Underwater cleaning robot shipborne engineering operation system
By integrated design of the underwater cleaning robot system on the engineering ship, the problems of low cleaning efficiency and low space utilization in the existing technology are solved, flexible operation and efficient cleaning are achieved, and on-site cleanliness and operation efficiency are improved.
Patent Information
- Application Number
- CN202420891320.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing underwater cleaning robot systems lack integrated design in robots and auxiliary integrated systems, resulting in the inability to move flexibly, the operating range is limited, the cleaning efficiency is low, and the on-site space utilization and cleanliness are not high.
A ship-borne engineering operation system of underwater cleaning robot is designed, including an integrated underwater cleaning robot integrated system, a control system designed with integrated modules, integrated cable trays, support beams, upper welds, and high-voltage Pump control cabinets, distribution cabinets, underwater cleaning robots, cantilever cranes, water storage mechanisms, maintenance platforms and submersible pumps realize the collection and discharge of pipelines and efficient arrangement through chain drive groups and motor components.
It realizes flexible operation of the underwater cleaning robot system without being restricted by geographical location, reduces cleaning operation time, improves on-site space utilization and cleanliness, and improves operating efficiency and standardization.
Smart Images

Figure CN222097892U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of ship cleaning, and specifically relates to an underwater cleaning robot ship-borne engineering operation system. Background Art
[0002] In recent years, with the development of my country's shipping industry, the volume of waterborne cargo in my country has continued to rise. As ships sail in the water for a long time, algae, barnacles and other organisms in the water attach to the hull in a large area, causing serious adverse effects on ship transportation. The attached marine organisms not only damage the hull, but also increase the resistance of the ship's navigation, leading to an increase in shipping costs. Therefore, it is necessary to clean the surface of the ship regularly.
[0003] Recently, a variety of underwater cleaning robots have appeared on the market, but there is no integrated design in the robots and auxiliary integrated systems. They cannot move flexibly and have a limited operating range, which requires the rearrangement of circuits and pipelines on site, prolonging the cleaning operation time and reducing cleaning efficiency. In addition, the required operating area is large, the on-site space utilization rate is low, and the cleanliness is low. Utility Model Content
[0004] In view of the above analysis, the embodiments of the present invention aim to provide an underwater cleaning robot ship-borne engineering operation system to solve one or more of the above problems existing in the prior art.
[0005] The purpose of the utility model is achieved in this way:
[0006] An underwater cleaning robot ship-borne engineering operation system comprises an engineering ship, wherein the engineering ship is provided with an underwater cleaning robot integrated system and a control cabin, wherein the control cabin is provided with a control system, and the control system is connected with the underwater cleaning robot integrated system by signal control, and is used to control the operation of the underwater cleaning robot integrated system;
[0007] The underwater cleaning robot integrated system includes an integrated base and a cable reel, a support beam, an upper welding frame, a high-pressure pump control cabinet, a power distribution cabinet, an underwater cleaning robot, a cantilever crane, a water storage mechanism, a maintenance platform, a submersible pump, a water tank welding frame and a high-pressure pump group arranged on the integrated base.
[0008] Furthermore, the underwater cleaning robot integrated system is arranged at the stern of the engineering ship, and the control cabin is arranged at the bow of the engineering ship.
[0009] Furthermore, the control system is arranged in a control cabin, and the control system adopts an integrated module design, including a host computer, a remote controller and a control console.
[0010] Furthermore, the integrated base has a first installation area, a second installation area and a third installation area on the plane, wherein the second installation area and the third installation area are arranged side by side on the same side of the first installation area; the first installation area is installed with a load-bearing cable reel, a support beam, an upper welding frame, a cantilever crane, a water storage mechanism, a water tank welding frame and a high-pressure pump group; the second installation area is installed with a high-pressure pump control cabinet and a distribution cabinet; the third installation area is installed with an underwater cleaning robot, a maintenance platform and a submersible pump.
[0011] Furthermore, the integrated base is welded by channel steel and steel pipe.
[0012] Furthermore, the integrated base is provided with at least one of a lifting interface, a fork mounting interface, and a transfer wheel mounting interface.
[0013] Furthermore, the cable reel includes a base and a water pipe reel, a motor assembly, a chain drive group and a brake assembly arranged on the base; the chain drive group is connected to the output shaft end of the motor assembly through a chain, and the brake assembly is used for braking the water pipe reel; the cables, water pipes and communication cables connected to the underwater cleaning robot are arranged in a protective tube to form an integrated pipeline; the integrated pipeline is wound around the water pipe reel, and the motor assembly drives the water pipe reel to rotate through the chain drive group and the chain to achieve the retraction and release of the integrated pipeline.
[0014] Furthermore, the cable drum also includes a chain guard and a guide pulley. The chain guard is arranged on the outside of the chain, and the guide pulley is used for guiding when the integrated pipeline is released.
[0015] Furthermore, a floating material is arranged on the protection tube.
[0016] Furthermore, the water storage mechanism is configured to store seawater, and the water storage mechanism has a water tank, a water inlet pipe and a water outlet pipe. The water inlet of the water tank is connected to a submersible pump through the water inlet pipe, and the submersible pump can pump seawater into the water tank; the water outlet of the water tank is connected to a high-pressure pump group through the water outlet pipe, and the high-pressure pump group is used to pump out the water in the water tank at high pressure for the underwater cleaning robot to clean the hull and bottom of the ship.
[0017] Compared with the prior art, the underwater cleaning robot ship-borne engineering operation system provided by the utility model can flexibly carry out ship cleaning operations at sea without geographical restrictions by setting an integrated underwater cleaning robot integrated system on an engineering ship; and the underwater cleaning robot integrated system adopts an integrated design, optimizes pipelines and lines, and integrates the originally scattered components into an integrated base, eliminating the trouble of multiple loading and unloading and transportation, the need to place and route the components, and laying out the pipelines, reducing the cleaning operation time, achieving efficient operation, a smaller operation area, improving on-site space utilization and cleanliness, and making the on-site cleanliness and standardization better. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0019] Figure 1 A schematic diagram of the structure of the underwater cleaning robot ship-borne engineering operation system provided by the utility model;
[0020] Figure 2 A schematic diagram of the state of hoisting the underwater cleaning robot when the underwater cleaning robot ship-borne engineering operation system provided by the utility model is operating;
[0021] Figure 3 A schematic diagram of the structure of a control system of an underwater cleaning robot ship-borne engineering operation system provided by the utility model;
[0022] Figure 4 This is a front and side view of the underwater cleaning robot integrated system provided by the utility model;
[0023] Figure 5 A rear side view of the underwater cleaning robot integrated system provided by the utility model;
[0024] Figure 6 An exploded view of the underwater cleaning robot integrated system provided by the utility model;
[0025] Figure 7 A schematic diagram of the structure of the cable reel provided by the utility model;
[0026] Figure 8 A schematic diagram of the structure of the water pipe reel of the cable reel provided by the utility model;
[0027] Fig. 9 A schematic diagram of the structure of the water storage mechanism provided by the utility model;
[0028] Fig.10 This is a schematic diagram of the internal structure of the water storage mechanism provided by the utility model.
[0029] Reference numerals:
[0030] 100-engineering ship; 200-underwater cleaning robot integrated system; 300-control cabin; 301-host computer; 302-control console;
[0031] 1-Integrated base; 2-Cable reel; 2.1-Base; 2.2-Water pipe reel; 2.2.1-Main shaft; 2.2.2-Inner bushing; 2.2.3-Small disc; 2.2.4-Sleeve; 2.2.5-Large disc; 2.2.6-Bearing with seat; 2.2.7-Sprocket; 2.2.8-Connecting rod; 2.2.9-Swivel joint; 2.2.10-Shaft retaining ring; 2.3-Motor assembly; 2.4-Chain drive group; 2.5-Chain guard; 2.6-Protective tube; 2.7-Brake assembly; 2.8-Guide pulley; 3-Support beam ;4-upper welding frame;5-high-pressure pump control cabinet;6-power distribution cabinet;7-underwater cleaning robot;8-cantilever crane;9-water storage mechanism;9.1-water tank;9.2-water inlet pipe;9.2.1-transfer end;9.3-water tank overflow pipe;9.4-drain pipe;9.5-liquid level observation pipeline;9.6-automatic water supply device;9.7-inspection cover;9.8-high-pressure pump overflow pipe;9.9-water outlet pipe;9.10-first filter element;9.11-second filter element;10-inspection platform;11-submersible pump;12-water tank welding frame;13-high-pressure pump group. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. It should be noted that, in the absence of conflict, the embodiments in the present disclosure and the features in the embodiments can be combined, separated, interchanged and / or rearranged with each other. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0033] In the accompanying drawings, the size and relative size of components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments may be implemented differently, a specific process sequence may be performed in a different order than described. For example, two successively described processes may be performed substantially simultaneously or in an order opposite to the order described. In addition, the same reference numerals represent the same components.
[0034] The terms used here are for the purpose of describing specific embodiments, and are not intended to be restrictive. As used here, unless the context clearly indicates otherwise, the singular forms "one (kind, person)" and "said (the)" are also intended to include plural forms. In addition, when the terms "comprise" and / or "include" and their variations are used in this specification, it is explained that there are stated features, integral bodies, steps, operations, parts, assemblies and / or their groups, but it is not excluded that there are or add one or more other features, integral bodies, steps, operations, parts, assemblies and / or their groups. It should also be noted that, as used here, the terms "substantially", "approximately" and other similar terms are used as approximate terms and not as degree terms, so that they are used to explain the inherent deviations of the measured values, calculated values and / or the values provided that will be recognized by those of ordinary skill in the art.
[0035] Example 1
[0036] A specific embodiment of the utility model is as follows Figures 1 to 3 As shown, an underwater cleaning robot ship-borne engineering operation system is disclosed, including an engineering ship 100, on which an underwater cleaning robot integrated system 200 and a control cabin 300 are provided. A control system is provided in the control cabin 300, and the control system is connected to the underwater cleaning robot integrated system 200 by signal control for controlling the operation of the underwater cleaning robot integrated system 200.
[0037] The control system is arranged in a control cabin 300 of the engineering vessel 100 . The control system adopts an integrated module design, including a host computer 301 , a remote controller and a control console 302 , and controls the operation of the underwater cleaning robot integrated system 200 .
[0038] The underwater cleaning robot integrated system 200 is disposed at the stern of the engineering ship 100 , and the control cabin 300 is disposed at the bow of the engineering ship 100 .
[0039] When the underwater cleaning robot ship-borne engineering operation system is operating, the engineering ship 100 is driven to the working position, the underwater cleaning robot 7 of the underwater cleaning robot integrated system 200 is lifted above the sea surface, and dives below the sea surface to clean the hull and bottom of the ship to be cleaned; after the cleaning is completed, the underwater cleaning robot 7 is lifted above the sea surface and moved and reset to the initial placement position on the engineering ship 100.
[0040] like Figures 4 to 10 As shown, the underwater cleaning robot integrated system 100 includes an integrated base 1 and a cable reel 2, a support beam 3, an upper welding frame 4, a high-pressure pump control cabinet 5, a distribution cabinet 6, an underwater cleaning robot 7, a cantilever crane 8, a water storage mechanism 9, a maintenance platform 10, a submersible pump 11, a water tank welding frame 12 and a high-pressure pump group 13 arranged on the integrated base 1.
[0041] The integrated base 1 is configured to carry components such as a cable drum 2, a support beam 3, an upper welding frame 4, a high-pressure pump control cabinet 5, a power distribution cabinet 6, an underwater cleaning robot 7, a cantilever crane 8, a water storage mechanism 9, a maintenance platform 10, a submersible pump 11, a water tank welding frame 12, and a high-pressure pump group 13; the integrated base 1 has a first installation area, a second installation area, and a third installation area on a plane, wherein the second installation area and the third installation area are arranged side by side on the same side of the first installation area, and the three installation areas roughly form a rectangular area on the plane where the integrated base 1 is located; the cable drum 2, the support beam 3, the upper welding frame 4, the cantilever crane 8, the water storage mechanism 9, the water tank welding frame 12, and the high-pressure pump group 13 are installed in the first installation area; the high-pressure pump control cabinet 5 and the power distribution cabinet 6 are installed in the second installation area; and the underwater cleaning robot 7, the maintenance platform 10, and the submersible pump 11 are installed in the third installation area. Through the above reasonable layout, the center of gravity of the integrated system can be roughly located in the middle of the space above the integrated base 1 to avoid instability caused by the displacement of the center of gravity. The underwater cleaning robot integrated system has a compact structure and is easy to deploy after integration. The overall length and width of the underwater cleaning robot integrated system are 3500mm*2000mm.
[0042] The cable reel 2's cable reeling and unwinding operation side and the high-pressure pump control cabinet 5 and the power distribution cabinet 6's operation sides are arranged on the same side. Because the cable reeling and unwinding operation requires the cooperation of two persons, the operators at the high-pressure pump control cabinet 5 and the power distribution cabinet 6 can assist the cable reel's cable reeling and unwinding personnel.
[0043] The motor of the cable drum 2 and the motor of the high-pressure pump group 13 are arranged close to the power distribution cabinet 6. The cable drum 2 and the motor of the high-pressure pump group 13 are close to the power distribution cabinet 6, which is convenient for wiring.
[0044] The water storage mechanism 9, the high-pressure pump group 13, the high-pressure pump control cabinet 5, and the power distribution cabinet 6 are arranged diagonally, that is, the water storage mechanism 9, the high-pressure pump group 13 are arranged in a corner area of the integrated base 1, and the high-pressure pump control cabinet 5 and the power distribution cabinet 6 are arranged in a diagonal area of the integrated base 1. The long distance can avoid damage to electrical components caused by accidental leakage of water.
[0045] The installation steps of the underwater cleaning robot integrated system are as follows: first install the integrated base 1, and install 8 shock-absorbing pads at its bottom, then hoist the cable reel 2 to the first installation area of the integrated base 1 for installation, and then install the high-pressure pump group 13 and its pipelines on the first installation area of the integrated base 1, install the water storage mechanism 9 on the water tank welding frame 12 and connect the corresponding pipelines, then install the welding frame 4 and its supporting beam 3, and then install the cantilever crane 8; then install the maintenance platform 10 and the high-pressure pump control cabinet 5 and the distribution cabinet 6 in the second installation area of the integrated base 1, and finally straighten the lines and pipelines and fix them on the integrated base 1; fix the maintenance platform 10 on the third installation area of the integrated base 1, hoist the underwater cleaning robot 7 on the maintenance platform 10, and place the submersible pump 11 and items such as cables in the maintenance space below the maintenance platform 10.
[0046] The integrated base 1 is welded by channel steel and steel pipe. According to the stress conditions at different positions, suitable materials are designed for welding, and plastic spraying is performed after completion. The integrated base 1 is provided with a hoisting interface, a fork-mounted interface, and a transfer wheel installation interface, and has multiple moving modes. Furthermore, the bottom of the integrated base 1 is also provided with multiple shock-absorbing pad installation interfaces, such as 8 shock-absorbing pad installation interfaces, and a shock-absorbing pad is installed on each shock-absorbing pad installation interface, for a total of 8 shock-absorbing pads.
[0047] The cable drum 2 is configured to store cables, water pipes, and communication cables connected to the underwater cleaning robot 7, and to retract and release cables, communication cables, and water pipes according to the underwater operation distance. Specifically, the cable drum 2 includes a base 2.1, a water pipe drum 2.2, a motor assembly 2.3, a chain drive group 2.4, a chain guard 2.5, a protective tube 2.6, a brake assembly 2.7, and a guide pulley 2.8; the protective tube 2.6 is used to protect water pipes, cables, and communication cables, and the cables, water pipes, and communication cables are integrated in the protective tube 2.6 to form an integrated pipeline; the integrated pipeline is wound around the water pipe drum 2.2, and the retraction and release of the integrated pipeline are achieved by the rotation of the water pipe drum 2.2; the water pipe drum 2.2, a motor assembly 2.3, a chain drive group 2.4 and a brake assembly 2.7 are arranged on the base 2.1. The chain drive group 2.4 is connected to the output shaft end of the motor assembly 2.3 through a chain. The motor assembly 2.3 drives the water pipe disc 2.2 to rotate through the chain drive group 2.4 and the chain. The outer cover of the chain is provided with a chain protective cover 2.5. The brake assembly 2.7 is used for braking the water pipe disc 2.2; the guide pulley 2.8 is used for guiding when the integrated pipeline is released, so that the integrated pipeline can be released and retracted smoothly.
[0048] In this embodiment, the water pipe disc 2.2 includes a main shaft 2.2.1, an inner sleeve 2.2.2, a small disc 2.2.3, a sleeve 2.2.4, a large disc 2.2.5, a seat bearing 2.2.6, a sprocket 2.2.7, a connecting rod 2.2.8, a rotary joint 2.2.9, and a shaft retaining ring 2.2.10. A frame is provided on the base 2.1, and both ends of the main shaft 2.2.1 are rotatably arranged on the frame through seat bearings 2.2.6. A sprocket 2.2.7 is provided at the end of the main shaft 2.2.1, and the sprocket 2.2.7 is connected to the chain drive group 2.4 through a chain. The motor assembly 2.3 rotates through the chain drive group 2.4 and the chain drive sprocket 2.2.7, thereby driving the main shaft 2.2.1 to rotate; a water passage is coaxially provided at one end of the main shaft 2.2.1, and a water outlet connector connected to the water passage is provided on the side wall of the main shaft 2.2.1, and the water outlet connector is used to connect the water pipe to be retracted; the rotary joint 2.2.9 has a water inlet end and a water outlet end, the water inlet end of the rotary joint 2.2.9 is connected to the water pipe, and the water outlet end of the rotary joint 2.2.9 is connected to the water passage of the main shaft 2.2.1. A large disc 2.2.5 is provided at both ends of the main shaft 2.2.1, and the space between the two large discs 2.2.5 forms a winding space for the integrated pipeline, and the water outlet connector is located in the winding space. A plurality of connecting rods 2.2.8 are also provided in the winding space, and the connecting rods 2.2.8 are arranged parallel to the main shaft 2.2.1. The two ends of the connecting rods 2.2.8 are fixedly connected to the two large discs 2.2.5, and the plurality of connecting rods 2.2.8 are located on the same cylindrical surface, and the integrated pipeline is wound on the connecting rods 2.2.8 located on the same circumferential surface. At least one small disc 2.2.3 is also provided on the main shaft 2.2.1, and the diameter of the small disc 2.2.3 is smaller than the diameter of the large disc 2.2.5. A plurality of connecting rods 2.2.8 are evenly fixed on the outer circumference of the small disc 2.2.3, and the small disc 2.2.3 supports the connecting rods 2.2.8. Among them, an inner sleeve 2.2.2 is installed between the small disc 2.2.3 and the main shaft 2.2.1, and the inner sleeve 2.2.2 is fixed by a shaft retaining ring 2.2.10; a sleeve 2.2.4 is installed between the large disc 2.2.5 and the main shaft 2.2.1. During installation, install the two inner sleeves 2.2.2 and the two small discs 2.2.3 on the main shaft 2.2.1, and fix the inner sleeves with the shaft retaining ring 2.2.10, then install the key on the main shaft 2.2.1, insert the large disc 2.2.5, install the sleeve 2.2.4 on the main shaft 2.2.1, and insert it on the large disc 2.2.5, then tighten the bolts, install the 6 connecting rods 2.2.8, and fasten them to the large disc 2.2.5 with bolts, then install the seat bearing 2.2.6 on the main shaft 2.2.1, and tighten the set screws, and finally install the sprocket 2.2.7 and the rotary joint 2.2.9 on the main shaft 2.2.1.Lift the installed water pipe reel 2.2 onto the base 2.1 and fasten it with bolts. Then install the chain drive group 2.4 and the motor assembly 2.3 onto the base 2.1. The chain drive group 2.4 is connected to the output shaft end of the motor assembly 2.3 through a chain. After the chain is tightened, fasten the motor assembly 2.3. Finally, install the chain guard 2.5 and the brake assembly 2.7. The overall installation of the cable reel 2 is now complete. During operation, the guide pulley 2.8 needs to be placed against the shore.
[0049] In this embodiment, the motor of the motor assembly 2.3 has a frequency conversion function and is configured to control the motor speed through the frequency converter according to the operation requirements, thereby controlling the speed of cable reeling and releasing. Optionally, the cable drum 2 also has a manual release function. In an emergency, the brake is opened and the cable drum 2 is manually rotated to reel in and release the cable. The brake assembly 2.7 can hold the large disk of the cable drum during transportation to reduce its vibration. In an emergency, the brake assembly 2.7 can also be manually pressed to prevent the large disk from continuing to rotate.
[0050] Furthermore, floating materials and protective tubes 2.6 are used to wrap water pipes, cables, and communication cables. That is, protective tubes 2.6 are sheathed on the outside of water pipes, cables, and communication cables, and floating materials are arranged on the protective tubes 2.6, which can achieve zero buoyancy and facilitate the robot's movement and operation.
[0051] The upper welding frame 4 is a rectangular frame structure, which is fixedly arranged on the top of the support beam 3. There are four support beams 3 in total, which are used to support the upper welding frame 4. The four support beams 3 and the upper welding frame 4 constitute a lateral stress resistance mechanism. The lateral stress resistance mechanism is a rectangular frame structure as a whole, which is located in the first installation area of the integrated base 1. When the underwater cleaning robot integrated system is hoisted, it can resist the lateral stress during hoisting and better protect the water tank and the cable reel 2 from being squeezed by the sling.
[0052] Furthermore, an oblique brace is provided on the support beam 3 , one end of the oblique brace is fixed on the support beam 3 , and the other end is fixed on the upper welding frame 4 , and the angle between the oblique brace and the support beam 3 is 45°-60°.
[0053] Furthermore, the upper welding frame 4 is welded from steel pipes, and a blocking plate is welded at the port to prevent rainwater from seeping in. After completion, it is sprayed with plastic. When the underwater cleaning robot integrated system is hoisted, it can resist the lateral stress during hoisting and better protect the water tank and cable reel 2 from being squeezed by the sling.
[0054] The high-pressure pump control cabinet 5 can adjust the pressure of the high-pressure pump group according to the flow rate used during operation to meet the needs of cleaning work;
[0055] The power distribution cabinet 6 adopts a modular design, integrating control modules such as the robot power control switch, the water pump control power supply, the automatic water supply device switch, and the motor control switch of the cable drum 2, which can supply power to the underwater cleaning robot integrated system and has a safety protection switch and a control switch, which is safe and convenient;
[0056] The underwater cleaning robot 7 is configured to clean the hull and bottom of the ship. After cleaning the dirt, the ship can run faster and more fuel-efficiently.
[0057] The cantilever crane 8 is arranged on the opposite side of the underwater cleaning robot 7, which can better realize the cantilever crane rotating 180° and hoisting the underwater cleaning robot into the water. The cantilever crane 8 has the functions of up and down height adjustment, front and rear telescopic and horizontal 360° rotation. According to actual needs, the underwater cleaning robot 7 can be hoisted to a suitable position. For example, the cantilever crane 8 has a vertically arranged lifting rod and a horizontal telescopic rod. The lifting rod is rotatably connected to the top of the horizontal telescopic rod. The lifting rod can rotate 360° around the axis of the telescopic rod. The lengths of the lifting rod and the horizontal telescopic rod are both adjustable. The end of the horizontal telescopic rod is connected to the underwater cleaning robot 7 through a sling; wherein, the lifting rod is arranged at a side edge away from the underwater cleaning robot 7 in the first installation area, and the horizontal telescopic rod spans the first installation area and extends to the top of the underwater cleaning robot 7 located in the third installation area.
[0058] The water storage mechanism 9 is configured to store seawater. The water storage mechanism 9 has a water tank 9.1, a water inlet pipe 9.2 and a water outlet pipe 9.9. The water tank 9.1 is a welded water tank. The water tank 9.1 has a water inlet and a water outlet. The water inlet of the water tank 9.1 is connected to a submersible pump 11 through a water inlet pipe 9.2. The submersible pump 11 can pump seawater into the water tank 9.1. The water outlet of the water tank 9.1 is connected to a high-pressure pump group 13 through a water outlet pipe 9.9. The high-pressure pump group 13 is used to pump out the water in the water tank 9.1 at high pressure, so that the underwater cleaning robot 7 can clean the hull and bottom of the ship.
[0059] The water storage mechanism 9 also includes a water tank overflow pipe 9.3, a sewage pipe 9.4, a liquid level observation pipeline 9.5 and a high-pressure pump overflow pipe 9.8; wherein, one end of the water tank overflow pipe 9.3 is connected to the pagoda joint on the top surface of the water tank 9.1, and the other end is connected to the drain valve and the sewage pipe 9.4 at the bottom of the water tank 9.1 by a three-way pagoda joint. The water tank overflow pipe 9.3 is configured to overflow through the water tank overflow pipe 9.3 when the water level in the water tank 9.1 is too high, so as to prevent the water level from overflowing the water tank and overflowing to the integrated system; one end of the sewage pipe 9.4 is connected to the three-way pagoda joint as described above, and the other end extends to the coast. When the water level is too high, the water in the water tank overflow pipe 9.3 can be discharged When it comes to the sea, when it is necessary to clean the water tank 9.1, open the drain valve to discharge the silt and other debris at the bottom of the water tank; the two ends of the liquid level observation pipeline 9.5 are connected to the upper pagoda joint and the lower pagoda joint on the side of the water tank, and the upper pagoda joint and the lower pagoda joint are installed one above the other, serving as the upper and lower limits of the water tank 9.1. The liquid level observation pipeline 9.5 is a transparent tube, and the water level in the water tank can be observed from the outside, so as to more intuitively judge whether the submersible pump is blocked, etc.; one end of the high-pressure pump overflow pipe 9.8 is connected to the mechanical pressure regulating valve of the high-pressure pump group 13, and the other end is connected to the upper interface of the water tank 9.1, and is configured to flow back into the water tank 9.1 when the pressure of the high-pressure pump is too high and water overflow occurs.
[0060] Furthermore, the water storage mechanism 9 also has an automatic water supply device 9.6, which has an automatic water supply function and can control the operation of the submersible pump 11 in real time;
[0061] Furthermore, the water tank 9.1 also has a two-stage filtering function, and is provided with a first filter element 9.10 and a second filter element 9.11. Specifically, the first filter element 9.10 and the second filter element 9.11 are respectively provided at the water outlet and the water inlet of the water tank 9.1, the second filter element 9.11 provided at the water inlet of the water tank adopts a 30-mesh filter element, and the first filter element 9.10 provided at the water outlet of the water tank adopts a 50-mesh filter element, which can better filter out impurities and enable the underwater cleaning robot 7 to perform a stable cleaning operation; further, two openable and closable inspection covers 9.7 are provided on the top of the water tank 9.1, one of which is located above the first filter element 9.10, and the other is located above the second filter element 9.11.
[0062] When installing the water storage mechanism 9, first fix the water tank 9.1 on the water tank welding frame 12, then wrap the raw tape around all the joints of the water tank 9.1, and install the water inlet pipe 9.2, the water tank overflow pipe 9.3, the sewage pipe 9.4, the high-pressure pump overflow pipe 9.8, and the liquid level observation pipeline 9.5 to the corresponding positions of the water tank 9.1 in turn. One end of the water inlet pipe 9.2 is connected to the water tank 9.1, and the other end is the adapter end 9.2.1, which is used to connect to the water outlet pipeline of the submersible pump 11; the adapter end 9.2.1 is connected to the water inlet pipe 9.2 through a quick-disassembly joint, which can realize quick disassembly and connection. Then one end of the water outlet pipe 9.9 is connected to the water tank 9.1, and the other end is connected to the water inlet of the high-pressure pump group 13. After that, the first filter element 9.10 and the second filter element 9.11 are installed at the joint inside the water tank, and the end of the filter element is threaded for easy disassembly, and can also store impurities for easy cleaning. After that, the automatic water supply device 9.6 is installed on the inspection cover 9.7, and the positions of the two liquid level switches on the automatic water supply device are adjusted to achieve the ideal water supply effect. In this way, the water storage mechanism 9 is installed.
[0063] The maintenance platform 10 is configured to place the underwater cleaning robot 7, which is placed above the maintenance platform 10. The bottom of the maintenance platform 10 has a maintenance space, and the bottom maintenance space is used to store items such as cables and submersible pumps 11 during transportation, so the space utilization rate is high;
[0064] The submersible pump 11 is configured to extract seawater and inject it into the water tank 9.1 for storage, so as to be used by the high-pressure pump group 13; further, a protective cage is provided outside the submersible pump 11, and the aperture of the protective cage is 5 mm, so as to prevent the submersible pump 11 from inhaling larger impurities;
[0065] The water storage mechanism 9, the water tank welding frame 12 and the high-pressure pump group 13 are arranged in a vertical structure layer, which can effectively utilize the space, and the water storage mechanism 9 is located above the high-pressure pump group 13, which is convenient for pipeline layout, making the entire system look more beautiful and neat. Specifically, the water tank welding frame 12 is a support frame for installing the water tank 9.1. The water tank 9.1 is arranged on the top surface of the water tank welding frame 12. The lower space of the water tank welding frame 12 is used to install the high-pressure pump group 13. Since the lower space of the support frame is surrounded by a plurality of legs, the high-pressure pump group 13 can also be protected;
[0066] The high-pressure pump group 13 is configured to provide high-pressure water to the underwater cleaning robot 7, and can pump the water in the water tank 9.1 to the cleaning operation end of the underwater cleaning robot 7 under high pressure; optionally, the high-pressure pump group 13 is separately provided with a control cabinet for storing the frequency converter, and the pressure of the high-pressure pump group 13 can be adjusted according to demand.
[0067] When the underwater cleaning robot integrated system is in operation, first connect the submersible pump 11 to the water storage mechanism 9 through the water supply pipe, and fix the submersible pump 11 at a position 3 to 4 meters below the sea level, and use the cantilever crane 8 to lift the underwater cleaning robot 7 to a position 0.5m above the sea level and stop, test the status of the underwater cleaning robot 7's propeller, crawler motor and other electrical components, and after ensuring that there are no problems, pressurize the high-pressure pump group to test the high-pressure pump status. After all are in good condition, lift the underwater cleaning robot 7 into the sea, remove the belt, operate the frequency converter of the cable drum 2 to release the cable, and control the underwater cleaning robot 7 to operate. The overall operation is simple and fast.
[0068] Compared with the prior art, the underwater cleaning robot ship-borne engineering operation system provided in this embodiment has the following beneficial effects:
[0069] 1. By installing an integrated underwater cleaning robot integrated system on an engineering ship, ship cleaning operations can be carried out flexibly at sea without geographical restrictions.
[0070] 2. The underwater cleaning robot integrated system integrates the cable reel, support beam, upper welding frame, high-pressure pump control cabinet, distribution cabinet, underwater cleaning robot, cantilever crane, water storage mechanism, maintenance platform, submersible pump, water tank welding frame, high-pressure pump group, etc. through the integrated base. After the system integration, the pipelines and lines are also optimized to make the site more beautiful and tidy, with high integration, eliminating the trouble of multiple loading and unloading and transportation, the need to place and route the components, and the laying of pipelines, reducing the cleaning operation time, achieving efficient operation, and a smaller operation area, improving the utilization rate of on-site space and cleanliness, and making the site clean and standardized.
[0071] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only the specific implementation method of the present application and is not intended to limit the scope of protection of the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application.
Claims
1. An underwater cleaning robot ship-borne engineering operation system, characterized in that: It includes an engineering ship, wherein the engineering ship is provided with an underwater cleaning robot integrated system and a control cabin, wherein a control system is provided in the control cabin, and the control system is connected with the underwater cleaning robot integrated system by signal control to control the operation of the underwater cleaning robot integrated system; The underwater cleaning robot integrated system includes an integrated base and a cable reel, a support beam, an upper welding frame, a high-pressure pump control cabinet, a power distribution cabinet, an underwater cleaning robot, a cantilever crane, a water storage mechanism, a maintenance platform, a submersible pump, a water tank welding frame and a high-pressure pump group arranged on the integrated base.
2. The underwater cleaning robot ship-borne engineering operation system according to claim 1 is characterized in that: The underwater cleaning robot integrated system is arranged at the stern of the engineering ship, and the control cabin is arranged at the bow of the engineering ship.
3. The underwater cleaning robot ship-borne engineering operation system according to claim 1 is characterized in that: The control system is arranged in the control cabin, and the control system adopts an integrated module design, including a host computer, a remote controller and a control console.
4. The underwater cleaning robot ship-borne engineering operation system according to claim 1, characterized in that: The integrated base has a first installation area, a second installation area and a third installation area on a plane, wherein the second installation area and the third installation area are arranged side by side on the same side of the first installation area; the first installation area is installed with a load-bearing cable drum, a support beam, an upper welding frame, a cantilever crane, a water storage mechanism, a water tank welding frame and a high-pressure pump group; the second installation area is installed with a high-pressure pump control cabinet and a distribution cabinet; the third installation area is installed with an underwater cleaning robot, a maintenance platform and a submersible pump.
5. The underwater cleaning robot ship-borne engineering operation system according to claim 4 is characterized in that: The integrated base is welded by channel steel and steel pipe.
6. The underwater cleaning robot ship-borne engineering operation system according to claim 5, characterized in that: The integrated base is provided with at least one of a lifting interface, a fork-mounting interface, and a transfer wheel installation interface.
7. The underwater cleaning robot ship-borne engineering operation system according to claim 1, characterized in that: The cable reel includes a base and a water pipe reel, a motor assembly, a chain drive group and a brake assembly arranged on the base; the chain drive group is connected to the output shaft end of the motor assembly through a chain, and the brake assembly is used for braking the water pipe reel; the cables, water pipes and communication cables connected to the underwater cleaning robot are arranged in a protective tube to form an integrated pipeline; the integrated pipeline is wound around the water pipe reel, and the motor assembly drives the water pipe reel to rotate through the chain drive group and the chain to realize the retraction and release of the integrated pipeline.
8. The underwater cleaning robot ship-borne engineering operation system according to claim 1, characterized in that: The cable drum also includes a chain protection cover and a guide pulley. The chain protection cover is arranged on the outside of the chain, and the guide pulley is used for guiding when the integrated pipeline is released.
9. The underwater cleaning robot ship-borne engineering operation system according to claim 1, characterized in that: A floating material is provided on the protective tube.
10. The underwater cleaning robot ship-borne engineering operation system according to claim 4, characterized in that: The water storage mechanism is configured to store seawater. The water storage mechanism has a water tank, a water inlet pipe and a water outlet pipe. The water inlet of the water tank is connected to a submersible pump through the water inlet pipe, and the submersible pump can pump seawater into the water tank; the water outlet of the water tank is connected to a high-pressure pump group through the water outlet pipe, and the high-pressure pump group is used to pump out the water in the water tank at high pressure for the underwater cleaning robot to clean the hull and bottom of the ship.
