Fabricated concrete energy storage power station
Through the construction of prefabricated concrete splicing and the use of specific connectors, the problem of insufficient speed of traditional website construction is solved, the rapid construction of energy storage power stations is achieved, and the emergency situation of urban and industrial electricity needs is met.
Patent Information
- Application Number
- CN202420438546.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-06
AI Technical Summary
The traditional website construction speed and website construction model are difficult to meet the urgent needs of rapid growth in urban central areas, industrial park electricity demand and capacity transformation of old substations, especially in the context of scarce land resources and surge in electricity consumption. There is a need for a prefabricated concrete energy storage power station that can increase the speed of site construction.
The precast concrete base plate, wall plate and roof plate are spliced and built through specific connectors, and the construction process is accelerated by components such as holed hanging nails, oblique support sleeves and double-bar sleeves, and the structural connection strength is enhanced through the L-shaped connecting plate.
It has achieved rapid construction of energy storage power stations, improved construction speed, met urgent needs, and has significant speed advantages compared to traditional structures.
Smart Images

Figure CN222101635U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of energy storage power stations, in particular to an assembled concrete energy storage power station. Background Art
[0002] With the development of our society, the scale of power grid has further expanded, land resources are scarce, electricity consumption has surged, and users have an urgent need to improve power supply reliability and shorten construction period. For example, the rapid growth of load in the central area of the city has an urgent need for substation construction, the newly introduced industrial power users in the industrial park urgently need 110kV power supply point support, the capacity expansion and transformation of old substations to deal with insufficient distribution line circuits, and the temporary improvement of power supply reliability due to the needs of cultural activity areas. The traditional station construction speed and station construction mode are difficult to meet the requirements. Therefore, it is necessary to design a prefabricated concrete energy storage power station that can improve the station construction speed. Utility Model Content
[0003] In view of the above problems in the prior art, the present application proposes an assembled concrete energy storage power station, which can increase the construction speed of the energy storage power station.
[0004] The utility model provides an assembled concrete energy storage power station, which comprises a plurality of precast concrete bottom plates, a plurality of precast concrete wall plates and a plurality of precast concrete top plates. The plurality of precast concrete bottom plates are horizontally spliced in sequence to form a power station bottom plate, the plurality of precast concrete wall plates are vertically spliced in sequence through a first connecting member to form a power station wall plate which is arranged around the outer edge of the power station bottom plate, and the power station wall plate is connected to the power station bottom plate through the first connecting member, the plurality of precast concrete top plates are horizontally spliced in sequence to form a power station top plate which is arranged on the upper side of the power station wall plate, and the power station wall plate is connected to the power station top plate through a second connecting member.
[0005] As a further improvement of the above technical solution:
[0006] The above-mentioned prefabricated concrete energy storage power station, further, the upper surface of the precast concrete bottom plate, the upper side of the precast concrete wall panel and the upper surface of the precast concrete top plate are all provided with hanging nails with holes, and the hanging nails with holes are used to hang the precast concrete bottom plate, the precast concrete wall panel and the precast concrete top plate.
[0007] The above-mentioned assembled concrete energy storage power station, further, the inner side wall of the precast concrete wall panel is provided with an oblique support sleeve, and the oblique support sleeve can be connected with the oblique support thread to assist in supporting the precast concrete wall panel when installing the precast concrete wall panel.
[0008] The above-mentioned prefabricated concrete energy storage power station, further, the first connecting part includes a double-rod sleeve and an embedded part, the double-rod sleeve and the embedded part are respectively preset on the two adjacent precast concrete wall panels, or the precast concrete wall panels and the precast concrete bottom plate, when the two adjacent precast concrete wall panels are spliced, or the precast concrete wall panels and the precast concrete bottom plate are spliced, the connecting steel bars in the embedded part can extend out and be connected with the double-rod sleeve threadedly.
[0009] The above-mentioned prefabricated concrete energy storage power station, further, the second connecting member includes an L-shaped connecting plate and two single-rod sleeves, the two single-rod sleeves are respectively preset on the precast concrete wall panel and the precast concrete top plate, and the two ends of the L-shaped connecting plate are respectively fixed to the two single-rod sleeves by bolts.
[0010] The above technical features can be combined in various suitable ways or replaced by equivalent technical features as long as the purpose of the utility model can be achieved.
[0011] The utility model provides an assembled concrete energy storage power station, which has at least the following beneficial effects compared with the prior art: when it is necessary to build an energy storage power station, firstly, multiple precast concrete bottom plates are horizontally spliced in sequence to form a power station bottom plate, then multiple precast concrete wall plates are vertically spliced in sequence through a first connecting member to form a power station wall plate, which is arranged around the outer edge of the power station bottom plate, and the power station wall plate is connected to the power station bottom plate through the first connecting member, and finally, multiple precast concrete top plates are horizontally spliced in sequence to form a power station top plate, which is covered on the upper side of the power station wall plate, and the power station wall plate is connected to the power station top plate through a second connecting member, thereby completing the construction of the energy storage power station. Since the bottom plate, wall plate and top plate of the assembled concrete energy storage power station all use precast concrete structures, when building, it is only necessary to assemble and build the precast concrete bottom plate, precast concrete wall plate and precast concrete top plate to complete the construction of the energy storage power station. Therefore, compared with the existing energy storage power station structure, the assembled concrete energy storage power station can increase the construction speed of the energy storage power station.
[0012] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0014] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings.
[0015] Figure 1 A schematic diagram showing the structure of a prefabricated concrete bottom plate of an assembled concrete energy storage power station provided by an embodiment of the utility model is shown;
[0016] Figure 2 A schematic diagram showing the structure of a prefabricated concrete wall panel of an assembled concrete energy storage power station provided by an embodiment of the utility model is shown;
[0017] Figure 3 A schematic structural diagram of a precast concrete top plate of an assembled concrete energy storage power station provided in an embodiment of the utility model is shown.
[0018] In the drawings, like reference numerals are used for like parts. The drawings are not necessarily to scale.
[0019] Description of reference numerals:
[0020] 110 - precast concrete bottom plate, 120 - precast concrete wall plate, 121 - inclined support sleeve, 130 - precast concrete top plate, 140 - first connecting piece, 141 - double rod sleeve, 142 - embedded part, 150 - second connecting piece, 160 - hanging nail with hole. DETAILED DESCRIPTION
[0021] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0022] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0024] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0026] The utility model will be further described below in conjunction with the accompanying drawings.
[0027] The embodiment of the utility model provides an assembled concrete energy storage power station, which can increase the construction speed of the energy storage power station.
[0028] See also Figure 1 , Figure 2 as well as Figure 3 The utility model embodiment provides an assembled concrete energy storage power station, which comprises a plurality of precast concrete bottom plates 110, a plurality of precast concrete wall plates 120 and a plurality of precast concrete top plates 130. The plurality of precast concrete bottom plates 110 are horizontally spliced in sequence to form a power station bottom plate. The plurality of precast concrete wall plates 120 are vertically spliced in sequence to form a power station wall plate through a first connecting member 140 and are arranged around the outer edge of the power station bottom plate. The power station wall plate is connected to the power station bottom plate through the first connecting member 140. The plurality of precast concrete top plates 130 are horizontally spliced in sequence to form a power station top plate and are arranged on the upper side of the power station wall plate. The power station wall plate is connected to the power station top plate through a second connecting member 150.
[0029] When it is necessary to build an energy storage power station, first, multiple precast concrete bottom plates 110 are horizontally spliced in sequence to form a power station bottom plate, and then multiple precast concrete wall panels 120 are vertically spliced in sequence to form power station wall panels through the first connecting member 140 and arranged around the outer edge of the power station bottom plate, and the power station wall panels are connected to the power station bottom plate through the first connecting member 140, and finally, multiple precast concrete top plates 130 are horizontally spliced in sequence to form a power station top plate and covered on the upper side of the power station wall panels, and the power station wall panels are connected to the power station top plate through the second connecting member 150, thereby completing the construction of the energy storage power station.
[0030] Since the bottom plate, wall plate and top plate of the assembled concrete energy storage power station provided by the embodiment of the utility model all use precast concrete structures, during construction, it is only necessary to assemble the precast concrete bottom plate 110, the precast concrete wall plate 120 and the precast concrete top plate 130 to complete the construction of the energy storage power station. Therefore, compared with the existing energy storage power station structure, the assembled concrete energy storage power station provided by the embodiment of the utility model can increase the construction speed of the energy storage power station.
[0031] The assembled concrete energy storage power station provided in the embodiment of the utility model, further, please refer to Figure 1 , Figure 2 as well as Figure 3 The upper surface of the precast concrete bottom plate 110, the upper side of the precast concrete wall plate 120 and the upper surface of the precast concrete top plate 130 are all provided with hanging nails 160 with holes, and the hanging nails 160 with holes are used to hang the precast concrete bottom plate 110, the precast concrete wall plate 120 and the precast concrete top plate 130. When constructing the energy storage power station, the hanging rope of the hoisting equipment is passed through the hanging nails 160 with holes to hang the precast concrete bottom plate 110, the precast concrete wall plate 120 and the precast concrete top plate 130, and the arrangement of the hanging nails 160 with holes facilitates the hoisting of the precast concrete bottom plate 110, the precast concrete wall plate 120 and the precast concrete top plate 130.
[0032] The assembled concrete energy storage power station provided in the embodiment of the utility model, further, please refer to Figure 2 The inner wall of the precast concrete wall panel 120 is provided with an inclined support sleeve 121, which can be connected with the inclined support thread to assist in supporting the precast concrete wall panel 120 when the precast concrete wall panel 120 is installed. When building an energy storage power station, multiple precast concrete base plates 110 are horizontally spliced in sequence to form a power station base plate. When building the precast concrete wall panel 120, the precast concrete wall panel 120 is first hoisted to a preset position on the precast concrete base plate 110, and then the inclined support sleeve 121 is connected with the inclined support thread to assist in supporting the precast concrete wall panel 120. Then, the first connecting member 140 is used to connect the precast concrete wall panel 120 to the precast concrete base plate 110, and finally, the inclined support is removed to complete the construction of the precast concrete wall panel 120.
[0033] The assembled concrete energy storage power station provided by the utility model embodiment is specifically Figure 1 , Figure 2 as well as Figure 3 The first connecting member 140 includes a double-rod sleeve 141 and an embedded member 142. The double-rod sleeve 141 and the embedded member 142 are respectively preset on two adjacent precast concrete wall panels 120, or on a precast concrete wall panel 120 and a precast concrete bottom plate 110. When two adjacent precast concrete wall panels 120 are spliced, or the precast concrete wall panel 120 and the precast concrete bottom plate 110 are spliced, the connecting steel bars in the embedded member 142 can extend out and be connected to the double-rod sleeve 141 by threaded cooperation. When two adjacent precast concrete wall panels 120 are installed, the connecting steel bars in the embedded parts 142 are driven from the inner side of the precast concrete wall panels 120 to extend out and be threadedly connected to the double-rod sleeve 141 to strengthen the connection strength between the two adjacent precast concrete wall panels 120; when the precast concrete wall panels 120 are installed, the connecting steel bars in the embedded parts 142 are driven from the inner side of the precast concrete wall panels 120 to extend out and be threadedly connected to the double-rod sleeve 141 to strengthen the connection strength between the precast concrete wall panels 120 and the precast concrete base plate 110.
[0034] The assembled concrete energy storage power station provided by the embodiment of the utility model, specifically, the second connecting member 150 includes an L-shaped connecting plate and two single-rod sleeves, the two single-rod sleeves are respectively preset on the precast concrete wall panel 120 and the precast concrete top panel 130, and the two ends of the L-shaped connecting plate are respectively fixed to the two single-rod sleeves by bolts. When the precast concrete top panel 130 is built, the two ends of the L-shaped connecting plate are respectively fixed to the two single-rod sleeves on the precast concrete wall panel 120 and the precast concrete top panel 130 by bolts.
[0035] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0036] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments, and other arrangements may be designed without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the features described in the various dependent claims and herein may be combined in a manner different from that described in the original claims. It may also be understood that the features described in conjunction with the individual embodiments may be used in other described embodiments.
Claims
1. An assembled concrete energy storage power station, characterized in that: The assembled concrete energy storage power station includes a plurality of precast concrete bottom plates, a plurality of precast concrete wall plates and a plurality of precast concrete top plates. The plurality of precast concrete bottom plates are horizontally spliced in sequence to form a power station bottom plate. The plurality of precast concrete wall plates are vertically spliced in sequence through a first connecting member to form a power station wall plate, which is arranged around the outer edge of the power station bottom plate. The power station wall plate is connected to the power station bottom plate through a first connecting member. The plurality of precast concrete top plates are horizontally spliced in sequence to form a power station top plate, which is arranged on the upper side of the power station wall plate. The power station wall plate is connected to the power station top plate through a second connecting member.
2. The assembled concrete energy storage power station according to claim 1, characterized in that: The upper surface of the precast concrete bottom plate, the upper side of the precast concrete wall plate and the upper surface of the precast concrete top plate are all provided with hanging nails with holes, and the hanging nails with holes are used to hang the precast concrete bottom plate, the precast concrete wall plate and the precast concrete top plate.
3. The assembled concrete energy storage power station according to claim 1, characterized in that: The inner side wall of the precast concrete wall panel is provided with an oblique support sleeve, and the oblique support sleeve can be connected with the oblique support thread to assist in supporting the precast concrete wall panel when the precast concrete wall panel is installed.
4. The assembled concrete energy storage power station according to claim 1, characterized in that: The first connecting member includes a double-rod sleeve and an embedded member, and the double-rod sleeve and the embedded member are respectively preset on two adjacent precast concrete wall panels, or the precast concrete wall panel and the precast concrete bottom plate. When the two adjacent precast concrete wall panels are spliced, or the precast concrete wall panel and the precast concrete bottom plate are spliced, the connecting steel bars in the embedded member can extend out and be connected with the double-rod sleeve threadedly.
5. The assembled concrete energy storage power station according to claim 1, characterized in that: The second connecting member includes an L-shaped connecting plate and two single-rod sleeves. The two single-rod sleeves are respectively preset on the precast concrete wall panel and the precast concrete top panel. The two ends of the L-shaped connecting plate are respectively fixed to the two single-rod sleeves by bolts.