In-hole deep dynamic compaction foundation

By adopting a multi-layer combined structural design in the deep strong tamp foundation in the hole, including a strong tamp layer, a transition layer and a drainage layer, and using the water filter dust-insulating mesh of the drainage tank body, the high laying cost and surface water erosion are solved. The problem is to achieve effective drainage and structural stability of the foundation.

CN222120187UActive Publication Date: 2024-12-06济南一建集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420793575.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-06
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The laying cost of deep-stacked foundations in the holes is high and it is difficult to prevent surface water erosion, resulting in the collapse of the foundation structure and affecting the building's load-bearing capacity.

Method used

The foundation design adopts a multi-layer combined structure, including setting up three layers of strong tamping layers in the vertical direction, laying transition layers and drainage layers between each layer, and setting up a drainage tank at the bottom and inside of the drainage layer, and using water filter dust insulation mesh holes Achieve anti-dust dust and multi-layer drainage.

Benefits of technology

It reduces laying costs, prevents surface water erosion, extends the service life of the foundation structure, and improves the load-bearing capacity of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120187U_ABST
    Figure CN222120187U_ABST
Patent Text Reader

Abstract

The utility model particularly relates to an in-hole deep dynamic compaction foundation. Specifically, the dynamic compaction foundation is of a multi-layer combined structure and comprises three dynamic compaction layers arranged at intervals in the direction perpendicular to the ground; a transition layer is laid below each dynamic compaction layer, and a drainage layer is laid below each transition layer; the top end of the drainage box is arranged at the bottom of the upper drainage layer, and the bottom end of the drainage box is arranged in the lower drainage layer. The drainage box body is of a vertical hollow structure, and a plurality of water filtering and dust isolating meshes are formed in the top end face and the bottom end face of the drainage box body. The drainage layers corresponding to the two sides of the drainage box body are in the symmetrical gradient trend extending and rising towards the outer side. By means of the dynamic compaction foundation structure, it can be achieved that the laying structure of the deep-layer dynamic compaction foundation in the hole is firm and does not collapse while the foundation laying cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of deep-layer dynamic compaction in a hole, in particular to a deep-layer dynamic compaction foundation in a hole. Background Art

[0002] Since some areas of my country are collapsible loess areas, it is necessary to take corresponding measures to eliminate the collapsibility of loess when laying the foundation in order to improve the bearing capacity of the foundation. At present, a more useful method is the deep compaction method in the hole. Compared with other methods (such as bored pile method), the deep compaction method in the hole is more suitable for the foundation treatment process when the deep collapsible loess and the bearing capacity requirements are high. At the same time, the deep compaction method in the hole also has the advantages of low cost and short construction period.

[0003] The foundation formed by the aforementioned deep-layer compaction method in the hole often has the problem of high laying cost; at the same time, the formed foundation is inevitably difficult to reduce the erosion of the overall structure of the foundation by surface water in time, which causes the overall structure of the foundation to collapse through long-term accumulation, and ultimately has an adverse effect on the buildings on the ground supported by the foundation;

[0004] In order to solve the technical problems existing in the original in-hole deep compaction foundation structure, it is urgently needed to provide an in-hole deep compaction foundation. Utility Model Content

[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the utility model provides an in-hole deep compaction foundation, which solves the two technical problems existing in the original in-hole deep compaction foundation structure: "high laying cost and difficulty in timely reducing the erosion of the overall foundation structure by surface water".

[0006] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:

[0007] The utility model provides a deep-layer compaction foundation in a hole, and the compaction foundation is a multi-layer composite structure. Specifically,

[0008] The compacted foundation comprises: a compacted layer, which is arranged in three layers at intervals in a direction perpendicular to the ground; a transition layer is laid under each compacted layer, and a drainage layer is laid under each transition layer;

[0009] The top of the drainage box is arranged at the bottom of the upper drainage layer, and the bottom of the drainage box is arranged inside the lower drainage layer; the drainage box is a vertical hollow structure with a plurality of water filtering and dust-proof mesh holes on both the top and bottom surfaces; the drainage layers corresponding to the two sides of the drainage box present a symmetrical slope trend extending upward outward;

[0010] Among them, the compaction layer is made of mudstone; the transition layer is made of permeable dust-proof material; the transition layer is used to prevent dust mixing between the mudstone of the compaction layer and the gravel of the drainage layer; the drainage layer is made of gravel; the drainage layer is used to achieve multi-layer drainage of the compaction foundation.

[0011] Optionally, multiple drainage boxes at the same level may be arranged at equal intervals.

[0012] Optionally, a first horizontal edge is fixed to the outer side of the top of the drainage box body, and a second horizontal edge is fixed to the outer side of the bottom of the drainage box body; the lateral length of the first horizontal edge is smaller than the lateral length of the second horizontal edge.

[0013] Optional, for the laying structure of the topmost compaction layer, transition layer and drainage layer:

[0014] The laying thickness of the compaction layer is 1 meter, and the laying thickness of the transition layer is 5 centimeters;

[0015] The thickest paving thickness corresponding to the drainage layer is 0.5 meters, and the thinnest paving thickness corresponding to the drainage layer is 0.4 meters.

[0016] Optional laying structure of compaction layer, transition layer and drainage layer:

[0017] The thickest paving thickness corresponding to the compaction layer is 1 meter, and the thinnest paving thickness corresponding to the compaction layer is 0.8 meter; the paving thickness of the transition layer is 5 centimeters;

[0018] The thickest paving thickness corresponding to the drainage layer is 0.5 meters, and the thinnest paving thickness corresponding to the drainage layer is 0.4 meters.

[0019] Optionally, for the laying structure of the bottom compaction layer, transition layer and drainage layer:

[0020] The thickest paving thickness corresponding to the compaction layer is 1 meter, and the thinnest paving thickness corresponding to the compaction layer is 0.8 meter; the paving thickness of the transition layer is 5 centimeters; and the paving thickness of the drainage layer is 0.5 meter. Beneficial effects of this application:

[0021] In the present application, the mudstone corresponding to the compaction layer is a low-cost and easily available material. Since "the compaction layer is arranged in three layers at intervals along the vertical ground direction; a transition layer is laid under each compaction layer, and a drainage layer is laid under each transition layer", and "the top of the drainage box is arranged at the bottom of the upper drainage layer, and the bottom of the drainage box is arranged inside the lower drainage layer", based on the above structure, it can be ensured that: while the mudstone of the compaction layer and the gravel of the drainage layer are isolated from dust through the transition layer, based on the cooperation between the drainage layer and the drainage box, multi-layer drainage of the compaction foundation is achieved, thereby timely reducing the erosion of the overall structure of the foundation by surface water. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic diagram of the overall laying structure of a deep layer strongly compacted foundation in a hole provided by an embodiment of the utility model;

[0023] Figure 2 A schematic diagram of the upright structure of a drainage box provided by an embodiment of the utility model;

[0024] Figure 3 A schematic diagram of an inverted structure of a drainage box provided by an embodiment of the utility model;

[0025] The foregoing Figures 1 to 3 The components included are:

[0026] Strong compaction layer 1, transition layer 2, drainage layer 3, drainage box 4, water filtering and dust-isolating mesh 5, first horizontal edge 6, and second horizontal edge 7. DETAILED DESCRIPTION

[0027] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0028] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0029] Embodiment 1

[0030] This embodiment provides a deep compaction foundation in a hole, and the compaction foundation is a multi-layer composite structure. Figure 1 As shown, Figure 1 The schematic diagram of the overall laying structure of the deep compaction foundation in the hole; the compaction foundation comprises: a compaction layer 1, which is arranged in three layers at intervals along the vertical ground direction; a transition layer 2 is laid under each compaction layer 1, and a drainage layer 3 is laid under each transition layer 2;

[0031] In this embodiment, Figure 1 As shown, the top of the drainage box 4 is arranged at the bottom of the upper drainage layer 3, and the bottom of the drainage box 4 is arranged inside the lower drainage layer 3; Figure 2 and Figure 3 ,in, Figure 2 This is a schematic diagram of the positive structure of the drainage box. Figure 3 Schematic diagram of the inverted structure of the drainage box, the drainage box 4 is: a vertical hollow structure with a plurality of water filtering and dust separating mesh holes 5 on the top and bottom surfaces; Figure 1 As shown, the drainage layers 3 corresponding to the two sides of the drainage box 4 present a symmetrical slope trend extending upward outward.

[0032] In this embodiment, it should be noted that:

[0033] The strong compaction layer 1 is made of mudstone;

[0034] The transition layer 2 is made of a water-permeable dust-proof material; the transition layer 2 is used to prevent the mudstone of the compaction layer 1 from mixing with the gravel of the drainage layer;

[0035] The drainage layer 3 is made of crushed stone; the drainage layer 3 is used to achieve multi-layer drainage of the compacted foundation.

[0036] In this embodiment, Figure 1 As shown, a plurality of drainage boxes 4 at the same level are arranged at equal intervals; in addition, the size of the drainage boxes 4 is randomly adjusted according to actual working conditions and is not specifically limited.

[0037] In this embodiment, Figure 2 and Figure 3 As shown, a first horizontal edge 6 is fixed to the outer side of the top of the drainage box 4, and a second horizontal edge 7 is fixed to the outer side of the bottom of the drainage box 4; the lateral length of the first horizontal edge 6 is smaller than the lateral length of the second horizontal edge 7; based on the first horizontal edge 6 and the second horizontal edge 7, it can be ensured that the corresponding drainage box 4 can be stably set inside the foundation.

[0038] In this embodiment, it should be noted that for the laying structure of the topmost compaction layer 1, transition layer 2 and drainage layer 3:

[0039] The laying thickness of the compaction layer 1 is 1 meter, and the laying thickness of the transition layer 2 is 5 centimeters; the thickest laying thickness corresponding to the drainage layer 3 is 0.5 meter, and the thinnest laying thickness corresponding to the drainage layer 3 is 0.4 meter.

[0040] In this embodiment, it should be noted that for the laying structure of the strong compaction layer 1, the transition layer 2 and the drainage layer 3 in the middle part:

[0041] The thickest paving thickness corresponding to the compaction layer 1 is 1 meter, and the thinnest paving thickness corresponding to the compaction layer 1 is 0.8 meter; the paving thickness of the transition layer 2 is 5 centimeters; the thickest paving thickness corresponding to the drainage layer 3 is 0.5 meter, and the thinnest paving thickness corresponding to the drainage layer 3 is 0.4 meter.

[0042] In this embodiment, it should be noted that for the laying structure of the bottommost strong compaction layer 1, transition layer 2 and drainage layer 3:

[0043] The thickest paving thickness corresponding to the compaction layer 1 is 1 meter, and the thinnest paving thickness corresponding to the compaction layer 1 is 0.8 meter; the paving thickness of the transition layer 2 is 5 centimeters; and the paving thickness of the drainage layer 3 is 0.5 meter.

[0044] For the deep compaction foundation in the hole described in the aforementioned embodiment 1, the paving material mudstone corresponding to the compaction layer is a low-cost and easily available material. Since "the compaction layer is arranged in three layers at intervals along the vertical ground direction; a transition layer is laid under each compaction layer, and a drainage layer is laid under each transition layer", and "the top of the drainage box is arranged at the bottom of the upper drainage layer, and the bottom of the drainage box is arranged inside the lower drainage layer", based on the aforementioned structure, it can be ensured that: while the mudstone of the compaction layer and the gravel of the drainage layer are isolated from dust through the transition layer, based on the cooperation between the drainage layer and the drainage box, multi-layer drainage of the compaction foundation is achieved, thereby timely reducing the erosion of the overall structure of the foundation by surface water.

[0045] It should be noted that in the claims, any reference numerals placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The use of the words first, second, third, etc., is only for convenience of expression and does not indicate any order. These words may be understood as part of the component name.

[0046] In addition, it should be noted that, in the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0047] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments after knowing the basic creative concept. Therefore, the claims should be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present invention.

[0048] Obviously, those skilled in the art can make various modifications and variations to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention should also include these modifications and variations.

Claims

1. A deep compaction foundation in a hole, the compaction foundation is a multi-layer composite structure, characterized in that: The compacted foundation comprises: a compacted layer, which is arranged in three layers at intervals in a direction perpendicular to the ground; a transition layer is laid under each compacted layer, and a drainage layer is laid under each transition layer; The top of the drainage box is arranged at the bottom of the upper drainage layer, and the bottom of the drainage box is arranged inside the lower drainage layer; the drainage box is a vertical hollow structure with a plurality of water filtering and dust-proof mesh holes on both the top and bottom surfaces; the drainage layers corresponding to the two sides of the drainage box present a symmetrical slope trend extending upward outward; Among them, the compaction layer is made of mudstone; the transition layer is made of permeable dust-proof material; the transition layer is used to prevent dust mixing between the mudstone of the compaction layer and the gravel of the drainage layer; the drainage layer is made of gravel; the drainage layer is used to achieve multi-layer drainage of the compaction foundation.

2. The dynamic compaction foundation according to claim 1, characterized in that: For multiple drainage boxes at the same level, they are set at equal intervals.

3. The dynamic compaction foundation according to claim 1, characterized in that: A first horizontal edge is fixed on the outer side of the top of the drainage box body, and a second horizontal edge is fixed on the outer side of the bottom of the drainage box body; the transverse length of the first horizontal edge is smaller than the transverse length of the second horizontal edge.

4. The dynamic compaction foundation according to claim 1, characterized in that: For the laying structure of the topmost compaction layer, transition layer and drainage layer: The laying thickness of the compaction layer is 1 meter, and the laying thickness of the transition layer is 5 centimeters; The thickest paving thickness corresponding to the drainage layer is 0.5 meters, and the thinnest paving thickness corresponding to the drainage layer is 0.4 meters.

5. The dynamic compaction foundation according to claim 1, characterized in that: For the laying structure of the middle part of the compaction layer, transition layer and drainage layer: The thickest paving thickness corresponding to the compaction layer is 1 meter, and the thinnest paving thickness corresponding to the compaction layer is 0.8 meter; the paving thickness of the transition layer is 5 centimeters; The thickest paving thickness corresponding to the drainage layer is 0.5 meters, and the thinnest paving thickness corresponding to the drainage layer is 0.4 meters.

6. The dynamic compaction foundation according to claim 1, characterized in that: For the laying structure of the bottom compaction layer, transition layer and drainage layer: The thickest paving thickness corresponding to the compaction layer is 1 meter, and the thinnest paving thickness corresponding to the compaction layer is 0.8 meter; the paving thickness of the transition layer is 5 centimeters; and the paving thickness of the drainage layer is 0.5 meter.