By setting up the bidirectional communication between the first tank body and the second tank body and the dispersion equipment in the conductive paste preparation system, predispersion and multiple cycles are realized, and the problem of long grinding and dispersion time during the conductive paste preparation process is solved, and the problem of long grinding and dispersion time is improved. The output with the preparation efficiency and viscosity meets the standards.

CN222111636UActive Publication Date: 2024-12-06SUNWODA MOBILITY ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323508786.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-12-06
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

During the preparation of conductive paste, grinding and dispersing various materials takes a lot of time, which affects the preparation efficiency.

Method used

A conductive paste preparation system is designed, and by setting the bidirectional communication between the first tank body and the second tank body and the dispersion equipment, the pre-dispersion and multiple cycle dispersion of the mixed materials are realized, the dispersion time is reduced, and the preparation efficiency is improved.

Benefits of technology

Through pre-dispersion and multiple cycle dispersion, the dispersion time of the mixed material is significantly reduced, the preparation efficiency of the conductive paste is improved, and the output of the viscosity meets the standard is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222111636U_ABST
    Figure CN222111636U_ABST
Patent Text Reader

Abstract

The utility model discloses a conductive slurry preparation system, comprising a conductive agent pipeline used for conveying a conductive agent; the dispersant pipeline is used for conveying a dispersant; the solvent pipeline is used for conveying a solvent; the first tank body is respectively communicated with the conductive agent pipeline, the dispersing agent pipeline and the solvent pipeline; the dispersing equipment is communicated with the first tank body and is used for dispersing the mixed material conveyed by the first tank body; the second tank body is bidirectionally communicated with the dispersing equipment, the second tank body is used for storing the mixed material conveyed by the dispersing equipment or conveying the stored mixed material into the dispersing equipment, and the second tank body is communicated with a conductive agent pipeline. According to the utility model, formal dispersion and pre-dispersion of multiple cyclic dispersion are carried out at the same time, the dispersion time of mixed materials is greatly shortened, and the preparation efficiency of conductive paste is improved. Therefore, the problem that in the current preparation process of the conductive paste, a large amount of time is consumed for grinding and dispersing various materials, and the preparation efficiency of the conductive paste is very affected is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lithium batteries, and in particular to a conductive slurry preparation system. Background Art

[0002] Lithium-ion batteries have the advantages of high voltage, long cycle life, good safety performance, environmental protection and pollution-free, light weight and small size, etc. They are now widely used in many portable products such as mobile phones, notebooks, mobile power supplies, digital products, wearable devices, etc. In lithium batteries, the positive and negative electrode raw materials are generally composed of active substances, binders, conductive agents, dispersants and solvents. The conductive agent in the electrode ensures that the electrode has good charge and discharge performance, and plays the role of collecting microcurrents between active substances and between active substances and current collectors, so as to reduce the contact resistance of the electrode and accelerate the movement rate of electrons.

[0003] Conductive paste needs to be ground and dispersed during the preparation process, that is, the conductive agent in powder form is dispersed in the solvent to form the conductive paste. The above dispersion process is generally completed by a grinder. In the related art, various materials are usually directly put into the grinder for grinding and dispersing the conductive paste. However, it takes a lot of time to fully grind and disperse multiple materials, which greatly affects the preparation efficiency of the conductive paste. Utility Model Content

[0004] In view of this, the utility model provides a conductive paste preparation system to solve the problem that grinding and dispersing a variety of materials in the current conductive paste preparation process takes a lot of time, which greatly affects the preparation efficiency of the conductive paste.

[0005] The utility model provides a conductive slurry preparation system, comprising: a conductive agent pipeline for conveying a conductive agent; a dispersant pipeline for conveying a dispersant; a solvent pipeline for conveying a solvent; a first tank body, which is respectively connected to the conductive agent pipeline, the dispersant pipeline and the solvent pipeline; a dispersion device, which is connected to the first tank body and is used to disperse a mixed material conveyed by the first tank body; a second tank body, which is bidirectionally connected to the dispersion device, the second tank body is used to store the mixed material conveyed by the dispersion device or convey the stored mixed material to the dispersion device, and the second tank body is connected to the conductive agent pipeline.

[0006] Beneficial effect: The utility model provides a conductive slurry preparation system, which is used to premix the conductive agent and the dispersant by setting a first tank body, and then form a mixed material by adding a solvent subsequently, first pre-dispersing, and then conveying the pre-dispersed mixed material to a dispersing device for formal dispersion, and temporarily storing the mixed material by setting a second tank body. After the mixed material in the first tank body is completely conveyed, the mixed material in the second tank body is led out and formally dispersed again by the dispersing device, and the two-way connection between the second tank body and the dispersing device is used to make the mixed material in the second tank body be dispersed in multiple cycles in the dispersing device after being led out, and finally the mixed material with a viscosity that meets the standard is output for use; while dispersing again, the first tank body continues to add the conductive agent and the dispersant for premixing, and continues to add the solvent to fully mix to form a mixed material, that is, pre-dispersing; thereby, the formal dispersion and pre-dispersion of multiple cycles of dispersion are carried out simultaneously, which greatly reduces the dispersion time of the mixed material and improves the preparation efficiency of the conductive slurry. Thereby solving the problem that grinding and dispersing multiple materials in the current preparation process of the conductive slurry takes a lot of time, which greatly affects the preparation efficiency of the conductive slurry.

[0007] In an optional embodiment, the first tank is bidirectionally connected to the dispersion device.

[0008] Beneficial effect: The first tank body and the dispersing device are bidirectionally connected through pipelines and driving devices. While the second tank body and the dispersing device are circulated and dispersed for the mixed material, the mixed material is further circulated and dispersed through the circulated conduction between the first tank body and the dispersing device, thereby formally dispersing the mixed material on the basis of pre-dispersion of the mixed material, further reducing the dispersion time of the mixed material and further improving the preparation efficiency of the conductive slurry.

[0009] In an optional embodiment, the conductive slurry preparation system also includes a first discharge pipeline and a first feed pipeline, which are respectively connected between the dispersion device and the second tank body; the first discharge pipeline is used to discharge the mixed material in the dispersion device and transport it to the second tank body; the first feed pipeline is used to discharge the mixed material in the second tank body and transport it to the dispersion device; the second tank body and the dispersion device are connected through the first discharge pipeline and the first feed pipeline, so that the mixed material circulates between the second tank body and the dispersion device, so that the dispersion device disperses the mixed material multiple times.

[0010] Beneficial effects: by setting a first discharge pipeline so as to facilitate the mixed material in the dispersion device to be discharged and transported to the second tank body, by setting a first feed pipeline so as to facilitate the mixed material in the second tank body to be discharged and transported to the dispersion device, a circulation pipeline is formed between the dispersion device and the second tank body through the first discharge pipeline and the first feed pipeline, so that the mixed material can be circulated and dispersed multiple times between the dispersion device and the second tank body until the final viscosity of the mixed material reaches the standard for output utilization; by the circulation connection between the second tank body and the dispersion device, a circulation flow path of the mixed material is formed between the second tank body and the dispersion device, so that the mixed material can be dispersed multiple times by the dispersion device, ensuring that the viscosity requirement is met when the mixed material is finally output for utilization.

[0011] In an optional embodiment, the conductive slurry preparation system also includes a second discharge pipeline and a second feed pipeline, which are respectively connected between the dispersion device and the first tank body; the second discharge pipeline is used to discharge the mixed material in the dispersion device and transport it to the first tank body; the second feed pipeline is used to discharge the mixed material in the first tank body and transport it to the dispersion device; the first tank body and the dispersion device are connected through the second discharge pipeline and the second feed pipeline, so that the mixed material circulates between the first tank body and the dispersion device, so that the dispersion device disperses the mixed material multiple times.

[0012] Beneficial effects: a second discharge pipeline is provided to facilitate the discharge of the mixed material in the dispersion device and its delivery to the first tank body; a second feed pipeline is provided to facilitate the discharge of the mixed material in the first tank body and its delivery to the dispersion device; a circulation pipeline is formed between the dispersion device and the first tank body through the second discharge pipeline and the second feed pipeline, so that the mixed material can be circulated and dispersed between the dispersion device and the first tank body for multiple times until the final viscosity of the mixed material reaches the standard for output utilization; a circulation connection is set between the first tank body and the dispersion device through a pipeline and a driving device, and while the circulation connection between the second tank body and the dispersion device is realized to carry out the circulation dispersion of the mixed material, the circulation dispersion of the mixed material is further carried out through the circulation connection between the first tank body and the dispersion device, so that the mixed material is formally dispersed on the basis of the pre-dispersion of the mixed material, the dispersion time of the mixed material is further reduced, and the preparation efficiency of the conductive paste is further improved.

[0013] In an optional embodiment, the first feed pipeline and / or the second feed pipeline are respectively provided with a first pump body; the first discharge pipeline and / or the second discharge pipeline are respectively provided with a second pump body.

[0014] Beneficial effects: By setting the first pump body to provide driving force for the mixed material in the first feed pipeline or the second feed pipeline, the flow of the mixed material in the pipeline is ensured; by setting the second pump body to provide driving force for the mixed material in the first discharge pipeline or the second discharge pipeline, the flow of the mixed material in the pipeline is ensured; thereby realizing multiple circulation dispersion of the mixed material between the dispersion equipment and the second tank body, and between the dispersion equipment and the first tank body.

[0015] In an optional embodiment, a plurality of the first pump bodies are arranged in series; a plurality of the second pump bodies are arranged in series.

[0016] Beneficial effect: Since the mixed material after grinding and dispersion by the dispersing equipment has a higher viscosity, by setting multiple first pump bodies in the feed section pipeline and multiple second pump bodies in the discharge end pipeline, the mixed material conveying capacity in the pipeline is improved and the pipeline is prevented from being blocked; at the same time, the circulation flow speed of the mixed material is increased, the grinding and dispersion efficiency is improved, thereby improving the preparation efficiency of the conductive slurry.

[0017] In an optional embodiment, a first three-way valve is arranged between the first feed pipeline and the second feed pipeline, at least a portion of the first feed pipeline and at least a portion of the second feed pipeline are set as the same pipeline, and are connected between the first three-way valve and the dispersion equipment; and / or a second three-way valve is arranged between the first discharge pipeline and the second discharge pipeline, at least a portion of the first discharge pipeline and at least a portion of the second discharge pipeline are set as the same pipeline, and are connected between the second three-way valve and the dispersion equipment.

[0018] Beneficial effect: The first three-way valve is used to control the transportation of the mixed material between the first feed pipeline and the second feed pipeline, and the second three-way valve is used to control the transportation of the mixed material between the first discharge pipeline and the second discharge pipeline, so that the mixed material can be dispersed in multiple cycles between the dispersion device and the second tank body and between the dispersion device and the first tank body.

[0019] In an optional embodiment, the conductive slurry preparation system also includes a feed main pipe and a discharge main pipe, wherein the feed main pipe is connected to the first tank body, and the feed main pipe is used to add a conductive agent and a dispersant into the first tank body; the discharge main pipe is connected to the second tank body, and the discharge main pipe is used to discharge the dispersed mixed material.

[0020] Beneficial effect: By setting a feed main pipe, it is convenient to add the conductive agent and the dispersant into the first tank body, and by setting a discharge main pipe, it is convenient to discharge the dispersed mixed material, that is, to prepare the formed conductive slurry.

[0021] In an optional embodiment, the discharge main pipe is connected to the first tank body, the dispersion device and the second tank body respectively through a third three-way valve.

[0022] Beneficial effects: The first feed pipeline and the pipe section connecting the discharge pipe to the second tank body are integrated. A third three-way valve is arranged between the first feed pipeline and the discharge pipe, connecting the first tank body, the dispersion device and the second tank body, at least part of the first feed pipeline and at least part of the discharge pipe are arranged as the same pipeline and connected between the third three-way valve and the second tank body, and the circulating material between the dispersion device and the second tank body is controlled by controlling the third three-way valve to be discharged from the discharge pipe.

[0023] In an optional embodiment, the conductive slurry preparation system further includes a cooling pipeline, and the cooling pipeline is connected to the first tank body and / or the dispersion device and / or the second tank body for heat exchange.

[0024] Beneficial effect: The first tank body, the dispersion device and the second tank body are cooled by the cooling pipeline to avoid high viscosity of the mixed material caused by volatilization of the solvent in the equipment due to excessive temperature, ensure that the mixed material has strong fluidity and prevent equipment clogging. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 The utility model provides a schematic structural diagram of a conductive paste preparation system.

[0027] Description of reference numerals:

[0028] 1. First tank body; 2. Dispersing equipment; 3. Second tank body; 4. First pump body; 5. Second pump body; 6. First three-way valve; 7. Second three-way valve; 8. Third three-way valve; 9. Third pump body; 10. Fourth pump body;

[0029] 100, first discharge pipeline; 200, first feed pipeline; 300, second discharge pipeline; 400, second feed pipeline; 500, feed main pipe; 600, discharge main pipe; 700, solvent pipeline; 800, cooling pipeline; 8001, water inlet pipeline; 8002, water outlet pipeline. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.

[0031] Combine the following Figure 1 , describing an embodiment of the utility model.

[0032] According to an embodiment of the present invention, a conductive paste preparation system is provided, such as Figure 1 As shown, it includes: a conductive agent pipeline, a dispersant pipeline, a solvent pipeline 700, a first tank body 1, a dispersing device 2, a second tank body 3, etc.

[0033] The conductive agent pipeline is used to transport the conductive agent; the dispersant pipeline is used to transport the dispersant; the solvent pipeline 700 is used to transport the solvent; the first tank body 1 is connected to the conductive agent pipeline, the dispersant pipeline and the solvent pipeline 700 respectively; the dispersion device 2 is connected to the first tank body 1, and is used to disperse the mixed material transported by the first tank body 1; the second tank body 3 is bidirectionally connected to the dispersion device 2, the second tank body 3 is used to store the mixed material transported by the dispersion device 2 or transport the stored mixed material to the dispersion device 2, and the second tank body 3 is connected to the solvent pipeline 700.

[0034] Specifically, Figure 1 As shown, the conductive agent and dispersant of the powder are premixed in the first tank body 1, and then fully mixed with the subsequently added solvent in the first tank body 1 to form a mixed material, that is, pre-dispersed, and then the solvent is transported to the dispersion equipment 2 to formally disperse the mixed material, and then the mixed material is transported to the second tank body 3 for temporary storage. After the mixed material in the first tank body 1 is completely transported, the mixed material in the second tank body 3 is discharged and dispersed again by the dispersion equipment 2. By utilizing the two-way connection between the second tank body 3 and the dispersion equipment 2, the mixed material in the second tank body 3 is discharged and dispersed in multiple cycles by the dispersion equipment 2, and at the same time, the conductive agent and dispersant are continued to be added to the first tank body 1 for premixing, and the solvent is continued to be added for full mixing to form a mixed material.

[0035] Furthermore, in this embodiment, the conductive agent pipeline and the dispersant pipeline can be connected to the second tank body 3 so as to replenish the conductive agent and the dispersant to the second tank body 3 .

[0036] Furthermore, solvents may be added to both the first tank body 1 and the second tank body 3. Adding solvent to the first tank body 1 facilitates the conductive agent and the dispersant to form a mixed material and pre-disperse under the action of the solvent, and adding solvent to the second tank body 3 replenishes the solvent.

[0037] Furthermore, the dispersing device 2 is configured as a grinder, and the dispersing operation of the dispersing device 2 is specifically a grinding operation by the grinder.

[0038] Furthermore, the first tank body 1 is configured as a feeding tank; and the second tank body 3 is configured as a circulation tank.

[0039] Furthermore, if Figure 1 As shown, the first tank body 1 and the dispersion device 2, and the dispersion device 2 and the second tank body 3 are connected through pipelines with a driving device, and the driving device can be set as a pump body.

[0040] This embodiment provides a conductive paste preparation system, which is used to premix the conductive agent and the dispersant by setting a first tank body 1, and then form a mixed material by adding a solvent subsequently, first pre-dispersing, and then conveying the pre-dispersed mixed material to the dispersion device 2 for formal dispersion, and temporarily storing the mixed material by setting a second tank body 3. After the mixed material in the first tank body 1 is completely conveyed, the mixed material in the second tank body 3 is discharged and formally dispersed again by the dispersion device 2, and the two-way connection between the second tank body 3 and the dispersion device 2 is used to make the mixed material in the second tank body 3 be discharged and dispersed in multiple cycles by the dispersion device 2, and finally the mixed material with a viscosity that meets the standard is output for use; while dispersing again, the first tank body 1 continues to add the conductive agent and the dispersant for premixing, and continues to add the solvent to fully mix to form a mixed material, that is, pre-dispersing; thereby, the formal dispersion and pre-dispersion of multiple cycles of dispersion are carried out simultaneously, which greatly reduces the dispersion time of the mixed material and improves the preparation efficiency of the conductive paste. This solves the problem that grinding and dispersing multiple materials in the current preparation process of the conductive paste takes a lot of time, which greatly affects the preparation efficiency of the conductive paste.

[0041] Furthermore, the conductive agent selected in this embodiment is a CNT conductive agent, that is, a carbon nanomaterial conductive agent.

[0042] Furthermore, if Figure 1 As shown, a solvent, namely NMP solvent, is added to the first tank body 1 through the solvent pipeline 700, and the conductive agent and the dispersant form a mixed material under the action of the NMP solvent to facilitate pre-dispersion; a solvent, namely NMP solvent, is added to the second tank body 3 through the solvent pipeline 700 to supplement the solvent.

[0043] Furthermore, if Figure 1 As shown, the solvent pipeline 700 is provided with a plurality of ball valves for pipeline on-off control.

[0044] Furthermore, the NMP solvent is N-methylpyrrolidone solvent.

[0045] In one embodiment, Figure 1 As shown, the first tank body 1 is bidirectionally connected to the dispersion device 2 .

[0046] Specifically, Figure 1 As shown, the first tank body 1 and the dispersion device 2 are bidirectionally connected through pipelines and driving devices. While the second tank body 3 and the dispersion device 2 are circulated and connected to each other for circulatory dispersion of the mixed material, the circulatory dispersion of the mixed material is further carried out through the circulatory connection between the first tank body 1 and the dispersion device 2, thereby formally dispersing the mixed material on the basis of pre-dispersion of the mixed material, further reducing the dispersion time of the mixed material and further improving the preparation efficiency of the conductive slurry.

[0047] In one embodiment, Figure 1 As shown, the conductive slurry preparation system also includes a first discharge pipeline 100 and a first feed pipeline 200, which are respectively connected between the dispersion device 2 and the second tank body 3; the first discharge pipeline 100 is used to discharge the mixed material in the dispersion device 2 and transport it to the second tank body 3; the first feed pipeline 200 is used to discharge the mixed material in the second tank body 3 and transport it to the dispersion device 2; the second tank body 3 and the dispersion device 2 are connected through the first discharge pipeline 100 and the first feed pipeline 200, so that the mixed material circulates between the second tank body 3 and the dispersion device 2, so that the dispersion device 2 disperses the mixed material multiple times.

[0048] Specifically, Figure 1 As shown, a first discharge pipeline 100 is provided to facilitate the mixed material in the dispersion device 2 to be discharged and transported to the second tank body 3, and a first feed pipeline 200 is provided to facilitate the mixed material in the second tank body 3 to be discharged and transported to the dispersion device 2. A circulation pipeline is formed between the dispersion device 2 and the second tank body 3 through the first discharge pipeline 100 and the first feed pipeline 200, so that the mixed material is circulated and dispersed multiple times between the dispersion device 2 and the second tank body 3 until the final viscosity of the mixed material reaches the standard for output utilization; through the circulation connection between the second tank body 3 and the dispersion device 2, a circulation flow path of the mixed material is formed between the second tank body 3 and the dispersion device 2, so that the mixed material can be dispersed multiple times by the dispersion device 2, ensuring that the viscosity requirement is met when the mixed material is finally output for utilization.

[0049] Furthermore, if Figure 1 As shown, in this embodiment, at least two sections of pipelines are connected between the second tank 3 and the dispersion device 2 to achieve circulation conduction.

[0050] Furthermore, if Figure 1As shown, the first discharge pipeline 100 and the first feed pipeline 200 are correspondingly provided with a plurality of ball valves for pipeline on-off control.

[0051] In one embodiment, Figure 1 As shown, the conductive paste preparation system also includes a second discharge pipeline 300 and a second feed pipeline 400, which are respectively connected between the dispersion device 2 and the first tank body 1; the second discharge pipeline 300 is used to guide the mixed material in the dispersion device 2 and transport it to the first tank body 1; the second feed pipeline 400 is used to guide the mixed material in the first tank body 1 and transport it to the dispersion device 2; the first tank body 1 and the dispersion device 2 are connected through the second discharge pipeline 300 and the second feed pipeline 400, so that the mixed material circulates between the first tank body 1 and the dispersion device 2, so that the dispersion device 2 disperses the mixed material multiple times

[0052] Specifically, Figure 1 As shown, a second discharge pipeline 300 is provided to facilitate the mixed material in the dispersion device 2 to be discharged and transported to the first tank body 1, and a second feed pipeline 400 is provided to facilitate the mixed material in the first tank body 1 to be discharged and transported to the dispersion device 2. A circulation pipeline is formed between the dispersion device 2 and the first tank body 1 through the second discharge pipeline 300 and the second feed pipeline 400, so that the mixed material is circulated and dispersed between the dispersion device 2 and the first tank body 1 for multiple times until the final viscosity of the mixed material reaches the standard for output utilization; the first tank body 1 and the dispersion device 2 are arranged to be circulated and connected through pipelines and driving devices, and while the second tank body 3 and the dispersion device 2 are circulated and connected to circulate and disperse the mixed material, the circulated and dispersed mixed material is further circulated and connected through the first tank body 1 and the dispersion device 2, so that the mixed material is formally dispersed on the basis of pre-dispersion of the mixed material, which further reduces the dispersion time of the mixed material and further improves the preparation efficiency of the conductive paste.

[0053] Furthermore, if Figure 1 As shown, the second discharge pipeline 300 and the second feed pipeline 400 are correspondingly provided with a plurality of ball valves for pipeline on-off control.

[0054] Furthermore, the first tank body 1 may be connected to a discharge pipeline (not shown) to facilitate the output of the mixed material for utilization.

[0055] In one embodiment, Figure 1 As shown, the first feed pipeline 200 and / or the second feed pipeline 400 are respectively provided with a first pump body 4; the first discharge pipeline 100 and / or the second discharge pipeline 300 are respectively provided with a second pump body 5.

[0056] Specifically, Figure 1As shown, by setting the first pump body 4 to provide driving force for the mixed material in the first feed pipeline 200 or the second feed pipeline 400, the flow of the mixed material in the pipeline is ensured; by setting the second pump body 5 to provide driving force for the mixed material in the first discharge pipeline 100 or the second discharge pipeline 300, the flow of the mixed material in the pipeline is ensured; thereby realizing multiple circulation dispersion of the mixed material between the dispersion device 2 and the second tank body 3, and between the dispersion device 2 and the first tank body 1.

[0057] Furthermore, the first pump body 4 is configured as a diaphragm pump, and the second pump body 5 is configured as a diaphragm pump. The diaphragm pump is electrically driven to improve flow control efficiency.

[0058] Furthermore, in this embodiment, there is no limitation on the specific arrangement between the first feed pipeline 200 and the second feed pipeline 400 .

[0059] As an embodiment, the pipeline sections of the first feed pipeline 200 and the second feed pipeline 400 connected to the dispersion equipment 2 are separately arranged, and are respectively connected to the dispersion equipment 2 through two sections of pipelines. At this time, the first pump body 4 is set to at least two, and is respectively connected to the first feed pipeline 200 and the second feed pipeline 400.

[0060] As an implementation method, Figure 1 As shown, the first feed pipeline 200 and the second feed pipeline 400 are integrated with the pipeline section connecting to the dispersion equipment 2, and are connected to the dispersion equipment 2 through a main pipeline. A three-way valve is set in the main pipeline to control the opening and closing of the first feed pipeline 200 and the second feed pipeline 400 respectively. At this time, the first pump body 4 is set to at least one and is connected in the main pipeline.

[0061] Furthermore, the specific arrangement between the first discharge pipeline 100 or the second discharge pipeline 300 is the same as the specific arrangement between the first feed pipeline 200 and the second feed pipeline 400 .

[0062] In one embodiment, Figure 1 As shown, a plurality of first pump bodies 4 are arranged in series; a plurality of second pump bodies 5 are arranged in series.

[0063] Specifically, Figure 1 As shown, since the mixed material after grinding and dispersion by the dispersing equipment 2 has a higher viscosity, by setting a plurality of first pump bodies 4 in the feed section pipeline and a plurality of second pump bodies 5 in the discharge end pipeline, the mixed material conveying capacity in the pipeline is improved to prevent pipeline blockage; at the same time, the circulation flow speed of the mixed material is increased, the grinding and dispersion efficiency is improved, thereby improving the preparation efficiency of the conductive slurry.

[0064] Furthermore, a large-diameter pipeline structure is adopted for the first discharge pipeline 100, the first feed pipeline 200, the second discharge pipeline 300 and the second feed pipeline 400 to further improve the mixed material conveying capacity in the pipeline and prevent the pipeline from being blocked.

[0065] In one embodiment, Figure 1 As shown, a first three-way valve 6 is arranged between the first feed pipeline 200 and the second feed pipeline 400, at least a portion of the first feed pipeline 200 and at least a portion of the second feed pipeline 400 are set as the same pipeline, and are connected between the first three-way valve 6 and the dispersion equipment 2; and / or a second three-way valve 7 is arranged between the first discharge pipeline 100 and the second discharge pipeline 300, at least a portion of the first discharge pipeline 100 and at least a portion of the second discharge pipeline 300 are set as the same pipeline, and are connected between the second three-way valve 7 and the dispersion equipment 2.

[0066] Specifically, Figure 1 As shown, the mixed material transportation between the first feed pipeline 200 and the second feed pipeline 400 is controlled by the first three-way valve 6, and the mixed material transportation between the first discharge pipeline 100 and the second discharge pipeline 300 is controlled by the second three-way valve 7, so that the mixed material can be dispersed in multiple cycles between the dispersion device 2 and the second tank body 3 and between the dispersion device 2 and the first tank body 1.

[0067] In one embodiment, Figure 1 As shown, the conductive slurry preparation system also includes a feed pipe 500 and a discharge pipe 600. The feed pipe 500 is connected to the first tank body 1 and is used to add a conductive agent and a dispersant to the first tank body 1. The discharge pipe 600 is connected to the second tank body 3 and is used to discharge the dispersed mixed material.

[0068] Specifically, Figure 1 As shown, a feed main pipe 500 is provided to facilitate adding a conductive agent and a dispersant into the first tank body 1, and a discharge main pipe 600 is provided to facilitate discharging the dispersed mixed material, that is, preparing a formed conductive slurry.

[0069] Furthermore, if Figure 1 As shown, a third pump body 9 is connected to the feed main pipe 500, and the third pump body 9 provides driving force for the mixed material in the feed main pipe 500 to ensure the flow of the mixed material in the pipeline; a fourth pump body 10 is connected to the discharge main pipe 600, and the fourth pump body 10 provides driving force for the mixed material in the discharge main pipe 600 to ensure the flow of the mixed material in the pipeline.

[0070] In one embodiment, Figure 1As shown, the discharge main pipe 600 is connected to the first tank body 1, the dispersion device 2 and the second tank body 3 respectively through the third three-way valve 8.

[0071] Specifically, Figure 1 As shown, in this embodiment, the first feed pipeline 200 and the discharge main pipe 600 are integrated with the pipeline section connected to the second tank body 3. A third three-way valve 8 is arranged between the first feed pipeline 200 and the discharge main pipe 600, connecting the first tank body 1, the dispersion device 2 and the second tank body 3. At least part of the first feed pipeline 200 and at least part of the discharge main pipe 600 are arranged as the same pipeline and connected between the third three-way valve 8 and the second tank body 3. The third three-way valve 8 is controlled to facilitate the control of the circulating material between the dispersion device 2 and the second tank body 3 to be discharged from the discharge main pipe 600.

[0072] Furthermore, the third pump body 9 is configured as a diaphragm pump, and the fourth pump body 10 is configured as a diaphragm pump. The diaphragm pump is electrically driven to improve the efficiency of controlling flow.

[0073] In one embodiment, Figure 1 As shown, the conductive slurry preparation system further includes a cooling pipeline 800 , and the cooling pipeline 800 is connected to the first tank body 1 and / or the dispersion device 2 and / or the second tank body 3 for heat exchange.

[0074] Specifically, Figure 1 As shown, the first tank body 1, the dispersion device 2 and the second tank body 3 are cooled by the cooling pipeline 800 to avoid high viscosity of the mixed material caused by volatilization of the solvent in the equipment due to excessive temperature, ensure that the mixed material has strong fluidity, and prevent equipment clogging.

[0075] Furthermore, if Figure 1 As shown, the cooling pipeline 800 includes an inlet pipeline 8001 and an outlet pipeline 8002. The inlet pipeline 8001 is used to introduce external cooling water, and the outlet pipeline 8002 is used to output the hot water after heat exchange to the outside. The hot water after heat exchange is re-cooled by a cooling device outside and then circulates into the inlet pipeline 8001 for circulation cooling.

[0076] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A conductive paste preparation system, characterized in that: include: Conductive agent pipeline, used for conveying conductive agent; Dispersant pipeline, used for conveying dispersant; A solvent pipeline (700) for conveying a solvent; A first tank body (1) is connected to the conductive agent pipeline, the dispersant pipeline and the solvent pipeline (700) respectively; a dispersion device (2), which is in communication with the first tank (1) and is used to disperse the mixed material transported by the first tank (1); The second tank body (3) is bidirectionally connected to the dispersion device (2). The second tank body (3) is used to store the mixed material transported by the dispersion device (2) or to transport the stored mixed material to the dispersion device (2). The second tank body (3) is connected to the solvent pipeline (700).

2. The conductive paste preparation system according to claim 1, characterized in that: The first tank (1) is bidirectionally connected to the dispersion device (2).

3. The conductive paste preparation system according to claim 2, characterized in that: It also includes a first discharge pipeline (100) and a first feed pipeline (200), which are respectively connected between the dispersion device (2) and the second tank body (3); The first discharge pipeline (100) is used to discharge the mixed material in the dispersion device (2) and transport it to the second tank (3); The first feed pipeline (200) is used to guide the mixed material in the second tank (3) and transport it to the dispersion device (2); The second tank body (3) and the dispersion device (2) are connected via the first discharge pipeline (100) and the first feed pipeline (200), so that the mixed material circulates between the second tank body (3) and the dispersion device (2), so that the dispersion device (2) disperses the mixed material multiple times.

4. The conductive paste preparation system according to claim 3, characterized in that: It also includes a second discharge pipeline (300) and a second feed pipeline (400), which are respectively connected between the dispersion device (2) and the first tank body (1); The second discharge pipeline (300) is used to discharge the mixed material in the dispersion device (2) and transport it to the first tank (1); The second feed pipeline (400) is used to guide the mixed material in the first tank (1) and transport it to the dispersion device (2); The first tank body (1) and the dispersion device (2) are connected via the second discharge pipeline (300) and the second feed pipeline (400), so that the mixed material circulates between the first tank body (1) and the dispersion device (2), so that the dispersion device (2) disperses the mixed material multiple times.

5. The conductive paste preparation system according to claim 4, characterized in that: The first feed pipeline (200) and / or the second feed pipeline (400) are respectively provided with a first pump body (4); the first discharge pipeline (100) and / or the second discharge pipeline (300) are respectively provided with a second pump body (5).

6. The conductive paste preparation system according to claim 5, characterized in that: A plurality of the first pump bodies (4) are arranged in series; and a plurality of the second pump bodies (5) are arranged in series.

7. The conductive paste preparation system according to claim 4, characterized in that: A first three-way valve (6) is provided between the first feed pipeline (200) and the second feed pipeline (400); at least a portion of the first feed pipeline (200) and at least a portion of the second feed pipeline (400) are provided as the same pipeline and are connected between the first three-way valve (6) and the dispersing device (2); And / or a second three-way valve (7) is provided between the first discharge pipeline (100) and the second discharge pipeline (300), at least a portion of the first discharge pipeline (100) and at least a portion of the second discharge pipeline (300) are provided as the same pipeline and are connected between the second three-way valve (7) and the dispersion device (2).

8. The conductive paste preparation system according to any one of claims 1 to 7, characterized in that: It also includes a feed pipe (500) and a discharge pipe (600), wherein the feed pipe (500) is connected to the first tank body (1), and the feed pipe (500) is used to add a conductive agent and a dispersant into the first tank body (1); the discharge pipe (600) is connected to the second tank body (3), and the discharge pipe (600) is used to discharge the dispersed mixed material.

9. The conductive paste preparation system according to claim 8, characterized in that: The discharge main pipe (600) is respectively connected to the first tank body (1), the dispersion device (2) and the second tank body (3) through a third three-way valve (8).

10. The conductive paste preparation system according to any one of claims 1 to 7, characterized in that: It also includes a cooling pipeline (800), which is connected to the first tank body (1) and / or the dispersion device (2) and / or the second tank body (3) for heat exchange.