Positioning device for pre-buried channel of hanging fence at top of high-speed railway bridge pier
By designing a high-speed railway bridge pier ceiling fence embedded channel positioning device with positioning and fixing components, the problem of damage to the embedded channel during construction and dismantling is solved, and accurate positioning, safe construction and convenient operation is achieved. Effect.
Patent Information
- Application Number
- CN202420554377.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of high-speed railway bridge pier body, the embedded channel of the pier ceiling fence is easily deviated during concrete pouring and vibration, resulting in inaccurate installation and easy to damage the concrete surface during demolition, posing safety hazards, and existing fixed The method is labor-consuming and time-consuming.
A high-speed railway bridge pier ceiling fence embedded channel positioning device is designed, including fixed components and positioning components, and the positioning screw and the fixed screw are fixed by welding and steel plate to ensure that the embedded channel is not biased during concrete pouring and vibration. and can be recycled, without damaging formwork and concrete when removed.
It realizes accurate positioning of the embedded channel, safe and reliable construction, and convenient operation, avoids damage to concrete and formwork, and improves construction efficiency and safety.
Smart Images

Figure CN222100629U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of high-speed railway bridge pier construction, in particular to a high-speed railway bridge pier top hanging fence embedded groove positioning device. Background Art
[0002] During the construction of the pier of a high-speed railway bridge, the embedded grooves of the pier top hanging fences are prone to displacement during concrete pouring and vibration because there is no special device to fix them. In the past, the method of embedding the grooves of the pier top hanging fences was to press the grooves of the embedded grooves against the template and then spot weld them to the template, and the groove anchors at the rear end were effectively welded and fixed to the structural steel bars; however, if the spot welding of the grooves of the embedded grooves and the template is too strong, the removal of the template will easily damage the concrete surface and cause great damage to the template surface; if the spot welding is too light, during the concrete pouring process, the impact and vibration of the concrete will easily cause the displacement of the embedded grooves and cause displacement. After the template is removed in the later stage, the embedded grooves cannot be installed with hanging fences due to displacement, and can only be treated with rebar planting, which is labor-intensive and time-consuming, and there are great safety hazards after installing the hanging fences.
[0003] Therefore, during the construction of high-speed railway bridge piers, what kind of fixing device should be used to fix the embedded groove of the pier top hanging fence to achieve accurate positioning, no deviation, fast, efficient, reliable and recyclable use is a difficult problem that needs to be solved urgently. Utility Model Content
[0004] The purpose of the utility model is to provide a high-speed railway bridge pier top hanging fence embedded groove positioning device, the device has a simple structure, is easy to process, can be made of local materials, is easy to install and disassemble, has accurate positioning, will not deviate due to concrete pouring and vibration impact during the construction process, is safe and reliable, can be recycled, will not damage the formwork and concrete surface when dismantled, is easy to operate, and has considerable overall work efficiency.
[0005] To achieve the above-mentioned purpose, the utility model provides a pre-embedded groove positioning device for a suspended fence on the top of a high-speed railway bridge pier, comprising a fixing component and a positioning component, the positioning component comprising a first steel plate, a first through hole being opened in the middle of the first steel plate, a positioning screw being arranged in the first through hole, a second steel plate being welded below the first steel plate, a second through hole being opened in the middle of the second steel plate, a third steel plate being arranged below the second steel plate, the fixing component comprising a fixing screw, and the fixing screw being welded to the pier body formwork.
[0006] Preferably, the number of the third steel plates is two, the third steel plates are provided with slots, the fixing screw passes through the slots, and the fixing screw is connected to the third steel plates via a first nut.
[0007] Preferably, the third steel plate is placed below both sides of the second steel plate, and the third steel plate and the second steel plate are overlap-welded.
[0008] Preferably, the positioning screw is a T-bolt, and a second nut is sleeved on the positioning screw.
[0009] Preferably, the first steel plate is an elliptical steel plate of 50mm*80mm with the same thickness as the pier body formwork, and the first through hole is a circular hole of φ18.
[0010] Preferably, the second steel plate is a rectangular steel plate of 90mm*60mm*10mm, and the second through hole is a rectangular hole of 40mm*20mm in the middle and a semicircle of φ20 on both sides.
[0011] Preferably, the third steel plate is a 50mm*50mm*8mm steel plate, and the notch is a U-shaped notch of 20mm*30mm.
[0012] Preferably, the pier body formwork thickness is 6 mm.
[0013] Therefore, the utility model adopts the above-mentioned high-speed railway bridge pier top suspended fence embedded groove positioning device, the device has a simple structure, is easy to process, can be made from local materials, is easy to install and disassemble, and has accurate positioning. The construction process will not be deviated due to concrete pouring and vibration impact. It is safe and reliable, can be recycled, and will not damage the formwork and concrete surface during dismantling. It is easy to operate and has considerable overall work efficiency.
[0014] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the installation structure of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0016] Figure 2 It is a side sectional view of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0017] Figure 3 It is a top sectional view of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0018] Figure 4 It is a structural schematic diagram of the fixing components of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0019] Figure 5 It is a schematic diagram of the installation structure of the first steel plate, the second steel plate and the third steel plate of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0020] Figure 6This is a schematic diagram of the first steel plate structure of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0021] Figure 7 This is a schematic diagram of the second steel plate structure of an embodiment of a high-speed railway bridge pier top hanging fence embedded channel positioning device of the utility model;
[0022] Figure 8 It is a schematic diagram of the third steel plate structure of an embodiment of a high-speed railway bridge pier top suspended fence embedded channel positioning device of the utility model.
[0023] Reference numerals
[0024] 1. First steel plate; 2. Second steel plate; 3. Third steel plate; 4. First nut; 5. Second nut; 6. Mounting hole; 7. Positioning screw; 8. Fixing screw; 9. Channel anchor rod; 10. Pier body formwork; 11. Embedded channel. DETAILED DESCRIPTION
[0025] The technical solution of the utility model is further described below through the accompanying drawings and embodiments.
[0026] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0027] Embodiment 1
[0028] like Figures 1 to 8 As shown, the utility model provides a pre-embedded groove positioning device for a high-speed railway bridge pier top suspended fence, including a fixing component and a positioning component. The positioning component is used to determine the installation position of the bridge pier top suspended fence, and the fixing component is used to fix the positioning component to facilitate the installation of the bridge pier top suspended fence.
[0029] The positioning assembly includes a first steel plate 1, which is an oval steel plate of 50mm*80mm with the same thickness as the pier body formwork 10, and is used to provide support for the positioning screw 7. A first through hole is opened in the middle of the first steel plate 1, and the first through hole is a circular hole of φ18, and the first through hole is used to determine the installation position of the positioning screw 7. The positioning screw 7 is arranged in the first through hole, and the positioning screw 7 is a T-bolt. The positioning screw 7 is sleeved with a second nut 5, and the positioning screw 7 is used to accurately position the embedded channel 11, and the second nut 5 is used to fix the embedded channel 11 on the pier body formwork 10.
[0030] A second steel plate 2 is welded below the first steel plate 1. The second steel plate 2 is a rectangular steel plate of 90mm*60mm*10mm. The second steel plate 2 is used to provide support for the first steel plate 1. A second through hole is opened in the middle of the second steel plate 2. The second through hole is a semicircle with two sides of φ20 and a rectangular hole with a size of 40mm*20mm in the middle. The second through hole is provided to facilitate the installation and tightening of the second nut 5 with a socket wrench.
[0031] A third steel plate 3 is provided below the second steel plate 2. There are two third steel plates 3. The third steel plates 3 are 50mm*50mm*8mm steel plates. The third steel plates 3 are used to provide support for the second steel plate 2. The third steel plates 3 are placed below both sides of the second steel plate 2, and the third steel plates 3 and the second steel plates 2 are overlap-welded. The third steel plate 3 is provided with a notch, through which the fixing screw 8 passes. The notch is a 20mm*30mm U-shaped notch, and the notch is used to provide space for the installation of the fixing screw 8.
[0032] The fixing assembly includes a fixing screw 8, which is welded to the pier body formwork 10, and is connected to the third steel plate 3 through a first nut 4. The fixing screw 8 is used to fix the positioning assembly, and the spacing between the two fixing screws 8 is 130 mm. The pier body formwork 10 is 6 mm thick, and a mounting hole 6 of the same size as the first steel plate 1 is opened in the middle. The upper part of the pier body formwork 10 is an embedded groove 11, and a groove anchor 9 is provided above the embedded groove 11.
[0033] When using the positioning device for the embedded groove 11 of the suspended fence on the top of a high-speed railway bridge pier provided by the utility model, the first steel plate 1 is installed in the mounting hole 6 of the pier body template 10, and the notches of the third steel plates 3 on both sides are clamped on the fixing screws 8 on both sides of the mounting hole 6 and tightened with the second nuts 5. Then, the positioning screw 7 is installed on the embedded groove 11, and the positioning screw 7 passes through the first through hole of the first steel plate 1. The first nut 4 of the positioning screw 7 is tightened with a socket wrench in the second through hole of the second steel plate 2 to fix the embedded groove 11 on the pier body template 10, and the embedded groove 11 is accurately positioned. After the pier body concrete is poured and vibrated to reach the strength, the positioning screw 7 is taken out, and the pier body template 10 is removed to complete the accurate embedding of the embedded groove 11 of the suspended fence on the top of the bridge pier.
[0034] Therefore, the utility model adopts the above-mentioned high-speed railway bridge pier top suspended fence embedded groove positioning device, the device has a simple structure, is easy to process, can be made from local materials, is easy to install and disassemble, and has accurate positioning. The construction process will not be deviated due to concrete pouring and vibration impact. It is safe and reliable, can be recycled, and will not damage the formwork and concrete surface during dismantling. It is easy to operate and has considerable overall work efficiency.
[0035] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that they can still modify or replace the technical solution of the utility model with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the utility model.
Claims
1. A high-speed railway bridge pier top hanging fence embedded channel positioning device, characterized in that: It includes a fixing component and a positioning component, the positioning component includes a first steel plate, a first through hole is opened in the middle of the first steel plate, a positioning screw is arranged in the first through hole, a second steel plate is welded below the first steel plate, a second through hole is opened in the middle of the second steel plate, a third steel plate is arranged below the second steel plate, and the fixing component includes a fixing screw, which is welded to the pier body formwork.
2. A high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The number of the third steel plates is two, and the third steel plates are provided with slots, through which the fixing screw passes, and the fixing screw is connected to the third steel plates via a first nut.
3. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The third steel plate is placed below both sides of the second steel plate, and the third steel plate and the second steel plate are overlap-welded.
4. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The positioning screw is a T-bolt, and a second nut is sleeved on the positioning screw.
5. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The first steel plate is an elliptical steel plate of 50mm*80mm with the same thickness as the pier body formwork, and the first through hole is a circular hole of φ18.
6. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The second steel plate is a rectangular steel plate of 90mm*60mm*10mm, and the second through hole is a rectangular hole of 40mm*20mm in the middle and a semicircle of φ20 on both sides.
7. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 2, characterized in that: The third steel plate is a 50mm*50mm*8mm steel plate, and the notch is a U-shaped notch of 20mm*30mm.
8. The high-speed railway bridge pier top hanging fence embedded channel positioning device according to claim 1, characterized in that: The thickness of the pier body formwork is 6 mm.