Material filling device, stirring equipment and battery production line

By designing material filling devices for material storage parts, conveying components and measuring parts, the problem of low filling accuracy in the existing technology is solved, and the accurate filling of materials in the active materials of secondary battery is achieved, and the material quality is improved .

CN222111700UActive Publication Date: 2024-12-06CONTEMPORARY AMPEREX TECHNOLOGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420467998.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-12-06
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

The existing material filling device is difficult to accurately control the filling amount of liquid and powder during the preparation of active materials for secondary battery, resulting in low filling accuracy and affecting the quality of the material.

Method used

A material filling device is designed, including material storage parts, conveying components and metering parts. The accurate conveying and metering of materials is achieved through circulation pipelines and conveying pumps, and combined with control components and detection parts, automatic control and precise filling are achieved.

Benefits of technology

The efficiency and accuracy of material filling are improved, the content of each component in the active material of the secondary battery is controlled within the required range, and the quality of the material is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222111700U_ABST
    Figure CN222111700U_ABST
Patent Text Reader

Abstract

The utility model discloses a material filling device, stirring equipment and a battery production line, and relates to the technical field of material conveying. According to the material filling device, under the condition that the material filling efficiency is improved, the control precision of the material filling amount in the material filling process can be improved. The material filling device comprises a material storage part, a conveying assembly and at least two metering parts, wherein the material storage part is used for storing materials to be filled; one end of the conveying assembly is connected with the storage piece; each metering part is independently connected to the conveying assembly, can be connected with a target device and is used for detecting the amount of the to-be-injected materials injected into the target device. The material filling device is used for filling materials into the target device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of material conveying, and in particular to a material filling device, a stirring device and a battery production line. Background Art

[0002] Secondary batteries are being used more and more widely in life and industry. For example, new energy vehicles equipped with secondary batteries have been widely used. In addition, secondary batteries are also being increasingly used in energy storage fields.

[0003] After the secondary battery is discharged, the active material in the battery can be activated by charging, so that the secondary battery can continue to be used. In the process of preparing the active material in the secondary battery, it is usually necessary to add the powder and the liquid into the stirring device in different proportions, and form the required slurry by stirring. In the related art, the amount of liquid added to the stirring device is often determined by detecting the amount of liquid reduction in the liquid storage tank. This method usually cannot accurately control the amount of liquid added to the stirring device. Utility Model Content

[0004] The present application provides a material filling device, a stirring device and a battery production line, which can improve the material filling efficiency and also improve the control accuracy of the material filling amount during the material filling process.

[0005] The first aspect of the present application provides a material filling device, which includes: a material storage piece, a conveying component and at least two measuring pieces; wherein the material storage piece is used to store the material to be filled; one end of the conveying component is connected to the material storage piece; each measuring piece is independently connected to the conveying component, the measuring piece can be connected to a target device, and the measuring piece is used to detect the amount of material to be filled in the target device.

[0006] The material filling device provided by the present application includes a material storage part, through which a certain amount of material to be filled can be temporarily stored. In addition, one end of the conveying component is connected to the material storage part, and the material to be filled in the material storage part can be transported to the target device through the conveying component. At the same time, at least two metering parts are connected to the conveying component, and the target devices with the same number as the metering parts can be connected to a metering part respectively, so that at least two target devices can be filled with the material to be filled at the same time through the material filling device, which is conducive to improving the efficiency of the material filling device for material filling; and in the process of the material to be filled passing through the metering part and entering the target device, the amount of the material to be filled filled in the target device can be accurately detected by the metering part, which is conducive to improving the control of the end material filling accuracy in the process of filling the material. Therefore, the material filling device provided by the present application can improve the control accuracy of the material filling amount in the process of filling the material while improving the filling efficiency of the material.

[0007] In a possible implementation of the present application, the conveying component includes a circulation pipeline, one end of the circulation pipeline is connected to the discharge port of the material storage member, and the other end is connected to the reflux port of the material storage member; at least two metering members are connected to the circulation pipeline in sequence.

[0008] In the technical solution of the present application, the conveying assembly is configured to include a circulation pipeline, and one end of the circulation pipeline is connected to the discharge port of the material storage part, while the other end of the circulation pipeline is connected to the return port of the material storage part. In this way, not only can the material to be filled be transported to the target device through the circulation pipeline, but also when there is gas in the circulation pipeline, the gas can flow in the circulation pipeline until it enters the material storage part through the return port, so that the gas in the circulation pipeline can be removed, thereby reducing the risk of gas entering the target device through the metering part and affecting the filling accuracy of the material to be filled, and will not cause waste of the material to be filled.

[0009] In a possible implementation of the present application, the conveying assembly also includes a conveying pump, which is connected between the discharge port and one end of the circulation pipeline close to the discharge port and is electrically connected to the metering member. The conveying pump is used to pump the material to be filled stored in the storage member into the circulation pipeline.

[0010] In the technical solution of the present application, since the material outlet of the material storage part and the end of the circulation pipeline near the material outlet are connected by a delivery pump, the material to be filled can be pumped into the circulation pipeline by the delivery pump, so as to fill the material to be filled into the target device. At the same time, the metering part is electrically connected to the delivery pump, and the delivery pump can be automatically controlled according to the difference between the amount of the filled material detected by the metering part and the amount of the material to be filled planned to be filled, which is conducive to improving the control of the filling accuracy of the material to be filled.

[0011] In a possible implementation of the present application, the conveying assembly also includes a reflux control component, which is connected between the reflux port and an end of the circulation pipeline close to the reflux port, and is used to control the magnitude of the force acting on the material to be filled in the circulation pipeline.

[0012] In the technical solution of the present application, since a reflux control component is provided between the reflux port of the material storage component and one end of the circulation pipeline close to the reflux port, the pressure to which the material to be filled in the circulation pipeline is subjected can be controlled by the reflux control component so that the material to be filled can be quickly filled into the target device, which helps to reduce the risk of the material to be filled directly flowing back to the material storage component through the circulation pipeline, thereby affecting the filling efficiency of the material to be filled.

[0013] In a possible implementation of the present application, the material filling device also includes a control component, and each metering component and the conveying component are connected through a group of control components, and the control component is used to control the opening and closing of the pipeline between the conveying component and the corresponding metering component.

[0014] In the technical solution of the present application, since a control component is provided between the metering element and the conveying component, the control component can be used to control the on and off of the conveying component at the front end of the metering element, so as to control the conveying or stopping of the material to be filled in the conveying component.

[0015] In a possible implementation of the present application, the control component includes a first control valve, which is electrically connected to the corresponding metering component and is used to control the on-off of the pipeline between the conveying component and the corresponding metering component according to a control signal sent by the metering component.

[0016] In the technical solution of the present application, since a first control valve is provided between the conveying component and the metering component, and the corresponding first control valve and the metering component are electrically connected, not only can the channel of the conveying pipeline of the material to be filled be controlled by the first control valve, but the first control valve can also be controlled by the amount of filled material detected by the metering component, which is conducive to timely shutting off the pipeline between the conveying component and the metering component, thereby improving the accuracy of control over the amount of filled material filled into the target device.

[0017] In a possible implementation of the present application, the control component further includes a second control valve, which is connected between the conveying component and the first control valve and is used to manually control the on-off of the pipeline between the conveying component and the corresponding metering element.

[0018] In the technical solution of the present application, since a second control valve is further provided between the conveying assembly and the first control valve, the user can manually operate the second control valve to close or open the pipeline between the conveying assembly and the target device according to the use requirements of the material filling device. In this way, when the material filling device is being repaired or the material filling device is not used for a long time, the second control valve can be manually closed or opened, thereby improving the reliability of the on-off control of the conveying pipeline.

[0019] In a possible implementation of the present application, a detection component is provided in the accommodating cavity of the material storage component, and the detection component is used to detect the amount of material to be filled in the accommodating cavity. The detection component can be electrically connected to the material storage device and can send a filling instruction to the material storage device.

[0020] In the technical solution of the present application, since a detection member is provided in the accommodating chamber of the material storage part, the detection member can be used to detect the amount of the material to be filled in the accommodating chamber. At the same time, the detection member is set to a structural form that can be electrically connected to the material storage device that stores the material to be filled, and the material storage device can be controlled to replenish the material to be filled in the material storage part in time according to the information of the amount of the material to be filled in the accommodating chamber detected by the detection member. In this way, even in the case of filling the target device with the material to be filled by the material filling device, the material to be filled can also be replenished in the material storage part at the same time, thereby improving the working efficiency of the material filling device.

[0021] In a possible implementation of the present application, the metering element includes a mass flow meter, and the storage element is used to store liquid.

[0022] In the technical solution of the present application, since the material storage component is configured as a structure capable of storing liquid, the measuring component can adopt a mass flow meter. In the process of simultaneously filling liquid into at least two target devices through the material filling configuration, the volume or mass of the liquid filled into each target device can be accurately measured, thereby improving the control over the accuracy of the liquid filling amount.

[0023] The second aspect of the present application provides a stirring device, comprising: a material filling device provided in any one of the first aspects above and at least two stirring devices; wherein each stirring device is connected to an end of a metering member away from a conveying component.

[0024] The stirring device provided by the present application includes the material filling device provided by any one of the above items, so that while improving the filling efficiency of the material, it can also improve the control accuracy of the material filling amount during the filling process. At the same time, at least two stirring devices are provided in the stirring device, and one material storage member can be used to provide and fill the at least two stirring devices with the material to be filled, which is conducive to reducing the layout space required for the stirring device and can reduce the cost of the stirring device and related costs.

[0025] The third aspect of the present application provides a battery production line, which includes: a material storage device, a coating device and a stirring device provided in the second aspect above; wherein the material storage device is used to store materials to be filled; the material storage parts in the stirring device are connected to the material storage device; and the coating device is used to coat the slurry prepared by the stirring device on the current collector.

[0026] The battery production line provided by the present application, because it includes the above-mentioned stirring device, can improve the efficiency of material filling, and can also improve the control accuracy of the material filling amount during the material filling process, thereby improving the quality of the active material in the prepared battery. At the same time, by coating the slurry active material onto the current collector through the coating device, the manufacturing quality and efficiency of the electrode sheet can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Moreover, the same reference numerals are used throughout the drawings to represent the same components. In the drawings:

[0028] Figure 1 A schematic diagram of the structure of the material filling device provided in this application;

[0029] Figure 2 Provided for this application Figure 1 A partial enlarged view of part A.

[0030] Description of reference numerals:

[0031] 1- material storage part; 11- material outlet; 12- reflux port; 13- material supply port; 2- conveying component; 21- circulation pipeline; 22- conveying pump; 23- reflux control component; 3- metering component; 4- control component; 41- first control valve; 42- second control valve; 5- connecting pipe; 6- stirring device; 7- material storage equipment. DETAILED DESCRIPTION

[0032] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification of this application and the above-mentioned drawings and any variations thereof are intended to cover non-exclusive inclusions.

[0034] In the description of the embodiments of the present application, the technical terms "first", "second", "third", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.

[0035] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0036] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0037] In the description of the embodiments of the present application, the orientation or position relationship indicated by technical terms such as "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", and "circumferential" are based on the orientation or position relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed, operated or used in a specific orientation. Therefore, they should not be understood as limitations on the embodiments of the present application.

[0038] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0039] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, the technical term "contact" should be understood in a broad sense, and may be direct contact or contact through an intermediate medium layer. It may be contact with essentially no interaction force between the two contacting parties, or it may be contact with interaction force between the two contacting parties.

[0040] Below, this application is described in detail.

[0041] Batteries are used everywhere in our daily lives. For example, mobile phones, portable devices, laptops, electric vehicles, electric toys, electric tools, vehicles, ships, and spacecraft can all be powered by batteries to enable these devices or equipment to operate normally. These devices or equipment are usually equipped with secondary batteries, which refer to battery cells that can be recharged to activate the active materials after the battery cells are discharged and continue to be used. In the process of preparing secondary batteries, the active material needs to be coated on the current collector, and then the current collector coated with the active material is cold pressed and cut to obtain the pole piece; then the pole piece is subjected to a series of processing to obtain the final battery required.

[0042] The active material in the battery is usually in a slurry state before coating. In the process of preparing the slurry active material, liquid and powder need to be added to a mixer or a pulper to fully stir the liquid and powder to obtain a uniform slurry active material. In order to obtain high-quality active materials, it is necessary to improve the control accuracy of the filling amount of materials such as liquid and powder to control the content of each component in the active material within the required range.

[0043] The embodiment of the present application provides a material filling device, which can fill the material to be filled into the target device and can more accurately control the amount of the filled material. In order to facilitate the description and explanation of the material filling device provided in the embodiment of the present application, the material filling device provided in the embodiment of the present application is explained below by taking the material to be filled as a liquid as an example, but it does not limit the material filling device provided in the embodiment of the present application to only be used for conveying and filling liquids.

[0044] Reference Figure 1 and Figure 2 , Figure 1 The schematic diagram of the structure of the material filling device provided by the present application is shown. Figure 2 Provided for this application Figure 1 A partial enlarged view of part A in the figure. The material filling device provided in the embodiment of the present application comprises: a material storage part 1, a conveying component 2 and at least two metering parts 3; wherein the material storage part 1 is used to store the material to be filled; one end of the conveying component 2 is connected to the material storage part 1; each metering part 3 is independently connected to the conveying component 2, the metering part 3 can be connected to the target device, and the metering part 3 is used to detect the amount of the material to be filled in the target device.

[0045] In the embodiment of the present application, the material storage part 1 is used to temporarily store the material to be added to the target device, and the material storage part 1 can be set according to the type and property of the material to be added. For example, when the material to be added is liquid, the material storage part 1 can be set as a tank structure; when the material to be added is solid powder or solid particles, the material storage part 1 can be set as a box structure, etc. The embodiment of the present application does not limit the structure of the material storage part 1.

[0046] In the embodiment of the present application, there is a certain distance between the material storage part 1 and the target device, and a conveying component 2 can be set in the material filling device to convey the material to be filled temporarily stored in the material storage part 1 to the target device through the conveying component 2. One end of the conveying component 2 can be connected to the discharge port 11 of the material storage part 1, so that the conveying component 2 is connected to the accommodating cavity of the material storage part 1, and the conveying component 2 is extended to the location of the target device. For example, the conveying component 2 can be set to a structural form including a pipeline, and the material storage part 1 is connected to the target device through the pipeline.

[0047] In the embodiment of the present application, a metering element 3 may be provided in the material filling device so as to detect and control the amount of the material to be filled that is delivered to the target device through the metering element 3 .

[0048] Exemplarily, at least two metering members 3 may be provided on the conveying assembly 2 along the extension direction of the conveying assembly 2, and the at least two metering members 3 are independently connected to the conveying assembly 2. For example, two, three, four or five metering members 3 may be sequentially provided on the portion of the conveying assembly 2 away from the material storage member 1.

[0049] As another example, a connection structure adapted to the input port on the target device can be provided at the end of each metering member 3 away from the conveying component 2, and then a target device can be connected to each metering member 3. In this way, when it is necessary to add materials to the target device, the materials to be added stored in the material storage member 1 can be simultaneously conveyed to multiple target devices through the conveying component 2. While the materials to be added pass through the metering member 3, the metering member 3 can detect the amount of the materials to be added to determine the amount of the materials to be added to the target device. For example, when the materials to be added are liquid, the metering member 3 can use a mass flow meter, and then the volume or mass of the liquid added to the target device can be detected; when the materials to be added are powder, the metering member 3 can use a powder flow meter, and then the volume of the powder added to the target device can be detected.

[0050] The material filling device provided in the embodiment of the present application includes a material storage part 1, through which a certain amount of material to be filled can be temporarily stored. In addition, one end of the conveying component 2 is connected to the material storage part 1, and the material to be filled in the material storage part 1 can be transported to the target device through the conveying component 2. At the same time, at least two metering parts 3 are connected to the conveying component 2, and the target devices with the same number as the metering parts 3 can be connected to a metering part 3 respectively, so that at least two target devices can be filled with the material to be filled at the same time through the material filling device, which is conducive to improving the efficiency of the material filling device for material filling; and in the process of the material to be filled passing through the metering part 3 and entering the target device, the amount of the material to be filled filled in the target device can be accurately detected by the metering part 3, which is conducive to improving the control of the end material filling accuracy in the process of filling the material. Therefore, the material filling device provided in the embodiment of the present application can improve the control accuracy of the material filling amount in the process of filling the material while improving the filling efficiency of the material.

[0051] In some embodiments of the present application, the conveying component 2 includes a circulation pipeline 21, one end of the circulation pipeline 21 is connected to the discharge port 11 of the material storage member 1, and the other end is connected to the reflux port 12 of the material storage member 1; at least two metering members 3 are connected to the circulation pipeline 21 in sequence.

[0052] In the present application embodiment, Figure 1 As shown, a circulation pipeline 21 for conveying the material to be filled can be provided in the conveying assembly 2 , so that the material to be filled is conveyed from the material storage part 1 to the target device through the circulation pipeline 21 .

[0053] Exemplarily, the circulation pipeline 21 can be a pipeline, one end of the pipeline is connected to the discharge port 11 of the material storage member 1, and the other end of the pipeline is connected to the return port 12 of the material storage member 1. The discharge port 11 of the material storage member 1 is used to output the material to be filled from the storage chamber of the material storage member 1, and the return port 12 of the material storage member 1 is used to return the material to be filled that has not entered the target device in the pipeline and the gas in the pipeline to the storage chamber of the material storage member 1.

[0054] In another example, at least two metering elements 3 may be sequentially arranged on the pipeline along the extension direction of the pipeline, and each metering element 3 may be independently connected to the pipeline. For example, a connecting pipe 5 with a smaller diameter and adapted to the metering element 3 may be used, one end of the connecting pipe 5 may be connected to the pipeline as the circulation pipeline 21, and the metering element 3 may be connected to the other end of the connecting pipe 5.

[0055] In another example, the storage member 1 can be placed at a position higher than the target device in the vertical direction, so that the material to be filled can flow into the target device under the action of gravity. A device that can generate pressure on the material to be filled in the storage member 1 can also be provided to press the material to be filled into the circulation pipeline 21 through the pressure, for example, a gas with a high pressure is introduced into the containing chamber of the closed storage member 1 to apply pressure to the material to be filled.

[0056] In the above embodiment, since the conveying assembly 2 is configured to include a circulation pipeline 21, and one end of the circulation pipeline 21 is connected to the discharge port 11 of the material storage member 1, and the other end of the circulation pipeline 21 is connected to the return port 12 of the material storage member 1. In this way, not only can the material to be filled be conveyed to the target device through the circulation pipeline 21; but also, when there is gas in the circulation pipeline 21, the gas can flow in the circulation pipeline 21 until it enters the material storage member 1 through the return port 12, so that the gas in the circulation pipeline 21 can be removed, thereby reducing the risk of gas entering the target device through the metering member 3 and affecting the filling accuracy of the material to be filled, and will not cause waste of the material to be filled.

[0057] In some embodiments of the present application, the conveying component 2 also includes a conveying pump 22, which is connected between the discharge port 11 and an end of the circulation pipeline 21 close to the discharge port 11, and the conveying pump 22 is electrically connected to the metering member 3. The conveying pump 22 is used to pump the material to be filled stored in the storage member 1 into the circulation pipeline 21.

[0058] In the present application embodiment, Figure 1 As shown, a conveying pump 22 can be set in the conveying component 2, and the discharge port 11 of the material storage member 1 and the end of the circulation pipeline 21 close to the discharge port 11 are connected through the conveying pump 22, so that the conveying pump 22 applies force to the material to be filled, and the material to be filled is pumped into the circulation pipeline 21.

[0059] Exemplarily, when the material to be added is liquid, the delivery pump 22 can be a centrifugal pump, a gear pump, a diaphragm pump or a plunger pump, etc. When the material to be added is powder, the delivery pump 22 can be a screw pump, etc. The inlet of the delivery pump 22 can be connected to the discharge port 11 of the material storage member 1, and the outlet of the delivery pump 22 can be connected to one end of the circulation pipeline 21, so as to connect the delivery pump 22 between the discharge port 11 and the circulation pipeline 21.

[0060] In another example, all metering elements 3 in the material filling device can be electrically connected to the delivery pump 22. For example, all metering elements 3 are electrically connected to the controller of the delivery pump 22 through a transmission cable, or through a wireless connection method such as Bluetooth. In this way, the delivery power of the delivery pump 22 and the start and stop of the delivery pump 22 can be controlled according to the difference between the amount of the material already filled into the target device detected by each metering element 3 and the amount of the material to be filled planned to be filled, so as to realize the control of the filling accuracy of the material to be filled and the automatic adjustment of the delivery power of the delivery pump 22.

[0061] In the above embodiment, since the discharge port 11 of the material storage member 1 and the end of the circulation pipeline 21 close to the discharge port 11 are connected by the delivery pump 22, the material to be filled can be pumped into the circulation pipeline 21 by the delivery pump 22, so as to fill the material to be filled into the target device. At the same time, the metering member 3 is electrically connected to the delivery pump 22, and the delivery pump 22 can be automatically controlled according to the difference between the amount of the filled material detected by the metering member 3 and the amount of the material to be filled planned to be filled, which is conducive to improving the control of the filling accuracy of the material to be filled.

[0062] In some embodiments of the present application, the conveying component 2 also includes a reflux control component 23, which is connected between the reflux port 12 and an end of the circulation pipeline 21 close to the reflux port 12, and is used to control the magnitude of the force acting on the material to be filled in the circulation pipeline 21.

[0063] In the embodiment of the present application, a reflux control component 23 may be provided in the conveying assembly 2 so that the material to be filled in the circulation pipeline 21 can be better filled into the target device.

[0064] Exemplarily, a reflux control member 23 may be provided between the end of the circulation pipeline 21 and the reflux port 12 of the material storage member 1, that is, the reflux control member 23 is located between a metering member 3 closest to the reflux port 12 and the reflux port 12, and is connected between the circulation pipeline 21 and the reflux port 12. For example, the reflux control member 23 may be a pressure control valve, such as a back pressure valve.

[0065] In the above embodiment, since a reflux control component 23 is provided between the reflux port 12 of the material storage component 1 and one end of the circulation pipeline 21 close to the reflux port 12, the reflux control component 23 can be used to control the pressure to which the material to be filled in the circulation pipeline 21 is subjected, so that the material to be filled can be quickly filled into the target device, which helps to reduce the risk of the material to be filled directly flowing back to the material storage component 1 through the circulation pipeline 21, thereby affecting the filling efficiency of the material to be filled.

[0066] In some embodiments of the present application, the material filling device also includes a control component 4, each metering component 3 and the conveying component 2 are connected through a group of control components 4, and the control component 4 is used to control the on-off of the pipeline between the conveying component 2 and the corresponding metering component 3.

[0067] In the present application embodiment, Figure 2 As shown, a control component 4 may also be provided in the material filling device to control the opening and closing of a pipeline for conveying the material to be filled through the control component 4 .

[0068] For example, a group of control components 4 can be arranged at the position corresponding to each metering element 3 on the circulation pipeline 21. For example, the control component 4 can be a valve to control the opening and closing of the pipeline through the valve. In this way, before the target device needs to be filled with the material to be filled, the valve corresponding to the target device can be opened first to connect the pipeline between the delivery pump 22 and the target device. After the filling of the material to be filled in the target device is completed, the pipeline can be closed in time.

[0069] In the above embodiment, since a control component 4 is provided between the metering member 3 and the conveying component 2, the on and off of the conveying component 2 at the front end of the metering member 3 can be controlled by the control component 4, so as to control the conveying or stopping of the material to be filled in the conveying component 2.

[0070] In some embodiments of the present application, the control component 4 includes a first control valve 41, which is electrically connected to the corresponding metering component 3 and is used to control the on-off of the pipeline between the conveying component 2 and the corresponding metering component 3 according to the control signal sent by the metering component 3.

[0071] In the present application embodiment, Figure 2 As shown, a first control valve 41 may be provided in the control assembly 4 , and the first control valve 41 may be electrically connected to the metering element 3 .

[0072] For example, the first control valve 41 may be an electric valve, a pneumatic valve, a hydraulic valve, or other valves capable of realizing automatic control. For example, the first control valve 41 may be an electromagnetic valve.

[0073] In another example, the first control valve 41 and the metering element 3 connected to the same target device can be electrically connected through a transmission cable, such as electrically connecting the metering element 3 to the controller of the corresponding first control valve 41. The corresponding first control valve 41 and the metering element 3 can also be electrically connected by wireless connection. In this way, when the metering element 3 detects that the amount of material added to the target device reaches the planned amount, the metering element 3 can send a control signal to the first control valve 41, and the first control valve 41 performs a closing action in response to the control signal, thereby shutting off the pipeline between the conveying component 2 and the metering element 3, so that the material to be added can be controlled to stop being added to the target device.

[0074] As another example, the first control valve 41 can also be electrically connected to the controller of the material filling device. When the target device needs to be filled with the material to be filled, a control signal can be sent to the first control valve 41 through the controller of the material filling device. The first control valve 41 performs an opening action in response to the control signal, thereby opening the pipeline between the conveying component 2 and the metering device 3.

[0075] In the above embodiment, since the first control valve 41 is provided between the conveying component 2 and the metering component 3, and the corresponding first control valve 41 and the metering component 3 are electrically connected, not only can the channel of the conveying pipeline of the material to be filled be controlled by the first control valve 41, but the first control valve 41 can also be controlled by the amount of the filled material detected by the metering component 3, which is conducive to timely shutting off the pipeline between the conveying component 2 and the metering component 3, thereby improving the accuracy of the control of the amount of the filled material filled into the target device.

[0076] In some embodiments of the present application, the control component 4 also includes a second control valve 42, which is connected between the conveying component 2 and the first control valve 41, and the second control valve 42 is used to manually control the on-off of the pipeline between the conveying component 2 and the corresponding metering component 3.

[0077] In the present application embodiment, Figure 2 As shown, a second control valve 42 may be further provided in the control assembly 4 , and the second control valve 42 may be connected between the delivery assembly 2 and the first control valve 41 .

[0078] Exemplarily, the second control valve 42 may be a manual ball valve, the inlet of the manual ball valve may be connected to the circulation pipeline 21 in the conveying assembly 2, and the outlet of the manual ball valve may be connected to the inlet of the first control valve 41. In this way, the on-off of the pipeline between the conveying assembly 2 and the target device may be controlled by the user manually closing the second control valve 42, or manually opening the second control valve 42. For example, if the material filling device is not used for a long time, the second control valve 42 may be manually closed, or if the material filling device is under maintenance, the second control valve 42 may be manually closed.

[0079] In the above embodiment, since the second control valve 42 is further provided between the conveying assembly 2 and the first control valve 41, the user can manually operate the second control valve 42 to close or open the pipeline between the conveying assembly 2 and the target device according to the use requirements of the material filling device. In this way, when the material filling device is to be repaired or the material filling device is not to be used for a long time, the second control valve 42 can be manually closed or opened, thereby improving the reliability of the control of the on-off of the conveying pipeline.

[0080] In some embodiments of the present application, Figure 1 As shown, a detection component is provided in the accommodating chamber of the material storage component 1, and the detection component is used to detect the amount of the material to be filled in the accommodating chamber. The detection component can be electrically connected to the material storage device 7 and can send a material replenishment instruction to the material storage device 7.

[0081] In the embodiment of the present application, a detection member may be provided in the accommodating chamber of the material storage member 1 so as to detect the amount of the material to be filled in the accommodating chamber of the material storage member 1 through the detection member.

[0082] Exemplarily, when the material to be added is liquid, the detection member may be a level meter, which can detect the liquid level in the containing chamber to determine whether it is necessary to add liquid to the containing chamber of the storage member 1. When the material to be added is powder, the detection member may be a level meter, which can detect the surface position of the powder to determine whether it is necessary to add powder to the containing chamber of the storage member 1.

[0083] In another example, the detection member can be set to a structural form that can be electrically connected to the storage device 7, for example, the detection member is electrically connected to the storage device 7 in the factory that stores the materials to be filled through a transmission cable, such as the detection member is electrically connected to the controller of the conveying device in the storage device 7. In this way, when the detection member detects that the amount of the materials to be filled in the storage member 1 is less than the preset threshold, a refilling instruction can be sent to the controller, and the controller responds to the refilling instruction to control the conveying device to start and replenish the materials to be filled in the storage member 1 until the materials to be filled in the storage member 1 reach the required amount.

[0084] In the above embodiment, since a detection member is provided in the accommodating chamber of the material storage member 1, the detection member can be used to detect the amount of the material to be filled in the accommodating chamber. At the same time, the detection member is set to a structural form that can be electrically connected to the material storage device 7 that stores the material to be filled, and the material storage device 7 can be controlled to replenish the material to be filled in the material storage member 1 in time according to the information of the amount of the material to be filled in the accommodating chamber detected by the detection member. In this way, even when the material to be filled is filled into the target device through the material filling device, the material to be filled can also be replenished into the material storage member 1 at the same time, thereby improving the working efficiency of the material filling device.

[0085] In some embodiments of the present application, the metering element 3 includes a mass flow meter, and the storage element 1 is used to store liquid.

[0086] In the embodiment of the present application, the material filling device can be used as a device for filling the target device with liquid. The material storage part 1 can be set as a tank or other structural form capable of temporarily storing liquid, and the metering part 3 can be a mass flow meter. In this way, the material filling device can be used to simultaneously fill at least two target devices with the required liquid.

[0087] In the above embodiment, since the material storage member 1 is configured to be a structure capable of storing liquid, the measuring member 3 can adopt a mass flow meter. In the process of simultaneously filling liquid into at least two target devices through the material filling configuration, the volume or mass of the liquid filled into each target device can be accurately measured, thereby improving the control of the accuracy of the liquid filling amount.

[0088] In addition, the present application also provides a stirring device, such as Figure 1 As shown, the stirring device comprises: a material filling device provided by any one of the above embodiments and at least two stirring devices 6; wherein each stirring device 6 is connected to an end of a metering member 3 away from the conveying assembly 2.

[0089] In the embodiment of the present application, the stirring device 6 can be a device for stirring and mixing materials of at least two components. The stirring device 6 can be selected according to the type and characteristics of the stirred materials, for example, the stirring device 6 can be a paddle stirrer, an anchor stirrer, a worm wheel stirrer or a screw stirrer.

[0090] For example, the number of stirring devices 6 can be selected as needed, and one stirring device 6 can be connected to the conveying assembly 2 in the material filling device through a corresponding metering member 3. For example, eight metering members 3 can be set in the material filling system, and correspondingly, eight stirring devices 6 can be set in the stirring device.

[0091] The stirring device provided in the embodiment of the present application includes the material filling device provided in any of the above embodiments. Therefore, while improving the filling efficiency of the material, it is also possible to improve the control accuracy of the material filling amount during the filling process. At the same time, at least two stirring devices 6 are provided in the stirring device, and one material storage member 1 can be used to provide and fill the at least two stirring devices 6 with the material to be filled, which is conducive to reducing the layout space required for the stirring device, and can reduce the cost of the stirring device and related costs (plant and energy consumption, etc.).

[0092] At the same time, the embodiment of the present application also provides a battery production line, such as Figure 1 As shown, the battery production line includes: a material storage device 7, a coating device and a stirring device provided in the above embodiment; wherein the material storage device 7 is used to store materials to be filled; the material storage part 1 in the stirring device is connected to the material storage device 7; and the coating device is used to coat the slurry prepared by the stirring device on the current collector.

[0093] In the embodiment of the present application, the storage device 7 may be a device for storing materials to be filled, for example, the storage device 7 may be a tank or box that can store a large amount of materials to be filled. A conveying device may be provided in the storage device 7, and the conveying device may be connected to the feeding port 13 of the storage member 1 in the material filling device, so that the storage member 1 can be replenished with materials to be filled.

[0094] Exemplarily, the material to be filled may be a solution for preparing an active material in a battery, and the solution and the powder may be stirred evenly by a stirring device to obtain a slurry-like active material.

[0095] In the embodiment of the present application, the coating device is used to coat the slurry active material on the current collector. The strip-shaped current collector can be mounted on the coating device, and the slurry active material can be added to the coating device. During the operation of the coating device, the slurry active material can be evenly coated on the surface of the strip-shaped current collector to obtain a pole piece with good consistency, which is conducive to improving the quality of the obtained pole piece.

[0096] Exemplarily, the positive electrode current collector in the battery has two surfaces opposite to each other in its own thickness direction, and the positive electrode active material is arranged on either or both of the two surfaces opposite to the positive electrode current collector. The positive electrode current collector can be a metal foil or a composite current collector. For example, as a metal foil, aluminum or stainless steel, stainless steel, copper, aluminum, nickel, carbon electrode, carbon, nickel or titanium, etc., treated with silver surface, can be used. The composite current collector may include a polymer material base and a metal layer. The composite current collector can be formed by forming a metal material (aluminum, aluminum alloy, nickel, nickel alloy, titanium, titanium alloy, silver and silver alloy, etc.) on a polymer material substrate (such as a substrate of polypropylene, polyethylene terephthalate, polybutylene terephthalate, polystyrene, polyethylene, etc.).

[0097] As another example, the positive electrode active material may include at least one of the following materials: lithium-containing phosphates, lithium transition metal oxides, and their respective modified compounds. However, the present application is not limited to these materials, and other traditional materials that can be used as positive electrode active materials for batteries may also be used. These positive electrode active materials may be used alone or in combination of two or more. Among them, examples of lithium-containing phosphates may include, but are not limited to, at least one of lithium iron phosphate (such as LiFePO4 (also referred to as LFP)), a composite material of lithium iron phosphate and carbon, lithium manganese phosphate (such as LiMnPO4), a composite material of lithium manganese phosphate and carbon, lithium iron manganese phosphate, and a composite material of lithium iron manganese phosphate and carbon.

[0098] The battery production line provided in the embodiment of the present application includes the stirring device provided in the above embodiment, which can improve the efficiency of material filling and the control accuracy of the material filling amount during the material filling process, thereby improving the quality of the active material in the prepared battery. At the same time, the slurry-like active material is coated on the current collector through the coating device, which can improve the manufacturing quality and efficiency of the electrode sheet.

[0099] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application is described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some or all of the technical features can be replaced by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the specification of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way.

Claims

1. A material filling device, characterized in that: include: A material storage part, wherein the material storage part is used to store materials to be filled; A conveying assembly, one end of which is connected to the material storage member; At least two metering members, each of which is independently connected to the conveying assembly, and the metering members can be connected to a target device, and the metering members are used to detect the amount of the material to be filled into the target device.

2. The material filling device according to claim 1, characterized in that: The conveying assembly comprises a circulation pipeline, one end of which is connected to the discharge port of the material storage member, and the other end of which is connected to the reflux port of the material storage member; at least two of the metering members are sequentially connected to the circulation pipeline.

3. The material filling device according to claim 2, characterized in that: The conveying assembly also includes a conveying pump, which is connected between the discharge port and one end of the circulation pipeline close to the discharge port and is electrically connected to the metering member. The conveying pump is used to pump the material to be filled stored in the storage member into the circulation pipeline.

4. The material filling device according to claim 2, characterized in that: The conveying assembly also includes a reflux control component, which is connected between the reflux port and an end of the circulation pipeline close to the reflux port and is used to control the magnitude of the force applied to the material to be filled in the circulation pipeline.

5. The material filling device according to any one of claims 1 to 4, characterized in that: It also includes a control component, each of the metering components and the conveying component is connected through a group of the control components, and the control component is used to control the on-off of the pipeline between the conveying component and the corresponding metering component.

6. The material filling device according to claim 5, characterized in that: The control component includes a first control valve, which is electrically connected to the corresponding metering component and is used to control the on-off of the pipeline between the conveying component and the corresponding metering component according to a control signal sent by the metering component.

7. The material filling device according to claim 6, characterized in that: The control assembly further comprises a second control valve, which is connected between the conveying assembly and the first control valve and is used for manually controlling the on-off of the pipeline between the conveying assembly and the corresponding metering element.

8. The material filling device according to any one of claims 1 to 4, characterized in that: A detection member is provided in the accommodating cavity of the material storage member, and the detection member is used to detect the amount of the material to be filled in the accommodating cavity. The detection member can be electrically connected to the material storage device and can send a material replenishment instruction to the material storage device.

9. The material filling device according to any one of claims 1 to 4, characterized in that: The metering element comprises a mass flow meter, and the storage element is used for storing liquid.

10. A stirring device, characterized in that: include: The material filling device according to any one of claims 1 to 9; At least two stirring devices, each of which is connected to an end of one of the metering members away from the conveying assembly.

11. A battery production line, characterized in that: include: A material storage device, wherein the material storage device is used to store materials to be filled; The stirring device according to claim 10, wherein the material storage member is connected to the material storage device; A coating device is used to coat the slurry prepared by the stirring device on a current collector.