Complex terrain engineering investigation drilling rig

By introducing adjustment units and drilling units into the drilling device, the problems of device parallelism and trajectory stability in complex terrain are solved, and stable and efficient drilling in complex terrain is achieved.

CN222121437UActive Publication Date: 2024-12-06NUCLEAR IND LIUZHOU ENG INVESTIGATION INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421014582.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-11
Publication Date
2024-12-06
Estimated Expiration
2034-05-11

AI Technical Summary

Technical Problem

In complex terrain, existing drilling devices are difficult to ensure parallelism, resulting in unsmooth drilling and insufficient labor saving during drilling, which can easily lead to changes in drilling trajectory.

Method used

A complex terrain engineering survey drilling device is designed, including adjustment units and drilling units. The adjustment unit realizes fine adjustment of the device height and angle adjustment through hollow columns, threaded holes, support columns and special-shaped blocks to improve stability; the drilling unit controls the drilling trajectory through cylinders, rotating motors and limiting structures to ensure consistency of the drilling trajectory. .

Benefits of technology

In complex terrain, the stability and working efficiency of the drilling device are improved, the parallelism and labor saving of the drilling trajectory are ensured, and the stability and efficiency of the drilling process are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121437U_ABST
    Figure CN222121437U_ABST
Patent Text Reader

Abstract

The utility model discloses a complex terrain engineering investigation drilling device, which relates to the technical field of terrain investigation drilling and comprises an investigation box, an adjusting unit arranged at the bottom end of the investigation box and a drilling unit arranged in the investigation box. The adjusting unit comprises hollow columns fixedly connected to the four sides of the bottom end of the investigation box, a plurality of threaded holes formed in the surfaces of the hollow columns, and adjusting assemblies arranged at the bottom ends of the hollow columns. The drilling unit comprises a driving assembly arranged in the exploration box and a collecting assembly arranged at the bottom end of the driving assembly. According to the complex terrain engineering investigation drilling rig, the supporting columns can be pulled to move, the bolts are connected with other threaded holes, and therefore the heights of the four corners of the bottom end of the drilling rig can be adjusted, and the stability of the drilling rig can be improved by inserting special-shaped blocks into the ground; and in the descending process of the rotating motor, the sliding block can be driven to move up and down in the sliding groove, the moving track of the rotating shaft is limited, and therefore the drilling track is limited.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of terrain survey and drilling, in particular to a complex terrain engineering survey and drilling device. Background Art

[0002] In the process of geological exploration, the main special mechanical equipment that drives the drill to drill physical geological data, cores, ore cores, cuttings, liquid samples, gas samples, etc. from underground is called drilling rig for short. The drilling rig is used to drill holes of a certain depth and diameter from the surface at a certain angle and along a certain trajectory to take out representative cores, ore cores or cuttings of the strata, so as to achieve the purpose of exploring underground geology and mineral resources and exploring the mysteries of the earth.

[0003] After searching in the publication (announcement) number: CN208718566U, a drilling device for geotechnical engineering investigation is disclosed, including a base plate, the bottom of the base plate is rotatably connected to a first roller through a first bracket, one end of the bottom of the base plate is fixedly connected to a motor, the driving shaft of the motor passes through the base plate and is fixedly connected to a traction shaft, the side of the traction shaft is fixedly connected to a traction rope, the top of the base plate is provided with a first slide groove, the inner wall of the first slide groove is slidably connected to a slide bar, the top of the slide bar is fixedly connected to a support plate, the top of the support plate is fixedly connected to a drilling machine, and the bottom of the support plate is rotatably connected to a second roller through a second bracket. The utility model relates to the technical field of drilling devices for geotechnical engineering investigation. This drilling device for geotechnical engineering investigation is easy to move, can adapt to complex terrain operations, has a simple structure and operation, and has a low maintenance cost. The drilling machine can be separated from the mobile device, which can increase the stability during the operation.

[0004] Although the above scheme allows the drilling machine to be separated from the mobile device, which can increase stability during operation, the drilling device needs to be fixed before use. When facing complex terrain, it is difficult to ensure that the drilling device is parallel, which leads to unsmooth drilling work. In addition, the drilling process is not labor-saving enough and easily causes changes in the drilling trajectory. Utility Model Content

[0005] The main purpose of the utility model is to provide a drilling device for engineering surveys in complex terrain. By setting an adjustment unit, the problem that it is difficult to ensure the parallelism of the drilling device when facing complex terrain, which leads to unsmooth drilling work, is solved. By setting a drilling unit, the problem that the drilling process is not labor-saving enough and easily leads to changes in the drilling trajectory is solved.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A complex terrain engineering survey and drilling device comprises a survey box, an adjustment unit arranged at the bottom of the survey box, and a drilling unit arranged inside the survey box;

[0008] The adjustment unit includes a hollow column fixedly connected to four sides of the bottom end of the survey box, a plurality of threaded holes opened on the surface of the hollow column, and an adjustment component arranged at the bottom end of the hollow column;

[0009] The drilling unit comprises a driving assembly arranged inside the survey box, and a collecting assembly arranged at the bottom end of the driving assembly.

[0010] Preferably, the adjustment assembly in the adjustment unit includes a support column arranged inside the hollow column, a bolt arranged on one side of the front of the support column, and a stabilizing structure arranged at the bottom end of the support column;

[0011] One end of the bolt is threadedly connected to the corresponding threaded hole.

[0012] Preferably, the stabilizing structure in the adjustment unit includes a plurality of limit frames fixedly connected to the bottom end of the support column, a movable groove opened inside the limit frame, a movable shaft rotatably connected inside the limit frame, and a special-shaped block fixedly connected to the surface of the movable shaft;

[0013] One side of the special-shaped block is triangular, and the other side is semicircular.

[0014] Preferably, the driving assembly in the drilling unit includes a cylinder fixedly connected to the top of the survey box, a telescopic column arranged at the bottom of the cylinder, a rotating motor fixedly connected to the bottom of the telescopic column, a limiting structure arranged on the side of the rotating motor, and a rotating shaft fixedly connected to the bottom of the rotating motor.

[0015] Preferably, the limiting structure in the drilling unit includes a fixing ring fixedly connected to the side of the rotating motor, connecting columns fixedly connected to both sides of the fixing ring, a slider fixedly connected to one side of the connecting column, an elastic column arranged inside the slider, and push blocks arranged on both sides of the elastic column;

[0016] The survey box is fixedly connected with two fixing rods and a slide groove opened on one side of the fixing rods, and the sliding block is slidably connected with the slide groove.

[0017] Preferably, the collecting assembly in the drilling unit includes a limiting ring fixedly connected to the bottom end of the rotating shaft, a plurality of conical columns fixedly connected to the bottom end of the limiting ring, a material picking frame detachably connected to the inner wall of the limiting ring, and a plurality of triangular blocks fixedly connected to the bottom end of the material picking frame.

[0018] Preferably, the material taking frame in the drilling unit is in the shape of a truncated cone.

[0019] Compared with the prior art, the utility model has the following beneficial effects:

[0020] 1. In the utility model, by setting the adjustment unit, when the drilling device is used on complex terrain, first observe whether the device is parallel to the ground, then remove the bolts at the lower end of the device, pull the support column downward, and connect the bolts with other threaded holes to increase the height of this end of the device, and remove the bolts at the higher end of the device, push the support column upward, and connect the bolts with other threaded holes to lower the height of this end of the device, and rotate the movable shaft so that one end of the special-shaped block faces the ground. On the one hand, the angle between the survey box and the ground can be fine-tuned, and on the other hand, the special-shaped block inserted into the ground can improve the stability of the drilling device.

[0021] 2. In the utility model, through the setting of the drilling unit, the cylinder is started to drive the rotating motor to descend, and then the rotating motor is started to drive the rotating shaft, the limit ring and the material picking frame to rotate together, thereby driving the conical column to drill the ground. At the same time, the soil in the ground will enter the inside of the material picking frame through multiple triangular blocks. During the descent of the rotating motor, it will drive the slider to move up and down in the slide slot, limiting the moving trajectory of the rotating shaft, thereby limiting the drilling trajectory and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0023] Figure 2 It is a cross-sectional view of the utility model;

[0024] Figure 3 For this utility model Figure 2 A schematic diagram of the structure enlargement in the middle;

[0025] Figure 4 For this utility model Figure 2 A magnified schematic diagram of the structure at B in the middle;

[0026] Figure 5 For this utility model Figure 2 Enlarged schematic diagram of the structure at point C in the middle.

[0027] In the figure:

[0028] 1. Survey box;

[0029] 2. Adjustment unit; 201. Hollow column; 202. Threaded hole; 203. Bolt; 204. Support column; 205. Limit frame; 206. Movable shaft; 207. Special-shaped block; 208. Movable slot;

[0030] 3. Drilling unit; 301. Material taking frame; 302. Limiting ring; 303. Rotating shaft; 304. Fixed rod; 305. Slide; 306. Connecting column; 307. Fixed ring; 308. Rotating motor; 309. Telescopic column; 310. Cylinder; 311. Sliding block; 312. Elastic column; 313. Push block; 314. Triangular block; 315. Conical column. DETAILED DESCRIPTION

[0031] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0032] Example 1

[0033] like Figure 1 , Figure 2 , Figure 3 , Figure 4 as well as Figure 5 As shown, a complex terrain engineering survey and drilling device comprises a survey box 1, an adjustment unit 2 arranged at the bottom end of the survey box 1, and a drilling unit 3 arranged inside the survey box 1;

[0034] The adjustment unit 2 includes a hollow column 201 fixedly connected to four sides of the bottom end of the survey box 1, a plurality of threaded holes 202 opened on the surface of the hollow column 201, and an adjustment component arranged at the bottom end of the hollow column 201;

[0035] The drilling unit 3 includes a driving assembly arranged inside the survey box 1 and a collecting assembly arranged at the bottom end of the driving assembly.

[0036] The adjustment assembly in the adjustment unit 2 includes a support column 204 disposed inside the hollow column 201, a bolt 203 disposed on one side of the front of the support column 204, and a stabilizing structure disposed at the bottom end of the support column 204;

[0037] One end of the bolt 203 is threadedly connected to the corresponding threaded hole 202 .

[0038] The stable structure in the adjustment unit 2 includes a plurality of limit frames 205 fixedly connected to the bottom end of the support column 204, a movable slot 208 opened inside the limit frame 205, a movable shaft 206 rotatably connected inside the limit frame 205, and a special-shaped block 207 fixedly connected to the surface of the movable shaft 206;

[0039] One side of the special-shaped block 207 is triangular, and the other side is semicircular.

[0040] The driving assembly in the drilling unit 3 includes a cylinder 310 fixedly connected to the top of the inside of the survey box 1, a telescopic column 309 arranged at the bottom of the cylinder 310, a rotating motor 308 fixedly connected to the bottom of the telescopic column 309, a limiting structure arranged on the side of the rotating motor 308, and a rotating shaft 303 fixedly connected to the bottom of the rotating motor 308.

[0041] The limiting structure in the drilling unit 3 includes a fixing ring 307 fixedly connected to the side of the rotating motor 308, a connecting column 306 fixedly connected to both sides of the fixing ring 307, a slider 311 fixedly connected to one side of the connecting column 306, an elastic column 312 arranged inside the slider 311, and push blocks 313 arranged on both sides of the elastic column 312;

[0042] Two fixed rods 304 and a slide groove 305 are fixedly connected inside the survey box 1 , and a slider 311 is slidably connected to the slide groove 305 .

[0043] The collecting assembly in the drilling unit 3 includes a limiting ring 302 fixedly connected to the bottom end of the rotating shaft 303, a plurality of conical columns 315 fixedly connected to the bottom end of the limiting ring 302, a material picking frame 301 detachably connected to the inner wall of the limiting ring 302, and a plurality of triangular blocks 314 fixedly connected to the bottom end of the material picking frame 301.

[0044] The shape of the material taking frame 301 in the drilling unit 3 is a truncated cone.

[0045] When the drilling device is used on complex terrain, first observe whether the device is parallel to the ground, then remove the bolt 203 at the lower end of the device, pull the support column 204 downward, and connect the bolt 203 with other threaded holes 202 to increase the height of this end of the device. In addition, the bolt 203 at the higher end of the device can be removed, and the support column 204 can be pushed upward. The bolt 203 is connected with other threaded holes 202 to lower the height of this end of the device. The movable shaft 206 can also be rotated so that one end of the special-shaped block 207 faces the ground. On the one hand, the angle between the survey box 1 and the ground can be fine-tuned. On the other hand, the special-shaped block 207 inserted into the ground can improve the stability of the drilling device.

[0046] Example 2

[0047] like Figure 1 , Figure 2 , Figure 3 , Figure 4 as well as Figure 5 As shown, it includes a survey box 1, an adjustment unit 2 arranged at the bottom end of the survey box 1, and a drilling unit 3 arranged inside the survey box 1;

[0048] The adjustment unit 2 includes a hollow column 201 fixedly connected to four sides of the bottom end of the survey box 1, a plurality of threaded holes 202 opened on the surface of the hollow column 201, and an adjustment component arranged at the bottom end of the hollow column 201;

[0049] The drilling unit 3 includes a driving assembly arranged inside the survey box 1 and a collecting assembly arranged at the bottom end of the driving assembly.

[0050] The adjustment assembly in the adjustment unit 2 includes a support column 204 disposed inside the hollow column 201, a bolt 203 disposed on one side of the front of the support column 204, and a stabilizing structure disposed at the bottom end of the support column 204;

[0051] One end of the bolt 203 is threadedly connected to the corresponding threaded hole 202 .

[0052] The stable structure in the adjustment unit 2 includes a plurality of limit frames 205 fixedly connected to the bottom end of the support column 204, a movable slot 208 opened inside the limit frame 205, a movable shaft 206 rotatably connected inside the limit frame 205, and a special-shaped block 207 fixedly connected to the surface of the movable shaft 206;

[0053] One side of the special-shaped block 207 is triangular, and the other side is semicircular.

[0054] The driving assembly in the drilling unit 3 includes a cylinder 310 fixedly connected to the top of the inside of the survey box 1, a telescopic column 309 arranged at the bottom of the cylinder 310, a rotating motor 308 fixedly connected to the bottom of the telescopic column 309, a limiting structure arranged on the side of the rotating motor 308, and a rotating shaft 303 fixedly connected to the bottom of the rotating motor 308.

[0055] The limiting structure in the drilling unit 3 includes a fixing ring 307 fixedly connected to the side of the rotating motor 308, a connecting column 306 fixedly connected to both sides of the fixing ring 307, a slider 311 fixedly connected to one side of the connecting column 306, an elastic column 312 arranged inside the slider 311, and push blocks 313 arranged on both sides of the elastic column 312;

[0056] Two fixed rods 304 and a slide groove 305 are fixedly connected inside the survey box 1 , and a slider 311 is slidably connected to the slide groove 305 .

[0057] The collecting assembly in the drilling unit 3 includes a limiting ring 302 fixedly connected to the bottom end of the rotating shaft 303, a plurality of conical columns 315 fixedly connected to the bottom end of the limiting ring 302, a material picking frame 301 detachably connected to the inner wall of the limiting ring 302, and a plurality of triangular blocks 314 fixedly connected to the bottom end of the material picking frame 301.

[0058] The shape of the material taking frame 301 in the drilling unit 3 is a truncated cone.

[0059] The starting cylinder 310 drives the rotating motor 308 to descend, and then the rotating motor 308 is started to drive the rotating shaft 303, the limit ring 302 and the material picking frame 301 to rotate together, thereby driving the conical column 315 to drill the ground. At the same time, the soil in the ground will enter the inside of the material picking frame 301 through multiple triangular blocks 314. During the descending process of the rotating motor 308, the slider 311 will be driven to move up and down inside the slide groove 305, limiting the moving trajectory of the rotating shaft 303, thereby limiting the drilling trajectory and improving work efficiency.

[0060] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A complex terrain engineering survey drilling device, comprising a survey box (1), characterized in that: It also includes an adjustment unit (2) arranged at the bottom end of the survey box (1), and a drilling unit (3) arranged inside the survey box (1); The adjustment unit (2) comprises a hollow column (201) fixedly connected to four sides of the bottom end of the investigation box (1), a plurality of threaded holes (202) opened on the surface of the hollow column (201), and an adjustment component arranged at the bottom end of the hollow column (201); The drilling unit (3) comprises a driving component arranged inside the survey box (1), and a collecting component arranged at the bottom end of the driving component.

2. The complex terrain engineering survey drilling device according to claim 1, characterized in that: The adjustment assembly in the adjustment unit (2) comprises a support column (204) arranged inside the hollow column (201), a bolt (203) arranged on a front side of the support column (204), and a stabilizing structure arranged at the bottom end of the support column (204); One end of the bolt (203) is threadedly connected to the corresponding threaded hole (202).

3. The complex terrain engineering survey drilling device according to claim 2, characterized in that: The stable structure in the adjustment unit (2) comprises a plurality of limit frames (205) fixedly connected to the bottom end of the support column (204), a movable groove (208) provided inside the limit frames (205), a movable shaft (206) rotatably connected inside the limit frames (205), and a special-shaped block (207) fixedly connected to the surface of the movable shaft (206); One side of the special-shaped block (207) is triangular, and the other side is semicircular.

4. The complex terrain engineering survey drilling device according to claim 3, characterized in that: The driving assembly in the drilling unit (3) comprises a cylinder (310) fixedly connected to the top end of the survey box (1), a telescopic column (309) arranged at the bottom end of the cylinder (310), a rotating motor (308) fixedly connected to the bottom end of the telescopic column (309), a limiting structure arranged on the side of the rotating motor (308), and a rotating shaft (303) fixedly connected to the bottom end of the rotating motor (308).

5. The complex terrain engineering survey drilling device according to claim 4, characterized in that: The limiting structure in the drilling unit (3) comprises a fixing ring (307) fixedly connected to the side of the rotating motor (308), a connecting column (306) fixedly connected to both sides of the fixing ring (307), a sliding block (311) fixedly connected to one side of the connecting column (306), an elastic column (312) arranged inside the sliding block (311), and pushing blocks (313) arranged on both sides of the elastic column (312); The survey box (1) is internally fixedly connected with two fixing rods (304) and a slide groove (305) opened on one side of the fixing rod (304), and the sliding block (311) is slidably connected with the slide groove (305).

6. The complex terrain engineering survey drilling device according to claim 5, characterized in that: The collecting assembly in the drilling unit (3) comprises a limiting ring (302) fixedly connected to the bottom end of the rotating shaft (303), a plurality of conical columns (315) fixedly connected to the bottom end of the limiting ring (302), a material taking frame (301) detachably connected to the inner wall of the limiting ring (302), and a plurality of triangular blocks (314) fixedly connected to the bottom end of the material taking frame (301).

7. The complex terrain engineering survey drilling device according to claim 6, characterized in that: The material taking frame (301) in the drilling unit (3) is in the shape of a truncated cone.

Citation Information

Patent Citations

  • Drilling equipment for geotechnical engineering investigation

    CN208718566U