EPDM particle and glue composite runway structure

By designing the composite structure of EPDM particles and glue in the plastic runway, the height difference and specific shape levels are formed, and the problems of difficulty in cleaning up water and surface damage cannot be partially repaired, achieving rapid drainage and resource conservation effects.

CN222100539UActive Publication Date: 2024-12-03GUANGDONG JINYE SPORTS FACILITIES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323656362.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-31
Publication Date
2024-12-03
Estimated Expiration
2033-12-31

AI Technical Summary

Technical Problem

The existing plastic runway is difficult to clean when it rains, users are prone to slipping, and cannot be repaired partially when the surface is damaged, so they can only replace the entire runway, wasting resources.

Method used

A composite runway structure of EPDM particles and glue is designed, including the foundation layer, waterproof layer, bottom layer, clamping layer and surface layer. By forming structures with height difference and specific shapes, using gravity drainage and connecting grooves, the rapid rainwater is achieved. Exhaust and partial replacement.

Benefits of technology

It provides an elastic runway surface to quickly discharge accumulated water, enhances the firmness of the surface and the bottom layer, saves resources, reduces replacement time and cost, and avoids surface damage caused by long-term rainwater convergence.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100539U_ABST
    Figure CN222100539U_ABST
Patent Text Reader

Abstract

The utility model provides an EPDM particle and glue composite runway structure which comprises a base layer, a waterproof layer is arranged on the base layer, a bottom layer is arranged on the waterproof layer, a clamping layer is arranged on the bottom layer, and a surface layer is arranged on the clamping layer. Rainwater on the surface layer can better flow into the inner layer from the outer side by adopting the stepped base layer and the bottom layer, the connecting contact surface of the clamping layer and the bottom layer is increased by adopting the grooves and the bulges, the connecting layer and the bottom layer are connected more firmly, the surface layer can be better arranged by adopting the square clamping layer during production, the runway can be conveniently used during later runway construction, and the service life of the runway is prolonged. Moreover, when part of the surface layer is damaged, regional replacement can be carried out, resources are greatly saved, the communicating grooves and the slopes are formed in the surface layer so that rainwater can flow into the communicating ports of the sewer pipeline more quickly and better, and the situation that the rainwater is gathered on the surface layer for a long time and consequently the surface layer is damaged is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of runway structures, and in particular to a runway structure composited with EPDM particles and glue. Background Art

[0002] The rubber track is also called the all-weather track for athletics. It is composed of polyurethane prepolymer, mixed polyether, waste tire rubber, EPDM (Ethylene Propylene Diene Monomer, ethylene propylene diene monomer) rubber particles, pigments, additives and fillers. The plastic track is an indispensable and important facility in modern track and field venues. Compared with the traditional soil track, it has good elasticity, anti-slip properties, wear resistance, shock absorption, easy site maintenance, bright colors, and beautiful and neat appearance. In competitive competitions, the plastic track is more conducive to the athletes' speed and technology, can effectively improve sports performance, and can also reduce the rate of falls and damage to athletes' knees. At present, the plastic track, which is widely used in various stadiums and campuses, still has certain problems. First, it is difficult to clean up the accumulated water on rainy days. The rainwater accumulated on the surface of the plastic track can easily cause users to slip, which in turn causes sports injuries. When the surface of the track is damaged, it cannot be repaired, and the track can only be replaced as a whole, which greatly wastes resources. Utility Model Content

[0003] In order to make it easier to replace the surface layer of the runway when it is damaged, the present application provides a composite runway structure of EPDM particles and glue, including a base layer, a waterproof layer is arranged above the base layer, a bottom layer is arranged above the waterproof layer, a clamping layer is arranged above the bottom layer, and a surface layer is arranged above the clamping layer; the surface layer is formed by gluing EPDM particles and glue together; the composite runway structure of EPDM particles and glue forms a height difference from the outside to the inside.

[0004] Preferably, the cross section of the base layer is stepped, and the height of the outer upper surface of the base layer is greater than the height of the inner upper surface.

[0005] Preferably, the waterproof layer is fixedly connected to the base layer, the cross-sections of the upper and lower surfaces of the waterproof layer are stepped, and the height of the outer upper surface of the waterproof layer is greater than the height of the inner upper surface.

[0006] Preferably, the bottom layer is fixedly connected to the waterproof layer, the cross-section of the lower surface of the bottom layer is stepped, and the height of the outer lower surface of the bottom layer is greater than the height of the inner lower surface.

[0007] Preferably, a plurality of grooves are formed through the upper surface of the bottom layer, and the cross-section of the grooves is U-shaped.

[0008] Preferably, the clamping layer is clamped and fixed to the bottom layer, and a plurality of protrusions are formed through the lower surface of the clamping layer.

[0009] Preferably, the upper surface of the clamping layer is square, a plurality of clamping layers are arranged above the bottom layer, and the height of the clamping layer on one side is higher than the height of the clamping layer on the other side.

[0010] Preferably, a plurality of surface layers in a uniform array are fixedly disposed on the upper surface of the clamping layer, the cross section of the surface layer is square, and a connecting groove is provided through the center of the side wall of the surface layer.

[0011] Preferably, the height of the outer surface layer is higher than that of the inner surface layer, and both sides of the upper end of the surface layer are sloped.

[0012] Preferably, a water slide block is provided on one side of the surface layer, the cross-section of the water slide block is triangular, the upper surface of the water slide block is arc-shaped, a connecting block is provided below the water slide block, a sewer pipe is provided on one side of the connecting block, a connecting port is opened on the sewer pipe, and a blocking net is provided in the connecting port.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] The surface layer formed by gluing EPDM particles and glue can provide an elastic runway surface and facilitate the rapid discharge of accumulated water; by forming a height difference from the outside to the inside of the runway structure, a gravitational potential energy difference for drainage can be provided; the stepped base layer and bottom layer are set to allow rainwater on the surface to flow better from the outside to the inner layer, and grooves and protrusions are used to increase the connection contact surface between the clamping layer and the bottom layer, making the connection between the connecting layer and the bottom layer more firmly. The square clamping layer is used during production to better arrange and place the surface layer, which is convenient for use in the later construction of the runway, saving a lot of time. When part of the surface layer is damaged, it can be replaced regionally, greatly saving resources. Connecting grooves and slopes are opened on the surface layer to allow rainwater to flow into the connecting port of the sewer pipe faster and better, avoiding long-term accumulation of rainwater on the surface layer and causing damage to the surface layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 An exploded view of a cross section provided for one embodiment of the present application;

[0016] Figure 2 An overall schematic diagram provided for an implementation method of the present application;

[0017] Figure 3 A schematic front view of a cutaway diagram provided in accordance with an embodiment of the present application;

[0018] Figure 4 A schematic side view of an embodiment of the present application is provided.

[0019] Illustration Description:

[0020] 1. Base layer; 2. Waterproof layer; 3. Bottom layer; 4. Clamping layer; 5. Surface layer; 6. Connecting block; 61. Water slide block; 7. Drain pipe; 8. Blocking net; 9. Connecting port; 10. Groove; 11. Protrusion. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0022] In this document, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, the meaning of "plurality" is two or more.

[0023] In addition, in this article, directional terms such as "upper" and "lower" are defined relative to the orientation of the structure schematically placed in the drawings. It should be understood that these directional terms are relative concepts. They are used for relative description and clarification, and they can change accordingly according to the change of the orientation of the structure.

[0024] See also Figures 1 to 4 In one embodiment of the present application, a composite runway structure of EPDM particles and glue is provided, including a base layer 1, a waterproof layer 2 is arranged above the base layer 1, a bottom layer 3 is arranged above the waterproof layer 2, a clamping layer 4 is arranged above the bottom layer 3, and a surface layer 5 is arranged above the clamping layer 4. The base layer 1 of the runway is usually paved with cement or asphalt. The main function of the base layer 1 is to bear the load of the surface layer 5 of the runway and transfer the load to the foundation soil. At the same time, it can also provide a flat, hard and durable foundation surface to facilitate the laying and use of the runway in the later stage.

[0025] In terms of overall structure, the EPDM particle and glue composite runway structure forms a height difference from the outside to the inside. Specifically, the height of the outside is higher than the height of the inside, so that the accumulated water on the runway can flow from the outside to the inside due to the potential energy brought by the height difference.

[0026] Specific, combined Figure 1 and 3As shown, the cross section of the base layer 1 is stepped, and the height of the outer upper surface of the base layer 1 is greater than the height of the inner upper surface. When the cross section of the base layer 1 is stepped and the height of the outer periphery is higher than the height of the inner periphery, in order to make the height of the surface layer 5 above the base layer 1 stepped, the rainwater on the runway can flow into the sewer pipe 7 on the inner side of the runway faster and better.

[0027] The waterproof layer 2 is fixedly connected to the base layer 1, and the cross-sections of the upper and lower surfaces of the waterproof layer 2 are stepped, and the height of the outer upper surface of the waterproof layer 2 is greater than the height of the inner upper surface. The upper and lower surfaces of the waterproof layer 2 are parallel and stepped. The function of the waterproof layer 2 is to prevent rainwater, groundwater and other water sources from entering the lower layer of the runway, and to avoid moisture from damaging the lower structure and runway materials, while also ensuring the service life and safety of the runway. The waterproof layer 2 is in contact with the upper surface of the base layer 1, and the outer height of the waterproof layer 2 is also higher than the outer height, so that the upper paving layer can better allow rainwater to flow.

[0028] The bottom layer 3 is fixedly connected to the waterproof layer 2, and the cross section of the lower surface of the bottom layer 3 is stepped, and the height of the lower surface of the outer side of the bottom layer 3 is greater than the height of the lower surface of the inner side. The lower surface of the bottom layer 3 is in contact with the waterproof layer 2, in a stepped shape, and the height of the outer side is greater than the height of the inner side. The function of the runway bottom layer 3 is to support the surface layer 5 of the runway and bear the load of the athletes. It is also the connecting part between the runway and the ground, playing a role in buffering and dispersing the load. The material selection and construction quality of the bottom layer 3 directly affect the service life and performance of the plastic runway. Generally speaking, the runway bottom layer 3 should have good compressive resistance, tensile strength, bending strength, wear resistance and stability, and also have certain elasticity and shock absorption performance to ensure the safety and comfort of athletes in the game.

[0029] The upper surface of the bottom layer 3 is provided with a plurality of grooves 10, and the cross section of the grooves 10 is U-shaped. The grooves 10 provided on the upper surface of the bottom layer 3 are used for clamping and fixing with the clamping layer 4, and the U-shaped grooves 10 increase the contact surface between the bottom layer 3 and the clamping layer 4.

[0030] The clamping layer 4 is clamped and fixed with the bottom layer 3, and a plurality of protrusions 11 are provided through the lower surface of the clamping layer 4. The clamping layer 4 is connected with the bottom layer 3 by bonding and fixing, and the groove 10 is clamped and matched with the protrusion 11.

[0031] The upper surface of the clamping layer 4 is square, and a plurality of clamping layers 4 are arranged above the bottom layer 3, and the height of the clamping layer 4 on one side is higher than that of the clamping layer 4 on the other side. The clamping layer 4 is square so that it can be laid and cut better, and the surface layer 5 fixedly arranged above the clamping layer 4 is formed by gluing EPDM particles of a specific shape with glue.

[0032] Several uniformly arrayed surface layers 5 are fixedly arranged on the upper surface of the clamping layer 4. The cross section of the surface layer 5 is square, and a connecting groove is opened through the center of the side wall of the surface layer 5. The cross section of the surface layer 5 is square, so that the surface layer 5 can be better arranged and fixed on the surface of the clamping layer 4. The connecting groove in the center of the surface layer 5 can better allow rainwater to flow through. The role of EPDM particles and glue in the runway is to fill and bond the surface layer of the plastic runway to form a uniform and elastic surface layer. EPDM particles are a kind of high-quality rubber particles with good aging resistance, wear resistance, elasticity and UV resistance, which can improve the service life and performance of the plastic runway. Glue can not only bond the EPDM particles into shape, but also make the EPDM particles evenly distributed in the surface layer of the plastic runway, and ensure that it is firmly attached to the bottom layer 3, thereby forming a uniform, strong and durable plastic runway surface layer 5.

[0033] The height of the outer surface layer 5 is higher than that of the inner surface layer 5, and the upper ends of the surface layer 5 are sloped on both sides. The surface layer 5 is attached to the clamping layer 4, and the height of the surface layer 5 on the outer side of the runway is higher than that on the inner side, and the slopes on both sides of the surface layer 5 also allow rainwater to flow through better.

[0034] A water slide block 61 is arranged on one side of the surface layer 5. The cross section of the water slide block 61 is triangular, and the upper surface of the water slide block 61 is arc-shaped. A connecting block 6 is arranged below the water slide block 61. A sewer pipe 7 is arranged on one side of the connecting block 6. A connecting port 9 is opened on the sewer pipe 7, and a blocking net 8 is arranged in the connecting port 9. The water slide block 61 arranged on the side wall of the surface layer 5 on the inner side of the runway can prevent rainwater in the connecting groove and between the slopes from flowing into the connecting port 9 of the sewer pipe 7 along the arc of the water slide block 61, and discharge the rainwater. The blocking net 8 is used to intercept large impurities to prevent the sewer pipe 7 from being blocked.

[0035] First, the base layer 1 is laid on the soil, and then the waterproof layer 2 is brushed on the upper surface of the base layer 1, and then the bottom layer 3 is laid on the waterproof layer 2, and then the protrusion 11 on the lower surface of the clamping layer 4 is glued into the groove 10 of the bottom layer 3, and the clamping layer 4 is fixed. The clamping layer 4 can be cut and spliced ​​at the turning place. The surface layer 5 is evenly arranged and fixed on the clamping layer 4 during production, which is more convenient for use when building a runway. When rainwater is on the surface layer 5, it flows into the connecting groove and the slope and into the connecting port 9 of the sewer pipe 7, which can better prevent slipping.

[0036] The runway structure provided by the implementation method of the present application is introduced in detail above, and the principles and implementation methods of the present application are explained by using specific examples. The above description is only used to help understand the method and core mechanism of the present application; at the same time, for those skilled in the art, according to the ideas of the present application, there will be changes in the specific examples and application scopes. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A composite track structure of EPDM particles and glue, comprising a base layer (1), characterized in that: A waterproof layer (2) is arranged above the base layer (1), a bottom layer (3) is arranged above the waterproof layer (2), a clamping layer (4) is arranged above the bottom layer (3), a surface layer (5) is arranged above the clamping layer (4), and the surface layer (5) is formed by mixing EPDM particles and glue and gluing them together; the EPDM particles and glue composite runway structure forms a height difference from the outside to the inside; The cross section of the base layer (1) is in a stepped shape, and the height of the outer upper surface of the base layer (1) is greater than the height of the inner upper surface; The waterproof layer (2) is fixedly connected to the base layer (1), the cross-sections of the upper and lower surfaces of the waterproof layer (2) are stepped, and the height of the outer upper surface of the waterproof layer (2) is greater than the height of the inner upper surface; The bottom layer (3) is fixedly connected to the waterproof layer (2), the cross section of the lower surface of the bottom layer (3) is stepped, and the height of the outer lower surface of the bottom layer (3) is greater than the height of the inner lower surface; The height of the outer surface layer (5) is higher than that of the inner surface layer (5), and both sides of the upper end of the surface layer (5) are sloped; A water slide block (61) is arranged on one side of the surface layer (5); the cross section of the water slide block (61) is triangular; the upper surface of the water slide block (61) is arc-shaped; a connecting block (6) is arranged below the water slide block (61); a water sewer pipe (7) is arranged on one side of the connecting block (6); a connecting port (9) is provided on the water sewer pipe (7); a blocking net (8) is arranged in the connecting port (9).

2. The EPDM particle and glue composite runway structure according to claim 1, characterized in that: A plurality of grooves (10) are formed through the upper surface of the bottom layer (3), and the cross section of the grooves (10) is U-shaped.

3. The EPDM particle and glue composite runway structure according to claim 1, characterized in that: The clamping layer (4) is clamped and fixed to the bottom layer (3), and a plurality of protrusions (11) are provided through the lower surface of the clamping layer (4).

4. The EPDM particle and glue composite runway structure according to claim 1, characterized in that: The upper surface of the clamping layer (4) is square, and a plurality of clamping layers (4) are arranged above the bottom layer (3), with the height of the clamping layer (4) on one side being higher than the height of the clamping layer (4) on the other side.

5. The EPDM particle and glue composite runway structure according to claim 1, characterized in that: A plurality of surface layers (5) in a uniform array are fixedly arranged on the upper surface of the clamping layer (4); the cross section of the surface layer (5) is square; and a connecting groove is provided through the center of the side wall of the surface layer (5).