Assembled temporary fence for road construction and maintenance

By designing assembled temporary fences, using vertical columns, lubricating rods and telescopic structures, the problems of poor isolation effect and inconvenient assembly of existing construction fences are solved, rapid isolation and protection are achieved, installation costs and time are reduced, and suitable for temporary Construction requirements.

CN222121156UActive Publication Date: 2024-12-06JINING RENCHENG DISTRICT TRANSPORTATION BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421289907.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-12-06
Estimated Expiration
2034-06-06

AI Technical Summary

Technical Problem

The existing temporary construction fences have poor isolation effect in the construction area, are inflexible in assembly, are high in installation cost and low in efficiency, and have poor appearance, making it difficult to meet the thorough protection needs of temporary construction.

Method used

A assembled temporary fence including vertical columns, lubricating rods, movable sliding sleeves, movable shaft seats and telescopic parts structures is designed. By combining the positioning insert blocks and limit slots, it can realize rapid assembly and disassembly, and use fixing. The casters are connected to the sliding movable, achieving isolation and protection effect, and the telescopic structure can adjust the enclosure range.

Benefits of technology

It realizes rapid isolation and protection of construction areas, is suitable for use in temporary urban areas, reduces installation costs and time, improves assembly flexibility and practicality, and is easy to carry and transport.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121156U_ABST
    Figure CN222121156U_ABST
Patent Text Reader

Abstract

The assembled temporary fence for road construction and maintenance comprises a first vertical column, a second vertical column, lubricating rods and isolation handrails, the second vertical column is arranged on the side portion of the first vertical column, one side of the interior of the first vertical column is symmetrically connected with the two lubricating rods, the lubricating rods are sleeved with movable sliding sleeves, and the movable sliding sleeves are connected with the isolation handrails. The side portion of the movable sliding sleeve and one side of the second vertical stand column are connected with a movable shaft base at the same time. According to the utility model, a first positioning insertion block is in positioning insertion connection with a first positioning insertion groove, a limiting insertion rod is in positioning insertion connection with a limiting through hole, a second positioning insertion block is in positioning insertion connection with a second positioning insertion groove, and a springback type positioning insertion piece and the limiting insertion groove are automatically inserted and fixed through the resilience of a second spring; the whole fence can be temporarily and rapidly assembled and rapidly disassembled and separated in a construction area, the construction area can be effectively isolated from the outside, and the fence is suitable for maintenance and isolation of temporary areas in urban areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of protective fences, in particular to an assembled temporary fence for road construction and maintenance. Background Art

[0002] Maintenance railings are generally used in temporary sites of construction sites and highway construction, mainly for temporary protection and safeguarding of temporary sites of construction sites and highway construction.

[0003] Most of the existing fences used for temporary construction protection are simple rod-shaped components. Such fences mainly serve to isolate the construction area from the outside, but outsiders can easily cross them, and they cannot achieve internal and external isolation to achieve complete protection of the construction area. Some devices used for complete isolation of the construction area are mostly vertically fixed installations of colored steel tiles, which are removed after the construction is completed. However, such structural settings are not suitable for temporary construction protection, and the disassembly is not flexible enough, and it is not easy to assemble and operate. The installation cost of such protection products is high, the installation efficiency is low, and the appearance after installation is poor, which affects the environment of the construction area and needs to be developed urgently. Utility Model Content

[0004] The purpose of the utility model is to provide an assembled temporary fence for road construction and maintenance to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled temporary fence for road construction and maintenance, comprising a vertical column one, a vertical column two, a lubrication rod and an isolation railing, wherein the side of the vertical column one is provided with a vertical column two, one side of the interior of the vertical column one is symmetrically connected to two lubrication rods, the outer sleeve of the lubrication rod is provided with a movable sleeve, the side of the movable sleeve and one side of the vertical column two are simultaneously connected to a movable axle seat, the two movable axle seats are connected by an isolation railing, and the isolation railing includes a telescopic structure and a prompt marking area.

[0006] Preferably, two sliding grooves are symmetrically connected to one side of the vertical column, and the two isolation railings are movably arranged in the two sliding grooves respectively.

[0007] Preferably, the bottoms of the vertical column 1 and the vertical column 2 are symmetrically connected with fixed casters.

[0008] Preferably, one side of the first vertical column is respectively connected with a first positioning plug-in block and a second positioning plug-in block, and the interior of the first positioning plug-in block is connected with a limiting opening.

[0009] Preferably, one side of the vertical column 2 is connected to a first positioning slot matching the first positioning plug-in block, one side of the vertical column 2 is connected to a second positioning slot matching the second positioning plug-in block, and the top and bottom of the second positioning slot are connected to limit slots matching the rebound positioning plug-in.

[0010] Preferably, a movable cavity is connected to the top of the second vertical column, a limit plate is arranged inside the movable cavity, and a connecting rod and a limit plug rod are respectively connected to the top and bottom of the limit plate.

[0011] Preferably, two sliding blocks are symmetrically arranged at the top and bottom of the second positioning block, the two sliding blocks are connected by a second spring, and the side of the sliding block is connected to a rebound type positioning plug-in, which is symmetrically arranged relative to the top and bottom of the second positioning block.

[0012] Preferably, one end of the connecting rod is connected to a handle, and the handle is located at the top of the second vertical column. The outside of the connecting rod is sleeved with a first spring, and the first spring is located in the movable cavity.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] (1) This type of assembled temporary fence for road construction and maintenance can be quickly assembled and disassembled in the construction area by positioning and plugging the first positioning plug block with the first positioning slot, positioning and plugging the limit plug rod with the limit opening, positioning and plugging the second positioning plug block with the second positioning slot, and automatically plugging the rebound positioning plug and the limit slot through the recovery of the second spring, so that the overall fence can be quickly assembled and disassembled in the construction area, and can effectively isolate the construction area from the outside, which is more suitable for temporary area maintenance and isolation in urban areas;

[0015] (2) This type of assembled temporary fence for road construction and maintenance uses fixed casters to pull and move the vertical column 1 and the vertical column 2 in the opposite directions, and uses the movable sleeve to slide along the lubricating rod and the movable connection of the two movable shaft seats to realize the rotation of the two isolation railings until they are parallel, which can play an isolation and protection effect. When the vertical column 1 and the vertical column 2 move closer, the movable sleeve slides along the lubricating rod, and the two isolation railings rotate and are stored in the vertical column 1. The vertical column 1 and the vertical column 2 are combined, which is convenient for carrying and transporting;

[0016] (3) This type of assembled temporary fence for road construction and maintenance can change its length by using a telescopic structure when the isolation railing is subjected to a relative external pulling force, thereby adjusting the range of enclosure and isolation. The setting of a prompt marking area can be used to indicate matters that require attention during road construction, thereby improving the practicality of the fence structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the front view structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the assembly structure of the fence of the utility model;

[0019] Figure 3 It is a schematic diagram of the expanded structure of the vertical column 1 and the vertical column 2 of the utility model;

[0020] Figure 4 This is a schematic diagram of the connection structure between the second positioning plug-in block and the rebound-type positioning plug-in of the utility model;

[0021] Figure 5 It is a schematic diagram of the side structure of the vertical column 1 and the vertical column 2 of the utility model.

[0022] In the figure: 1. vertical column one; 2. vertical column two; 3. lubrication rod; 4. movable sliding sleeve; 5. movable shaft seat; 6. isolation railing; 601. telescopic structure; 602. prompt marking area; 7. sliding groove; 8. first positioning block; 801. limiting opening; 9. second positioning block; 10. rebound positioning plug-in; 11. first positioning slot; 12. second positioning slot; 1201. limiting slot; 13. movable cavity; 14. limiting plate; 15. limiting rod; 16. connecting rod; 17. handle; 18. first spring; 19. fixed caster; 20. sliding block; 21. second spring. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-5 The utility model provides an embodiment: an assembled temporary fence for road construction and maintenance, comprising a vertical column 1, a vertical column 2, a lubricating rod 3 and an isolation railing 6. The side of the vertical column 1 is provided with a vertical column 2 2, and one side of the interior of the vertical column 1 is symmetrically connected with two lubricating rods 3. The outer sleeve of the lubricating rod 3 is provided with a movable sliding sleeve 4. The vertical column 1 and the vertical column 2 are pulled and moved in the back direction by using a fixed caster 19. The movable sliding sleeve 4 is used to slide along the lubricating rod 3 and the movable connection of the two movable shaft seats 5 to realize the rotation of the two isolation railings 6 until they are in a parallel state, which can play an isolation and protection effect.

[0025] The side of the movable sleeve 4 and one side of the vertical column 2 are simultaneously connected with a movable shaft seat 5, and the two movable shaft seats 5 are connected by an isolation railing 6. The isolation railing 6 includes a telescopic structure 601 and a prompt marking area 602. When the vertical column 1 and the vertical column 2 move closer, the movable sleeve 4 slides along the lubrication rod 3, and the two isolation railings 6 rotate and are stored in the vertical column 1. The vertical column 1 and the vertical column 2 are combined, which is convenient for carrying and transporting.

[0026] Two sliding grooves 7 are symmetrically connected to one side of the vertical column 1, and two isolation railings 6 are movably arranged in the two sliding grooves 7. When the isolation railings 6 are subjected to relative external pulling force, the length can be changed by using the telescopic structure 601 to adjust the range of enclosure and isolation. The setting of the prompt marking area 602 is realized to mark the matters that need to be paid attention to during the road construction.

[0027] The bottoms of the vertical column 1 and the vertical column 2 are symmetrically connected with fixed casters 19.

[0028] One side of the vertical column 1 is respectively connected with a first positioning plug-in block 8 and a second positioning plug-in block 9 , and the interior of the first positioning plug-in block 8 is connected with a limiting opening 801 .

[0029] One side of the vertical column 2 is connected to a first positioning slot 11 that matches the first positioning block 8, and one side of the vertical column 2 is connected to a second positioning slot 12 that matches the second positioning block 9. The top and bottom of the second positioning slot 12 are connected to limit slots 1201 that match the rebound positioning plug-in 10.

[0030] The top of the second vertical column 2 is connected with an active cavity 13, and a limit plate 14 is arranged inside the active cavity 13. The top and bottom of the limit plate 14 are respectively connected with a connecting rod 16 and a limit plug rod 15.

[0031] Two sliding blocks 20 are symmetrically arranged at the top and bottom of the second positioning block 9, and the two sliding blocks 20 are connected by a second spring 21. The side of the sliding block 20 is connected to a rebound type positioning plug-in 10, and the rebound type positioning plug-in 10 is symmetrically arranged relative to the top and bottom of the second positioning block 9.

[0032] One end of the connecting rod 16 is connected to a handle 17 , which is located at the top of the vertical column 2 . A first spring 18 is sleeved on the outside of the connecting rod 16 , and the first spring 18 is located in the movable cavity 13 .

[0033] When the embodiment of the present application is in use: the first positioning block 8 is positioned and plugged with the first positioning slot 11, the limiting plug rod 15 is positioned and plugged with the limiting opening 801, the second positioning block 9 is positioned and plugged with the second positioning slot 12, and the rebound positioning plug 10 is automatically plugged with the limiting slot 1201 through the restorative property of the second spring 21, so that the overall fence can be temporarily and quickly assembled and quickly disassembled and separated in the construction area, the vertical column 1 and the vertical column 2 are pulled and moved in the back direction by the fixed casters 19, and the movable sleeve 4 is slidable along the lubricating rod 3 and the movable connection of the two movable shaft seats 5, so that the two isolation railings 6 are rotated until they are parallel, which can play an isolation and protection effect, and when the vertical column 1 and the vertical column 2 move close to each other, when the movable sleeve 4 slides along the lubricating rod 3, the two isolation railings 6 are rotated and stored in the vertical column 1, and the vertical column 1 and the vertical column 2 are combined, which is convenient for carrying and transporting.

Claims

1. An assembled temporary fence for road construction and maintenance. It is characterized in that The invention comprises a vertical column 1 (1), a vertical column 2 (2), a lubricating rod (3) and an isolation railing (6), wherein the side of the vertical column 1 (1) is provided with the vertical column 2 (2), one side of the interior of the vertical column 1 (1) is symmetrically connected with two lubricating rods (3), the outer side of the lubricating rod (3) is sleeved with a movable sliding sleeve (4), the side of the movable sliding sleeve (4) and one side of the vertical column 2 (2) are simultaneously connected with a movable shaft seat (5), the two movable shaft seats (5) are connected via the isolation railing (6), and the isolation railing (6) comprises a telescopic structure (601) and a prompt marking area (602).

2. The assembled temporary fence for road construction and maintenance according to claim 1, Features: Two sliding grooves (7) are symmetrically connected to one side of the vertical column (1), and the two isolation railings (6) are movably arranged in the two sliding grooves (7).

3. The assembled temporary fence for road construction and maintenance according to claim 2, Features: The bottoms of the vertical column 1 (1) and the vertical column 2 (2) are symmetrically connected with fixed casters (19).

4. The assembled temporary fence for road construction and maintenance according to claim 3, Features: One side of the vertical column 1 (1) is respectively connected to a first positioning plug-in block (8) and a second positioning plug-in block (9), and the interior of the first positioning plug-in block (8) is connected with a limiting opening (801).

5. The assembled temporary fence for road construction and maintenance according to claim 1, Features: A first positioning slot (11) matching with the first positioning plug-in block (8) is connected to one side of the second vertical column (2), a second positioning slot (12) matching with the second positioning plug-in block (9) is connected to one side of the second vertical column (2), and a limit slot (1201) matching with the resilient positioning plug-in block (10) is connected to the top and bottom of the second positioning slot (12).

6. The assembled temporary fence for road construction and maintenance according to claim 5, Features: The top of the second vertical column (2) is connected to an active cavity (13), a limit plate (14) is arranged inside the active cavity (13), and the top and bottom of the limit plate (14) are respectively connected to a connecting rod (16) and a limit plug rod (15).

7. The assembled temporary fence for road construction and maintenance according to claim 4, Features: Two sliding blocks (20) are symmetrically arranged at the top and bottom of the second positioning plug-in block (9), and the two sliding blocks (20) are connected by a second spring (21). The side of the sliding block (20) is connected to a resilient positioning plug-in (10), and the resilient positioning plug-in (10) is symmetrically arranged relative to the top and bottom of the second positioning plug-in block (9).

8. The assembled temporary fence for road construction and maintenance according to claim 6, Features: One end of the connecting rod (16) is connected to a handle (17), and the handle (17) is located at the top of the second vertical column (2). The outside of the connecting rod (16) is sleeved with a first spring (18), and the first spring (18) is located in the movable cavity (13).