In-tower elevator operation simulation test device

The simulation inspection device addresses the challenges of integrated ladder frames in elevator test towers by providing adjustable rollers and handles to simulate elevator operation, improving installation ease and safety while preventing ladder wear.

CN222099307UActive Publication Date: 2024-12-03SHANGHAI TAISHENG WIND POWER EQUIP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420924869.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-03
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

Current elevator test towers face challenges with integrated ladder frames that complicate transportation, installation, increase labor costs, and pose safety hazards, necessitating a simulation to detect elevator trajectory interference with tower components.

Method used

A simulation inspection device with adjustable rollers and handles to simulate elevator operation, allowing for adjustment of roller spacing to fit different ladder widths and prevent contact with the ladder, featuring a sliding frame, connecting plates, and adjustable rollers with rubber pads.

Benefits of technology

Facilitates efficient simulation of elevator operation on ladders of varying widths, reducing installation complexity and potential wear on elevator components, enhancing safety and ease of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222099307U_ABST
    Figure CN222099307U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of in-tower elevator operation simulation inspection, and particularly relates to an in-tower elevator operation simulation inspection device which comprises an elevator simulation frame, the lower end of the elevator simulation frame is connected with a simulation mechanism, the simulation mechanism comprises a simulation unit and an adjusting unit, the simulation unit is arranged at the lower end of the elevator simulation frame, and the adjusting unit is arranged at the lower end of the elevator simulation frame. And the adjusting unit is arranged at the upper end of the simulation unit. According to the in-tower elevator operation simulation inspection device, during in-tower elevator operation simulation inspection, a lower roller on the outer side of a connecting plate is placed at the lower end of the outer side of an elevator climbing frame body, then a first handle is rotated to drive a first threaded rod to rotate, and meanwhile, a first adjusting plate on the outer side moves downwards to drive a moving plate and an upper roller to move downwards; and after the upper roller moves to the upper end of the outer side of the elevator climbing frame body, the elevator simulation frame is pushed along the elevator climbing frame body, and whether the elevator simulation frame interferes with other parts in the tower drum or not in the moving process is observed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of simulation inspection of elevator operation in a tower, in particular to a simulation inspection device for elevator operation in a tower. Background Art

[0002] With the improvement of people's living standards, the scope and places of use of elevators are increasing, so the design requirements for elevators are getting higher and higher. Generally, elevator manufacturers will build elevator test towers to ensure that the various parameters and indicators of electrical appliances meet the safety and use requirements before mass production. Therefore, elevator test towers are also one of the indispensable facilities of elevator companies. As the use height of elevators increases, the construction height of elevator test towers is also increasing. Therefore, the internal structure design of the tower of elevator test towers is also constantly optimized and upgraded. The ladder located on the inner wall at the bottom of the tower body needs to increase accordingly due to the increase in the height of the tower.

[0003] However, the tower inner wall ladders currently in use all use an integrated ladder frame mode, which is not conducive to the transportation and installation of the ladder, increases the installation strength and labor costs, and also has certain safety hazards.

[0004] For example, the ladder on the inner wall of an elevator test tower disclosed in Chinese patent CN104895481A adopts a segmented ladder split frame to connect and fix an elongated ladder frame. Therefore, in actual application, it not only meets the depth requirement of the bottom of the elevator test tower, but also reduces the production, transportation and installation strength and cost of the ladder, and further improves the safety of operators when going up and down the ladder. The overall structure is simple, practical and easy to install, and is suitable for popularization and application.

[0005] However, before using the elevator in the tower, it is necessary to simulate the running trajectory of the elevator on the ladder to detect whether there is any interference with other parts in the tower.

[0006] For this reason, we urgently need to provide a kind of tower elevator operation simulation test device. Utility Model Content

[0007] The utility model aims to provide a tower elevator operation simulation inspection device to solve the problem proposed in the above background technology that before the tower elevator is used, it is necessary to simulate the running trajectory of the elevator on the ladder to detect whether there is interference with other parts in the tower.

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an elevator operation simulation inspection device in a tower, comprising an elevator simulation frame, a simulation mechanism is connected to the lower end of the elevator simulation frame, the simulation mechanism comprises a simulation unit and an adjustment unit, the simulation unit is arranged at the lower end of the elevator simulation frame, and the adjustment unit is arranged at the upper end of the simulation unit.

[0009] The simulation unit includes a sliding frame, a connecting plate, a limiting rod, a movable plate, a lower roller, an upper roller, a fixed plate, a first bearing, a first threaded rod, a first handle and a first adjusting plate. The sliding frame is connected to the outer side of the lower end of the elevator simulation frame, the connecting plate is fixedly connected to the middle position of the lower side of the sliding frame, the limiting rod is connected to the inside of the connecting plate, the movable plate is connected to the outer end of the limiting rod, the lower roller is rotatably connected to the outer side of the lower end of the connecting plate, the upper roller is connected to the outside of the movable plate, the fixed plate is fixedly connected to the middle position of the upper end of the connecting plate away from the lower roller, the first bearing is fixedly connected to the inner middle position of the fixed plate, the first threaded rod is fixedly connected to the inner side of the first bearing, the first handle is fixedly connected to the lower end of the first threaded rod, and the first adjusting plate is connected to the outer end of the first threaded rod.

[0010] A further improvement is that a through slot is provided at the middle position of the upper part of the connecting plate, and limiting holes are provided at the front and rear ends of the movable plate, and the limiting rod is vertically fixedly connected to the inner side of the through slot, and the outer side of the limiting rod is slidably connected to the inner side of the limiting hole, and the outer side of the movable plate is slidably connected to the inner side of the through slot. Therefore, when the movable plate is located inside the through slot and moves, it can only slide along the outer side of the limiting rod, thereby limiting the movement of the movable plate.

[0011] A further improvement is that a first threaded hole is provided in the middle of the first adjustment plate, the outer side of the first threaded rod is threadedly connected to the inner side of the first threaded hole, and the outer side of the first adjustment plate is fixedly connected to the side of the movable plate away from the upper roller. Thus, when the first handle is turned to drive the first threaded rod to rotate, the outer first adjustment plate can be driven to move, thereby driving the movable plate to move along the outer side of the limit rod, so that the spacing between the lower roller and the upper roller can be adjusted according to the thickness of the elevator climbing frame.

[0012] A further improvement is that the inner side of the sliding frame is slidably connected to the outer side of the lower end of the elevator simulation frame, so that when the sliding frame moves, it can only slide along the outer side of the lower end of the elevator simulation frame, thereby limiting the movement of the sliding frame and the lower roller and upper roller at the lower end.

[0013] A further improvement is that the adjustment unit includes a support plate, a second bearing, a second threaded rod, a second handle and a second adjustment plate, the support plate is fixedly connected to the middle position of the inner bottom end of the elevator simulation frame, the second bearing is fixedly connected to the middle position of the inner upper end of the support plate, the second threaded rod is symmetrically fixedly connected to the inner side of the second bearing, the second handle is fixedly connected to the end of the second threaded rod away from the second bearing, and the second adjustment plate is fixedly connected to the upper middle position of the sliding frame.

[0014] A further improvement is that a second threaded hole is provided in the middle of the upper end of the second adjustment plate, and the outer side of the second threaded rod is threadedly connected to the inner side of the second threaded hole. Thus, when the second handle is turned to drive the second threaded rod to move, the two second adjustment plates on the outer sides of the two second threaded rods can move relative to each other, thereby driving the two connecting plates at the lower ends to move relative to each other, changing the spacing between the lower roller and the upper roller at the outer ends of the two connecting plates, so as to facilitate the simulation device to be placed on the outer sides of elevator climbing frames of different widths.

[0015] A further improvement is that the outer sides of the lower roller and the upper roller are fixedly connected with rubber pads, so that when the lower roller and the upper roller are located on the outer side of the elevator climbing frame and roll, the rubber pads on the outer sides of the lower roller and the upper roller contact the outer side of the elevator climbing frame, which can prevent the elevator climbing frame from contacting the outer sides of the lower roller and the upper roller, causing wear on the outer side of the elevator climbing frame.

[0016] In summary, the present application discloses a device for simulating and testing the operation of an elevator in a tower.

[0017] This technical solution drives the first threaded rod to rotate by rotating the first handle, which can drive the first adjustment plate on the outside to move, thereby driving the movable plate to move along the outside of the limit rod, so that the distance between the lower roller and the upper roller can be adjusted according to the thickness of the elevator climbing frame.

[0018] Furthermore, by rotating the second handle to drive the second threaded rod to move, the two second adjustment plates on the outside of the two second threaded rods can be moved relative to each other, thereby driving the two connecting plates at the lower end to move relative to each other, changing the distance between the lower roller and the upper roller at the outer ends of the two connecting plates, so as to facilitate the simulation device to be placed on the outside of the elevator climbing frame with different widths. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the main structure of the utility model;

[0020] Figure 2 This is a structural schematic diagram of the lower end of the elevator simulation frame of the utility model;

[0021] Figure 3 This is a structural schematic diagram of one side of the connecting plate of the utility model;

[0022] Figure 4 It is a structural schematic diagram of the other side of the connecting plate of the utility model.

[0023] In the figure: 1. elevator simulation frame; 201. sliding frame; 202. connecting plate; 203. limiting rod; 204. moving plate; 205. lower roller; 206. upper roller; 207. fixing plate; 208. first bearing; 209. first threaded rod; 210. first handle; 211. first adjusting plate; 301. supporting plate; 302. second bearing; 303. second threaded rod; 304. second handle; 305. second adjusting plate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-Figure 4 , the utility model provides a technical solution: Example

[0026] A tower elevator operation simulation inspection device comprises an elevator simulation frame 1, the lower end of which is connected to a simulation mechanism, the simulation mechanism comprises a simulation unit and an adjustment unit, the simulation unit is arranged at the lower end of the elevator simulation frame 1, and the adjustment unit is arranged at the upper end of the simulation unit.

[0027] The simulation unit includes a sliding frame 201, a connecting plate 202, a limiting rod 203, a movable plate 204, a lower roller 205, an upper roller 206, a fixed plate 207, a first bearing 208, a first threaded rod 209, a first handle 210 and a first adjusting plate 211. The sliding frame 201 is connected to the outer side of the lower end of the elevator simulation frame 1, the connecting plate 202 is fixedly connected to the lower middle position of the sliding frame 201, the limiting rod 203 is connected to the inside of the connecting plate 202, the movable plate 204 is connected to the outer end of the limiting rod 203, a through groove is provided in the middle position of the upper inside of the connecting plate 202, limiting holes are provided at the front and rear ends of the movable plate 204, the limiting rod 203 is vertically fixedly connected to the inner side of the through groove, the outer side of the limiting rod 203 is slidably connected to the inner side of the limiting hole, and the outer side of the movable plate 204 is slidably connected to the inner side of the through groove. Therefore, when the movable plate 204 is located inside the through slot and moves, it can only slide along the outer side of the limiting rod 203 , thereby limiting the movement of the movable plate 204 .

[0028] The lower roller 205 is rotatably connected to the outer side of the lower end of the connecting plate 202, the upper roller 206 is connected to the outer side of the moving plate 204, and the inner side of the sliding frame 201 is slidably connected to the outer side of the lower end of the elevator simulation frame 1. Therefore, when the sliding frame 201 moves, it can only slide along the outer side of the lower end of the elevator simulation frame 1, thereby limiting the movement of the sliding frame 201 and the lower roller 205 and the upper roller 206 at the lower end.

[0029] The fixed plate 207 is fixedly connected to the middle position of the upper end of the connecting plate 202 away from the lower roller 205, the first bearing 208 is fixedly connected to the middle position of the inner part of the fixed plate 207, the first threaded rod 209 is fixedly connected to the inner side of the first bearing 208, the first handle 210 is fixedly connected to the lower end of the first threaded rod 209, and the first adjustment plate 211 is connected to the outer end of the first threaded rod 209. A first threaded hole is provided in the middle position of the inner part of the first adjustment plate 211, the outer side of the first threaded rod 209 is threadedly connected to the inner side of the first threaded hole, and the outer side of the first adjustment plate 211 is fixedly connected to the side of the moving plate 204 away from the upper roller 206. Therefore, when the first handle 210 is rotated to drive the first threaded rod 209 to rotate, the outer first adjustment plate 211 can be driven to move, thereby driving the moving plate 204 to move along the outer side of the limit rod 203, so that the distance between the lower roller 205 and the upper roller 206 can be adjusted according to the thickness of the elevator climbing frame. Example

[0030] On the basis of Example 1: the adjustment unit includes a support plate 301, a second bearing 302, a second threaded rod 303, a second handle 304 and a second adjustment plate 305, the support plate 301 is fixedly connected to the middle position of the inner bottom end of the elevator simulation frame 1, the second bearing 302 is fixedly connected to the middle position of the inner upper end of the support plate 301, the second threaded rod 303 is symmetrically fixedly connected to the inner side of the second bearing 302, the second handle 304 is fixedly connected to one end of the second threaded rod 303 away from the second bearing 302, and the second adjustment plate 305 is fixedly connected to the upper middle position of the sliding frame 201.

[0031] A second threaded hole is provided in the middle of the upper end of the second adjusting plate 305, and the outer side of the second threaded rod 303 is threadedly connected to the inner side of the second threaded hole. Therefore, when the second handle 304 is turned to drive the second threaded rod 303 to move, the two second adjusting plates 305 on the outer sides of the two second threaded rods 303 can move relative to each other, thereby driving the two connecting plates 202 at the lower end to move relative to each other, changing the spacing between the lower roller 205 and the upper roller 206 on the outer ends of the two connecting plates 202, so as to facilitate the simulation device to be placed on the outer sides of the elevator climbing frame of different widths. Example

[0032] On the basis of the first embodiment: the outer sides of the lower roller 205 and the upper roller 206 are fixedly connected with rubber pads. Therefore, when the lower roller 205 and the upper roller 206 are located on the outer side of the elevator climbing frame and roll, the rubber pads on the outer sides of the lower roller 205 and the upper roller 206 contact the outer side of the elevator climbing frame, which can prevent the elevator climbing frame from contacting the outer sides of the lower roller 205 and the upper roller 206, causing wear on the outer side of the elevator climbing frame.

[0033] Working principle: When conducting a simulation test of the elevator operation in the tower, the lower roller 205 on the outside of the connecting plate 202 is placed at the lower end of the outer side of the elevator climbing frame. Then, the first handle 210 is rotated to drive the first threaded rod 209 to rotate, so that the first adjustment plate 211 on the outside moves downward, driving the movable plate 204 and the upper roller 206 to move downward, until the upper roller 206 moves to the upper end of the outer side of the elevator climbing frame. Then, the elevator simulation frame 1 is pushed along the elevator climbing frame, and it is observed whether the elevator simulation frame 1 interferes with other parts in the tower during the movement.

[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

Claims

1. A tower elevator operation simulation test device, comprising an elevator simulation frame (1), Features: The lower end of the elevator simulation frame (1) is connected to a simulation mechanism, the simulation mechanism comprising a simulation unit and an adjustment unit, the simulation unit is arranged at the lower end of the elevator simulation frame (1), and the adjustment unit is arranged at the upper end of the simulation unit; The simulation unit comprises a sliding frame (201), a connecting plate (202), a limiting rod (203), a moving plate (204), a lower roller (205), an upper roller (206), a fixing plate (207), a first bearing (208), a first threaded rod (209), a first handle (210) and a first adjusting plate (211); the sliding frame (201) is connected to the outer side of the lower end of the elevator simulation frame (1); the connecting plate (202) is fixedly connected to the middle position of the lower side of the sliding frame (201); the limiting rod (203) is connected to the inside of the connecting plate (202); the moving plate (204) is connected to the outer side of the limiting rod (203); The lower roller (205) is rotatably connected to the outer side of the lower end of the connecting plate (202); the upper roller (206) is connected to the outer side of the movable plate (204); the fixed plate (207) is fixedly connected to the middle position of the upper end of the connecting plate (202) away from the lower roller (205); the first bearing (208) is fixedly connected to the inner middle position of the fixed plate (207); the first threaded rod (209) is fixedly connected to the inner side of the first bearing (208); the first handle (210) is fixedly connected to the lower end of the first threaded rod (209); and the first adjustment plate (211) is connected to the outer end of the first threaded rod (209).

2. A tower elevator operation simulation test device according to claim 1, Features: A through slot is provided at the middle position of the upper interior of the connecting plate (202), and limiting holes are provided at the front and rear ends of the interior of the movable plate (204). The limiting rod (203) is vertically fixedly connected to the inner side of the through slot, and the outer side of the limiting rod (203) is slidably connected to the inner side of the limiting hole, and the outer side of the movable plate (204) is slidably connected to the inner side of the through slot.

3. The tower elevator operation simulation test device according to claim 1, Features: A first threaded hole is provided in the middle of the first adjustment plate (211), the outer side of the first threaded rod (209) is threadedly connected to the inner side of the first threaded hole, and the outer side of the first adjustment plate (211) is fixedly connected to a side of the movable plate (204) away from the upper roller (206).

4. The device for simulating and testing the operation of an elevator in a tower according to claim 1, Features: The inner side of the sliding frame (201) is slidably connected to the outer side of the lower end of the elevator simulation frame (1).

5. The tower elevator operation simulation test device according to claim 1, Features: The adjustment unit comprises a support plate (301), a second bearing (302), a second threaded rod (303), a second handle (304) and a second adjustment plate (305); the support plate (301) is fixedly connected to the middle position of the inner bottom end of the elevator simulation frame (1); the second bearing (302) is fixedly connected to the middle position of the inner upper end of the support plate (301); the second threaded rod (303) is symmetrically fixedly connected to the inner side of the second bearing (302); the second handle (304) is fixedly connected to one end of the second threaded rod (303) away from the second bearing (302); and the second adjustment plate (305) is fixedly connected to the middle position of the upper side of the sliding frame (201).

6. The device for simulating and testing the operation of an elevator in a tower according to claim 5, Features: A second threaded hole is provided at the middle position of the upper inner end of the second adjustment plate (305), and the outer side of the second threaded rod (303) is threadedly connected to the inner side of the second threaded hole.

7. The tower elevator operation simulation test device according to claim 1, Features: Rubber pads are fixedly connected to the outer sides of the lower roller (205) and the upper roller (206).

Citation Information

Patent Citations

  • Ladder stand on inner wall of elevator experimental tower

    CN104895481A