Prefabricated piezoelectric assembly type pavement

By setting up a water guide groove, water discharge structure and waterproof and breathable membrane on the prefabricated piezoelectric assembly pavement, the problem of moisture entering the piezoelectric components is solved, the stability and environmental protection of the pavement are improved, and the efficient collection and storage of electrical energy is achieved.

CN222100531UInactive Publication Date: 2024-12-03CHANGAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420775007.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When existing prefabricated piezoelectric assembly pavement rains for a long time or when there is water accumulation on the road surface, moisture enters the inside of the piezoelectric component through the concrete slab, resulting in damage to the piezoelectric component and is less practical.

Method used

Water guide grooves are set on both sides of the concrete slab, and water discharge structures and support plates are installed in the slope to discharge moisture using slopes, and waterproof and breathable membrane is covered on the outer surface of the piezoelectric element, combined with water-absorbing support plate made of Yuhua Stone to reduce moisture Influence.

Benefits of technology

Effectively prevent moisture from entering the piezoelectric element, improve the stability and reliability of the piezoelectric element, avoid the growth of mold, and realize environmentally friendly power collection and storage through underground wires and charging piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100531U_ABST
    Figure CN222100531U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated piezoelectric assembly type pavement which comprises a concrete slab and a piezoelectric element, the piezoelectric element is pre-buried in the concrete slab and is piezoelectric ceramics, water guide grooves are formed in the two corresponding sides of the concrete slab respectively, water drainage structures are arranged in the two water guide grooves respectively, and the water drainage structures are connected with the concrete slab. The water drainage structure is used for collecting and guiding out water on the upper surface of the piezoelectric element; a charging device is arranged at the top of the concrete plate, a buried line is pre-buried in the concrete plate, and the charging device is electrically connected with the piezoelectric element through the buried line. The water guide plate and the water guide groove are arranged at the top end of the piezoelectric element, water drained in the water guide groove is discharged, the water guide groove and the slope are arranged, water is discharged out of the concrete plate, and the problem that when an existing prefabricated piezoelectric assembly type pavement is used, due to the fact that no effective water discharge structure is arranged, water enters the piezoelectric element through the concrete plate, and water leakage is caused is solved. And therefore, the technical problem of low practicability caused by the damage of the piezoelectric element can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of piezoelectricity, and in particular relates to a prefabricated piezoelectric assembled pavement. Background Art

[0002] Prefabricated assembled pavement is a type of pavement in which the road surface is prefabricated into plates from materials such as concrete and then assembled and installed on site. When the existing prefabricated piezoelectric assembled pavement is in use, there is no effective drainage structure on the piezoelectric element. When it rains for a long time or there is water accumulation on the road surface, moisture will enter the piezoelectric element through the concrete slab, causing damage to the piezoelectric element, and the practicality is low. Utility Model Content

[0003] The purpose of the utility model is to provide a prefabricated piezoelectric assembled pavement, which solves the technical problem that when the existing prefabricated piezoelectric assembled pavement is in use, there is no effective drainage structure on the piezoelectric element. When it rains for a long time or there is water accumulation on the road surface, moisture enters the interior of the piezoelectric element through the concrete slab, thereby damaging the piezoelectric element and causing low practicality.

[0004] The technical solution adopted by the utility model is to prefabricate a piezoelectric assembled pavement, including a concrete slab and a piezoelectric element. The piezoelectric element is pre-buried in the interior of the concrete slab. The piezoelectric element is a piezoelectric ceramic. Water guide grooves are provided on the corresponding two sides of the concrete slab. A water discharge structure is provided inside the two water guide grooves. The water discharge structure is used to collect and discharge water on the upper surface of the piezoelectric element. A charging device is provided on the top of the concrete slab. An underground wire is pre-buried in the concrete slab. The charging device is electrically connected to the piezoelectric element through the underground wire.

[0005] The utility model is characterized in that:

[0006] A water guide plate is fixedly installed on the top of the piezoelectric element, and a plurality of water guide grooves are correspondingly opened on two corresponding sides of the top surface of the water guide plate, and the water guide grooves are inclined toward the water guide groove.

[0007] The outer surface of the piezoelectric element is covered with a waterproof and breathable membrane.

[0008] The water discharge structure comprises a plurality of support plates, and the plurality of support plates are respectively slidably installed inside the water guide groove.

[0009] A slope is provided at the bottom of one side of the two water guide grooves close to the piezoelectric element, and the slope is inclined from high to low in a direction away from the piezoelectric element.

[0010] The charging device includes a plurality of charging piles, which are respectively fixedly installed on the top of the concrete slab, and the plurality of charging piles are electrically connected to the piezoelectric element through buried wires.

[0011] Output wire boxes are fixedly installed on the top of the concrete slab, and two connecting wires are fixedly installed on the two output wire boxes.

[0012] The beneficial effects of the utility model are:

[0013] The utility model arranges a water guide plate and a water diversion trough at the top of the piezoelectric element to discharge the water trapped in the water diversion trough, and arranges a water diversion trough and a slope to discharge the water out of the concrete slab, and a support plate is slidably installed inside the water diversion trough, the support plate not only plays a supporting role, but also has water absorption because it is made of rain flower stone material, thereby reducing the influence of moisture on the piezoelectric element, and the outer surface of the piezoelectric element is covered with a waterproof and breathable membrane, which is a new type of polymer waterproof material, which can prevent mold growth while waterproofing, and improve the stability and reliability of the piezoelectric element, and solves the technical problem that the existing prefabricated piezoelectric assembled pavement has low practicality due to the lack of an effective water discharge structure on the piezoelectric element when it rains for a long time or there is water on the road surface, so that moisture enters the inside of the piezoelectric element through the concrete slab, thereby causing damage to the piezoelectric element.

[0014] The utility model provides a charging pile above the concrete slab and electrically connects the charging pile with the piezoelectric element. When a vehicle passes by, the piezoelectric element buried in the concrete slab collects mechanical energy and converts it into electrical energy to charge the charging piles on both sides of the road, thereby reducing environmental pollution and improving the environmental friendliness of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a structural schematic diagram of a prefabricated piezoelectric assembled pavement of the utility model;

[0016] Figure 2 It is a side cross-sectional schematic diagram of the utility model;

[0017] Figure 3 It is a schematic diagram of the local structure of the utility model.

[0018] In the figure: 1. Concrete slab, 2. Piezoelectric element, 3. Water guide trough, 4. Water guide plate, 5. Water guide trough, 6. Support plate, 7. Slope, 8. Charging pile, 9. Underground cable, 10. Output box, 11. Communication cable, 12. Waterproof and breathable membrane. DETAILED DESCRIPTION

[0019] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0020] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0021] In the description of the present utility model, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0022] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0023] Example 1

[0024] like Figure 1-3 As shown, the utility model provides a prefabricated piezoelectric assembled road surface, including a concrete slab 1 and a piezoelectric element 2, wherein the piezoelectric element 2 is pre-buried inside the concrete slab 1, and the piezoelectric element 2 is a piezoelectric ceramic, and water guide grooves 3 are provided on the front and rear surfaces of the concrete slab 1, and a water discharge structure is provided inside the two water guide grooves 3, and the water discharge structure is used to collect and discharge the water on the upper surface of the piezoelectric element 2; a charging device is provided on the upper surface of the concrete slab 1, and the charging device is used to charge an electric vehicle. An underground wire 9 is pre-buried in the concrete slab 1, and the charging device is electrically connected to the piezoelectric element 2 through the underground wire 9.

[0025] Example 2

[0026] On the basis of Example 1, a water guide plate 4 is fixedly installed on the upper surface of the piezoelectric element 2, and a plurality of water diversion grooves 5 are correspondingly opened on the front and rear sides of the upper surface of the water guide plate 4, and the water diversion grooves 5 have a certain slope to facilitate water to flow out of the front and rear sides of the water guide plate 4. More specifically, the water diversion grooves 5 are inclined toward the water guide groove 3.

[0027] Furthermore, the outer surface of the piezoelectric element 2 is covered with a waterproof breathable membrane 12, which is a new type of polymer waterproof material, and can prevent mold growth while being waterproof.

[0028] Example 3

[0029] Based on Example 1, the water discharge structure includes a plurality of support plates 6, which are respectively installed inside the water guide groove 3 on the front and rear sides, and the support plates 6 are made of Yuhua stone, which is water-absorbent, thereby reducing the influence of moisture on the piezoelectric element 2.

[0030] Furthermore, a slope 7 is provided at the bottom of one side of the two water-conducting grooves 3 close to the piezoelectric element 2 , and the slope 7 is inclined from high to low in a direction away from the piezoelectric element 2 . When using the utility model, a concrete slab 1 is prefabricated in the manufacturing plant in advance, and the piezoelectric element 2 is pre-buried inside the concrete slab 1. After the pre-buried is completed, the concrete slab 1 is transported together with the piezoelectric element 2 to the road construction site, and the concrete slab 1 is laid on the road foundation. When a vehicle passes by, the piezoelectric element 2 collects mechanical energy and converts it into electrical energy, and stores the electrical energy in the charging pile 8 through the buried line 9. The electrical energy of the charging pile 8 can be used for charging electric vehicles, and can also be connected to the road power facilities to provide electricity. When it rains or there is water on the road, in order to prevent moisture from entering the inside of the piezoelectric element 2, a water guide plate 4 and a water diversion trough 5 are set at the top of the piezoelectric element 2 to discharge the water in the water diversion trough 5, and a water diversion trough 3 and a slope 7 are set to discharge the water from the concrete slab 1, and a support plate 6 is fixedly installed on the outside of the water diversion trough 3. The support plate 6 not only plays a supporting role, but also has water absorption because it is made of rain flower stone, thereby reducing the influence of moisture on the piezoelectric element.

[0031] Example 4

[0032] Based on Example 1, the charging device includes eight charging piles 8, which are fixedly installed on the front and rear sides of the upper surface of the concrete slab 1, and the eight charging piles 8 are electrically connected to the piezoelectric element 2 through the buried wire 9.

[0033] Furthermore, output boxes 10 are fixedly installed at the right ends of the front and rear surfaces of the concrete slab 1, and two interconnecting wires 11 are fixedly installed on the two output boxes 10, so as to connect multiple piezoelectric materials. When the piezoelectric material is damaged or abnormal, a new signal can be output through the interconnecting wire 11, and then repaired in time, for example, the resistance or current will be different under abnormal conditions.

[0034] Working principle: When using this device, a concrete slab 1 is prefabricated in the manufacturing plant in advance, and the piezoelectric element 2 is pre-buried inside the concrete slab 1. After the pre-buried is completed, the concrete slab 1 together with the piezoelectric element 2 is transported to the road construction site, and the concrete slab 1 is laid on the road foundation. When a vehicle passes by, the piezoelectric element 2 collects mechanical energy and converts it into electrical energy, and stores the electrical energy in the charging pile 8 through the buried line 9. The electrical energy of the charging pile 8 can be used to charge electric vehicles, and can also be connected to the road power facilities to provide electricity. When it rains or there is water on the road, in order to prevent moisture from entering the piezoelectric element 2 The inside of the piezoelectric element 2 is provided with a water guide plate 4 and a water guide groove 5 at the top thereof to discharge the water trapped in the water guide groove 5, and a water guide groove 3 and a slope 7 are provided to discharge the water out of the concrete slab 1, and a support plate 6 is fixedly installed on the outside of the water guide groove 3. The support plate 6 not only plays a supporting role, but also has water absorption because it is made of Yuhua stone, thereby reducing the influence of moisture on the piezoelectric element, and the outer surface of the piezoelectric element 2 is covered with a waterproof and breathable membrane 12, which is a new type of polymer waterproof material. While being waterproof, it can prevent the growth of mold and improve the stability and reliability of the piezoelectric element 2.

[0035] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A prefabricated piezoelectric assembled pavement, comprising a concrete slab (1) and a piezoelectric element (2), wherein the piezoelectric element (2) is pre-buried inside the concrete slab (1), characterized in that: The piezoelectric element (2) is a piezoelectric ceramic. Water guide grooves (3) are provided on the two corresponding sides of the concrete slab (1). A water discharge structure is provided inside the two water guide grooves (3). The water discharge structure is used to collect and discharge water on the upper surface of the piezoelectric element (2). A charging device is provided on the top of the concrete slab (1). An underground wire (9) is pre-buried in the concrete slab (1). The charging device is electrically connected to the piezoelectric element (2) via the underground wire (9).

2. The prefabricated piezoelectric assembled pavement according to claim 1, characterized in that: A water guide plate (4) is fixedly mounted on the top of the piezoelectric element (2), and a plurality of water guide grooves (5) are correspondingly provided on two corresponding sides of the top surface of the water guide plate (4), and the water guide grooves (5) are arranged to be inclined toward the water guide groove (3).

3. The prefabricated piezoelectric assembled pavement according to claim 2, characterized in that: The outer surface of the piezoelectric element (2) is covered with a waterproof and breathable membrane (12).

4. The prefabricated piezoelectric assembled pavement according to claim 1, characterized in that: The water discharge structure comprises a plurality of support plates (6), and the plurality of support plates (6) are respectively installed inside the water guide groove (3).

5. The prefabricated piezoelectric assembled pavement according to claim 4, characterized in that: A slope (7) is provided at the bottom end of one side of the two water guide grooves (3) close to the piezoelectric element (2), and the slope (7) is inclined from high to low in a direction away from the piezoelectric element (2).

6. The prefabricated piezoelectric assembled pavement according to claim 1, characterized in that: The charging device comprises a plurality of charging piles (8), wherein the plurality of charging piles (8) are respectively fixedly installed on the top of the concrete slab (1), and the plurality of charging piles (8) are electrically connected to the piezoelectric element (2) via the buried wire (9).

7. The prefabricated piezoelectric assembled pavement according to claim 6, characterized in that: An output wire box (10) is fixedly installed on the top of each of the concrete slabs (1), and two connecting wires (11) are fixedly installed on each of the two output wire boxes (10).