Railway roadbed geological exploration device
By setting up a shell and a rotating base in the railway exploration device, combined with the insertion rod and pressing rod reinforcement, the stability problem caused by the inclination of the tripod is solved, stable survey under different terrain is achieved, and the overall stability of the device is improved and Easy to use.
Patent Information
- Application Number
- CN202420485046.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-13
AI Technical Summary
Existing railway surveying devices can easily cause the legs of the tripod to tilt under different terrain and terrain, resulting in unstable devices and cannot guarantee the stability of the detector. They need to be manually supported or fixed with heavy objects.
A railway road base geological exploration device was designed. By setting a shell and a rotating base on the bottom of the tripod, the contact area is increased, and reinforced by inserting rods and pressing rods, combining springs and latch components to improve the stability of the device and the convenience of use. sex.
It effectively improves the stability and convenience of use of the exploration device, adapts to the geological survey needs of different terrains, and enhances the practicality of the device.
Smart Images

Figure CN222103313U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological prospecting instruments, in particular to a geological prospecting device for railway foundations. Background Art
[0002] Railway survey refers to the investigation of the terrain, landform and geology of the railway route in the early stage of the railway construction, and the design of the most suitable route for construction and passage. Secondly, geological exploration can provide accurate geological and topographic data for railway engineering design and construction, ensuring the stability and safety of the project. Finally, geological and topographic exploration can also provide a scientific basis for environmental protection and ecological balance, and avoid adverse effects on the surrounding ecological environment.
[0003] The current railway survey device mainly supports the detector by using a tripod, and the detector is leveled by adjusting the extension length of the legs on the tripod and the adjustment components on the detector. However, in actual use, because the railway passes through different terrains, survey work is often carried out in places with poor ground conditions during geological surveys. The legs of the tripod often need to be tilted at a large angle, resulting in the entire device being unstable. The existing device can only be manually supported or fixed with heavy objects to ensure the stability of the detector. In order to solve the above problems, we propose a railway roadbed geological exploration device. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the utility model provides a railway roadbed geological exploration device, which has the advantage of improving the stability of the exploration device and solves the problem that the exploration device cannot ensure stability only by relying on a tripod.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a railway roadbed geological exploration device, comprising an exploration device 1; the exploration device 1 comprises: a main body 11 having a detector 12 threadedly connected to the top; a tripod 13 arranged at the bottom of the main body 11; a reinforcement device 2 is arranged on the exploration device 1, and the reinforcement device 2 comprises: a shell 21 arranged at the bottom of the tripod 13, and a rotating shaft 211 is penetrated through the shell 21; a rod body 22 is rotatably connected to the rotating shaft 211; a base 23 is rotatably connected to the rod body 22; a fixing component 24 is arranged on the base 23; an insertion rod 241 is slidably connected to the base 23, and there are multiple rods; a pressing rod 242 is penetrated through the insertion rod 241 and the base 23; a spring 243 is arranged inside the base 23.
[0008] In some embodiments, the top of the shell 21 is a corrugated fixing sleeve.
[0009] In some embodiments, a thread groove 212 is provided on the housing 21 , and a threaded member 213 is threadedly connected to the thread groove 212 .
[0010] In some embodiments, the base 23 is a trapezoidal block.
[0011] In some embodiments, a slider 247 is disposed at the place where the pressing rod 242 passes through the base 23 .
[0012] In some embodiments, a slot 246 is disposed inside the base 23 , and a latch 244 is disposed through the pressing rod 242 .
[0013] In some embodiments, a second spring 245 is disposed inside the pressing rod 242 , and the second spring 245 is press-fitted with the latch 244 .
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides a railway foundation geological exploration device, which has the following beneficial effects:
[0016] 1. The railway roadbed geological exploration device has a shell body sleeved therewith arranged at the bottom of a tripod, and the shell body drives the base to rotate. The base can increase the contact area between the tripod and the contact surface, and improve the stability of the tripod. After the adjustment is completed, the threaded rod can be used to quickly stop the rotation of the rotating rod. The coordination of various components improves the stability of the entire device, and the structure is simple and easy to use.
[0017] 2. The railway foundation geological exploration device uses a pressing rod to press the insertion rod so that the insertion rod is inserted into the corresponding soil layer to reinforce the base. At the same time, a latch assembly is provided to cooperate with the insertion and retraction of the insertion rod. It is easy to use and improves the stability of the entire device, and also increases the practicality of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 It is a schematic diagram of the cross-sectional structure of the reinforcement device of the utility model;
[0020] Figure 3 It is an enlarged schematic diagram of point A in the structure of the utility model;
[0021] Figure 4 It is a schematic diagram of the cross-sectional structure of the fixing component in the utility model;
[0022] Figure 5 It is a structural schematic diagram of the reinforcement device of the utility model.
[0023] In the figure:
[0024] 1. Exploration device; 11. Main body; 12. Detector; 13. Tripod;
[0025] 2. Reinforcement device; 21. Shell; 211. Rotating shaft; 212. Threaded groove; 213. Threaded member; 22. Rod body; 23. Base; 24. Fixing assembly; 241. Insert rod; 242. Press rod; 243. Spring 1; 244. Latch; 245. Spring 2; 246. Slot; 247. Slider. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0027] It should be noted that all directional indications in the embodiments of the present application are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0028] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0029] First, open the tripod and adjust it to the appropriate height, then tighten the thread of the detector and dock it with the tripod, and then adjust the leveling detector at the bottom of the detector according to the level on the detector with the tripod, open the detector to enter data and parameters, and enter the measurement mode, and enter the necessary measurement data and parameters, such as the elevation, distance and type of the target prism. At the same time, set the horizontal angle of the alignment direction, set the target prism at the point to be measured, and the detector will calculate and analyze the data. Data can be exported to a computer or storage device for further processing as needed.
[0030] In the related art, the legs of the tripod often need to be tilted at a large angle, resulting in the instability of the entire device. The tripod has no corresponding reinforcement components and is easily offset by external influences, causing the horizontal angle of the detector to be affected. Existing devices can only be manually supported or fixed with heavy objects to ensure the stability of the detector.
[0031] In order to solve the problems in the related technology to a certain extent, the embodiment of the present application provides a railway roadbed geological exploration device. When it is needed, it is only necessary to connect the detector 12, the main body 11 and the tripod 13, and then put the shell 21 on the bottom of the tripod 13, and then adjust the opening angle of the tripod 13 according to the actual situation. When the tilt angle of the tripod 13 is too large during the adjustment process, the base 23 will rotate to ensure that the tripod 13 is always in contact with the maximum area, thereby keeping the whole device stable. After adjustment, use the threaded rod 222 to fix the base 23. When encountering muddy or soft land geology, the fixing assembly can be used to reinforce the whole device.
[0032] The present application is described below with reference to the accompanying drawings and specific embodiments:
[0033] Combination Figure 1-Figure 5 , the embodiment of the present application provides that in order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a railway roadbed geological exploration device, including an exploration device 1; the exploration device 1 includes: a main body 11 with a detector 12 threadedly connected to the top; a tripod 13 is arranged at the bottom of the main body 11; a reinforcement device 2 is arranged on the exploration device 1, and the reinforcement device 2 includes: a shell 21 is arranged at the bottom of the tripod 13, and a rotating shaft 211 is penetrated on the shell 21; a rod body 22 is rotatably connected to the rotating shaft 211; a base 23 is rotatably connected to the rod body 22; a fixing component 24 is arranged on the base 23; an insertion rod 241 is slidably connected to the base 23, and there are multiple of them; a pressing rod 242 is penetrated and arranged on the insertion rod 241 and the base 23; a spring 243 is arranged inside the base 23.
[0034] The user first puts the tripod 13 on the shell 21, then opens the tripod 13, adjusts the tripod 13 to an approximate height through the fixing holes on the tripod 13 to keep the main body 11 stable, and then fixes the detector 12 and the top of the main body 11 through the threaded parts at the bottom of the detector 12 (this part is not shown in the figure and is common sense), and then continues to level the detector 12 according to the level on the detector 12. During the detection process, the tripod 13 will be opened. According to the different opening angles of the tripod 13, the shell 21 will drive the base 23 to rotate through the rotating shaft 211 and the rod body 22. The device increases the contact area between the tripod 13 and the contact surface (such as a slippery contact surface such as a mossy stone or a wet ground) through the base 23, thereby increasing the friction and improving the overall The stability of the device, the insertion rod 241 and the pressing rod 242 penetrate each other and are fixedly connected. When on muddy ground, the user presses downward or directly steps on the pressing rod 242 to insert the insertion rod 241 into the softer ground. The friction between the insertion rod 241 and the ground is large, and the elastic force of the spring 1 243 is less than this friction. When retracting, the insertion rod 241 is pulled out upward, and the spring 1 243 pushes the pressing rod 242 to reset it. After adjusting the tripod 13, the user uses the leveling component on the detector 12 to microscopically level the detector 12. After leveling, turn on the detector 12. The detector 12 can emit ultrasonic waves to the ground and then rebound to analyze the frequency of the ultrasonic waves to obtain geological data. The user can use the detector 12 to record and analyze the geological landforms along the railway base to complete the exploration.
[0035] In some embodiments, the top of the shell 21 is a corrugated fixing sleeve. The corrugated fixing sleeve is an elastic member with a certain elastic force. The user can directly put the shell 21 on the tripod 13, saving time and effort. The corrugated fixing sleeve has good elastic force and is not easy to be damaged. After the bottom of the tripod 13 is inserted into the shell 21, the corrugated fixing sleeve squeezes the tripod 13 to complete the fixing of the tripod 13.
[0036] In some embodiments, the housing 21 is provided with a thread groove 212, and a threaded member 213 is threadedly connected to the thread groove 212. The user passes the threaded member 213 through the rod 22 and is threadedly connected to the thread groove 212. After tightening the threaded member 213, the rod 22 can be pressed to limit the rotation of the rod 22, so that the housing 21 and the tripod 13 stop rotating relative to the base 23, thereby improving the stability of the entire device.
[0037] In some embodiments, the base 23 is a trapezoidal block. Figure 1 It can be seen that both ends of the base 23 are inclined surfaces, and are narrow at the top and wide at the bottom, and have good stability.
[0038] In some embodiments, the pressing rod 242 is provided with a slider 247 at the position where it passes through the base 23. Figure 4The neutralization base 23 is slidably connected, and the two sliders are provided to ensure that the pressing rod 242 and the insertion rod 241 move along the same horizontal plane, thereby preventing the insertion rod 241 from being offset by force.
[0039] In some embodiments, a slot 246 is provided inside the base 23, and a plug 244 is provided through the pressing rod 242. The user inserts the plug 244 into the base 23 and the slot 246 to limit the insertion rod 241 to prevent the insertion rod 241 from rebounding and affecting the stability of the device.
[0040] In some embodiments, a second spring 245 is disposed inside the pressing rod 242, and the second spring 245 is press-fitted with the latch 244. Press-fit connection is a connection method in which two parts are used together after applying pressure. In order to facilitate the staff to pull out the latch 244, Figure 5 As can be seen in the figure, a limit block is provided at the head of the latch 244 to enable the second spring 245 to expand and contract along with the latch 244 . Therefore, when the latch 244 needs to be pulled out, under the elastic force of the second spring 245 , the second spring 245 can assist the latch 244 to disengage from the slot 246 .
[0041] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.
[0042] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A railway foundation geological exploration device, comprising an exploration device (1); the exploration device (1) comprises: A main body (11), the top of which is threadedly connected with a detector (12); A tripod (13) is arranged at the bottom of the main body (11); The invention is characterized in that: the exploration device (1) is provided with a reinforcement device (2), and the reinforcement device (2) comprises: A shell (21) is arranged at the bottom of the tripod (13), and a rotating shaft (211) is arranged through the shell (21); A rod body (22) rotatably connected to the rotating shaft (211); A base (23) rotatably connected to the rod body (22); A fixing assembly (24) is arranged on the base (23); A plurality of inserting rods (241) are slidably connected to the base (23); A pressing rod (242) is provided through the insertion rod (241) and the base (23); Spring 1 (243) is arranged inside the base (23).
2. A railway foundation geological exploration device according to claim 1, characterized in that: The top of the shell (21) is a corrugated fixing sleeve.
3. A railway foundation geological exploration device according to claim 1, characterized in that: The housing (21) is provided with a thread groove (212), and a threaded member (213) is threadedly connected to the thread groove (212).
4. A railway foundation geological exploration device according to claim 1, characterized in that: The base (23) is a trapezoidal block.
5. A railway foundation geological exploration device according to claim 4, characterized in that: A slider (247) is provided at the position where the pressing rod (242) passes through the base (23).
6. A railway foundation geological exploration device according to claim 5, characterized in that: A slot (246) is provided inside the base (23), and a latch (244) is provided through the pressing rod (242).
7. A railway foundation geological exploration device according to claim 6, characterized in that: A second spring (245) is arranged inside the pressing rod (242), and the second spring (245) and the latch (244) are press-fitted and connected.