Offshore floating operation platform device
By designing the offshore floating operating platform device, using the structure of symmetrical truss and positioning plates, offshore pile head treatment and superstructure operations can be manually completed under the appropriate tide position, solving the problems of low efficiency and high cost of offshore construction work, and achieving high efficiency, Low-cost construction effect.
Patent Information
- Application Number
- CN202421072021.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-05-16
AI Technical Summary
During offshore construction, the pile head treatment and superstructure formwork support of high-pile structural docks are greatly affected by tides, resulting in low construction efficiency and high cost.
Design an offshore floating operating platform device, including an operating platform spliced by two symmetrical trusses, with a floating barrel and a positioning plate installed inside, and a positioning hole adapted to the pile foundation is provided in the middle of the positioning plate, and positioning is achieved through connecting members and telescopic springs. And fixed, manual pile head treatment and superstructure operations can be performed at the appropriate tide level, avoiding the use of auxiliary mechanical equipment.
It improves the efficiency and quality of offshore construction operations, reduces operating costs, and realizes that pile head treatment and superstructure operations are completed manually at the appropriate tide level.
Smart Images

Figure CN222117067U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an offshore floating operating platform device. Background Art
[0002] With the rapid development of domestic coastal port terminal construction, environmental protection requirements are becoming increasingly stringent, and high-pile structure docks are widely used as a permeable structure. The cast-in-place beam and slab of the high-pile structure superstructure or the bottom formwork support of the cast-in-place pier is a key construction process. The pile head treatment before the superstructure construction, as well as the support of the bottom formwork of the superstructure and the installation of the clamp are greatly affected by the tide, and the construction efficiency is low. It is necessary to make a simple floating platform to improve the quality and efficiency of the construction work. Utility Model Content
[0003] In order to solve the above problems of the prior art, the utility model provides an offshore floating operation platform device, which solves the problems of low efficiency and high operation cost of offshore construction operations.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an offshore floating operating platform device, comprising an operating platform, the operating platform is formed by splicing two symmetrical trusses, a panel is provided on the upper surface of the truss, a plurality of buoys are installed inside the truss, a positioning plate is provided in the center of the operating platform, and a positioning hole adapted to a pile foundation is opened in the middle of the positioning plate.
[0005] With the above structural design, the operating platform is fixed on the pile foundation. Under the premise of no other auxiliary mechanical equipment at the appropriate tide level, the pile head processing and upper structure operations can be carried out manually using the operating platform, which not only improves the efficiency of the construction work, but also reduces the operation cost.
[0006] Preferably, the positioning plate is formed by splicing a left positioning plate and a right positioning plate, and a connecting member is installed between the left positioning plate and the right positioning plate.
[0007] With the above structural design, the left positioning plate and the right positioning plate are fixed on two trusses respectively, and a segmented structure is adopted to facilitate the operation platform to be clamped around the pile foundation.
[0008] Preferably, the connecting member includes a clamping block connected to the side wall of the left positioning plate by bolts, a connecting groove opened on the side wall of the right positioning plate and cooperating with the clamping block, a sliding groove connected to the connecting groove is opened on the right positioning plate, a limiting rod is arranged in the sliding groove, a telescopic spring is sleeved on the limiting rod, and the clamping block can extend into the connecting groove and clamp with the limiting rod.
[0009] By adopting the above structural design, the left positioning plate and the right positioning plate are relatively fixed by connecting the clamping block and the limiting rod, and the connection is convenient. When the positioning plates need to be separated, only the limiting rod needs to be pulled to move the clamping block out of the connecting groove, and the operation is simple.
[0010] Preferably, a fixing column is installed at the upper end of the truss, the fixing columns on the two spliced trusses fit together, and the sleeve is sleeved on the two fixing columns to fix the two trusses relatively.
[0011] With the above structural design, the two fixing columns are fixed by the sleeve, thereby fixing the two trusses relatively, thereby increasing the firmness of the device connection.
[0012] Preferably, the lower end of the limiting rod is an inclined surface.
[0013] With the above structural design, when the clamping block gradually extends into the connecting groove, there is no need to pull the limit rod. The clamping block contacts the inclined surface of the limit rod, pushes the limit rod upward, and then the limit rod is bounced into the clamping groove of the clamping block by the telescopic spring.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] The operating platform is fixed on the pile foundation. When the tide is appropriate, without using other auxiliary mechanical equipment, the pile head processing and superstructure operations can be carried out manually using the operating platform, which not only improves the efficiency of the construction work, but also reduces the operation cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model;
[0017] Figure 2 It is a structural schematic diagram of the operating platform of the utility model;
[0018] Figure 3 It is a structural schematic diagram of the left half of the operating platform of the utility model;
[0019] Figure 4 This is a structural schematic diagram of the positioning plate of the utility model;
[0020] Figure 5 For this utility model Figure 4 An enlarged schematic diagram of point A. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-5 The utility model provides a technical solution: an offshore floating operating platform device, including an operating platform 1, the operating platform 1 is spliced by two symmetrical trusses 2, and the trusses 2 are all welded by channel steel. A panel 3 is provided on the upper surface of the truss 2, and the panel 3 is a wooden board. Several buoys 5 are installed inside the truss 2, and the buoys 5 are fixed in the truss 2 by nylon ropes or steel wires. A positioning plate 4 is provided in the center of the operating platform 1, and a positioning hole adapted to the pile foundation 9 is opened in the middle of the positioning plate 4. The operating platform 1 is fixed by relying on the pile foundation 9. Under the premise of not using other auxiliary mechanical equipment at a suitable tide level, the pile head processing and upper structure operation can be carried out manually by using the operating platform 1, which not only improves the efficiency of the construction operation, but also reduces the operation cost.
[0023] The positioning plate 4 is composed of a left positioning plate 41 and a right positioning plate 42, and a connecting member is installed between the left positioning plate 41 and the right positioning plate 42. The left positioning plate 41 and the right positioning plate 42 are respectively fixed on two trusses 2, and adopt a segmented structure, which facilitates the operation platform 1 to be clamped around the pile foundation 9.
[0024] The connecting member includes a clamping block 81 connected to the side wall of the left positioning plate 41 by bolts, a connecting groove 82 provided on the side wall of the right positioning plate 42 and matched with the clamping block 81, a sliding groove 85 connected to the connecting groove 82 is provided on the right positioning plate 42, a limiting rod 83 is arranged in the sliding groove 85, a telescopic spring 84 is sleeved on the limiting rod 83, and the clamping block 81 can extend into the connecting groove 82 and be clamped with the limiting rod 83. The connection between the clamping block 81 and the limiting rod 83 can relatively fix the left positioning plate 41 and the right positioning plate 42, and the connection is convenient. When the positioning plate 4 needs to be separated, only the limiting rod 83 needs to be pulled to move the clamping block 81 out of the connecting groove 82, and the operation is simple.
[0025] The upper end of the truss 2 is provided with a fixing column 6, the fixing columns 6 on the two spliced trusses 2 fit each other, and the sleeve 7 is sleeved on the two fixing columns 6 to relatively fix the two trusses 2. The two fixing columns 6 are fixed by the sleeve 7, and then the two trusses 2 are relatively fixed, which increases the firmness of the device connection.
[0026] The lower end of the limit rod 83 is an inclined surface. When the clamping block 81 gradually extends into the connecting groove 82, the limit rod 83 does not need to be pulled. The clamping block 81 contacts the inclined surface of the limit rod 83, pushing the limit rod 83 upward, and then the limit rod 83 is bounced into the clamping groove of the clamping block 81 by the telescopic spring 84, so that the limit rod 83 and the clamping block 81 are fixed to each other.
[0027] Working principle: At a suitable tide level, the operator will hoist the completed operating platform 1 to the position of the pile foundation 9, and use manual assistance to clamp the two positioning plates 4 to the pile foundation 9, and then position and fix them through connecting components. Finally, the fixed columns 6 on both sides are fixed with sleeves 7 to prevent the operating platform 1 from separating. After the fixation is completed, the workers can go to the positioning plate 4 to install the clamp.
[0028] The contents not described in detail in this specification belong to the prior art known to the professional and technical personnel in this field. Although the present utility model is described in detail with reference to the above embodiments, it is still possible for the technical solutions recorded in the above embodiments to be modified, or some of the technical features therein to be replaced by equivalents, and any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model shall be included in the protection scope of the present utility model.
Claims
1. An offshore floating operating platform device, characterized in that: The operating platform (1) comprises an operating platform (1) which is formed by splicing two symmetrical trusses (2). A panel (3) is provided on the upper surface of the truss (2). A plurality of buoys (5) are installed inside the truss (2). A positioning plate (4) is provided at the center of the operating platform (1). A positioning hole adapted for a pile foundation (9) is provided in the middle of the positioning plate (4).
2. The offshore floating operation platform device according to claim 1, characterized in that: The positioning plate (4) is formed by splicing a left positioning plate (41) and a right positioning plate (42), and a connecting component is installed between the left positioning plate (41) and the right positioning plate (42).
3. An offshore floating operation platform device according to claim 2, characterized in that: The connecting member comprises a clamping block (81) connected to the side wall of the left positioning plate (41) by bolts, and a connecting groove (82) provided on the side wall of the right positioning plate (42) and cooperating with the clamping block (81); the right positioning plate (42) is provided with a sliding groove (85) connected to the connecting groove (82); a limiting rod (83) is provided in the sliding groove (85); a telescopic spring (84) is sleeved on the limiting rod (83); the clamping block (81) can extend into the connecting groove (82) and be clamped with the limiting rod (83).
4. The offshore floating operation platform device according to claim 1, characterized in that: A fixing column (6) is installed at the upper end of the truss (2), the fixing columns (6) on the two spliced trusses (2) fit together, and the sleeve (7) is sleeved on the two fixing columns (6) to fix the two trusses (2) relatively.
5. The offshore floating operation platform device according to claim 3, characterized in that: The lower end of the limiting rod (83) is an inclined surface.