston 108a and rear piston 108b), 109-rotating sleeve, 110-rotating joint, 111-angular contact bearing installed at the front end bearing sleeve,
[0023] 112-a set of angular contact bearings installed at the adapter plate of the main shaft, 113-dynamic balancing sleeve, 114-locking nut, 115-front end bearing sleeve, 116-adapter plate, 117-motor rotor, 118-proximity switch, 119-tie rod bearing. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0025] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0026] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0027] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0028] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0029] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0030] In conjunction with the accompanying drawings, some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0031] Figure 1-Figure 3 is a schematic diagram of an optional vertical spindle according to an embodiment of the present application, including:
[0032] A main shaft 1 and a sleeve 2 sleeved on the main shaft;
[0033] A multi-layer labyrinth sealing structure 101 and a corresponding air-sealing ring groove 102 are formed at the front end of the main shaft, and the labyrinth sealing structure is connected to the air-sealing ring groove. The rear end of the main shaft has an air inlet end 103 for high-pressure air, and internal through holes are formed inside the main shaft that are respectively connected to the air inlet end and the air-sealing ring groove; high-pressure air flows in from the air inlet end, flows through the internal through holes and the air-sealing ring groove, and flows out from the air outlet hole 1011 of the labyrinth sealing structure to form an airtight seal.
[0034] The above-mentioned spindle includes: a steel ball 104 that can move forward and backward, a pull rod 105, a broach sleeve 106 installed on the pull rod, a spring 107 connected to the pull rod, and a piston 108 driven by the pull rod (the piston 108 includes two pistons, a front piston 108a and a rear piston 108b, to form a double-cylinder structure); when installing the tool, high-pressure air drives the piston through the internal through hole of the spindle to push the pull rod to stretch the spring, and drives the broach sleeve to move toward the front end of the spindle to tighten the tool handle through the broach sleeve and the steel ball; when unloading the tool, the high-pressure air is disconnected, and the pull rod is driven by the reset tension of the spring to drive the broach sleeve to move toward the rear end of the spindle, thereby loosening the tool handle.
[0035] The spindle also includes a rotating sleeve 109 and a rotating joint 110. The rotating sleeve is used to connect the rear end of the pull rod and the rotating joint. The cooling water enters the central through hole of the pull rod through the rotating joint to realize the internal cooling function of the tool. The vertical spindle also includes a fixed seat 3. The rotating joint is installed on the fixed seat. A proximity switch 118 (including 118a and 118b) is installed on both sides of the fixed seat. The proximity switch identifies the three states of loose tool, tool presence and no tool for the equipment system by sensing the raised ring of the rotating sleeve. A group of pull rod bearings 119 are installed near the rear end of the spindle to maintain the stable operation of the pull rod.
[0036] A group of angular contact bearings 111 are installed at the front end bearing sleeve 115 of the above-mentioned main shaft, and a group of angular contact bearings 112 are installed at the adapter plate 116 of the main shaft. The group of angular contact bearings installed at the front end bearing sleeve of the main shaft and the group of angular contact bearings installed at the adapter plate of the main shaft are used to maintain stable operation of the main shaft.
[0037] A set of matching dynamic balancing sleeves 113 (including 113a and 113b) and locking nuts 114 are installed at both ends of the motor rotor 117 of the above-mentioned main shaft. The dynamic balancing sleeves and locking nuts are respectively formed with top screw thread holes for dynamic balancing, which are used for adding material balance when the main shaft is dynamically balanced.
[0038] In the technical solution of the present application, a vertical spindle includes a spindle and an outer sleeve mounted on the spindle; a multi-layer labyrinth sealing structure and a plurality of air-sealing ring grooves are formed at the front end of the spindle, the labyrinth sealing structure is connected to the air-sealing ring grooves, the rear end of the spindle has an air inlet end for high-pressure air, and internal through holes are formed inside the spindle that are respectively connected to the air inlet end and the air-sealing ring grooves; high-pressure air flows in from the air inlet end, flows through the internal through holes and the air-sealing ring grooves, and flows out from the air outlet holes of the labyrinth sealing structure to form an airtight seal, thereby preventing cutting fluid, debris, etc. from entering the interior of the spindle, thereby preventing these impurities from affecting the operating performance of the spindle, thereby solving the technical problem of low operating performance of the vertical electric spindle in the related art.
[0039] As an optional embodiment, the technical solution of the present application is further described in detail below in combination with a specific implementation method:
[0040] The front end of the spindle is designed with a multi-layer labyrinth sealing structure (such as labyrinth 101a, labyrinth 101b, labyrinth 101c, etc.). For example, labyrinth 101a is designed with an annular air sealing structure. High-pressure air enters through the quick-connect connector at the rear end of the spindle, enters the annular groove at the front end of the spindle through the internal through hole, and is blown out from multiple axial air holes of the labyrinth 101a, thereby realizing an air sealing function and preventing cooling water from entering the inside of the spindle.
[0041] The spindle adopts the form of a steel ball broaching sleeve. The steel ball will move outward or inward when the broaching sleeve moves forward and backward, thereby loosening and tightening the tool handle. High-pressure air enters through the quick-connect connector at the rear end of the spindle, and pushes the two push rods of the front piston and the rear piston through the internal through-hole, so that the broaching sleeve moves forward to loosen the tool. When the high-pressure air is disconnected, the spring pushes the rod backward, so that the broaching sleeve moves backward to broach the tool.
[0042] The dynamic balancing sleeves and locking nuts at both ends of the motor rotor are designed with threaded holes for dynamic balancing, which is convenient for adding material when the main shaft is dynamically balanced.
[0043] A set of angular contact bearings is designed at the front end bearing sleeve of this spindle, and a set of angular contact bearings is designed at the adapter plate. These two sets of bearings keep the spindle running stably. Due to the use of double cylinders, the pull rod is relatively long, so an additional set of pull rod bearings is added to keep the pull rod stable during operation.
[0044] The rear part of the spindle is designed with a double cylinder structure with two front and rear pistons, which can greatly improve the tool loosening and pulling force.
[0045] The rotating sleeve at the rear end of the pull rod connects the pull rod and the rotating joint. The internal cooling water enters the central through hole of the pull rod through the rotating joint to realize the internal cooling function of the tool.
[0046] The middle fixed rotating joint of the fixed seat has two proximity switches installed on both sides. The signals of the three states of loose knife, knife in place and knife absent are transmitted to the equipment system for identification by sensing the raised ring of the rotating sleeve.
[0047] The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A vertical spindle, characterized in that: include: A main shaft and a sleeve sleeved on the main shaft; The front end of the main shaft is formed with a multi-layer labyrinth seal structure and a plurality of air-sealing ring grooves, the labyrinth seal structure is connected with the air-sealing ring grooves, the rear end of the main shaft is provided with an air inlet end for high-pressure air, and the inside of the main shaft is formed with internal through holes respectively connected with the air inlet end and the air-sealing ring grooves; High-pressure air flows in from the air inlet end, flows through the internal through hole and the air-sealing ring groove, and flows out from the air outlet hole of the labyrinth sealing structure to form an airtight seal.
2. The vertical spindle according to claim 1, characterized in that: The spindle comprises: a steel ball that can move forward and backward, a pull rod, a broach sleeve installed on the pull rod, a spring connected to the pull rod, and a piston drivingly connected to the pull rod; When installing the tool, high-pressure air drives the piston through the internal through hole of the spindle to push the pull rod to stretch the spring, and drives the broaching sleeve to move toward the front end of the spindle, so as to tighten the tool handle through the broaching sleeve and the steel ball; When the tool is unloaded, the high-pressure air is disconnected, and the pull rod, driven by the reset tension of the spring, drives the pull sleeve to move toward the rear end of the spindle, thereby releasing the tool handle.
3. The vertical spindle according to claim 2, characterized in that: The spindle also includes a rotating sleeve and a rotating joint. The rotating sleeve is used to connect the rear end of the pull rod and the rotating joint. Cooling water enters the central through hole of the pull rod through the rotating joint to achieve the internal cooling function of the tool.
4. The vertical spindle according to claim 3, characterized in that: The vertical spindle also includes a fixed base, the rotary joint is installed on the fixed base, and a proximity switch is installed on each side of the fixed base. The proximity switch identifies the three states of loose tool, tool present and no tool for the equipment system by sensing the raised ring of the rotary sleeve.
5. The vertical spindle according to claim 2, characterized in that: A group of tie rod bearings for maintaining stable operation of the tie rod are installed near the rear end of the main shaft.
6. The vertical spindle according to claim 2, characterized in that: The piston comprises two pistons, a front piston and a rear piston, to form a double-cylinder structure.
7. The vertical spindle according to any one of claims 1 to 6, characterized in that: A group of angular contact bearings are installed at the front end bearing sleeve of the main shaft, and a group of angular contact bearings are installed at the adapter plate of the main shaft. The group of angular contact bearings installed at the front end bearing sleeve of the main shaft and the group of angular contact bearings installed at the adapter plate of the main shaft are used to maintain stable operation of the main shaft.
8. The vertical spindle according to any one of claims 1 to 6, characterized in that: A set of matching dynamic balancing sleeves and locking nuts are installed at both ends of the motor rotor of the main shaft. The dynamic balancing sleeves and the locking nuts are respectively formed with top screw thread holes for dynamic balancing, which are used for increasing material balance when the main shaft is dynamically balanced.
9. A vertical glass processing equipment, characterized in that: A vertical spindle comprising any one of claims 1-8.