Size-adjustable bed slurry tank for mounting prefabricated pier column
By designing adjustable seat slurry tanks, the problem of unadjustable seat slurry tank size in the prior art is solved, efficient and accurate installation of prefabricated pier columns is achieved, construction quality and flexibility are improved, and it is reusable .
Patent Information
- Application Number
- CN202420826774.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-19
AI Technical Summary
The existing slurry tank is not adjustable in the installation of the lower structure of the highway bridge and the prefabricated pier column nodes, with poor flexibility and low accuracy, resulting in the inability to guarantee the construction quality and cannot be reused.
Design a slalom tank consisting of four vertically sliding connections, adjust their internal space by pulling these slalom tanks to accommodate different models of prefabricated piers, and long and short slalom panels are provided at the notches Secure the seat slurry to avoid leakage and ensure accuracy and flexibility through upright leg support and scale.
It realizes the easy turnover and assembly of prefabricated pier columns, improves construction efficiency, ensures construction quality, has high flexibility and accuracy, and is reusable, reducing the footprint.
Smart Images

Figure CN222119960U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated pier column node installation, in particular to a seat mortar groove with adjustable size for prefabricated pier column installation. Background Art
[0002] In the auxiliary application of the installation of the node of the pier and prefabricated pier of the lower structure of the highway bridge, the pier and the prefabricated pier are connected by a grouting groove. The existing conventional grouting groove cannot adjust the size and can only adapt to one type of prefabricated pier. The grouting material is easy to leak out of the grouting range during grouting. The existing grouting groove has poor flexibility, low precision, cannot guarantee the construction quality and is not reusable. Utility Model Content
[0003] The utility model aims to provide a mortar seat groove with adjustable size for installing a prefabricated pier column, so as to solve the problems of poor flexibility, low precision, inability to ensure construction quality and non-reusability in the prior art.
[0004] The embodiment of the utility model is achieved as follows:
[0005] The utility model embodiment provides a seat mortar groove with adjustable size for installation of prefabricated pier columns, which includes a first seat mortar groove, a second seat mortar groove, a third seat mortar groove and a fourth seat mortar groove;
[0006] The first slurry groove, the second slurry groove, the third slurry groove and the fourth slurry groove are vertically slidably connected to each other and form a slurry groove body;
[0007] One end of the first slurry groove is slidably connected to the other end of the fourth slurry groove, one end of the second slurry groove is slidably connected to the other end of the first slurry groove, one end of the third slurry groove is slidably connected to the other end of the second slurry groove, and one end of the fourth slurry groove is slidably connected to the other end of the third slurry groove.
[0008] When in use, by pulling the first mortar groove, the second mortar groove, the third mortar groove and the fourth mortar groove, the space inside the mortar groove body is expanded or reduced to adapt to prefabricated piers of different models.
[0009] The adjustable-size seat mortar groove for installing a prefabricated pier column disclosed in the present embodiment is provided with the above-mentioned first seat mortar groove, the above-mentioned second seat mortar groove, the above-mentioned third seat mortar groove and the above-mentioned fourth seat mortar groove which can slide and overlap with each other, so that the above-mentioned quadrilateral seat mortar groove body is formed, which is convenient for achieving the purpose of adjustable size, and thus the adjustable-size seat mortar groove for installing a prefabricated pier column has the beneficial effects of being easy to turn around and assemble, high in construction efficiency, reusable, small in footprint, high in flexibility, high in precision and able to ensure construction quality.
[0010] Optionally: the first slurry trough, the second slurry trough, the third slurry trough and the fourth slurry trough all have a long-section seat paddle board and a short-section seat paddle board, and the long-section seat paddle board and the short-section seat paddle board are located in the same horizontal plane and are integrated with each other.
[0011] In this way, the long-section mortar plate and the short-section mortar plate are mainly used to fix the mortar material within the mortar range during mortar installation to avoid mortar leakage and ensure smooth installation of the foundation and prefabricated pier node.
[0012] Optionally: a slot is provided at the connection between the long-section seat paddle plate and the short-section seat paddle plate.
[0013] With such arrangement, the above-mentioned groove facilitates the slidable overlap of the above-mentioned first mortar groove, the above-mentioned second mortar groove, the above-mentioned third mortar groove and the above-mentioned fourth mortar groove, which is beneficial to the formation of the above-mentioned mortar groove body. At the same time, the arrangement of the above-mentioned groove enables the above-mentioned first mortar groove, the above-mentioned second mortar groove, the above-mentioned third mortar groove and the above-mentioned fourth mortar groove to be pulled arbitrarily, thereby adjusting the size of the space inside the above-mentioned mortar groove body, so as to adapt to prefabricated piers of different sizes.
[0014] Optionally: the height of the notch is the same as the width of the long-section seat paddle plate and the short-section seat paddle plate.
[0015] Such arrangement makes it easy to insert the adjacent long-section seat pads into the above-mentioned grooves without leaving gaps, thereby avoiding leakage of the seat slurry. The above-mentioned grooves are the key parts for size adjustment. After the adjacent long-section seat pads are inserted into the above-mentioned grooves, they can be moved horizontally more flexibly.
[0016] Optionally: a connecting plate is provided at one end of the notch, and both ends of the connecting plate are respectively fixedly connected to the long-section seat paddle plate and the short-section seat paddle plate.
[0017] In this way, the connecting plate connects the long-section seat paddle plate and the short-section seat paddle plate into a horizontal whole, so that the strength of the connection between the long-section seat paddle plate and the short-section seat paddle plate is ensured under the setting of the groove, and deformation or damage of the whole connected with each other of the long-section seat paddle plate and the short-section seat paddle plate is effectively avoided.
[0018] Optionally: one end of the long-section seat paddle board away from the short-section seat paddle board is provided with a first upright leg, and one end of the long-section seat paddle board away from the short-section seat paddle board is vertically fixedly connected to the first upright leg;
[0019] One end of the short-section seat paddle board away from the long-section seat paddle board is provided with a second upright leg, and one end of the short-section seat paddle board away from the long-section seat paddle board is vertically fixedly connected to the second upright leg.
[0020] In this way, the first upright leg and the second upright leg are used to contact the ground to support the first mortar trough, the second mortar trough, the third mortar trough and the fourth mortar trough. The first upright leg and the second upright leg are arranged at both ends to ensure stable placement and avoid spatial conflicts between the mortar trough body and the jacks used in the installation of the prefabricated piers.
[0021] Optionally: the bottom edges of the long-section seat paddle board and the short-section seat paddle board are higher than the bottom edges of the first upright leg and the second upright leg.
[0022] In this way, the long-section seat slurry plate and the short-section seat slurry plate are erected so that foaming agent can be sprayed underneath the long-section seat slurry plate and the short-section seat slurry plate to further seal the internal space of the seat slurry groove body, making it easier to fix the seat slurry within the seat slurry range when the seat slurry is installed.
[0023] Optionally: the first upright leg and the second upright leg are both isosceles triangles, and the outer ends of the long-section seat paddle board and the short-section seat paddle board are respectively connected to the height lines of the first upright leg and the second upright leg.
[0024] With such arrangement, the outer side of the slurry trough body of the above-mentioned combination will not affect the arrangement of other devices, which effectively reduces the occupied space, facilitates the installation of other equipment, and further reduces the construction area.
[0025] Optionally: the outer side surface of the long-section seat paddle board has a scale, and the scale is distributed along the longitudinal direction of the long-section seat paddle board.
[0026] In this way, the scale is used to determine the size of the current pulp tank. The scale can be produced by pasting standard scale paper or etching.
[0027] Optionally: the above-mentioned long section seat paddle plate of the above-mentioned first seat paddle groove can be slidably connected to the above-mentioned slot of the above-mentioned fourth seat paddle groove, the above-mentioned long section seat paddle plate of the above-mentioned second seat paddle groove can be slidably connected to the above-mentioned slot of the above-mentioned first seat paddle groove, the above-mentioned long section seat paddle plate of the above-mentioned third seat paddle groove can be slidably connected to the above-mentioned slot of the above-mentioned second seat paddle groove, and the above-mentioned long section seat paddle plate of the above-mentioned fourth seat paddle groove can be slidably connected to the above-mentioned slot of the above-mentioned third seat paddle groove.
[0028] With such arrangement, the first mortar groove, the second mortar groove, the third mortar groove and the fourth mortar groove can slide on the groove, which is beneficial for adjusting the space inside the mortar groove body and facilitating the use of various types of prefabricated piers.
[0029] Based on the above description, the utility model discloses a mortar trough with adjustable size for installation of prefabricated pier columns, which has the beneficial effects of easy turnover assembly, high construction efficiency, reusability, small footprint, high flexibility, high precision and ability to ensure construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 It is a front view of a mortar groove with adjustable size for installation of a prefabricated pier column in an embodiment of the utility model;
[0032] Figure 2 It is a side view of a mortar groove with adjustable size for installation of a prefabricated pier column in an embodiment of the utility model;
[0033] Figure 3 It is a three-dimensional structural schematic diagram of a mortar seat groove with adjustable size for installation of a prefabricated pier column in an embodiment of the utility model;
[0034] Figure 4 The figure shows a schematic diagram of the structure in which the first grout groove, the second grout groove, the third grout groove and the fourth grout groove cooperate with the prefabricated pier column in the embodiment of the utility model;
[0035] Figure 5 The utility model is a schematic diagram of an application of a mortar groove with adjustable size for installing a prefabricated pier column in an embodiment of the utility model.
[0036] Icons: 1-first slurry trough, 2-second slurry trough, 3-third slurry trough, 4-fourth slurry trough, 5-long section slurry plate, 6-short section slurry plate, 7-slot, 8-connecting plate, 9-first vertical leg, 10-second vertical leg, 11-scale, 12-prefabricated pier, 13-supporting corbel, 14-jack, 15-cap, 16-foaming agent, 17-slurry, 18-slurry trough body. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0038] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] Example
[0040] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 This embodiment provides a seat mortar groove with adjustable size for installation of prefabricated pier columns, including a first seat mortar groove 1, a second seat mortar groove 2, a third seat mortar groove 3 and a fourth seat mortar groove 4;
[0041] The first slurry groove 1, the second slurry groove 2, the third slurry groove 3 and the fourth slurry groove 4 are vertically slidably connected to each other and form a slurry groove body 18;
[0042] One end of the first slurry groove 1 is slidably connected to the other end of the fourth slurry groove 4, one end of the second slurry groove 2 is slidably connected to the other end of the first slurry groove 1, one end of the third slurry groove 3 is slidably connected to the other end of the second slurry groove 2, and one end of the fourth slurry groove 4 is slidably connected to the other end of the third slurry groove 3.
[0043] When in use, by pulling the first slurry groove 1 , the second slurry groove 2 , the third slurry groove 3 and the fourth slurry groove 4 , the space inside the slurry groove body 18 is expanded or reduced to adapt to different types of prefabricated piers 12 .
[0044] The present embodiment discloses an adjustable-size seat mortar groove for installation of a prefabricated pier column. The seat mortar groove is provided with a first seat mortar groove 1, a second seat mortar groove 2, a third seat mortar groove 3 and a fourth seat mortar groove 4 which are slidably overlapped with each other, so as to form a quadrilateral seat mortar groove body 18, which is convenient for achieving the purpose of adjustable size, and thus makes the seat mortar groove with adjustable size for installation of the prefabricated pier column have the beneficial effects of being easy to assemble, having high construction efficiency, being reusable, occupying a small area, having high flexibility, having high precision and being able to ensure construction quality.
[0045] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 The first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4 all have a long seat slurry plate 5 and a short seat slurry plate 6. The long seat slurry plate 5 and the short seat slurry plate 6 are all located in the same horizontal plane and are integrated with each other. The long seat slurry plate 5 and the short seat slurry plate 6 are mainly used to fix the seat slurry within the seat slurry range during the seat slurry to avoid leakage of the seat slurry, thereby ensuring the smooth installation of the nodes of the abutment 15 and the prefabricated pier 12.
[0046] A slot 7 is provided at the connection between the long seat slurry plate 5 and the short seat slurry plate 6. The slot 7 facilitates the slidable overlap of the first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4, which is conducive to forming a seat slurry groove body 18. At the same time, the setting of the slot 7 enables the first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4 to be pulled arbitrarily, thereby adjusting the size of the space inside the seat slurry groove body 18, so as to adapt to prefabricated piers 12 of different sizes.
[0047] The height of the slot 7 is the same as the width of the long-section seat paddle plate 5 and the short-section seat paddle plate 6, so that it is convenient to insert the adjacent long-section seat paddle plates 5 into the slot 7 without leaving gaps, thereby avoiding leakage of the seat slurry. The slot 7 is a key part for size adjustment. After the adjacent long-section seat paddle plates 5 are inserted into the slot 7, they can be moved horizontally more flexibly.
[0048] A connecting plate 8 is provided at one end of the slot 7, and both ends of the connecting plate 8 are respectively fixedly connected to the long-section seat paddle board 5 and the short-section seat paddle board 6. The connecting plate 8 connects the long-section seat paddle board 5 and the short-section seat paddle board 6 into a horizontal whole, so that the strength of the connection between the long-section seat paddle board 5 and the short-section seat paddle board 6 is ensured under the setting of the slot 7, and deformation or damage of the whole connected between the long-section seat paddle board 5 and the short-section seat paddle board 6 is effectively avoided.
[0049] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 , a first upright leg 9 is provided at one end of the long-segment seat paddle board 5 away from the short-segment seat paddle board 6, and one end of the long-segment seat paddle board 5 away from the short-segment seat paddle board 6 is vertically fixedly connected to the first upright leg 9;
[0050] A second upright leg 10 is provided at one end of the short-section seat paddle board 6 away from the long-section seat paddle board 5, and one end of the short-section seat paddle board 6 away from the long-section seat paddle board 5 is vertically fixedly connected to the second upright leg 10. The first upright leg 9 and the second upright leg 10 are used to contact the ground to support the first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4. The first upright leg 9 and the second upright leg 10 are arranged at both ends to ensure stable placement and avoid spatial conflicts between the seat slurry groove body 18 and the jack used during the installation of the prefabricated pier 12.
[0051] The bottom edges of the long-section seat paddle board 5 and the short-section seat paddle board 6 are higher than the bottom edges of the first upright leg 9 and the second upright leg 10, so that the long-section seat paddle board 5 and the short-section seat paddle board 6 are erected so that a 10 mm thick foaming agent 16 can be sprayed underneath the long-section seat paddle board 5 and the short-section seat paddle board 6 to further seal the internal space of the seat paddle groove body 18, so as to fix the seat paddle material within the seat paddle range during the paddle operation.
[0052] The first upright leg 9 and the second upright leg 10 are both isosceles triangles, and the outer ends of the long-section seat paddle plate 5 and the short-section seat paddle plate 6 are respectively connected to the height lines of the first upright leg 9 and the second upright leg 10. The outer side of the seat paddle trough body 18 combined in this way will not affect the layout of other devices, effectively reducing the occupied space, facilitating the installation of other equipment, and further reducing the construction area.
[0053] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 The outer side surface of the long-section seat pulp board 5 has a scale 11, and the scale 11 is distributed along the longitudinal direction of the long-section seat pulp board 5. The scale 11 is used to determine the size of the current seat pulp groove. The scale 11 can be produced by pasting standard scale paper or etching.
[0054] The long section seat paddle plate 5 of the first seat slurry groove 1 can be slidably connected to the slot 7 of the fourth seat slurry groove 4, the long section seat paddle plate 5 of the second seat slurry groove 2 can be slidably connected to the slot 7 of the first seat slurry groove 1, the long section seat paddle plate 5 of the third seat slurry groove 3 can be slidably connected to the slot 7 of the second seat slurry groove 2, and the long section seat paddle plate 5 of the fourth seat slurry groove 4 can be slidably connected to the slot 7 of the third seat slurry groove 3. The first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4 can slide on the slot 7, which is conducive to adjusting the space inside the seat slurry groove body 18 and facilitating the use of various types of prefabricated piers 12.
[0055] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5In this embodiment, the long-section seat paddle board 5 and the short-section seat paddle board 6 are made of long strip steel plates with a thickness of 2mm to 5mm and a width of 50mm; the long-section seat paddle board 5 is 2.5m long and is mainly used to fix the seat slurry within the seat slurry range during seat slurrying; the short-section seat paddle board 6 is 0.5m long and is mainly used for balance.
[0056] In this embodiment, the first upright leg 9 and the second upright leg 10 are made of isosceles triangular steel plates with a thickness of 2mm to 5mm, and are connected to the long-section seat paddle board 5 and the short-section seat paddle board 6 by welding. The bottom width is about 50mm to 100mm, which is used to contact the ground to support the seat paddle board; the bottom of the first upright leg 9 and the second upright leg 10 protrudes 10mm beyond the long-section seat paddle board 5 and the short-section seat paddle board 6, and the long-section seat paddle board 5 and the short-section seat paddle board 6 are erected so that a 10mm thick foaming agent 16 sprayed thereunder is placed.
[0057] In this embodiment, the width of the slot 7 is set according to the thickness of the long-section seat paddle board 5 and the short-section seat paddle board 6, which is approximately 3mm to 6mm, and 1mm is reserved for installation; the height of the slot 7 is 50mm, the same as the width of the long-section seat paddle board 5 and the short-section seat paddle board 6, which is convenient for inserting the long-section seat paddle board 5 without leaving a gap.
[0058] In this embodiment, the connecting plate 8 is made of a steel plate with a thickness of 2 mm to 5 mm, and the connecting plate 8 is connected to the long-section seat paddle plate 5 and the short-section seat paddle plate 6 by welding.
[0059] In this embodiment, the width of the slot 7 is slightly larger than the thickness of the long-section seat paddle plate 5 and the short-section seat paddle plate 6, which is more conducive to the sliding of the long-section seat paddle plate 5 and the short-section seat paddle plate 6 on the slot 7. During the specific construction, the gap between the slot 7 and the long-section seat paddle plate 5 and the short-section seat paddle plate 6 can be sealed by using a foaming agent 16 to achieve a sealing effect.
[0060] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 In this embodiment, the specific method of using the adjustable mortar groove for installing the prefabricated pier column is as follows:
[0061] Step 1: Determine the required range of the seat mortar groove size according to the size of the prefabricated pier column 12 and the size required for on-site construction, and produce seat mortar grooves with adjustable sizes for installation of the prefabricated pier column 12 of corresponding specifications, with four seats as a set;
[0062] Step 2, the long section seat slurry plate 5 of the first seat slurry groove 1 is slidably inserted into the notch 7 of the fourth seat slurry groove 4, and translated to a suitable size; the long section seat slurry plate 5 of the second seat slurry groove 2 is slidably inserted into the notch 7 of the first seat slurry groove 1, and translated to a suitable size; the long section seat slurry plate 5 of the third seat slurry groove 3 is slidably inserted into the notch 7 of the second seat slurry groove 2, and translated to a suitable size; the long section seat slurry plate 5 of the fourth seat slurry groove 4 is slidably inserted into the notch 7 of the third seat slurry groove 3, and translated to a suitable size; the prefabricated pier 12 is enclosed in the closed range of the seat slurry grooves by the first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4;
[0063] Step 3: Place the assembled slurry trough body 18 on the top surface of the platform, and spray the outer contour of the slurry range with a foaming agent 16, the foaming agent 16 is about 10 mm high, and is located below the long-section slurry plate 5 and the short-section slurry plate 6;
[0064] Step 4: Apply a release agent to the inner side of the mortar range of the mortar groove with adjustable size for installing the prefabricated pier 12, and then cut off the excess foaming agent 16;
[0065] Step 5, performing the seat slurry construction for the installation of the prefabricated pier column 12;
[0066] Step six, dismantle the adjustable-size mortar groove used for installing the prefabricated pier column 12, and transfer it to the construction area for installing the next prefabricated pier column 12.
[0067] See also Figure 4 and Figure 5 A plurality of supporting brackets 13 are radially arranged on the outer wall of the prefabricated pier column 12, and a jack 14 is supported at the lower part of the plurality of supporting brackets 13. The prefabricated pier column 12 is lifted by the jack 14, and then a quadrilateral seat slurry groove body 18 surrounded by the first seat slurry groove 1, the second seat slurry groove 2, the third seat slurry groove 3 and the fourth seat slurry groove 4 is sleeved on the lower part of the prefabricated pier column 12, so that the seat slurry groove body 18 is placed on the base 15, and a 10 mm thick foaming agent 16 is sprayed between the seat slurry groove body 18 and the base 15, and then, the seat slurry 17 is poured in the space surrounded by the seat slurry groove body 18, and the seat slurry 17 will wrap the bottom and side surfaces of the prefabricated pier column 12. After the seat slurry 17 is dried and reaches the strength requirement, the node connection between the base 15 and the prefabricated pier column 12 can be realized.
[0068] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A mortar trough with adjustable size for installation of prefabricated pier columns, characterized in that: It includes a first pulp tank, a second pulp tank, a third pulp tank and a fourth pulp tank; The first slurry groove, the second slurry groove, the third slurry groove and the fourth slurry groove are vertically slidably connected to each other and form a slurry groove body; One end of the first seat slurry groove is slidably connected to the other end of the fourth seat slurry groove, one end of the second seat slurry groove is slidably connected to the other end of the first seat slurry groove, one end of the third seat slurry groove is slidably connected to the other end of the second seat slurry groove, and one end of the fourth seat slurry groove is slidably connected to the other end of the third seat slurry groove.
2. The adjustable mortar groove for installing a prefabricated pier according to claim 1, characterized in that: The first seat slurry groove, the second seat slurry groove, the third seat slurry groove and the fourth seat slurry groove all have a long seat slurry plate and a short seat slurry plate. The long seat slurry plate and the short seat slurry plate are located in the same horizontal plane and are integrated with each other.
3. The adjustable mortar groove for installing a prefabricated pier according to claim 2, characterized in that: A slot is provided at the connection between the long section seat paddle plate and the short section seat paddle plate.
4. The adjustable-size mortar groove for installing a prefabricated pier according to claim 3, characterized in that: The height of the notch is the same as the width of the long-section seat paddle plate and the short-section seat paddle plate.
5. The adjustable mortar groove for installing a prefabricated pier according to claim 4, characterized in that: A connecting plate is provided at one end of the notch, and two ends of the connecting plate are respectively fixedly connected to the long-section seat paddle board and the short-section seat paddle board.
6. The adjustable-size mortar groove for installing a prefabricated pier column according to claim 2, characterized in that: The end of the long-section seat paddle board away from the short-section seat paddle board is provided with a first upright leg, and the end of the long-section seat paddle board away from the short-section seat paddle board is vertically fixedly connected to the first upright leg; The end of the short-section seat paddle board away from the long-section seat paddle board is provided with a second upright leg, and the end of the short-section seat paddle board away from the long-section seat paddle board is vertically fixedly connected to the second upright leg.
7. The adjustable mortar groove for installing a prefabricated pier according to claim 6, characterized in that: The bottom edges of the long-section seat paddle plate and the short-section seat paddle plate are higher than the bottom edges of the first upright leg and the second upright leg.
8. The adjustable-size mortar groove for installing a prefabricated pier column according to claim 7, characterized in that: The first upright leg and the second upright leg are both isosceles triangles, and the outer ends of the long-section seat paddle board and the short-section seat paddle board are respectively connected to the height lines of the first upright leg and the second upright leg.
9. The adjustable-size mortar groove for installing a prefabricated pier column according to claim 2, characterized in that: The outer side surface of the long-section seat paddle board is provided with a scale, and the scale is distributed along the longitudinal direction of the long-section seat paddle board.
10. The adjustable-size mortar groove for installing a prefabricated pier according to claim 3, characterized in that: The long section seat paddle plate of the first seat paddle groove is slidably connected to the slot of the fourth seat paddle groove, the long section seat paddle plate of the second seat paddle groove is slidably connected to the slot of the first seat paddle groove, the long section seat paddle plate of the third seat paddle groove is slidably connected to the slot of the second seat paddle groove, and the long section seat paddle plate of the fourth seat paddle groove is slidably connected to the slot of the third seat paddle groove.