Prefabricated inner supporting structure capable of being used as cover arch
By combining the support structure in the foundation pit and the concealed excavation sleeve into one, the side walls and foundations are abolished, and directly supported on the side walls and crown beams of the foundation pit, the problems of complex construction, long cycle and large space occupation in tunnel construction are solved. , achieving improvements in stability and construction efficiency.
Patent Information
- Application Number
- CN202420926095.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-30
AI Technical Summary
In tunnel construction, the junction of light and dark excavation often faces risks such as earth collapse and foundation pit deformation. The conventional arch construction process is complex and the cycle is long, especially when geological conditions are poor, it is easy to lead to settlement risk, occupy a large space, and increase investment.
Provide a prefabricated internal support structure. By combining the foundation pit inner support structure and the concealed excavation sleeve arch into one, the sleeve arch side wall and foundation are cancelled, and directly supported on the foundation pit side wall and crown beam, adopting a prefabricated structure. Shorten the construction cycle and ensure stability and space savings.
It achieves the stability and space saving of the arch, shortens the construction cycle, improves the construction quality, and is suitable for firm foundations and deformation control under complex geological conditions.
Smart Images

Figure CN222102051U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to a prefabricated inner supporting structure which can be used as a sleeve arch. Background Art
[0002] Open-cut into underground excavation is a commonly used construction method in tunnel engineering. Construction at the junction of open and underground excavation may face risks such as earthwork collapse and foundation pit deformation. The conventional way to enter the tunnel is to complete the foundation pit support structure in advance. After the foundation pit support structure is completed, a cast-in-place concrete arch is constructed at the junction of open and underground excavation to enter the tunnel underground excavation construction.
[0003] In the construction of urban rail transit, we often face unfavorable conditions such as limited land use and complex geological conditions. The excavation of the foundation pit in the open-cut tunnel section often adopts vertical excavation. In the case of poor geological conditions, the support form of piles + internal support is often adopted.
[0004] Among them, the arch is an arch structure that fixes or supports the end of the pipe shed by using pipe shed advance support during the construction of the tunnel entrance section. The tunnel arch of this method requires a comprehensive protective envelope for the excavated tunnel section, that is, from the arch top to the arch waist, and finally to the side wall and the side wall base. The conventional construction process of the arch is: excavation of foundation pit support - site leveling - measurement and layout - excavation of the arch foundation - foundation treatment - pouring of arch foundation concrete - installation of steel pipe scaffolding, concrete lifting frame, arch steel arch frame, etc. - installation of pipe shed hole pipe - installation of arch concrete internal and external formwork - pouring of arch protection concrete.
[0005] However, this method has many disadvantages, especially in poor geological conditions:
[0006] The process is complicated and the construction period is long. The arch construction can only be carried out after the foundation pit is excavated in place;
[0007] The sleeve arch foundation needs to be treated separately. If the geological conditions are poor, the sleeve arch foundation will settle greatly when it is located in the fill section. After the pipe shed is installed, the tunnel excavation stage will still face the risk of settlement, which may easily lead to the synchronous settlement of the main tunnel arch.
[0008] The side walls of the arch take up space, which increases the width of the open excavation pit, increases investment, and increases land occupation. Utility Model Content
[0009] In view of this, the problem to be solved by the utility model is to provide a prefabricated internal support structure that can be used as a sleeve arch. By combining the internal support structure of the foundation pit with the sleeve arch that is secretly excavated into the hole, the side walls and foundation of the sleeve arch are eliminated, and the sleeve arch is directly supported on the side walls and crown beams of the foundation pit, thereby ensuring the stability of the sleeve arch and saving space in the open excavation of the foundation pit.
[0010] The utility model solves the above technical problems through the following technical means: The utility model provides a prefabricated internal support structure that can be used as a sleeve arch, including an upper cross brace, a lower cross brace and a connecting vertical wall, the upper cross brace is transversely arranged on a crown beam, the crown beam is longitudinally arranged on a retaining pile along the length direction of the tunnel, the retaining pile is provided with a corbel, the two ends of the lower cross brace are arranged on the corbel, the lower cross brace is arranged below the upper cross brace, the connecting vertical wall is arranged between the upper cross brace and the lower cross brace, and the upper and lower ends of the connecting vertical wall are respectively connected to the upper cross brace and the lower cross brace; the connecting vertical wall is provided with multiple faces, and the multiple connecting vertical walls are arranged in parallel along the length direction of the tunnel; a transverse I-beam frame and a longitudinal I-beam frame are arranged in the upper cross brace, the lower cross brace includes an upper I-beam frame and a lower I-beam frame arranged in parallel, and the upper I-beam frame and the lower I-beam frame are both arched and matched with the tunnel vault.
[0011] Furthermore, an upper supporting base for installing an upper cross brace is provided at the top of the crown beam, a retaining wall is also provided on the outer side of the crown beam, and retaining plates between piles are provided on the retaining piles.
[0012] Furthermore, two rows of longitudinal I-beam frames are arranged on the left and right sides of the upper cross brace, the transverse I-beam frames are arranged between the longitudinal I-beam frames on the left and right sides, the transverse I-beam frames are welded to the longitudinal I-beam frames, and the upper cross brace is wrapped with a C40 concrete layer.
[0013] Furthermore, reserved steel plates are provided at the bottom of both ends of the upper cross brace, through holes are provided on the reserved steel plates, screws are passed through the through holes, the lower ends of the screws are fixed to the upper support base on the crown beam, nuts are provided on the screws, and the nuts are provided below the reserved steel plates.
[0014] Furthermore, a pre-buried stainless steel pipe is arranged between the upper I-beam frame and the lower I-beam frame in the lower cross brace, and a fixed steel plate is arranged below the left and right sides of the lower cross brace, and the fixed steel plate is welded to the reserved steel plate on the corbel.
[0015] Furthermore, a first I-beam frame is arranged in the connecting vertical wall, the outer side of the first I-beam frame is wrapped with a C40 concrete layer, and the upper and lower ends of the first I-beam frame are respectively welded to the bottom of the upper cross brace and the top of the lower cross brace.
[0016] It can be seen from the above technical scheme that the beneficial effects of the utility model are as follows: the utility model provides a prefabricated internal support structure that can be used as a sleeve arch, including an upper cross brace, a lower cross brace and a connecting vertical wall, the upper cross brace is transversely arranged on a crown beam, the crown beam is longitudinally arranged on a retaining pile along the length direction of the tunnel, the retaining pile is provided with a corbel, the two ends of the lower cross brace are arranged on the corbel, the lower cross brace is arranged below the upper cross brace, the connecting vertical wall is arranged between the upper cross brace and the lower cross brace, and the upper and lower ends of the connecting vertical wall are respectively connected to the upper cross brace and the lower cross brace; the connecting vertical wall is provided with multiple faces, and the multiple connecting vertical walls are arranged in parallel along the length direction of the tunnel; a transverse I-beam frame and a longitudinal I-beam frame are arranged in the upper cross brace, the lower cross brace includes an upper I-beam frame and a lower I-beam frame arranged in parallel, and the upper I-beam frame and the lower I-beam frame are both arched and matched with the tunnel vault. By combining the inner support structure of the foundation pit with the arch of the dark excavation, the side wall and foundation of the arch are eliminated, and the arch is directly supported on the side wall and crown beam of the foundation pit, which ensures the stability of the arch and saves the space of the open excavation of the foundation pit. At the same time, the structure adopts prefabrication, and is directly hoisted into place during the foundation pit construction process, which greatly shortens the construction period, and the overall construction quality of the prefabricated components is also better. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0018] Figure 1 A front view of a prefabricated inner support structure that can be used as a sleeve arch provided by the utility model;
[0019] Figure 2 A three-dimensional schematic diagram of a prefabricated inner support structure that can be used as a sleeve arch provided by the utility model;
[0020] Figure 3 for Figure 2 A cross-sectional view of
[0021] Reference numerals:
[0022] 1-upper cross brace; 2-lower cross brace; 3-connecting vertical wall; 4-crown beam; 5-guard pile; 41-retaining wall; 42-upper support base; 51-corbel; 52-retaining board between piles; 11-longitudinal I-beam frame; 12-transverse I-beam frame; 21-upper I-beam frame; 22-lower I-beam frame; 23-embedded stainless steel pipe. DETAILED DESCRIPTION
[0023] The following embodiments of the technical solution of the utility model are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the utility model, and are therefore only used as examples, and cannot be used to limit the protection scope of the utility model.
[0024] See also Figures 1 to 3 The utility model provides a prefabricated internal support structure that can be used as a sleeve arch, including an upper cross brace 1, a lower cross brace 2 and a connecting vertical wall 3, the upper cross brace 1 is transversely arranged on a crown beam 4, the crown beam 4 is longitudinally arranged on a retaining pile 5 along the length direction of the tunnel, and a corbel 51 is arranged on the retaining pile 5, the two ends of the lower cross brace 2 are arranged on the corbel 51, the lower cross brace 2 is arranged below the upper cross brace 1, the connecting vertical wall 3 is arranged between the upper cross brace 1 and the lower cross brace 2, and the upper and lower ends of the connecting vertical wall 3 are respectively connected to the upper cross brace 1 and the lower cross brace 2; the connecting vertical wall 3 is provided with multiple faces, and the multiple-face connecting vertical walls 3 are arranged in parallel along the length direction of the tunnel; a transverse I-beam frame 12 and a longitudinal I-beam frame 11 are arranged in the upper cross brace 1, and the lower cross brace 2 includes an upper I-beam frame 21 and a lower I-beam frame 22 arranged in parallel, and the upper I-beam frame 21 and the lower I-beam frame 22 are both arched and matched with the tunnel vault. By combining the inner support structure of the foundation pit with the sleeve arch of the dark excavation hole, the side wall and foundation of the sleeve arch are eliminated, and the sleeve arch is directly supported on the side wall of the foundation pit and the crown beam 4, which ensures the stability of the sleeve arch and saves the space of the open excavation foundation pit. At the same time, the structure adopts prefabricated assembly, and is directly hoisted into place during the foundation pit construction process, which greatly shortens the construction period, and the overall construction quality of the prefabricated components is also better. The prefabricated assembly process is adopted to combine the inner support of the open excavation foundation pit with the sleeve arch of the dark excavation hole, which shortens the construction period and reduces the excavation width, while ensuring that the sleeve arch has a solid foundation and controllable deformation under complex geological conditions.
[0025] As a further improvement of the above technical solution, the top of the crown beam 4 is provided with an upper support base 43 for installing the upper cross brace 1, and a retaining wall 41 is also provided on the outer side of the crown beam 4, and an inter-pile retaining plate 52 is provided on the retaining pile 5. The retaining plate is provided on the outer side of the crown beam 4 to prevent rock and soil from entering the position of the upper cross brace 1, and the retaining wall 41 is provided between the retaining piles 5 to prevent rock and soil from entering the lower cross brace 2 and the inside of the tunnel.
[0026] As a further improvement of the above technical solution, two rows of longitudinal I-beam frames 11 are arranged on the left and right sides of the upper cross brace 1, and the transverse I-beam frames 12 are arranged between the longitudinal I-beam frames 11 on the left and right sides. The transverse I-beam frames 12 are welded and connected to the longitudinal I-beam frames 11, and the upper cross brace 1 is wrapped with a C40 concrete layer on the outside.
[0027] As a further improvement to the above technical solution, a reserved steel plate is provided at the bottom of both ends of the upper cross brace 1, and a through hole is provided on the reserved steel plate. A screw rod is passed through the through hole, and the lower end of the screw rod is fixed on the upper support base 43 on the crown beam 4. A nut is provided on the screw rod, and the nut is provided below the reserved steel plate. By providing a screw rod on the base at the upper end of the crown beam 4 and passing the screw rod through the reserved steel plate, the height of the upper cross brace 1 on the crown beam 4 is adjusted by adjusting the nut until the lower cross brace 2 is installed on the corbel 51. Specifically, a high-strength nut is provided on the screw rod, and the nut is located between the steel plate of the crown beam 4 and the steel plate of the upper cross brace 1. The reserved steel plate on the upper cross brace 1 is tightly attached to the high-strength nut for leveling by gravity. As the foundation pit is excavated step by step, the upper cross brace 1 moves downward step by step as the depth of the foundation pit deepens by adjusting the nut, playing the role of a temporary cross brace. Until the depth of the foundation pit is excavated to the position of the corbel 51, the steel plate at the corbel 51 is connected.
[0028] As a further improvement to the above technical solution, a pre-buried stainless steel pipe 23 is provided between the upper I-beam steel frame 21 and the lower I-beam steel frame 22 in the lower cross brace 2, and a fixed steel plate is provided below the left and right sides of the lower cross brace 2, and the fixed steel plate is welded and connected to the reserved steel plate on the corbel 51. A 133-diameter pre-buried stainless steel pipe 23 is provided between the upper and lower rows of frames as a reserved hole and positioning guide pipe for the 108-diameter advanced large pipe shed, and also serves as a connection. A fixed steel plate is provided below the left and right sides of the lower cross brace 2 through the frame, and the fixed steel plate is welded to the pre-buried steel plate at the corbel 51 on the pile board wall, serving as the base of the lower cross brace 2.
[0029] As a further improvement of the above technical solution, a first I-beam frame is arranged in the connecting vertical wall 3, the outer side of the first I-beam frame is wrapped with a C40 concrete layer, and the upper and lower ends of the first I-beam frame are respectively welded to the bottom of the upper cross brace 1 and the top of the lower cross brace 2.
[0030] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model, and they should all be included in the scope of the claims and specification of the utility model.
Claims
1. A prefabricated internal support structure that can be used as a sleeve arch. Features: It includes an upper cross brace, a lower cross brace and a connecting vertical wall, the upper cross brace is transversely arranged on a crown beam, the crown beam is longitudinally arranged on a retaining pile along the length direction of the tunnel, the retaining pile is provided with a corbel, the two ends of the lower cross brace are arranged on the corbel, the lower cross brace is arranged below the upper cross brace, the connecting vertical wall is arranged between the upper cross brace and the lower cross brace, the upper and lower ends of the connecting vertical wall are respectively connected to the upper cross brace and the lower cross brace; the connecting vertical wall is provided with multiple faces, and the multiple connecting vertical walls are arranged in parallel along the length direction of the tunnel; a transverse I-beam frame and a longitudinal I-beam frame are arranged in the upper cross brace, the lower cross brace includes an upper I-beam frame and a lower I-beam frame arranged in parallel, the upper I-beam frame and the lower I-beam frame are both arched to match the tunnel vault.
2. A prefabricated inner support structure that can be used as a sleeve arch according to claim 1, Features: An upper support base for installing an upper cross brace is arranged at the top of the crown beam, a retaining wall is arranged on the outer side of the crown beam, and retaining plates between piles are arranged on the retaining piles.
3. A prefabricated inner support structure that can be used as a sleeve arch according to claim 2, Features: The longitudinal I-beam frames in the upper cross brace are arranged in two rows on the left and right sides, the transverse I-beam frames are arranged between the longitudinal I-beam frames on the left and right sides, the transverse I-beam frames are welded and connected to the longitudinal I-beam frames, and the upper cross brace is wrapped with a C40 concrete layer.
4. A prefabricated inner support structure that can be used as a sleeve arch according to claim 3, Features: A reserved steel plate is provided at the bottom of both ends of the upper cross brace, a through hole is provided on the reserved steel plate, a screw rod passes through the through hole, the lower end of the screw rod is fixed on the upper support base on the crown beam, a nut is provided on the screw rod, and the nut is arranged below the reserved steel plate.
5. A prefabricated inner support structure that can be used as a sleeve arch according to claim 4, Features: An embedded stainless steel pipe is arranged between the upper I-beam frame and the lower I-beam frame in the lower cross brace, and a fixed steel plate is arranged below the left and right sides of the lower cross brace, and the fixed steel plate is welded and connected to the reserved steel plate on the corbel.
6. A prefabricated inner support structure that can be used as a sleeve arch according to claim 5, Features: A first I-beam frame is arranged in the connecting vertical wall, the outer side of the first I-beam frame is wrapped with a C40 concrete layer, and the upper and lower ends of the first I-beam frame are respectively welded to the bottom of the upper cross brace and the top of the lower cross brace.