Large-volume brick-concrete water tank for high-altitude water supply
By designing large-volume brick-concrete water tanks at high altitude construction sites, using technologies such as waterproof concrete foundations, ring beams and waterproof coil layers, the problems of insufficient water source and stability of the pool structure are solved, and continuous water use and efficient storage at the construction site are achieved. water.
Patent Information
- Application Number
- CN202420733966.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-10
AI Technical Summary
At the construction site in high-altitude areas of southern Africa, due to the steep terrain and long water source distance, the existing technology is difficult to meet the construction water needs, and the pool structure is insufficient and the waterproof performance is insufficient, resulting in great difficulties in construction.
A large-volume brick-concrete pool for high-altitude water supply was designed, using a waterproof concrete foundation and ring beam structure, combining brick walls and concrete columns, with waterproof coil layers and epoxy waterproof mortar layers inside and outside, and through a steel cage And wire tying improves structural stability and waterproofing.
Continuous water use at the construction site is realized, ensuring the stable structure of the pool and excellent waterproof performance, and meeting the water storage needs in high-altitude areas.
Smart Images

Figure CN222101642U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction water storage tanks, in particular to a large-volume brick-concrete water tank used for high-altitude water supply. Background Art
[0002] The water used at the construction site is mainly divided into three parts: construction water, domestic water, and fire-fighting water. Conventional construction water mainly includes surface water, groundwater, and tap water, which can be used as industrial and corporate water. Due to the different locations of the construction sites, some are built by the lake; some are built by the river; some are built by the spring; and some are built by the sea, and the water sources used are also different.
[0003] In southern Africa, the land is vast and sparsely populated. After on-site investigation, the construction area is steep and limited in area, which brings great difficulties to the construction, especially the access to water and electricity. The terrain of each working surface is undulating, with a slope of about 15%, and the height difference is too large. The construction site is about 600m away from the nearest water point, with a height difference of about 160m; the water source is difficult to meet the construction needs, so it is necessary to build a pool on the construction site to meet the water demand for construction. Utility Model Content
[0004] The purpose of the utility model is to solve the above-mentioned problem and provide a large-volume brick-concrete water pool for high-altitude water supply, which can ensure continuous water use at the construction site, and has a stable overall structure of the water pool body, excellent waterproof performance, and meets the water storage needs.
[0005] To achieve the above-mentioned purpose, the technical solution of the utility model is: a large-volume brick-concrete water pool for high-altitude water supply, including a water pool body, the water pool body including a waterproof concrete foundation at the bottom and a ring beam at the top, a brick wall and concrete columns are arranged between the waterproof concrete foundation and the ring beam, the concrete columns are arranged on the side and corners of the water pool body, and a water inlet pipe and a drain pipe are arranged on one side of the water pool body.
[0006] Preferably, the concrete column comprises an internal steel cage, the bottom of the steel cage is fixed on a waterproof concrete foundation, and the top of the steel cage extends into the ring beam.
[0007] Preferably, the concrete column also includes a pad at the bottom, the pad is arranged on a waterproof concrete foundation, a wire extending upward is provided in the pad, and the pad is bound to the steel cage by the wire.
[0008] Preferably, an inner formwork and an outer formwork are provided around the top of the brick wall, the inner formwork and the outer formwork are both supported by support rods, the ring beam is cast between the inner formwork and the outer formwork by concrete, and the ring beam is integrated with the brick wall through a steel cage.
[0009] Preferably, the inner wall of the pool body is provided with a waterproof roll material layer, an asphalt layer and an epoxy waterproof mortar layer, the asphalt layer is provided between the waterproof roll material layer and the epoxy waterproof mortar layer, and the epoxy waterproof mortar layer is provided on the outermost layer.
[0010] Preferably, the outer wall of the brick wall is provided with a waterproof roll material layer and an epoxy waterproof mortar layer, and the epoxy waterproof mortar layer is arranged on the outermost layer.
[0011] The utility model discloses a large-volume brick-concrete water pool for high-altitude water supply, comprising a water pool body, wherein the water pool body comprises a waterproof concrete foundation at the bottom and a ring beam at the top, brick walls and concrete columns are arranged between the waterproof concrete foundation and the ring beam, the concrete columns are arranged on the sides and corners of the water pool body, one side of the water pool body is provided with a water inlet pipe and a drain pipe, the concrete column comprises an internal steel cage, the bottom of the steel cage is fixed on the waterproof concrete foundation, and the top of the steel cage extends into the ring beam; compared with the prior art, the large-volume brick-concrete water pool for high-altitude water supply has the beneficial effects of being able to ensure continuous water use on a construction site when in use, and the overall structure of the water pool body is stable, the waterproof performance is excellent, and the water storage demand is met. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 The utility model is a schematic diagram of the overall structure of a large-volume brick-concrete water tank for high-altitude water supply.
[0013] Figure 2 The utility model is a schematic diagram of the internal structure of a large-volume brick-concrete water tank for high-altitude water supply.
[0014] Figure 3 The utility model is a schematic diagram of a ring beam casting support structure in a large-volume brick-concrete water pool for high-altitude water supply.
[0015] Figure 4 It is a structural schematic diagram of the cushion block in the utility model.
[0016] Figure 5 The utility model is a schematic diagram of a waterproof structure in a large-volume brick-concrete water pool for high-altitude water supply.
[0017] In the figure: 1. Pool body; 2. Waterproof concrete foundation; 3. Brick wall; 31. Waterproof membrane layer; 32. Asphalt layer; 33. Epoxy waterproof mortar layer; 4. Concrete column; 5. Steel cage; 51. Inner formwork; 52. Outer formwork; 53. Support rod; 54. Pad; 55. Tie wire; 6. Ring beam; 7. Water inlet pipe; 8. Drain pipe. DETAILED DESCRIPTION
[0018] The utility model is now described in further detail in conjunction with the accompanying drawings. The accompanying drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0019] Please refer to Figure 1-5 A large-volume brick-concrete water pool for high-altitude water supply includes a water pool body 1, wherein the water pool body 1 includes a waterproof concrete foundation 2 at the bottom and a ring beam 6 at the top, a brick wall 3 and a concrete column 4 are arranged between the waterproof concrete foundation 2 and the ring beam 6, and the concrete column 4 is arranged on the side and corner of the water pool body 1, and a water inlet pipe 7 and a drainage pipe 8 are arranged on one side of the water pool body 1.
[0020] Specifically, the concrete column 4 includes an internal steel cage 5, the bottom of the steel cage 5 is fixed on the waterproof concrete foundation 2, and the top of the steel cage 5 extends into the ring beam 6, wherein a steel cage frame is also provided in the ring beam 6, and the steel cage frame in the ring beam 6 is welded and tied to the steel cage 5 in the concrete column 4 to improve the overall stability.
[0021] The concrete column 4 further includes a cushion block 54 at the bottom, and the cushion block 54 is arranged on the waterproof concrete foundation 2. A tie wire 55 extending upward is arranged in the cushion block 54, and the cushion block 54 and the steel cage 5 are tied together by the tie wire 55.
[0022] After binding, the steel cage 5 is supported by formwork around it, and concrete is poured into the steel cage 5 to fill and cover the concrete to prevent the steel bars from being exposed.
[0023] In addition, the steel cage 5 is made of Y12 steel bars welded together with a spacing of 200 mm to ensure the overall strength of the pool.
[0024] In this embodiment, an inner formwork 51 and an outer formwork 52 are provided around the top of the brick wall 3, and the inner formwork 51 and the outer formwork 52 are both supported by support rods 53. The ring beam 6 is cast between the inner formwork 51 and the outer formwork 52 by concrete, and the ring beam 6 is integrated with the brick wall 3 through the steel cage 5.
[0025] That is to say, during construction, the inner formwork 51 and the outer formwork 52 are supported by the support rods 53 to form a pouring space, and concrete is poured inward to form a ring beam. At this time, the ring beam is integrated with the brick wall through the steel cage to improve the water storage strength.
[0026] Before pouring, ensure the brick wall is clean and pre-moistened, then pour C30 concrete to form a concrete slab with a 25cm tiger.
[0027] As a preferred solution, in order to avoid water leakage and seepage when the pool body is storing water, a waterproof membrane layer 31, an asphalt layer 32 and an epoxy waterproof mortar layer 33 are provided on the inner wall of the pool body, and the asphalt layer 32 is arranged between the waterproof membrane layer 31 and the epoxy waterproof mortar layer 33, and the epoxy waterproof mortar layer 33 is arranged in the outermost layer. In addition, a waterproof membrane layer 31 and an epoxy waterproof mortar layer 33 are provided on the outer wall of the brick wall 3, and the epoxy waterproof mortar layer 33 is arranged in the outermost layer. At this time, waterproofing is carried out inside and outside to avoid water seepage from the inside of the pool and affect the water storage capacity of the pool.
[0028] The construction steps of this new type of large-volume brick-concrete water tank for high-altitude water supply are as follows: (1) First determine the location of the water tank, clean the site, remove the topsoil, and dig a foundation with a depth of 1 to 1.5 meters, so that a large amount of the water tank foundation is located underground; (2) Level the water tank according to the size of the water tank, and then pour 10cm waterproof concrete; (3) Tie the steel bars at the four corners and columns of the water tank and install the template. When installing the steel bars, the steel bar placement position must be installed according to the measured layout position. The steel bar binding is required to meet the requirements of the specification, and the thickness of the steel bar protective layer is 4cm. After the steel bar binding is completed, organize the on-site construction personnel and quality inspection personnel to conduct joint acceptance with the supervision unit; (4) Pour the four corners and columns of the water tank; (5) Bricklaying. After the pouring is completed, continue to use the column steel cage and start bricklaying at the same time to erect a 2-meter-high brick wall; (6) Install the ring beam steel cage; (7) Pour concrete to form a ring beam; (8) Waterproof the water tank body; (9) Maintenance and backfilling; (10) Water supply. The pool body 1 constructed through the above construction steps has good water storage capacity, ensuring that the construction site meets daily construction needs.
[0029] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention of the utility model.
Claims
1. A large-volume brick-concrete water tank for high-altitude water supply, characterized in that: The invention comprises a pool body, which comprises a waterproof concrete foundation at the bottom and a ring beam at the top, a brick wall and concrete columns are arranged between the waterproof concrete foundation and the ring beam, the concrete columns are arranged on the sides and corners of the pool body, and a water inlet pipe and a drain pipe are arranged on one side of the pool body.
2. The large-volume brick-concrete water tank for high-altitude water supply according to claim 1 is characterized in that: The concrete column comprises an inner steel cage, the bottom of which is fixed on a waterproof concrete foundation, and the top of which extends into the ring beam.
3. The large-volume brick-concrete water tank for high-altitude water supply according to claim 2 is characterized in that: The concrete column also includes a cushion block at the bottom, which is arranged on a waterproof concrete foundation. A tie wire extending upward is arranged in the cushion block, and the cushion block is bound to the steel cage by the tie wire.
4. The large-volume brick-concrete water tank for high-altitude water supply according to any one of claims 1 to 3, characterized in that: An inner formwork and an outer formwork are arranged around the top of the brick wall, and both the inner formwork and the outer formwork are supported by support rods. The ring beam is poured between the inner formwork and the outer formwork by concrete, and the ring beam is integrated with the brick wall through a steel cage.
5. The large-volume brick-concrete water tank for high-altitude water supply according to claim 1, characterized in that: The inner wall of the pool body is provided with a waterproof roll material layer, an asphalt layer and an epoxy waterproof mortar layer, the asphalt layer is arranged between the waterproof roll material layer and the epoxy waterproof mortar layer, and the epoxy waterproof mortar layer is arranged on the outermost layer.
6. The large-volume brick-concrete water tank for high-altitude water supply according to claim 5, characterized in that: The outer wall of the brick wall is provided with a waterproof roll material layer and an epoxy waterproof mortar layer, and the epoxy waterproof mortar layer is arranged on the outermost layer.