UHPC wall rapid pouring device for civil air defense engineering
By introducing adjustable pouring direction and stable support structure into the concrete pouring device, the adjustment difficulty and swing problems of concrete hanging buckets during pouring in different directions in the prior art are solved, and efficient and stable pouring of UHPC walls is achieved.
Patent Information
- Application Number
- CN202420631291.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-29
AI Technical Summary
When pouring UHPC walls, the concrete outlet groove direction is fixed, personnel need to adjust the equipment when pouring in different directions, which increases the difficulty of adjusting the operation and the swing range of the hanging bucket, which affects the efficiency of use.
A UHPC wall rapid casting device for civil defense engineering was designed, using components such as hanging buckets, discharge valves, discharge pipes, drive motors, gears, solenoids, etc., and through the coordination of gears and electromagnets, flexible adjustment of casting direction is achieved. , and ensure the stability and support of the hanging bucket by supporting balls, guide grooves, columns and support springs.
It realizes convenient direction adjustment of UHPC walls, reduces the difficulty of pouring operations, ensures the stability and safety of the pouring process, and improves the efficiency of equipment use.
Smart Images

Figure CN222120962U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete pouring, in particular to a UHPC wall rapid pouring device for civil air defense projects. Background Art
[0002] UHPC stands for ultra-high performance concrete. It is a new type of material that appears in more and more large buildings due to its ultra-high strength, ultra-low water absorption, ultra-durability and corrosion resistance. Concrete bucket is a commonly used pouring equipment in construction. Concrete bucket is often used in the process of pouring UHPC walls.
[0003] For example, a Chinese utility model provides "a concrete bucket with controllable flow rate", and its announcement number is: CN212642147U. The application includes a concrete bucket with controllable flow rate, including a bucket body, a support frame is provided on the outer surface of the bucket body, a lifting ring is fixedly connected to the upper surface of the support frame, a flow rate limiting box is fixedly connected to the lower surface of the bucket body, a slot is provided on the upper surface of the flow rate limiting box, a concrete baffle is provided inside the slot, and the concrete bucket with controllable flow rate rotates the turntable counterclockwise to make the second rotating shaft drive the worm to rotate counterclockwise, so that the worm wheel drives the first rotating shaft to rotate clockwise stably and accurately, thereby The circular gear is meshed with the teeth on the front side of the connecting rod, so that the connecting rod drives the concrete baffle and the convex bar to move upward steadily and slowly along the concave slide rail, so that the concrete baffle can conveniently and accurately control the concrete flow rate, which not only avoids concrete waste but also improves the practicability of the device. During use, the direction of the concrete outlet chute of the concrete bucket in the above-mentioned technology is fixed, resulting in the need for personnel to operate the lifting equipment for adjustment when it is necessary to pour walls in different directions around the pouring process. In addition, since the swing amplitude of the bucket is large during the adjustment of the lifting equipment, the difficulty of the adjustment operation is greatly increased, which is not conducive to the use of personnel. Utility Model Content
[0004] The purpose of the utility model is to provide a UHPC wall rapid casting device for civil air defense projects, which has the advantage of being convenient for personnel to adjust the direction of the casting operation, and solves the problem that the direction of the concrete outlet chute in the above-mentioned technology is fixed during use, resulting in the need for personnel to operate the lifting equipment to adjust when it is necessary to cast walls in different directions around the casting process, and the swing amplitude of the bucket is large during the adjustment of the lifting equipment, which greatly increases the difficulty of the adjustment operation.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a UHPC wall rapid casting device for civil air defense engineering, comprising a hanging bucket, a discharge valve fixedly installed at the bottom of the hanging bucket, a discharge pipe fixedly installed on the surface of the discharge valve, a fixed frame fixedly connected to the upper end of the hanging bucket, a rotating shaft fixedly connected to the middle end of the top of the fixed frame, a turntable fixedly connected to the top of the rotating shaft, a gear ring fixedly installed on the top of the turntable, a slot is provided at the middle end of the top of the turntable, a fixed box movably connected to the middle end of the rotating shaft through a bearing, a driving motor fixedly installed at the lower end of the left side of the outer surface of the fixed box, a gear fixedly installed at the output end of the driving motor, the gear meshes with the gear ring, a fixed frame fixedly connected to the top of the inner cavity of the fixed box, an electromagnet fixedly installed at the middle end of the bottom of the fixed frame, pins movably connected to both ends of the bottom of the fixed frame, a cross plate fixedly connected between the tops of the two pins, and an iron block fixedly connected to the middle end of the bottom of the cross plate.
[0006] As a preferred solution, guide grooves are provided on both sides of the inner cavity of the fixing frame, and the surface of the transverse plate is movably connected to the surface of the guide grooves.
[0007] As a preferred solution, support balls are movably connected around the bottom of the inner cavity of the fixed box, and the tops of the support balls are movably connected to the bottom of the turntable.
[0008] As a preferred solution, columns are fixedly connected around the lower end of the bucket, and reinforcing plates are fixedly connected to the upper ends of the columns.
[0009] As a preferred solution, a top of the outer surface of the fixed box is fixedly connected with a lifting ring, and the number of the lifting rings is four.
[0010] As a preferred solution, both ends of the bottom of the inner cavity of the fixed frame are fixedly connected with support springs, and the top of the support spring is fixedly connected to the bottom of the transverse plate.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0012] 1. The utility model is convenient for placing concrete required for UHPC wall casting by setting the bucket, and is convenient for discharging the internal concrete into the formwork supported by the wall casting during the lifting process of the bucket through the setting of the discharge valve and the discharge pipe, thereby achieving the effect of casting the UHPC wall, and achieving the effect of adjusting the direction of the casting operation through the setting of the driving motor, gear, gear ring, turntable, shaft, fixed frame, bucket, discharge valve and discharge pipe, which is convenient for personnel to cast UHPC walls in different directions, and can effectively lock and fix the rotating position of the turntable, shaft, fixed frame and bucket through the setting of the electromagnet, iron block, cross plate, pin rod and slot, so as to prevent the bucket from rotating due to force during use, and ensure that the casting operation can be carried out stably.
[0013] 2. The utility model achieves the purpose of guiding the horizontal plate by setting the guide groove to prevent the horizontal plate from tilting during the movement. The utility model achieves the purpose of stably supporting the turntable by setting the support balls. The utility model achieves the purpose of stably supporting the bucket by setting the columns and the reinforcing plates. The utility model facilitates personnel to use the lifting equipment to lift the bucket by setting the lifting ring. The utility model achieves the purpose of supporting the horizontal plate by setting the support springs. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional diagram of the utility model;
[0015] Figure 2 This is a cross-sectional structural diagram of the fixed box of the utility model;
[0016] Figure 3 It is a cross-sectional structural schematic diagram of the fixing frame of the utility model.
[0017] In the figure: 1. bucket; 2. column; 3. reinforcement plate; 4. discharge valve; 5. discharge pipe; 6. fixed frame; 7. fixed box; 8. lifting ring; 9. fixed frame; 10. driving motor; 11. gear; 12. turntable; 13. slot; 14. rotating shaft; 15. supporting ball; 16. pin rod; 17. gear ring; 18. cross plate; 19. iron block; 20. guide groove; 21. supporting spring; 22. electromagnet. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-3 A UHPC wall rapid casting device for civil air defense engineering includes a bucket 1, a discharge valve 4 is fixedly installed at the bottom of the bucket 1, a discharge pipe 5 is fixedly installed on the surface of the discharge valve 4, the upper end of the bucket 1 is fixedly connected to a fixing frame 6, a rotating shaft 14 is fixedly connected to the middle end of the top of the fixing frame 6, a rotating disk 12 is fixedly connected to the top of the rotating shaft 14, a gear ring 17 is fixedly installed on the top of the rotating disk 12, a slot 13 is opened at the middle end of the top of the rotating disk 12, and the middle end of the rotating shaft 14 is movably connected through a bearing There is a fixed box 7, a driving motor 10 is fixedly installed at the lower end of the left side of the outer surface of the fixed box 7, a gear 11 is fixedly installed at the output end of the driving motor 10, the gear 11 is meshed with a gear ring 17, a fixed frame 9 is fixedly connected to the top of the inner cavity of the fixed box 7, an electromagnet 22 is fixedly installed at the middle end of the bottom of the fixed frame 9, both ends of the bottom of the fixed frame 9 are movably connected with pin rods 16, a cross plate 18 is fixedly connected between the tops of the two pin rods 16, and an iron block 19 is fixedly connected to the middle end of the bottom of the cross plate 18.
[0020] Through the above technical scheme, through the setting of the bucket 1, it is convenient to hold the concrete required for the casting of the UHPC wall. Through the setting of the discharge valve 4 and the discharge pipe 5, it is convenient to discharge the internal concrete into the formwork supported by the wall casting during the lifting process of the bucket 1, thereby achieving the effect of casting the UHPC wall. Through the setting of the driving motor 10, the gear 11, the gear ring 17, the turntable 12, the rotating shaft 14, the fixed frame 6, the bucket 1, the discharge valve 4 and the discharge pipe 5, the effect of adjusting the direction of the casting operation is achieved, which is convenient for personnel to cast the UHPC wall in different directions. Moreover, through the setting of the electromagnet 22, the iron block 19, the cross plate 18, the pin 16 and the slot 13, the rotation position of the turntable 12, the rotating shaft 14, the fixed frame 6 and the bucket 1 can be effectively locked and fixed, so as to prevent the bucket 1 from rotating due to force during use, thereby ensuring that the casting operation can be carried out stably.
[0021] Guide grooves 20 are provided on both sides of the inner cavity of the fixing frame 9 , and the surface of the transverse plate 18 is movably connected to the surface of the guide grooves 20 .
[0022] Through the above technical solution and the provision of the guide groove 20, the purpose of guiding the transverse plate 18 is achieved, thereby preventing the transverse plate 18 from tilting during the movement.
[0023] Support balls 15 are movably connected around the bottom of the inner cavity of the fixed box 7 , and the top of the support balls 15 is movably connected to the bottom of the rotating disk 12 .
[0024] Through the above technical solution and the provision of the supporting balls 15 , the purpose of stably supporting the turntable 12 is achieved.
[0025] The lower end of the bucket 1 is fixedly connected with columns 2 all around, and the upper end of the column 2 is fixedly connected with a reinforcing plate 3.
[0026] Through the above technical solution, by arranging the columns 2 and the reinforcing plates 3, the purpose of stably supporting the bucket 1 is achieved.
[0027] The top of the outer surface of the fixed box 7 is fixedly connected with a lifting ring 8, and the number of the lifting rings 8 is four.
[0028] Through the above technical solution, by setting the lifting ring 8, it is convenient for personnel to use lifting equipment to lift the bucket 1.
[0029] Both ends of the bottom of the inner cavity of the fixing frame 9 are fixedly connected with support springs 21 , and the top of the support spring 21 is fixedly connected to the bottom of the transverse plate 18 .
[0030] Through the above technical solution and the provision of the support spring 21 , the purpose of supporting the transverse plate 18 is achieved.
[0031] The working principle of the utility model is as follows: through the setting of the bucket 1, it is convenient to hold the concrete required for UHPC wall casting, and through the setting of the discharge valve 4 and the discharge pipe 5, it is convenient to discharge the internal concrete into the template supported by the wall casting during the lifting process of the bucket 1, thereby achieving the effect of pouring the UHPC wall, and when it is necessary to cast the UHPC wall in different directions, the gear 11 can be driven to rotate by starting the drive motor 10, and the gear 11 can drive the gear ring 17, the turntable 12, the rotating shaft 14, the fixed frame 6, the bucket 1, the discharge valve 4 and the discharge pipe 5 to rotate. The direction of the pouring operation can be adjusted by rotating, so that the personnel can pour UHPC walls in different directions. When the pouring direction of the discharge pipe 5 is adjusted, the electromagnet 22 can generate magnetic force by controlling the operation of the electromagnet 22, and the iron block 19 can be attracted to move downward. The movement of the iron block 19 can drive the cross plate 18 and the pin rod 16 to move downward, so that the pin rod 16 can be inserted into the slot 13, so that the rotation position of the turntable 12, the rotating shaft 14, the fixing frame 6 and the bucket 1 can be effectively locked and fixed, so as to prevent the bucket 1 from rotating due to the force during use, and ensure that the pouring operation can be carried out stably.
[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the essence and scope of the technical solution of the utility model.
Claims
1. A UHPC wall rapid casting device for civil air defense engineering, comprising a hanging bucket (1), Features: A discharge valve (4) is fixedly installed at the bottom of the bucket (1), a discharge pipe (5) is fixedly installed on the surface of the discharge valve (4), the upper end of the bucket (1) is fixedly connected to a fixing frame (6), the middle end of the top of the fixing frame (6) is fixedly connected to a rotating shaft (14), the top of the rotating shaft (14) is fixedly connected to a rotating disk (12), the top of the rotating disk (12) is fixedly installed with a gear ring (17), a slot (13) is provided at the middle end of the top of the rotating disk (12), the middle end of the rotating shaft (14) is movably connected to a fixing box (7) via a bearing, and the fixing box (7) is fixedly connected to the fixing box (7). ) is fixedly mounted on the lower end of the left side of the outer surface of the fixed box (7), a gear (11) is fixedly mounted on the output end of the drive motor (10), the gear (11) is meshed with a gear ring (17), a fixed frame (9) is fixedly connected to the top of the inner cavity of the fixed box (7), an electromagnet (22) is fixedly mounted on the middle end of the bottom of the fixed frame (9), both ends of the bottom of the fixed frame (9) are movably connected to pins (16), a cross plate (18) is fixedly connected between the tops of the two pins (16), and an iron block (19) is fixedly connected to the middle end of the bottom of the cross plate (18).
2. A UHPC wall rapid casting device for civil air defense engineering according to claim 1, Features: Guide grooves (20) are provided on both sides of the inner cavity of the fixing frame (9), and the surface of the transverse plate (18) is movably connected to the surface of the guide groove (20).
3. A UHPC wall rapid casting device for civil air defense engineering according to claim 1, Features: Support balls (15) are movably connected to the four sides of the bottom of the inner cavity of the fixed box (7), and the top of the support balls (15) is movably connected to the bottom of the rotating disk (12).
4. A UHPC wall rapid casting device for civil air defense engineering according to claim 1, Features: The lower end of the bucket (1) is fixedly connected to upright posts (2) on all sides, and the upper end of the upright posts (2) is fixedly connected to a reinforcing plate (3).
5. A UHPC wall rapid casting device for civil air defense engineering according to claim 1, Features: A lifting ring (8) is fixedly connected to the top of the outer surface of the fixed box (7), and the number of the lifting rings (8) is four.
6. A UHPC wall rapid casting device for civil air defense engineering according to claim 1, Features: Both ends of the bottom of the inner cavity of the fixed frame (9) are fixedly connected to support springs (21), and the top of the support spring (21) is fixedly connected to the bottom of the horizontal plate (18).