Electric power engineering pipeline installation equipment
By introducing support pressure and lifting mechanisms into the power engineering pipeline installation equipment, the quality problems caused by the shaking of the pipeline during welding are solved, the pipeline is fixed and precise buttable, and the welding accuracy and quality are improved.
Patent Information
- Application Number
- CN202420288678.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-07
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-02-07
AI Technical Summary
During the welding process, the existing power engineering pipeline installation equipment has poor welding quality and is difficult to achieve normal docking.
A power engineering pipeline installation equipment including a base plate and a support pressure auxiliary installation mechanism was designed. The lifting mechanism and a support pressure auxiliary installation mechanism were used to achieve the fixing and precise connection of the pipeline through components such as ball nuts, cylinders, motors and nested shells. , avoid shaking.
Effectively fixing and docking pipes improves the accuracy and quality of welding, is suitable for pipes of different inner diameters, and achieves more accurate docking through lifting mechanisms.
Smart Images

Figure CN222095204U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power engineering, in particular to electric power engineering pipeline installation equipment. Background Art
[0002] Power engineering pipeline installation equipment usually refers to equipment that assists in the docking of pipelines. When the pipelines are docked, welding is usually required to dock and fix them.
[0003] Existing power engineering pipeline installation equipment usually requires the use of other lifting equipment to lift the pipeline, and then dock it. This docking method is prone to shaking of the pipeline when the workers are welding, resulting in the inability to perform normal welding work or affecting the welding quality, so improvements are needed. Utility Model Content
[0004] The utility model aims to provide a power engineering pipeline installation device, characterized in that: it comprises a bottom plate and a supporting and pressing auxiliary installation mechanism, characterized in that: the top outer wall of the bottom plate is provided with a supporting and pressing auxiliary installation mechanism, and the top of the bottom plate is provided with a lifting mechanism;
[0005] The lifting mechanism includes a ball nut, one side outer wall of the ball nut is fixedly connected to a supporting and pressing auxiliary installation mechanism, the supporting and pressing auxiliary installation mechanism includes a first cylinder, the other end of the first cylinder is fixedly connected to a back plate, and the other end of the back plate is fixedly connected to a circular plate.
[0006] Preferably, the outer wall of the circular plate is provided with a plurality of grooves and a second cylinder fixed in the grooves.
[0007] Preferably, the other end of the second cylinder is fixedly connected to a support and pressure block and a pipe movably connected to the outer wall of the support and pressure block, and the outer wall of the pipe is nestedly connected to a first nesting shell and a first bottom block fixed to the bottom of the first nesting shell.
[0008] Preferably, an insertion rod is fixedly connected to an outer wall of one side of the first bottom block, and the outer wall of the other required docking pipe is nestedly connected to a second nesting shell and a second bottom block fixed at the bottom thereof, and an insertion hole is opened inside the second bottom block.
[0009] Preferably, the lifting mechanism comprises a motor fixed inside the base plate, and the output shaft of the motor is fixedly connected to the rotating shaft via a coupling.
[0010] Preferably, a ball screw and a ball nut cooperatively mounted on the outer wall of the rotating shaft are fixedly connected to the top of the rotating shaft.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] 1. The utility model achieves the effect of conveniently fixing the pipeline and adapting to pipelines of different inner diameters by setting a supporting and pressing auxiliary installation mechanism, and can also assist in docking and fixing. First, the pipeline is hung on the top of the supporting and pressing block located at the top, and then the supporting and pressing block is pushed by the second cylinder to support the pipeline from the inside, and then another pipeline to be docked is placed as above, and then the first nesting shell and the second nesting shell are respectively nested into the outer walls of the two pipelines, and then the insertion rod and the insertion hole are aligned by rotating the first nesting shell and the second nesting shell, and then the two pipelines are docked with each other by using the first cylinder, and then the insertion rod will be inserted into the insertion hole to assist it in achieving the effect of auxiliary docking and auxiliary welding. In general, through the design of the above functions, the pipelines can be effectively and conveniently docked and installed, and assisted in the welding device, and the shaking of the pipeline during welding work to affect the welding accuracy and quality can be effectively avoided.
[0013] 2. The utility model achieves the effect of lifting and lowering the pipeline for auxiliary installation by setting up the lifting mechanism. After the pipeline is placed by using the supporting and pressing auxiliary installation mechanism, the motor can be used to drive the rotating shaft and the ball screw to rotate, so that the ball nut is lifted and lowered, and the pipeline is lifted and lowered accordingly. This mechanism cooperates with the supporting and pressing auxiliary installation mechanism, so that the two pipelines can be connected more accurately. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the overall structure of a power engineering pipeline installation device of the utility model;
[0015] Figure 2 This is a schematic diagram of the structure of a supporting and pressing auxiliary installation mechanism of a power engineering pipeline installation device of the utility model;
[0016] Figure 3 This utility model is a lifting mechanism structure of a power engineering pipeline installation equipment Figure 2 The enlarged schematic diagram at A in the middle;
[0017] Figure 4 This is an enlarged structural diagram of a supporting and pressing auxiliary installation mechanism of a power engineering pipeline installation device of the utility model;
[0018] Figure 5 This is a schematic diagram of the internal structure of a lifting mechanism for a power engineering pipeline installation device of the utility model;
[0019] Numbers in the figure: 1. base plate; 2. supporting and pressing auxiliary installation mechanism; 201. first cylinder; 202. back plate; 203. round plate; 204. groove; 205. second cylinder; 206. supporting and pressing block; 207. pipeline; 208. first nesting shell; 209. first bottom block; 210. insertion rod; 211. second nesting shell; 212. second bottom block; 213. insertion hole; 3. lifting mechanism; 301. motor; 302. rotating shaft; 303. ball screw; 304. ball nut. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1 The utility model discloses a power engineering pipeline installation device, comprising a base plate 1 and a supporting and pressing auxiliary installation mechanism 2, characterized in that the top outer wall of the base plate 1 is provided with a supporting and pressing auxiliary installation mechanism 2.
[0022] Among them: when the supporting and pressing auxiliary installation mechanism 2 performs the supporting and pressing auxiliary installation work, it can achieve the effect of conveniently fixing the pipeline and adapting to pipelines 207 with different inner diameters, and can also assist in docking and fixing it. When the lifting mechanism 3 performs the lifting work, it achieves the effect of lifting the pipeline 207 for auxiliary installation.
[0023] See also Figures 1 to 4 , a kind of power engineering pipeline installation equipment, the lifting mechanism 3 includes a ball nut 304, the outer wall of one side of the ball nut 304 is fixedly connected with a support and pressure auxiliary installation mechanism 2, the support and pressure auxiliary installation mechanism 2 includes a first cylinder 201, the other end of the first cylinder 201 is fixedly connected with a back plate 202, the other end of the back plate 202 is fixedly connected with a circular plate 203, the outer wall of the circular plate 203 is provided with a plurality of grooves 204 and a second cylinder 205 fixed in the groove 204, the other end of the second cylinder 205 is fixedly connected with a support and pressure block 206 and a pipe 207 movably connected to the outer wall of the support and pressure block 206, the outer wall of the pipe 207 is nested with a first nested shell 208 and a first bottom block 209 fixed at the bottom of the first nested shell 208, the outer wall of one side of the first bottom block 209 is fixedly connected with an insertion rod 210, and the outer wall of the other required docking pipe 207 is nested with a second nested shell 211 and a second bottom block 212 fixed at its bottom, and an insertion hole 213 is provided inside the second bottom block 212.
[0024] Among them: when the supporting and pressing auxiliary installation mechanism 2 performs the supporting and pressing auxiliary installation work, the effect of conveniently fixing the pipeline and adapting to pipelines 207 with different inner diameters is achieved. First, the pipeline 207 is hung on the top of the supporting and pressing block 206 located at the top, and then the supporting and pressing block 206 is pushed by the second cylinder 205 to support the pipeline 207 from the inside, and then another pipeline 207 that needs to be docked is placed as above, and then the first nesting shell 208 and the second nesting shell 211 are respectively nested into the outer walls of the two pipelines 207, and then the insertion rod 210 is aligned with the insertion hole 213 by rotating the first nesting shell 208 and the second nesting shell 211, and then the two pipelines 207 are docked with each other by the first cylinder 201, and then the insertion rod 210 will be inserted into the insertion hole 213, so as to assist it to achieve the effect of auxiliary docking and auxiliary welding. In general, through the design of the above functions, the pipeline can be effectively and conveniently docked and installed, and assisted in the welding device, and the pipeline 207 can be effectively avoided from shaking during welding to affect the welding accuracy and quality.
[0025] See also Figure 1 , Figure 3 and Figure 4 , a power engineering pipeline installation equipment, the lifting mechanism 3 includes a motor 301 fixed inside the base plate 1, the output shaft of the motor 301 is fixedly connected to the rotating shaft 302 through a coupling, the top of the rotating shaft 302 is fixedly connected to a ball screw 303 and a ball nut 304 mounted on its outer wall.
[0026] Among them: when the lifting mechanism 3 is lifting, the effect of lifting and lowering the pipe 207 for auxiliary installation is achieved. After the pipe 207 is placed by using the supporting and pressing auxiliary installation mechanism 2, the motor 301 can then be used to drive the rotating shaft 302 and the ball screw 303 to rotate, so that the ball nut 304 is lifted and lowered, and the pipe 207 is lifted and lowered accordingly. This mechanism cooperates with the supporting and pressing auxiliary installation mechanism 2, so that the two pipes 207 can be connected more accurately.
[0027] The working principle of the utility model is: first, hang the pipe 207 on the top of the supporting block 206 located at the top, then use the second cylinder 205 to push the supporting block 206 so that it supports the pipe 207 from the inside, and then place another pipe 207 that needs to be connected as above, and then nest the first nesting shell 208 and the second nesting shell 211 into the outer walls of the two pipes 207 respectively, and then align the insertion rod 210 with the insertion hole 213 by rotating the first nesting shell 208 and the second nesting shell 211, and then use the motor 301 to drive the rotating shaft 302 and the ball screw 303 to rotate, so that the ball nut 304 is lifted and lowered, and then the pipe 207 is lifted and lowered, and then the first cylinder 201 is used to connect the two pipes 207 to each other, and then the insertion rod 210 will be inserted into the insertion hole 213 to assist them in achieving the effect of auxiliary connection and auxiliary welding. This is the working principle of a power engineering pipeline installation device.
[0028] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A power engineering pipeline installation device, Features: It comprises a bottom plate (1) and a supporting and pressing auxiliary installation mechanism (2), and is characterized in that: the top outer wall of the bottom plate (1) is provided with the supporting and pressing auxiliary installation mechanism (2), and the top of the bottom plate (1) is provided with a lifting mechanism (3); The lifting mechanism (3) comprises a ball nut (304), one side outer wall of the ball nut (304) is fixedly connected to a supporting and pressing auxiliary installation mechanism (2), the supporting and pressing auxiliary installation mechanism (2) comprises a first cylinder (201), the other end of the first cylinder (201) is fixedly connected to a back plate (202), and the other end of the back plate (202) is fixedly connected to a circular plate (203).
2. The power engineering pipeline installation equipment according to claim 1, Features: The outer wall of the circular plate (203) is provided with a plurality of grooves (204) and a second cylinder (205) fixed in the grooves (204).
3. The power engineering pipeline installation equipment according to claim 2, Features: The other end of the second cylinder (205) is fixedly connected to a support and pressure block (206) and a pipe (207) movably connected to the outer wall of the support and pressure block (206); the outer wall of the pipe (207) is nestedly connected to a first nesting shell (208) and a first bottom block (209) fixed to the bottom of the first nesting shell (208).
4. The power engineering pipeline installation equipment according to claim 3, Features: An insertion rod (210) is fixedly connected to an outer wall of one side of the first bottom block (209), and a second nesting shell (211) and a second bottom block (212) fixed to the bottom of the second bottom block (212) are nestedly connected to the outer wall of another required docking pipe (207), and an insertion hole (213) is provided inside the second bottom block (212).
5. The power engineering pipeline installation equipment according to claim 1, Features: The lifting mechanism (3) comprises a motor (301) fixed inside the base plate (1), and the output shaft of the motor (301) is fixedly connected to a rotating shaft (302) via a coupling.
6. The power engineering pipeline installation equipment according to claim 5, Features: The top of the rotating shaft (302) is fixedly connected with a ball screw (303) and a ball nut (304) mounted on the outer wall thereof.