Nano fine silicon stone cement concrete inspection well cover
By using nano-silica cement concrete material, limit slot and raised structure design, the problems of rust, deformation and safety hazards of traditional manhole cover materials are solved, and the high pressure resistance and safety of manhole covers are achieved. Convenient construction and dismantling operations.
Patent Information
- Application Number
- CN202420808588.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional manhole cover materials are prone to rust and deform, and have insufficient pressure resistance and safety. The plastic cover is not strong enough, which poses safety hazards.
The frame and cover are cast with nano-silica cement concrete material, combined with the limit slot, transition protrusion and limit block design, forming an inverted "T" structure to ensure the close combination of the cover and frame Convenient detachment.
It improves the pressure resistance and service life of the manhole cover, ensures safety, and facilitates construction, assembly and operation.
Smart Images

Figure CN222120311U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of manhole cover application, and in particular relates to a nano-silicon fine stone cement concrete manhole cover. Background Art
[0002] There will be many underground pipelines in urban construction, such as sewers, underground gas pipelines, water pipes, power pipelines, communication pipelines, national defense pipelines, etc. These pipelines must have an outlet leading to the ground at every section. The section from the pipeline to the ground is called a manhole. The manhole mouth is usually flush with the ground, so a cover is needed. The cover used to cover the manhole is called a manhole cover.
[0003] At present, traditional manhole covers are generally made of iron, which is heavy and easy to rust. It is not easy to open the manhole cover after rusting. At the same time, after long-term use, the iron manhole cover is also easy to deform under heavy pressure, which is easy to cause damage to vehicles passing by. After the tire passes through the manhole cover, the manhole cover and the manhole frame make a clanging sound. In addition, there are also manhole covers made of plastic materials, but the plastic is not strong enough and is easily crushed by passing vehicles, which poses a great safety hazard.
[0004] Nanoconcrete is a new type of material, which is composed of concrete and nanomaterials. Compared with traditional concrete materials, nanoconcrete has higher strength, toughness, durability and waterproofness, which can greatly improve the earthquake resistance, wind resistance, durability and other properties of buildings. Nanoconcrete uses the unique properties of nanoparticles such as size, shape, distribution and surface characteristics to more effectively fill the defects of concrete density, improve the consistency and fluidity of concrete, and thus improve the density and strength of concrete. In addition, nanoparticles can also combine with water molecules in concrete to form more stable hydrates, thereby improving the durability and waterproofness of concrete. Therefore, nanoconcrete has great advantages in waterproofing, earthquake resistance, wind resistance and other aspects.
[0005] At present, the application of nano concrete has been widely used in the fields of construction, infrastructure, roads, bridges and environmental protection. In the construction industry, nano concrete can be used to manufacture high-rise buildings, tunnels, underground tunnels, underwater tunnels, concrete drains, interior decoration, etc. In the field of infrastructure, nano concrete can be used to manufacture bridges, highways, overpasses, etc. In the field of environmental protection, nano concrete can also be used in sewage treatment, waste treatment and difficult-to-degrade organic matter.
[0006] In summary, how to reasonably cast nano-silica fine stone cement concrete and solve the problems existing in traditional manhole covers is currently in urgent need of research.
[0007] Therefore, based on the above problems, the utility model provides a nano-silica fine stone cement concrete manhole cover. Utility Model Content
[0008] Purpose of the utility model: The purpose of the utility model is to provide a nano-silica fine stone cement concrete manhole cover to solve the problems existing in the use of manhole covers in the prior art.
[0009] Technical solution: The utility model discloses a nano-silica fine stone cement concrete manhole cover, which includes a base layer, a foundation pit, a frame and a cover. The frame is made by casting a circular frame steel mesh and a first nano-silica fine stone cement concrete. The inner layer of the frame is provided with a frame through groove, and one side of the frame is provided with a frame clamping groove used in conjunction with the frame through groove; the cover is made by casting a circular cover steel mesh and a second nano-silica fine stone cement concrete. The inner layer of the cover is provided with a plurality of drainage holes, and one side of the cover is provided with a cover boss used in conjunction with the frame clamping groove.
[0010] In the technical solution, the nano-silica fine stone cement concrete manhole cover also includes at least one group of limit slots symmetrically arranged on one side of the frame slot, and transition protrusions symmetrically arranged on the outer wall of one side of the cover body boss, and limit blocks respectively arranged on one side of the transition protrusions and inserted into the limit slots; wherein the transition protrusions and the limit blocks constitute an inverted "T"-shaped structure.
[0011] In the technical solution, the limit slot is configured as an arc structure; the transition protrusion and the limit block are respectively configured as arc structures; wherein the size of the transition protrusion or the size of the limit block is respectively smaller than the size of the limit slot.
[0012] In the technical solution, the diameter of the steel bars of the circular frame steel mesh and the circular cover steel mesh is 0.4-0.8 cm.
[0013] Compared with the prior art, the beneficial effects of the nano-silica fine stone cement concrete manhole cover of the utility model are: 1. The frame and cover are cast and formed by nano-silica fine stone cement concrete, which effectively solves the problems existing in the use of traditional iron manhole covers or plastic manhole covers. They are pressure-resistant and have a long service life, and are easy to manufacture and construct and assemble; 2. The coordinated design of the frame slot and cover boss, combined with the use of limit slots, transition protrusions and limit blocks, prevents the cover from detaching from the frame, thereby ensuring safety of use. At the same time, the cover is convenient to detach from the frame or use in combination. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a schematic diagram of the main structure of a nano-silicon fine stone cement concrete manhole cover of the utility model;
[0016] Figure 2 It is a schematic diagram of the top view of the frame of a nano-silica fine stone cement concrete manhole cover of the utility model;
[0017] Figure 3 It is a schematic diagram of the top view of the structure of a nano-silica fine stone cement concrete manhole cover of the utility model;
[0018] Figure 4 This is a schematic diagram of the split structure of a nano-silica fine stone cement concrete manhole cover before the frame and cover are assembled;
[0019] Among them, the serial numbers in the figure are as follows: 100-base layer, 101-foundation pit, 200-frame, 201-frame through groove, 202-frame slot, 203-limiting slot, 204-circular frame steel mesh, 205-first nano-silicon fine stone cement concrete, 300-cover, 301-cover boss, 302-drain hole, 303-transition boss, 304-limiting block, 305-circular cover steel mesh, 306-second nano-silicon fine stone cement concrete. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0021] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "top", "bottom", "one side", "the other side", "front", "back", "middle part", "inside", "top end", "bottom end", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0023] Embodiment 1
[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 The nano-silica fine stone cement concrete manhole cover shown in the figure comprises a base layer 100, a foundation pit 101, a frame 200 and a cover 300.
[0025] The frame 200 is made by pouring a circular frame steel mesh 204 and a first nano-silicon fine stone cement concrete 205 (the first nano-silicon fine stone cement concrete is a homogeneous mixture of nano-silicon, stone water and cement). The inner layer of the frame 200 is provided with a frame through groove 201, and one side of the frame 200 is provided with a frame clamping groove 202 used in conjunction with the frame through groove 201;
[0026] The cover body 300 is made by casting a circular cover body steel mesh 305 and a second nano-silicon fine stone cement concrete 306 (the second nano-silicon fine stone cement concrete is a homogeneous mixture of nano-silicon, stone water and cement). The inner layer of the cover body 300 is provided with a plurality of drainage holes 302, and one side of the cover body 300 is provided with a cover body boss 301 used in conjunction with the frame slot 202.
[0027] Embodiment 2
[0028] On the basis of the first embodiment, the nano-silica fine stone cement concrete manhole cover further includes at least one set of limit slots 203 symmetrically arranged in one side of the frame slot 202, and transition protrusions 303 symmetrically arranged on one side of the outer wall of the cover body boss 301, and limit blocks 304 respectively arranged on one side of the transition protrusion 303 and inserted into the limit slots 203;
[0029] The transition protrusion 303 and the limiting block 304 form an inverted “T”-shaped structure. After being assembled, the limiting block 304 and the transition protrusion 303 are vertically inserted into the limiting slot 203 .
[0030] Embodiment 3
[0031] On the basis of the first or second embodiment, the limit slot 203 is configured as an arc structure; the transition protrusion 303 and the limit block 304 are respectively configured as an arc structure;
[0032] The size of the transition protrusion 303 or the size of the limiting block 304 is respectively smaller than the size of the limiting slot 203 . At this time, the transition protrusion 303 and the limiting block 304 can rotate and slide in the limiting slot 203 .
[0033] In addition, the diameter of the steel bars of the circular frame steel mesh 204 and the circular cover steel mesh 305 is preferably 0.4-0.8 cm. When they are cast with the first nano-silicon fine stone cement concrete 205 and the second nano-silicon fine stone cement concrete 306 respectively, they have good compressive bearing capacity.
[0034] The working principle or structural principle of the nano-silica fine stone cement concrete manhole cover of this structure:
[0035] First, the frame 200 is fixedly constructed in the foundation pit 101 of the base layer 100;
[0036] Then, the cross protrusion 303 and the limit block 304 on one side of the cover body boss 301 are aligned one by one with a group of limit slots 203 in one side of the frame body slot 202, and then the rotating cover body 300 drives the cross protrusion 303 and the limit block 304 on one side of the cover body boss 301 to rotate synchronously in the horizontal direction, and the frame body 200 and the cover body 300 are assembled;
[0037] Finally, when it is necessary to remove the frame body 200 and the cover body 300, the rotating cover body 300 drives the protrusion 303 and the limit block 304 on one side of the cover body boss 301 to rotate horizontally synchronously until they are aligned one by one with a set of limit slots 203. At this time, the cover body 300 can be lifted off (in actual application, a round metal rod is inserted into the water discharge hole 302 to rotate the cover body 300 and the cover body boss 301 horizontally).
[0038] During use, the cover body boss 301 on one side of the cover body 300 can be horizontally compressed on the surface of the frame body slot 202 and then reciprocate and rotate. At the same time, the combined transition protrusion 303 and the limit block 304 (inverted "T" shape) will not separate from a set of limit slots 203, thereby meeting the requirement of tight combination of the frame body 200 and the cover body 300.
[0039] It should be noted that, in this article, terms such as "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0040] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A nano-silica fine stone cement concrete manhole cover, comprising a base layer (100), a foundation pit (101), a frame (200) and a cover (300), characterized in that: The frame (200) is cast by a circular frame steel mesh (204) and a first nano-silica fine stone cement concrete (205); the inner layer of the frame (200) is provided with a frame through groove (201); and one side of the frame (200) is provided with a frame clamping groove (202) used in conjunction with the frame through groove (201); The cover body (300) is cast by a circular cover body steel mesh (305) and a second nano-silicon fine stone cement concrete (306); the inner layer of the cover body (300) is provided with a plurality of drainage holes (302); and one side of the cover body (300) is provided with a cover body boss (301) used in conjunction with the frame body slot (202).
2. The nano-silica fine stone cement concrete manhole cover according to claim 1, characterized in that: The nano-silica fine stone cement concrete manhole cover also includes at least one group of limit slots (203) symmetrically arranged in one side of the frame slot (202), a transition protrusion (303) symmetrically arranged on the outer wall of one side of the cover body boss (301), and limit blocks (304) respectively arranged on one side of the transition protrusion (303) and snapped into the limit slots (203); The transition protrusion (303) and the limit block (304) form an inverted "T"-shaped structure.
3. The nano-silica fine stone cement concrete manhole cover according to claim 2, characterized in that: The limiting slot (203) is configured as an arc-shaped structure; the transition protrusion (303) and the limiting block (304) are respectively configured as arc-shaped structures; The size of the transition protrusion (303) or the size of the limiting block (304) is respectively smaller than the size of the limiting slot (203).
4. The nano-silica fine stone cement concrete manhole cover according to claim 1, characterized in that: The diameter of the steel bars of the circular frame steel mesh (204) and the circular cover steel mesh (305) is 0.4-0.8 cm.