Hydraulic presplitting progressive rock crushing system
By setting up a high-pressure water injection pump and static water pipe at the faults of the coal mining working surface of the coal mine, a number of controllable water pressure fracturing is formed using sealing materials, which solves the difficulty of cutting through faults of the coal mining working surface and the traditional blasting method. Safety and environmental issues have improved coal mining efficiency and economic benefits.
Patent Information
- Application Number
- CN202420869564.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During coal mining, the coal mining surface passes through faults, resulting in serious tooth cutting loss, difficulty cutting, and slow propulsion speed. Traditional blasting methods have problems such as high risk, high destructiveness, great environmental impact and low economic benefits. It is difficult to control the crack expansion direction and the effect is not ideal if it has a hydraulic pre-cracking process.
The hydraulic pre-cracking and gradual rock crushing system is adopted, and drilling holes are installed at the faults of the coal mining working surface through high-pressure water injection pump and static water pipe. The water pressure is controlled by sealing materials and a one-way valve, and multiple controllable water pressures are gradually formed. Cracks achieve gradual breakage of rock mass.
It effectively increases the number and density of water pressure fracturing, reduces the difficulty of cutting coal miners, improves coal mine production efficiency, reduces production costs and safety hazards, and reduces the production of toxic gases.
Smart Images

Figure CN222121489U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coal mining, in particular to a hydraulic pre-cracking progressive rock crushing system. Background Art
[0002] The coal mining face in a coal mine is the main place for coal production. The construction efficiency of the coal mining face determines the output of the coal mine. However, during the on-site construction of the coal mine, the problem of the coal mining face passing through the fault is generally faced. During the cutting process of the coal mining machine, the cutting teeth are severely worn, cutting is difficult, the advancement speed is slow, and the output is greatly affected by the fault, which seriously restricts the normal production of the mine.
[0003] To address this problem, the traditional method is to pre-crack the rock section exposed by the working face by blasting, and use the energy released during the blasting process to pre-crack and vibrate the rock, so as to achieve the purpose of pre-crack and loosen the rock, promote the rock to peel off smoothly from the parent body during the cutting process, and make it smaller after cutting, thereby improving the efficiency of coal mining. However, the blasting process has the following problems: 1. The risk factor is high and it is difficult to approve its use; 2. It is highly destructive and can easily affect surrounding buildings and nearby residents, and it can also cause rock crushing, resulting in low utilization of stone materials; 3. There are high safety risks, and explosives have high safety risks during transportation, storage and operation; 4. The economic and social benefits are low, the cost of explosives is high, and a large amount of greenhouse gases and harmful gases will be generated during use, affecting the environment.
[0004] Theoretical and field applications have proven that hydraulic pre-fracture can effectively pre-fracture hard rock mass, and can produce main cracks and branch cracks in the rock mass by splitting the rock mass with high-pressure water, thus achieving the purpose of breaking the rock mass. However, in the existing fracturing process, the expansion direction of hydraulic fractures is mainly controlled by the direction of the principal stress and the degree of development of joints and fissures. It is difficult to control the expansion direction, and the number is small, resulting in a large rock mass after fracturing, which cannot reach the level of rock crushing. Therefore, its application in the process of working face crossing faults is not ideal. Summary of the invention
[0005] In response to the problems and needs raised above, this solution proposes a hydraulic pre-fracture progressive rock crushing system, which can achieve the above technical objectives and bring about many other technical effects by adopting the following technical features.
[0006] The utility model aims to provide a hydraulic pre-fracture progressive rock crushing system, comprising:
[0007] A high-pressure water injection pump, one end of which is connected to the water tank;
[0008] A static pressure water pipe, one end of which is connected to the other end of the high-pressure water injection pump, and the other end of which is connected to at least two packers and extends into a borehole opened in the fault of the coal mining face, and a water hole is opened on the static pressure water pipe between two adjacent packers; wherein the packer is connected to the static pressure water pipe, a one-way valve is arranged at the water hole, and the one-way valve is used to control the water pressure in the static pressure water pipe to be connected to the borehole when the water pressure reaches a threshold water pressure;
[0009] a pressure relief valve, which is mounted on the static water pipe and located outside the borehole, and is configured to release the water pressure in the static water pipe;
[0010] Wherein, when it is necessary to generate cracks in the borehole, the high-pressure water injection pump injects the fracturing fluid in the water tank into the borehole through the water hole of the static water pipe, so that the cracks extend in the fault; the plugging material is mixed in the water tank, so that the plugging material forms a plugging fracturing fluid through physical or chemical changes. When it is necessary to generate new cracks in the borehole, the high-pressure water injection pump injects the plugging fracturing fluid into the borehole to plug the cracks and generate new cracks;
[0011] Wherein, the plugging material is a temporary plugging agent.
[0012] In one example of the utility model, the static pressure water pipe includes a plurality of static pressure water pipes, each of which is adapted in a corresponding borehole; wherein the boreholes are arranged at intervals along the cross-fault extension direction of the coal mining face.
[0013] In an example of the present invention, a distance between two adjacent boreholes in the extension direction is 1.5 m to 2 m.
[0014] In one example of the utility model, the static pressure water pipe includes a plurality of static pressure water pipes, each of which is adapted in the corresponding borehole; wherein the boreholes are arranged at intervals along the cross-fault extension direction of the coal mining face and the thickness direction perpendicular to the extension direction to form an arrangement of at least two rows and at least two columns, and the multiple bore holes in one row arranged along the extension direction do not overlap with the multiple bore holes in another row in the thickness direction.
[0015] In one example of the present invention, a spacing D between multiple drill holes in one row and a spacing D between multiple drill holes in another row in the thickness direction are equal, and a distance L between one drill hole in one row and two drill holes in another row adjacent to the drill hole in the extension direction are equal.
[0016] In an example of the present invention, in the drilling group, the distance L between two adjacent drilling holes in the extension direction is 1.5m~2m, and the distance between two adjacent drilling holes in the thickness direction D is 1m~1.5m.
[0017] Compared with the prior art, the system has the following beneficial effects:
[0018] The crushing system effectively increases the number and density of hydraulic fractures, making the size of broken rock controllable; after fracturing, the rock is fully broken, the difficulty of coal mining machine cutting is reduced, the tooth loss is greatly reduced, and the cutting efficiency is significantly improved, which speeds up the production efficiency of coal mines, reduces production costs, and has important economic benefits; it can replace the safety hazards caused by the transportation, storage, management, and use of pyrotechnics, and reduce the generation of toxic gases such as CO during blasting, which has important social benefits.
[0019] The following will provide a more detailed description of the best embodiment of the present invention in conjunction with the accompanying drawings so that the features and advantages of the present invention can be easily understood. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments of the present invention are briefly introduced below. The drawings are only used to show some embodiments of the present invention, but not to limit all embodiments of the present invention thereto.
[0021] Figure 1 It is a structural schematic diagram of a rock crushing system according to an embodiment of the utility model;
[0022] Figure 2 It is a front view of a drilling fracturing structure without injecting plugging material according to an embodiment of the utility model;
[0023] Figure 3 A side view of a drilling fracturing structure without injecting plugging material according to an embodiment of the utility model;
[0024] Figure 4 It is a front view of the drilling and fracturing structure for injecting plugging material for the first time according to an embodiment of the utility model;
[0025] Figure 5 It is a side view of the drilling fracturing structure for injecting plugging material for the first time according to an embodiment of the utility model;
[0026] Figure 6 It is a front view of the drilling fracturing structure for injecting plugging material for the second time according to an embodiment of the utility model;
[0027] Figure 7 It is a side view of the drilling fracturing structure for injecting plugging material for the second time according to an embodiment of the utility model;
[0028] Figure 8 It is a front view of a drilling fracturing structure for injecting plugging materials multiple times according to an embodiment of the utility model;
[0029] Fig. 9 It is a side view of a drilling fracturing structure for injecting plugging materials multiple times according to an embodiment of the utility model;
[0030] Fig.10 A plan view of a drilling arrangement in a coal mining face according to an embodiment of the utility model;
[0031] Fig.11 A side view of a drilling arrangement in a coal mining face according to an embodiment of the utility model;
[0032] Fig.12 It is a structural schematic diagram of the drilling arrangement according to an embodiment of the utility model.
[0033] List of reference numerals:
[0034] Rock crushing system 100;
[0035] High-pressure water injection pump 110;
[0036] Water tank 120;
[0037] Static water pipe 130;
[0038] Packer 140;
[0039] Water hole 150;
[0040] Pressure relief valve 160;
[0041] High pressure hose 170;
[0042] Pressure gauge 180;
[0043] Coal mining face 200;
[0044] Drilling 210;
[0045] Crack 220;
[0046] plugging material 230;
[0047] Extension direction X;
[0048] Thickness direction Y. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical solution and advantages of the technical solution of the utility model clearer, the technical solution of the embodiment of the utility model will be clearly and completely described in combination with the drawings of the specific embodiments of the utility model. The same figure marks in the drawings represent the same parts. It should be noted that the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the described embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0050] Unless otherwise defined, the technical terms or scientific terms used herein shall have the usual meanings understood by persons with ordinary skills in the field to which the utility model belongs. The words "first", "second" and similar words used in the specification and claims of the utility model patent application do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "one" do not necessarily indicate quantity restrictions. Words such as "include" or "comprise" mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0051] According to a first aspect of the utility model, a hydraulic pre-fracture progressive rock crushing system 100 is provided. Figure 1 As shown, including:
[0052] A high-pressure water injection pump 110, one end of which is connected to the water tank 120;
[0053] A static pressure water pipe 130, one end of which is connected to the other end of the high-pressure water injection pump 110, and the other end of which is connected to at least two packers 140, and extends into a borehole 210 opened in the fault of the coal mining face 200, and a water hole 150 is opened on the static pressure water pipe 130 between two adjacent packers 140; wherein the packer 140 is connected to the static pressure water pipe 130, and a one-way valve is arranged at the water hole 150, and the one-way valve is used to control the water pressure in the static pressure water pipe 130 to be connected to the borehole 210 when the water pressure reaches a threshold water pressure;
[0054] The pressure relief valve 160 is installed on the static pressure water pipe 130 and is located outside the borehole 210. It is configured to release the water pressure in the static pressure water pipe 130; that is, after multiple fracturing and rock crushing in the borehole 210, when it is necessary to replace a new borehole 210 for fracturing or end fracturing, the pressure relief valve 160 is opened first to release the water pressure in the static pressure water pipe 130, thereby facilitating the removal of the static pressure water pipe 130 from the borehole 210 safely and reliably.
[0055] When it is necessary to generate a fissure 220 in the borehole 210, the high-pressure water injection pump 110 injects the fracturing fluid in the water tank 120 into the borehole 210 through the water hole 150 of the static water pipe 130, so that the fissure 220 extends in the fault; the plugging material 230 is mixed into the water tank 120, so that the plugging material 230 forms a plugging fracturing fluid through physical or chemical changes. When it is necessary to generate a new fissure in the borehole 210, the high-pressure water injection pump 110 injects the plugging fracturing fluid into the borehole 210 to plug the fissure and generate a new fissure;
[0056] Wherein, the plugging material 230 is a temporary plugging agent.
[0057] During the operation of the rock crushing system 100, the high-pressure water injection pump 110 first injects the fracturing fluid in the water tank 120 into the packer 140 through the static water pipe 130. The packer 140 expands continuously and contacts the inner wall of the borehole 210, so that a closed space is formed between two adjacent packers 140. When the pressure in the static water pipe 130 increases continuously to the threshold water pressure of the one-way valve at the water hole 150, the one-way valve is turned on to allow the fracturing fluid to be injected into the borehole 210 through the water hole 150, thereby forming a fissure 220 in the borehole 210. With the continuous injection of the fracturing fluid, the fissure 220 extends in the fault until the extension stops. Then, the plugging material 230 is added into the water tank 120 to mix with the fracturing fluid. The high-pressure water injection pump 110 injects the mixed plugging fracturing fluid in the water tank 120 through the static water pipe 130. The water hole 150 of the pressure water pipe 130 is injected into the borehole 210, and the sealing fracturing fluid is injected into the borehole 210 by the high-pressure water injection pump 110 to seal the cracks and generate new cracks 220. After the borehole 210 is fractured, the static pressure water pipe 130 is first taken out of the borehole 210 and placed in the next borehole 210 for re-fracturing until the rock is crushed; that is, the rock crushing system 100 can form cracks within a certain range around the borehole 210 by fracturing, and as the fracturing time increases, the cracks around the borehole 210 will further increase, and the density and penetration of the cracks will also be further improved, until the rock around the borehole 210 is fully crushed, providing good conditions for the subsequent cutting of the coal mining machine, which not only improves the cutting efficiency and reduces the loss of the cutting teeth, but also plays a positive role in reducing coal dust.
[0058] The crushing system effectively increases the number and density of hydraulic fractures, making the size of broken rock controllable; after fracturing, the rock is fully broken, the difficulty of coal mining machine cutting is reduced, the tooth loss is greatly reduced, and the cutting efficiency is significantly improved, which speeds up the production efficiency of coal mines, reduces production costs, and has important economic benefits; it can replace the safety hazards caused by the transportation, storage, management, and use of pyrotechnics, and reduce the generation of toxic gases such as CO during blasting, which has important social benefits.
[0059] In one example of the present invention, the static pressure water pipe 130 includes a plurality of static pressure water pipes 130, each of which is adapted in a corresponding borehole 210; wherein the boreholes 210 are arranged at intervals along the cross-fault extension direction X of the coal mining face 200;
[0060] For example, the static pressure water pipes 130 include three, and a four-way can be set at the position of the static pressure water pipe 130 near the borehole 210, one of the inlet ends is connected to the high-pressure water injection pump 110, and the three outlets are connected to the corresponding static pressure water pipes 130. The three static pressure water pipes 130 are respectively placed in the corresponding boreholes 210, and the high-pressure water injection pump 110 injects the fracturing fluid in the water tank 120 into the borehole 210 through the static pressure water pipe 130, so that the fissure 220 is formed in the borehole 210. With the continuous injection of the fracturing fluid, the fissure 220 extends in the fault until the extension stops; then the plugging material 23 is put into the water tank 120 0 is mixed with the fracturing fluid, and the high-pressure water injection pump 110 injects the mixed fracturing fluid in the water tank 120 into the borehole 210 through the water hole 150 of the static water pipe 130, so that the plugging material 230 plugs the fissure 220 in the fissure 220 by physical or chemical changes, and new fissures 220 are generated as the pressure fluid continues to flow in; after the three boreholes 210 are fractured, the static water pipe 130 is first taken out of the three boreholes 210, and placed in the next batch of boreholes 210 for re-fracturing until the rock is crushed; by setting a plurality of static water pipes 130, the rock crushing efficiency of the static water pipe 130 can be greatly improved.
[0061] In an example of the present invention, the distance L between two adjacent boreholes 210 in the extension direction X is 1.5m~2m;
[0062] For example, when a high-pressure water injection pump 110 is used for fracturing, the pressure must be 24 MPa, and the time for each fracturing section is 15 minutes. The fracturing range that each static pressure water pipe 130 can reach is 1.8m~2.4m, and the spacing between two adjacent boreholes 210 is 1.5m~2m, so that the two adjacent boreholes 210 can be completely covered, which can make the fracturing more complete and the effect better.
[0063] In one example of the present invention, the static pressure water pipe 130 includes a plurality of static pressure water pipes 130, each of which is adapted in a corresponding borehole 210; wherein the boreholes 210 are arranged in at least two rows and at least two columns along the cross-fault extension direction X of the coal mining face 200 and the thickness direction Y perpendicular to the extension direction X, and the plurality of boreholes 210 in one row arranged along the extension direction X do not overlap with the plurality of boreholes 210 in another row in the thickness direction Y;
[0064] That is to say, each row of drill holes 210 arranged along the extension direction X does not overlap with the drill holes 210 in the adjacent row in the thickness direction Y, and the drill holes 210 in two adjacent rows appear alternately in the extension direction X, which can greatly improve the uniformity of fracturing and help improve the rock crushing effect.
[0065] In one example of the present invention, the spacing D between the multiple drill holes 210 in one row and the multiple drill holes 210 in another row in the thickness direction Y is equal, and the distance L between one drill hole 210 in one row and two drill holes 210 in another row adjacent to the drill hole 210 in the extension direction X is equal;
[0066] For example, Fig.12 As shown, it includes two rows of drill holes 210 spaced apart in the extension direction X and the thickness direction Y, the spacing between two adjacent rows of drill holes 210 in the thickness direction Y is 1 m, and in the same row of drill holes 210, the spacing between two adjacent drill holes 210 is 3 m, and in two adjacent rows of drill holes 210, a drill hole 210 in one row is 1.5 m away from two adjacent drill holes 210 in the other row in the extension direction X.
[0067] The drill holes 210 arranged in the above structure can greatly improve the uniformity of fracturing and help improve the rock crushing effect.
[0068] In one example of the present invention, in the group of drill holes 210, the distance L between two adjacent drill holes 210 in the extension direction X is 1.5m~2m, and the distance D between two adjacent drill holes 210 in the thickness direction Y is 1m~1.5m;
[0069] For example, when a high-pressure water injection pump 110 is used for fracturing, the pressure must be 24 MPa, and the time for each fracturing section is 15 minutes. The fracturing range that each static pressure water pipe 130 can reach is 1.8m~2.4m, and the spacing between two adjacent boreholes 210 in the extension direction X is 1.5m~2m, and the spacing between two adjacent boreholes 210 in the thickness direction Y is 1m~1.5m, so that the two adjacent boreholes 210 can be completely covered, which can make the fracturing more complete and the effect better.
[0070] According to the second aspect of the present invention, a crushing method of the hydraulic pre-fracture progressive rock crushing system 100 as described above comprises the following steps:
[0071] S10: Drilling a borehole 210 in the fault layer of the coal mining face 200;
[0072] S20: placing one end of the static water pipe 130 provided with at least two packers 140 in the borehole 210;
[0073] S30: Turn on the high-pressure water injection pump 110, so that the high-pressure water injection pump 110 injects the fracturing fluid in the water tank 120 into the borehole 210 through the water hole 150 of the static water pipe 130, so that at least two packers 140 expand and contact the inner wall of the borehole 210, and form a closed space between two adjacent packers 140. When the pressure of the high-pressure water injection pump 110 is greater than the threshold pressure in the one-way valve on the water hole 150, the one-way valve is connected to the borehole 210, and a crack 220 is generated in the borehole 210;
[0074] S40: mixing the plugging material 230 into the water tank 120, and starting the high-pressure water injection pump 110 again, so that the high-pressure water injection pump 110 injects the plugging fracturing fluid added with the plugging material 230 in the water tank 120 into the borehole 210 through the water hole 150 of the static water pipe 130, so that the plugging fracturing fluid condenses under high pressure in the fissure 220 described in step S30 to form a high-strength retention segment plug to plug the first-pressed fissure, thereby generating a higher net fissure pressure, forcing the subsequent plugging fracturing fluid to no longer flow into the first-pressed fissure 220, but to continue to fracture other areas and require higher pressure to generate new fissures 220;
[0075] S50: Repeat step S40 to perform multiple fracturing operations until the fracturing purpose of the borehole 210 at the position is completed;
[0076] S60: Replace the borehole 210 or replace another position of the borehole 210, and repeat steps S10 to S50 until the rock crushing purpose is achieved.
[0077] Specifically, first, a borehole 210 is opened in the coal mining face 200, and a static pressure water pipe 130 is placed in the borehole 210, and the high-pressure water injection pump 110 is turned on, so that the fracturing fluid (water) generates cracks 220 in the borehole 210. Figure 2 and Figure 3The figure shows a front view and a side view of the borehole 210 without adding the plugging material 230. It can be seen from the figure that a limited number of fractures 220 are generated in the circumferential direction of the borehole 210. Then, the plugging material 230 is added to the water tank 120 for the first time, and the high-pressure water injection pump 110 injects the fracturing fluid mixed with the plugging material 230 into the borehole 210 and the fractures 220. The plugging material 230 blocks the fractures 220 by physical or chemical changes, so that the fracturing fluid changes direction to fracture new hydraulic fractures 220. Figure 4 and Figure 5 As shown, by plugging the borehole 210 and the crack 220, several main cracks 220 are newly opened in the circumferential direction of the borehole 210; then, the plugging material 230 is added to the water tank 120 for the second time, as shown in FIG. Figure 6 and Figure 7 As shown, the plugging material 230 will again plug the fissure 220, open a new secondary fissure 220 on the basis of the original main fissure 220 or open a new main fissure 220 in the circumferential direction of the borehole 210; finally, after adding the plugging material 230 to the water tank 120 for many times, the following is achieved: Figure 8 and Fig. 9 The fracturing effect shown, i.e., a plurality of fractures 220 are evenly opened in the circumferential direction of the borehole 210, and a plurality of secondary fractures 220 are opened on the basis of each main fracture 220, achieves the purpose of rock crushing.
[0078] Through the implementation of the method of hydraulic pre-fracture and progressive rock crushing with fault-sealing fracturing fluid, the traditional single hydraulic fracture is gradually formed into a complex and controllable hydraulic fracture network, which effectively pre-cracks the intact and hard rock mass, which not only improves the cutting efficiency and reduces the wear of the cutting teeth, but also provides favorable conditions for subsequent mechanical cutting; in addition, the successful application of this technology has also replaced the use of explosives and reduced the hidden dangers caused by the use of pyrotechnics; this technology also incidentally reduces the dust generated during the rock fracture process, and has many positive effects.
[0079] That is to say, the rock crushing method can form cracks within a certain range around the borehole 210 by fracturing, and as the fracturing time increases, the cracks around the borehole 210 will further increase, and the density and penetration of the cracks will also further increase, until the rocks around the borehole 210 are fully crushed, providing good conditions for subsequent cutting by the coal mining machine, which not only improves the cutting efficiency and reduces the loss of cutting teeth, but also plays a positive role in reducing coal dust.
[0080] This crushing method effectively increases the number and density of hydraulic fractures, making the size of broken rock controllable; after fracturing, the rock is fully broken, the difficulty of coal mining machine cutting is reduced, the tooth loss is greatly reduced, and the cutting efficiency is significantly improved, which speeds up the production efficiency of coal mines, reduces production costs, and has important economic benefits; it can replace the safety hazards caused by the transportation, storage, management, and use of pyrotechnics, and reduce the generation of toxic gases such as CO during blasting, which has important social benefits.
[0081] In one example of the present utility model, the boreholes 210 are arranged at intervals along the cross-fault extension direction X of the coal mining face 200;
[0082] For example, the static pressure water pipes 130 include three, and a four-way can be set at the position of the static pressure water pipe 130 near the borehole 210, one of the inlet ends is connected to the high-pressure water injection pump 110, and the three outlets are connected to the corresponding static pressure water pipes 130. The three static pressure water pipes 130 are respectively placed in the corresponding boreholes 210, and the high-pressure water injection pump 110 injects the fracturing fluid in the water tank 120 into the borehole 210 through the static pressure water pipe 130, so that the fissure 220 is formed in the borehole 210. With the continuous injection of the fracturing fluid, the fissure 220 extends in the fault until the extension stops; then the plugging material 23 is put into the water tank 120 0 is mixed with the fracturing fluid, and the high-pressure water injection pump 110 injects the mixed fracturing fluid in the water tank 120 into the borehole 210 through the water hole 150 of the static water pipe 130, so that the plugging material 230 plugs the fissure 220 in the fissure 220 by physical or chemical changes, and new fissures 220 are generated as the pressure fluid continues to flow in; after the three boreholes 210 are fractured, the static water pipe 130 is first taken out of the three boreholes 210, and placed in the next batch of boreholes 210 for re-fracturing until the rock is crushed; by setting a plurality of static water pipes 130, the rock crushing efficiency of the static water pipe 130 can be greatly improved.
[0083] In an example of the present invention, the distance between two adjacent boreholes 210 in the extension direction X is 1.5m~2m;
[0084] For example, when a high-pressure water injection pump 110 is used for fracturing, the pressure must be 24 MPa, and the time for each fracturing section is 15 minutes. The fracturing range that each static pressure water pipe 130 can reach is 1.8m~2.4m, and the spacing between two adjacent boreholes 210 is 1.5m~2m, so that the two adjacent boreholes 210 can be completely covered, which can make the fracturing more complete and the effect better.
[0085] In one example of the present invention, the drill holes 210 are arranged in at least two rows and at least two columns along the cross-fault extension direction X of the coal mining face 200 and in the thickness direction perpendicular to the extension direction X, and the multiple drill holes 210 in one row arranged along the extension direction X do not overlap with the multiple drill holes 210 in another row in the thickness direction Y;
[0086] That is to say, each row of drill holes 210 arranged along the extension direction X does not overlap with the drill holes 210 in the adjacent row in the thickness direction Y, and the drill holes 210 in two adjacent rows appear alternately in the extension direction X, which can greatly improve the uniformity of fracturing and help improve the rock crushing effect.
[0087] In one example of the present invention, the spacing between the multiple drill holes 210 in one row and the multiple drill holes 210 in another row in the thickness direction Y is equal, and the distance between one drill hole 210 in one row and two drill holes 210 in another row adjacent to the drill hole 210 in the extension direction X is equal;
[0088] For example, Fig.12 As shown, it includes two rows of drill holes 210 spaced apart in the extension direction X and the thickness direction Y, the spacing between two adjacent rows of drill holes 210 in the thickness direction Y is 1 m, and in the same row of drill holes 210, the spacing between two adjacent drill holes 210 is 3 m, and in two adjacent rows of drill holes 210, a drill hole 210 in one row is 1.5 m away from two adjacent drill holes 210 in the other row in the extension direction X.
[0089] The drill holes 210 arranged in the above structure can greatly improve the uniformity of fracturing and help improve the rock crushing effect.
[0090] In an example of the present invention, in the group of drill holes 210, the distance between two adjacent drill holes 210 in the extension direction X is 1.5m-2m, and the distance between two adjacent drill holes 210 in the thickness direction Y is 1m-1.5m.
[0091] For example, when a high-pressure water injection pump 110 is used for fracturing, the pressure must be 24 MPa, and the time for each fracturing section is 15 minutes. The fracturing range that each static pressure water pipe 130 can reach is 1.8m~2.4m, and the spacing between two adjacent boreholes 210 in the extension direction X is 1.5m~2m, and the spacing between two adjacent boreholes 210 in the thickness direction Y is 1m~1.5m, so that the two adjacent boreholes 210 can be completely covered, which can make the fracturing more complete and the effect better. Specific embodiments
[0093] like Fig.10 and Fig.11 As shown, a dynamic cycle plugging pre-splitting method is adopted, and pre-splitting is performed once every 1.8m (4 cuts), which is a pre-splitting cycle. Each cycle only pre-splits the rock section that has been exposed on the working face. The fracturing fluid no longer uses pure water, but a mixed fracturing fluid that is pre-mixed with plugging material 230.
[0094] Pre-splitting drilling 210 arrangement:
[0095] (1) When the rock section is found at the 8235 working face, hydraulic pre-fracture drilling hole 210 is constructed forward;
[0096] (2) The drilling holes 210 are arranged in a three-flower arrangement, with the upper and lower rows of drilling holes 210 arranged in a flower arrangement. The upper row of drilling holes 210 is 1.8m away from the bottom plate, and the lower row of drilling holes 210 is 0.8m away from the bottom plate. The lengths of both are 2.4m. The diameter of drilling holes 210 is 42mm, the spacing between drilling holes 210 is 3m, and the angle of drilling holes 210 is consistent with the advancement angle of the working face.
[0097] (3) Every time the working face advances 2.4 m (4 cuts), it is considered a cycle and 210 fracturing holes need to be reconstructed.
[0098] Fracturing of pre-split borehole 210:
[0099] (1) The length of borehole 210 is 2.4 m, and each borehole 210 is fractured in two sections: in the first section, the outer section of the borehole 210 is sealed with a single capsule sealer, and the fracturing range is 1.8~2.4 m;
[0100] (2) In order to improve the degree of rock mass crushing and increase the rock mass release capacity, plugging material 230 is used in field applications. Temporary plugging agent is added to the fracturing fluid as plugging material 230.
[0101] (3) Use a special grouting pump for fracturing, the pressure should be 24MPa, and the fracturing time for each section is 15 minutes.
[0102] The above method effectively increases the number and density of hydraulic fractures, making the rock fragmentation controllable; after fracturing, the rock is fully broken, and after field measurement, the rock fragmentation generally decreases from 80cm-110cm to 45cm-60cm, a decrease of about 40%; the number of main fractures increases from one to two or three; during fracturing, the water output of adjacent holes and roof increases, indicating that the opening of hydraulic fractures increases, the number of branch fractures increases, and a fracture network is formed. This shows that the plugging material has a significant effect, increases the number of hydraulic fractures and the opening of fractures, improves the hydraulic fracturing effect, reduces the difficulty of coal mining machine cutting, greatly reduces the loss of cutting teeth, and significantly improves the cutting efficiency, which speeds up the production efficiency of coal mines and reduces production costs, with important economic benefits; it can replace the safety hazards caused by the transportation, storage, management, and use of pyrotechnics, and reduces the generation of toxic gases such as CO during blasting, with important social benefits. The exemplary implementation of the hydraulic pre-fracture progressive rock crushing system 100 and method proposed in the present invention is described in detail above with reference to the preferred embodiments. However, it can be understood by those skilled in the art that, without departing from the concept of the present invention, various modifications and variations can be made to the above-mentioned specific embodiments, and various technical features and structures proposed in the present invention can be combined in various ways without exceeding the protection scope of the present invention, which is determined by the attached claims.
Claims
1. A hydraulic pre-fracture progressive rock crushing system, characterized in that: include: A high-pressure water injection pump (110), one end of which is connected to the water tank (120); A static pressure water pipe (130), one end of which is connected to the other end of the high-pressure water injection pump (110), and the other end of which is connected to at least two packers (140) and extends into a borehole (210) opened in the fault of the coal mining face (200), and a water hole (150) is opened on the static pressure water pipe (130) between two adjacent packers (140); wherein the packer (140) is connected to the static pressure water pipe (130), and a one-way valve is arranged at the water hole (150), and the one-way valve is used to control the water pressure in the static pressure water pipe (130) to be connected to the borehole (210) when the water pressure reaches a threshold water pressure; a pressure relief valve (160), which is installed on the static pressure water pipe (130) and is located outside the borehole (210), and is configured to release the water pressure in the static pressure water pipe (130); When it is necessary to generate a fissure (220) in the borehole (210), the high-pressure water injection pump (110) injects the fracturing fluid in the water tank (120) into the borehole (210) through the water hole (150) of the static water pipe (130), so that the fissure (220) extends in the fault; a plugging material (230) is mixed into the water tank (120), so that the plugging material (230) forms a plugging fracturing fluid through a physical or chemical change; when it is necessary to generate a new fissure in the borehole (210), the high-pressure water injection pump (110) injects the plugging fracturing fluid into the borehole (210), plugging the fissure and generating a new fissure; Wherein, the plugging material (230) is a temporary plugging agent.
2. The hydraulic pre-fracture progressive rock crushing system according to claim 1, characterized in that: The static pressure water pipe (130) includes a plurality of static pressure water pipes (130), each of which is adapted to be placed in a corresponding borehole (210); wherein the boreholes (210) are arranged at intervals along a cross-fault extension direction (X) of the coal mining working face (200).
3. The hydraulic pre-fracture progressive rock crushing system according to claim 2, characterized in that: The distance between two adjacent boreholes (210) in the extension direction (X) is 1.5 m to 2 m.
4. The hydraulic pre-fracture progressive rock crushing system according to claim 1, characterized in that: The static pressure water pipe (130) includes a plurality of static pressure water pipes (130), each of which is adapted in a corresponding borehole (210); wherein the boreholes (210) are arranged in a spaced manner along a cross-fault extension direction (X) of the coal mining face (200) and a thickness direction (Y) perpendicular to the extension direction (X) to form an arrangement of at least two rows and at least two columns, and the plurality of boreholes (210) in one row arranged along the extension direction (X) do not overlap with the plurality of boreholes (210) in another row in the thickness direction (Y).
5. The hydraulic pre-fracture progressive rock crushing system according to claim 4, characterized in that: The spacing D between the multiple drill holes (210) in one row and the multiple drill holes (210) in another row in the thickness direction (Y) is equal, and the distance L between one drill hole (210) in the multiple drill holes (210) in one row and two drill holes (210) in another row adjacent to the drill hole (210) in the extension direction (X) is equal.
6. The hydraulic pre-fracture progressive rock crushing system according to claim 4, characterized in that: In the drill hole (210) group, a distance L between two adjacent drill holes (210) in the extension direction (X) is 1.5 m to 2 m, and a distance D between two adjacent drill holes (210) in the thickness direction (Y) is 1 m to 1.5 m.