By designing a large concrete processing system, including a three-story steel structure main building and a closed control area, the problem that the concrete mixing station in the existing technology cannot produce different types of concrete products and covers a large area, and achieves a compact layout and wide applicability. , safe and environmentally friendly effects.
Patent Information
- Application Number
- CN202420521221.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-18
AI Technical Summary
The existing concrete mixing stations cannot produce different types of concrete products at the same time, and the area covers a large area, resulting in an increase in construction site requirements, making it difficult to meet the concrete strength and mix ratio requirements of different projects.
A large-scale concrete processing system was designed, including a three-story steel structure main building and a closed control area. There are processing areas on both sides of the left and right sides, equipped with two sets of concrete mixing stations and aggregate conveying devices, which are controlled and inspected through the control area. Reduce footprint and improve productivity and adaptability.
A concrete processing system with a compact layout, wide applicability, safe and environmentally friendly has been realized, which has improved production efficiency and maintenance safety, and has reduced the impact of dust pollution on personnel.
Smart Images

Figure CN222115581U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete processing, in particular to a large-scale concrete processing system. Background Art
[0002] Concrete mixing station is a combined device used for centralized mixing of concrete, also known as concrete prefabrication plant. Due to its high degree of mechanization and automation, it has high productivity, can ensure the quality of concrete and save cement, and is often used in large and medium-sized water conservancy, power, bridge and other projects with large concrete engineering volume, long construction period and concentrated construction sites. With the development of municipal construction, mixing stations that use centralized mixing and provide commercial concrete have great advantages and have therefore developed rapidly.
[0003] However, the concrete strength grades required for various components of water conservancy, power, bridges and other projects are quite different, resulting in different types and mix ratios of raw materials. The existing concrete mixing station can only produce a single type of concrete product at the same time. If different types of concrete products are required, a corresponding concrete mixing station needs to be configured separately. However, concrete mixing stations generally occupy a large area. Therefore, this method of configuring a separate concrete mixing station further increases the requirements for the construction site and needs further improvement. Utility Model Content
[0004] The utility model aims to provide a large-scale concrete processing system with compact layout and wide applicability.
[0005] The purpose of the utility model is achieved as follows: a large-scale concrete processing system, including a three-story steel structure main building, a closed control area is provided in the middle of the main building, processing areas are provided on the left and right sides, a powder batching hopper, an aggregate batching hopper and an admixture batching hopper are installed on the top layer of the processing area, the powder batching hopper, the aggregate batching hopper and the admixture batching hopper are connected to a mixing main machine installed in the middle layer of the processing area, a discharge port at the bottom of the mixing main machine is connected to a discharge hopper installed on the top of the bottom layer of the processing area, the layers of the control area are connected by stairs, and the control area of each layer is connected to the adjacent processing area through an inspection door, a powder silo is provided on the front side of the control area and the outside of the processing area, the powder silo is connected to the powder batching hopper through a closed powder conveying device, an entry and exit space for a concrete mixer truck is provided on the front side of the processing area, an aggregate delivery device is provided on the rear side of the processing area, and the aggregate delivery device is connected to the aggregate batching hopper.
[0006] The large-scale concrete processing system of the utility model is equipped with two sets of concrete mixing stations, which are controlled by a centrally arranged control area. While saving floor space, the concrete production efficiency is greatly improved. The two sets of concrete mixing stations can be controlled to respectively configure concrete with different mix ratios according to the needs of the construction project, thereby improving the adaptability of the concrete mixing station. At the same time, the maintenance of the large-scale concrete processing system of the utility model is carried out through the stairs and maintenance doors in the control area. Compared with the prior art method of directly setting stairs in the processing area, the time that maintenance personnel stay in the processing area to work is reduced, the safety of maintenance operations is improved, and the health effects of pollutants such as dust on maintenance personnel are reduced. In summary, the large-scale concrete processing system of the utility model has the advantages of compact layout, wide applicability, flexibility, safety and environmental protection.
[0007] As a further improvement of the utility model, the aggregate delivery device includes a plurality of aggregate feeding hoppers arranged side by side, an aggregate measuring hopper is arranged below the aggregate feeding hopper, a horizontal belt conveyor is arranged below the aggregate measuring hopper, the discharge end of the horizontal belt conveyor is arranged corresponding to the lower end of the feeding belt conveyor below, and the upper end of the feeding belt conveyor is connected to the aggregate batching hopper. The structural design is compact and space-saving.
[0008] As a further improvement of the utility model, the aggregate feed hopper is fixed on the ground through a bracket, the horizontal belt conveyor is arranged on the ground, and dust shields are arranged around the aggregate metering hopper and the horizontal belt conveyor to reduce dust emission during the feeding process.
[0009] As a further improvement of the utility model, the lower end of the loading belt conveyor is arranged in a pit, and a drop baffle is provided on the outer side of the discharge end of the horizontal belt conveyor corresponding to the lower end of the loading belt conveyor below, so as to reduce dust emission when the aggregate falls from the horizontal belt conveyor to the loading belt conveyor and protect the environment.
[0010] As a further improvement of the utility model, support columns are arranged between the middle part of the feeding belt conveyor and the ground to provide stable support for the feeding belt conveyor. The upper end of the support column is connected to the bottom of the feeding belt conveyor through a hinged seat to improve the wind and earthquake resistance. The detachable connection method also facilitates the installation and inspection and maintenance of the equipment.
[0011] As a further improvement of the utility model, the number of powder bins outside the processing area is 4, and the number of aggregate feed hoppers corresponding to each aggregate delivery device is 4, which can meet the real-time needs of large-scale projects for concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of a large-scale concrete processing system of the utility model.
[0013] Figure 2 for Figure 1 Top view of the .
[0014] Figure 3 It is a side view of the aggregate distribution device of the large-scale concrete processing system of the utility model.
[0015] Figure 4 The utility model is an end view of an aggregate distribution device of a large-scale concrete processing system.
[0016] Among them, 1 control area, 2 powder batching hopper, 3 aggregate batching hopper, 4 admixture batching hopper, 5 mixing main machine, 6 discharge hopper, 7 stairs, 8 powder silo, 9 powder conveying device, 10 aggregate feed hopper, 11 aggregate measuring hopper, 12 horizontal belt conveyor, 13 feeding belt conveyor, 14 dust shield, 15 pit, 16 drop baffle, 17 support column, 18 articulated seat. DETAILED DESCRIPTION
[0017] like Figure 1-4 The large-scale concrete processing system shown in the figure includes a three-story steel structure main building, with a closed control area 1 in the middle of the main building (the side walls of the control area are omitted in the figure), and processing areas on the left and right sides. The top layer of the processing area is equipped with a powder batching hopper 2, an aggregate batching hopper 3 and an admixture batching hopper 4. The powder batching hopper 2, the aggregate batching hopper 3 and the admixture batching hopper 4 are connected to the mixing main machine 5 installed in the middle layer of the processing area, and the bottom discharge port of the mixing main machine 5 is connected to the discharge hopper 6 installed on the top of the bottom layer of the processing area. Different functions can be allocated to each layer in the control area as needed. For example, the top layer is a tool room, where various maintenance tools and operating tools are placed; the middle layer is a control room, where various equipment for monitoring and controlling the equipment in the processing area is installed; the bottom layer is a duty room for personnel to rest.
[0018] Each floor of the control area 1 is connected by a staircase 7, and each floor of the control area 1 is connected to the adjacent processing area through an inspection door (omitted in the figure). Therefore, the maintenance of the equipment in the processing area is carried out through the staircase 7 and the inspection door in the control area 1 area. Compared with the prior art method of directly setting the staircase 7 in the processing area, the time that the maintenance personnel stay in the processing area to work is reduced, the safety of the maintenance work is improved, and the health impact of pollutants such as dust on the maintenance personnel is reduced.
[0019] A powder bin 8 is provided at the front side of the control area 1 and the outside of the processing area, and the powder bin 8 is connected to the powder batching hopper 2 through a closed powder conveying device 9. A concrete mixer truck entry and exit space is provided at the front side of the processing area, and an aggregate delivery device is provided at the rear side of the processing area, and the aggregate delivery device is connected to the aggregate batching hopper 3. In this embodiment, the number of powder bins 8 outside each processing area is 4, and a powder bin 8 is also provided at the front side of the control area 1. The powder bin 8 at the front side of the control area 1 is connected to the powder batching hoppers 2 of the two processing areas through two closed powder conveying devices 9. Therefore, the powder delivery direction in the powder bin 8 at the front side of the control area 1 can be flexibly controlled according to the demand for concrete of different mix ratios at the construction site, further improving the applicability of the concrete processing system. The number of aggregate feed hoppers 10 corresponding to each aggregate delivery device is 4, which can meet the real-time needs of large-scale projects for concrete.
[0020] Specifically, the aggregate delivery device includes a plurality of aggregate feed hoppers 10 arranged side by side, an aggregate metering hopper 11 is arranged below the aggregate feed hopper 10, a horizontal belt conveyor 12 is arranged below the aggregate metering hopper 11, the discharge end of the horizontal belt conveyor 12 is arranged corresponding to the lower end of the lower feeding belt conveyor 13, and the upper end of the feeding belt conveyor 13 is connected to the aggregate batching hopper 3. The aggregate feed hopper 10 is fixed to the ground through a bracket, the horizontal belt conveyor 12 is arranged on the ground, and dust shields 14 are arranged around the aggregate metering hopper 11 and the horizontal belt conveyor 12 to reduce dust emission during the material discharge process. The lower end of the feeding belt conveyor 13 is arranged in a pit 15, and a drop baffle 16 is arranged on the outer side of the discharge end of the horizontal belt conveyor 12 corresponding to the lower end of the lower feeding belt conveyor 13 to reduce dust emission when the aggregate falls from the horizontal belt conveyor 12 to the feeding belt conveyor 13, thereby protecting the environment. A support column 17 is provided between the middle of the feeding belt conveyor 13 and the ground to provide stable support for the feeding belt conveyor 13. The upper end of the support column 17 is connected to the bottom of the feeding belt conveyor 13 through a hinged seat 18 to improve the wind and earthquake resistance. The detachable connection method also facilitates the installation and inspection and maintenance of the equipment.
[0021] The large-scale concrete processing system of this embodiment has the advantages of compact layout, wide applicability, flexibility, safety and environmental protection.
[0022] The present utility model is not limited to the above-mentioned embodiments. On the basis of the technical solution disclosed in the present utility model, technicians in this field can make some substitutions and deformations to some technical features therein according to the disclosed technical content without creative labor, and these substitutions and deformations are all within the protection scope of the present utility model.
Claims
1. A large-scale concrete processing system, characterized in that: It includes a three-story steel structure main building, with a closed control area in the middle of the main building and processing areas on the left and right sides. A powder batching hopper, an aggregate batching hopper and an admixture batching hopper are installed on the top floor of the processing area. The powder batching hopper, the aggregate batching hopper and the admixture batching hopper are connected to a mixing main unit installed in the middle floor of the processing area. The bottom discharge port of the mixing main unit is connected to a discharge hopper installed on the top of the bottom floor of the processing area. The floors of the control area are connected by stairs, and the control area of each floor is connected to the adjacent processing area through an inspection door. A powder silo is provided on the front side of the control area and the outside of the processing area. The powder silo is connected to the powder batching hopper through a closed powder conveying device. An entry and exit space for a concrete mixer truck is provided on the front side of the processing area, and an aggregate delivery device is provided on the rear side of the processing area, and the aggregate delivery device is connected to the aggregate batching hopper.
2. The large-scale concrete processing system according to claim 1, characterized in that: The aggregate delivery device includes a plurality of aggregate feeding hoppers arranged side by side, an aggregate measuring hopper is arranged below the aggregate feeding hopper, a horizontal belt conveyor is arranged below the aggregate measuring hopper, the discharge end of the horizontal belt conveyor is arranged corresponding to the lower end of the feeding belt conveyor below, and the upper end of the feeding belt conveyor is connected to the aggregate batching hopper.
3. The large-scale concrete processing system according to claim 2, characterized in that: The aggregate feed hopper is fixed on the ground through a bracket, the horizontal belt conveyor is arranged on the ground, and dust shields are arranged around the aggregate weighing hopper and the horizontal belt conveyor.
4. The large-scale concrete processing system according to claim 3, characterized in that: The lower end of the feeding belt conveyor is arranged in the pit, and the discharge end of the horizontal belt conveyor is arranged corresponding to the lower end of the lower feeding belt conveyor, and a material drop baffle is arranged on the outer side.
5. The large-scale concrete processing system according to any one of claims 2 to 4, characterized in that: A support column is arranged between the middle of the feeding belt conveyor and the ground, and the upper end of the support column is connected to the bottom of the feeding belt conveyor through a hinged seat.
6. The large-scale concrete processing system according to any one of claims 2 to 4, characterized in that: The number of powder bins outside the processing area is 4, and the number of aggregate feed hoppers corresponding to each of the aggregate delivery devices is 4.