Special double-station continuous deburring and grinding equipment for robot
By designing a robot's dedicated double-station continuous deburring and grinding equipment, the workpiece is continuously processed on the front and back by using double-layer automatic feeding and robotic jaw mechanism, which solves the problem of low efficiency of single-station equipment and improves processing efficiency and automation level , meets the mass production needs of complex parts.
Patent Information
- Application Number
- CN202323494104.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-21
AI Technical Summary
Most of the existing automated deburring and grinding equipment are single-station forms, which cannot meet the needs of complex processes, resulting in low processing removal rate, long debugging cycle, insufficient production capacity, and unable to meet the production needs of batch and flexible multi-products quickly switched production.
Design a robot-specific double-station continuous deburring grinding equipment, adopting double-layer automatic feeding device, positioning device, robot jaw clamping mechanism and deburring device to realize continuous processing of workpieces on the front and back sides, and through the transfer fixture position and automatic deburring The material device improves processing efficiency and flexibility.
It realizes dual-station continuous processing of complex parts, improves processing efficiency and automation, extends the life of consumables, simplifies cleaning and maintenance, and meets batch and multi-process production needs.
Smart Images

Figure CN222095579U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of automation equipment, in particular to a robot-specific double-station continuous deburring and grinding device. Background Art
[0002] In the deburring process of parts with large batches, high process requirements, many and complex burr processing features, and the need to frequently switch to meet compatibility production, there is usually no automated equipment or tool on the market that can effectively, quickly and comprehensively deburr and grind the front and back sides of such product parts because the product requires many feature surfaces to be processed and the process requirements are high, and manual processing is easy to fail to complete or miss processing.
[0003] Most of the existing automated deburring and grinding equipment on the market are single-station processing forms, which use workpiece fixation or tool fixation for processing. When facing the needs of products with many processing requirements and complex processes, the cycle of single-station deburring equipment is too long, the processing removal rate is low, the debugging cycle is slow, and the production capacity is small, which cannot meet the needs of batch production and flexible multi-product rapid switching production. Therefore, it is necessary to propose a special deburring and grinding equipment that can meet the needs of batch production, multi-process, multi-process, and complex products to solve the above-mentioned problems. Utility Model Content
[0004] The purpose of the utility model is to provide a robot-specific double-station continuous deburring and grinding device to address the defects and shortcomings of the prior art. This device can meet the double-station continuous processing technology of complex parts, and can also be used as two independent stations to independently produce and process different products, achieving good complex process compatibility. It can solve the problems of low processing removal rate, slow debugging cycle and low production capacity of traditional equipment mentioned in the above background technology.
[0005] To achieve the above purpose, the utility model adopts the following technical scheme: a robot-specific double-station continuous deburring and grinding equipment, which includes an equipment body 1, a first pneumatic control cabinet 2, a system control cabinet 3, a double-layer automatic feeding device 4, a positioning device 5, a first robot clamping mechanism 6, a first deburring device 7, a transfer fixture position 8, a second robot clamping mechanism 9, a second deburring device 10, and a double-layer automatic unloading device 11. The first pneumatic control cabinet 2 is arranged in the middle of the front end of the equipment body 1, and the system control cabinet 3 is arranged below the first pneumatic control cabinet 2. A double-layer automatic feeding device 4 is arranged at the left end of the control cabinet 2, a positioning device 5 is arranged at the upper right corner of the double-layer automatic feeding device 4, a first robot clamping mechanism 6 is arranged on the rear side of the double-layer automatic feeding device 4, a first deburring device 7 is arranged on the right side of the first robot clamping mechanism 6, a transfer fixture position 8 is arranged on the right side of the first deburring device 7, a second deburring device 10 is arranged on the right side of the transfer fixture position 8, a second robot clamping mechanism 9 is arranged on the right side of the second deburring device 10, and a double-layer automatic unloading device 11 is arranged at the front end of the second robot clamping mechanism 9.
[0006] An integrated dustproof cover 1-1 is disposed on the periphery of the device body 1. The provision of the integrated dustproof cover 1-1 can improve the dust collection capability of the device and improve the ease of maintenance.
[0007] The front of the equipment body 1 is provided with a production observation window 1 - 2 , and the number of the production observation windows 1 - 2 is two, and the two production observation windows 1 - 2 are respectively arranged on the left and right sides of the front of the equipment body 1 .
[0008] A main control human-machine interface 1-3 is arranged on the front of the equipment body 1, and the main control human-machine interface 1-3 is arranged between the two production observation windows 1-2.
[0009] The back of the equipment body 1 is provided with a manual debugging door 1-4, and the number of the manual debugging doors 1-4 is provided with two, and the two manual debugging doors 1-4 are respectively provided on the left and right sides of the back of the equipment body 1. The setting of the manual debugging door 1-4 allows the staff to enter the machine for operation, improves the debugging flexibility, and improves the quality path requirements.
[0010] The back of the device body 1 is provided with a chip cleaning drawer 1-5, and the number of the chip cleaning drawers 1-5 is set to two, and the two chip cleaning drawers 1-5 are respectively arranged directly below the two manual debugging doors 1-4. The setting of the chip cleaning drawer 1-5 can realize the collection of waste chips collected in the device body 1 into the chip cleaning drawer.
[0011] The back of the equipment body 1 is provided with a second pneumatic control cabinet 1-6, and the number of the second pneumatic control cabinets 1-6 is provided with two, and the two second pneumatic control cabinets 1-6 are respectively provided on both sides of the two manual debugging doors 1-4. The provision of the second pneumatic control cabinet 1-6 can realize the inspection of the filter unit status at any time.
[0012] Two three-color lights 1-7 are installed on the top of the device body 1, and the two three-color lights 1-7 are respectively arranged at the left and right ends of the top of the device body 1. The three-color lights 1-7 can intuitively reflect the operating status of the device through red, yellow and green lights. The red light usually indicates that the device is abnormal or shut down, the yellow light indicates that the device is in standby mode or has a warning message, and the green light indicates that the device is operating normally.
[0013] The lower end of the device body 1 is provided with supporting feet 1-8. The provision of supporting feet 1-8 can increase the stability of the device during operation, and can also prevent moisture and corrosion, thereby increasing the service life of the device.
[0014] The bottom of the interior of the equipment body 1 is provided with a processing area chip outlet 1-9, and the number of the processing area chip outlet 1-9 is provided to be two.
[0015] The lower end of the device body 1 is provided with casters 1-10. The arrangement of the casters 1-10 facilitates the movement of the device body 1.
[0016] The second deburring device 10 comprises a radially floating electric spindle 10 - 1 and a radially floating pneumatic file 10 - 2 .
[0017] Working principle of the utility model: The utility model is provided with a double-layer automatic feeding device, a positioning device, a first robot gripper mechanism, a first deburring device, a transfer fixture, a second robot gripper mechanism, a second deburring device and a double-layer automatic unloading device. When the manual unloading is completed, press the start button of the main control human-machine interface to send the workpiece to be processed into the processing area, and the first robot gripper mechanism grabs the workpiece and sends it to the positioning device for secondary positioning. After the workpiece is accurately guided by the secondary positioning, the first robot gripper mechanism grabs it again and moves it to the first deburring device for continuous deburring and grinding operations. The first robot gripper mechanism processes the burr features on the front of the workpiece, and the first robot gripper mechanism places the workpiece on the transfer positioning fixture, and the second robot gripper mechanism grabs it and completes the burr processing on the back of the workpiece. After the workpiece is processed, the second robot gripper mechanism places the finished product on the double-layer automatic unloading device, and batch unloading is performed manually. The positioning device and transfer fixture are set up, which can correct the positioning accuracy of the workpiece before processing through secondary positioning and transfer positioning; the equipment working area has flexible space and convenient debugging, and the tool area is equipped with a rich combination of tools according to the product process, so that manual loading and unloading and robot operations do not interfere with each other.
[0018] After adopting the above technical solution, the beneficial effects of the utility model are as follows: the utility model mainly provides batch production, multi-process linkage processing, and grinding floating tools, which can effectively provide grinding automation and unmanned requirements, and the consumables have a longer life and are easy to clean and maintain. This type of equipment can meet the double-station continuous processing technology of complex parts, and can also be used as two independent stations for independent production and processing of different products, achieving good complex process compatibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0020] Figure 1 It is a schematic diagram of the overall structure of the front side of the utility model;
[0021] Figure 2 It is a schematic diagram of the overall structure of the rear of the utility model;
[0022] Figure 3 It is a schematic diagram of the internal structure of this utility model;
[0023] Figure 4 yes Figure 3 Enlarged view of part A in .
[0024] Explanation of the accompanying drawings: equipment body 1, integrated dust-proof cover 1-1, production observation window 1-2, main control human-machine interface 1-3, manual debugging door 1-4, chip cleaning drawer 1-5, second pneumatic control cabinet 1-6, three-color light 1-7, support foot 1-8, chip outlet of processing area 1-9, caster 1-10, first pneumatic control cabinet 2, system control cabinet 3, double-layer automatic feeding device 4, positioning device 5, first robot clamping mechanism 6, first deburring device 7, transfer fixture position 8, second robot clamping mechanism 9, second deburring device 10, floating electric spindle 10-1, radial floating pneumatic file 10-2, double-layer automatic unloading device 11. DETAILED DESCRIPTION
[0025] See also Figure 1-4As shown, the technical solution adopted in this specific embodiment is: a robot-specific double-station continuous deburring and grinding equipment, which includes an equipment body 1, a first pneumatic control cabinet 2, a system control cabinet 3, a double-layer automatic feeding device 4, a positioning device 5, a first robot clamping mechanism 6, a first deburring device 7, a transfer fixture position 8, a second robot clamping mechanism 9, a second deburring device 10, and a double-layer automatic unloading device 11. An integrated dustproof cover 1-1 is arranged on the periphery of the equipment body 1. The setting of the integrated dustproof cover 1-1 can improve the dust collection capacity of the equipment and improve the ease of maintenance. A production observation window 1-2 is arranged on the front of the equipment body 1, and the number of the production observation windows 1-2 is two, and the two production observation windows 1-2 are respectively arranged on the left and right sides of the front of the equipment body 1. A main control human-machine interface 1-3 is arranged on the front of the equipment body 1, and the main control human-machine interface 1-3 is arranged in the middle of the two production observation windows 1-2. A manual debugging door 1-4 is provided on the back of the equipment body 1, and the number of manual debugging doors 1-4 is set to two, and the two manual debugging doors 1-4 are respectively set on the left and right sides of the back of the equipment body 1. The setting of the manual debugging door 1-4 allows the staff to enter the machine for operation, improve the flexibility of debugging, and improve the quality path requirements. A chip cleaning drawer 1-5 is provided on the back of the equipment body 1, and the number of chip cleaning drawers 1-5 is set to two, and the two chip cleaning drawers 1-5 are respectively set directly below the two manual debugging doors 1-4. The setting of the chip cleaning drawer 1-5 can realize the collection of waste chips collected in the equipment body 1 to the chip cleaning drawer. A second pneumatic control cabinet 1-6 is provided on the back of the equipment body 1, and the number of the second pneumatic control cabinet 1-6 is set to two, and the two second pneumatic control cabinets 1-6 are respectively set on both sides of the two manual debugging doors 1-4. The setting of the second pneumatic control cabinet 1-6 can realize the inspection of the filter unit status at any time; two three-color lights 1-7 are installed on the top of the equipment body 1, and the two three-color lights 1-7 are respectively set at the left and right ends of the top of the equipment body 1. The three-color light 1-7 can intuitively reflect the operating status of the equipment through red, yellow and green lights. The red light usually indicates that the equipment is abnormal or shut down, the yellow light indicates that the equipment is in standby mode or has a warning message, and the green light indicates that the equipment is operating normally. Support feet 1-8 are provided at the lower end of the equipment body 1. The setting of the support feet 1-8 can increase the stability of the equipment during operation, and can also prevent moisture and corrosion, thereby increasing the service life of the equipment. The bottom of the interior of the equipment body 1 is provided with a processing area chip outlet 1-9, and the number of the processing area chip outlet 1-9 is set to two; the lower end of the equipment body 1 is provided with casters 1-10. The setting of the casters 1-10 facilitates the movement of the equipment body 1.A first pneumatic control cabinet 2 is arranged in the middle of the front end of the main body 1, a system control cabinet 3 is arranged below the first pneumatic control cabinet 2, a double-layer automatic feeding device 4 is arranged at the left end of the first pneumatic control cabinet 2, a positioning device 5 is arranged at the upper right corner of the double-layer automatic feeding device 4, a first robot clamping mechanism 6 is arranged on the rear side of the double-layer automatic feeding device 4, a first deburring device 7 is arranged on the right side of the first robot clamping mechanism 6, a transfer fixture position 8 is arranged on the right side of the first deburring device 7, a second deburring device 10 is arranged on the right side of the transfer fixture position 8, a second robot clamping mechanism 9 is arranged on the right side of the second deburring device 10, and a double-layer automatic unloading device 11 is arranged at the front end of the second robot clamping mechanism 9.
[0026] In this specific implementation method, the workpieces to be processed are manually placed in batches on a double-layer automatic feeding device. When the manual feeding is completed, the start button of the main control human-machine interface can be pressed to send the workpieces to be processed into the processing area. The first robot gripper mechanism grabs the workpiece and sends it to the positioning device for secondary positioning. After the workpiece is accurately guided by the secondary positioning, the first robot gripper mechanism grabs it again and moves it to the first deburring device for continuous deburring and grinding operations. The first robot gripper mechanism processes the burr features on the front of the workpiece, and the first robot gripper mechanism places the workpiece on the transfer positioning fixture, which is grabbed by the second robot gripper mechanism and completes the burr processing on the back of the workpiece. After the workpiece is processed, the second robot gripper mechanism places the finished product on the double-layer automatic unloading device, and batch unloading is performed manually.
[0027] The above description is only used to illustrate the technical solution of the utility model rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.
Claims
1. A robot-specific double-station continuous deburring and grinding equipment, characterized in that: It comprises an equipment body (1), a first pneumatic control cabinet (2), a system control cabinet (3), a double-layer automatic feeding device (4), a positioning device (5), a first robot clamping mechanism (6), a first deburring device (7), a transfer fixture position (8), a second robot clamping mechanism (9), a second deburring device (10), and a double-layer automatic unloading device (11). The first pneumatic control cabinet (2) is arranged in the middle of the front end of the equipment body (1), the system control cabinet (3) is arranged below the first pneumatic control cabinet (2), and the double-layer automatic feeding device (4) is arranged at the left end of the first pneumatic control cabinet (2). ), a positioning device (5) is arranged at the upper right corner of the double-layer automatic feeding device (4), a first robot clamping mechanism (6) is arranged on the rear side of the double-layer automatic feeding device (4), a first deburring device (7) is arranged on the right side of the first robot clamping mechanism (6), a transfer fixture position (8) is arranged on the right side of the first deburring device (7), a second deburring device (10) is arranged on the right side of the transfer fixture position (8), a second robot clamping mechanism (9) is arranged on the right side of the second deburring device (10), and a double-layer automatic unloading device (11) is arranged at the front end of the second robot clamping mechanism (9).
2. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: An integrated dustproof outer cover (1-1) is arranged on the periphery of the device body (1).
3. The robot-specific double-station continuous deburring and grinding equipment according to claim 1 is characterized in that: The front of the equipment body (1) is provided with a production observation window (1-2), the number of the production observation windows (1-2) is two, and the two production observation windows (1-2) are respectively arranged on the left and right sides of the front of the equipment body (1).
4. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: A main control human-machine interface (1-3) is arranged on the front of the equipment body (1), and the main control human-machine interface (1-3) is arranged between the two production observation windows (1-2).
5. The robot-specific double-station continuous deburring and grinding equipment according to claim 1 is characterized in that: A manual debugging door (1-4) is arranged on the back of the equipment body (1), and there are two manual debugging doors (1-4). The two manual debugging doors (1-4) are arranged on the left and right sides of the back of the equipment body (1), respectively.
6. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: A chip cleaning drawer (1-5) is arranged on the back of the equipment body (1), and there are two chip cleaning drawers (1-5). The two chip cleaning drawers (1-5) are arranged directly below the two manual debugging doors (1-4) respectively.
7. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: A second pneumatic control cabinet (1-6) is arranged on the back of the equipment body (1), and there are two second pneumatic control cabinets (1-6). The two second pneumatic control cabinets (1-6) are arranged on both sides of the two manual debugging doors (1-4) respectively.
8. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: Two three-color lamps (1-7) are installed on the top of the device body (1), and the two three-color lamps (1-7) are respectively arranged at the left and right ends of the top of the device body (1).
9. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: The lower end of the equipment body (1) is provided with a supporting foot (1-8).
10. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: The bottom of the interior of the equipment body (1) is provided with a processing area chip outlet (1-9), and the number of the processing area chip outlet (1-9) is two.
11. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: Casters (1-10) are provided at the lower end of the equipment body (1).
12. The robot-specific double-station continuous deburring and grinding equipment according to claim 1, characterized in that: The second deburring device (10) comprises a radially floating electric spindle (10-1) and a radially floating pneumatic file (10-2).